Exhibit B-1 Alaska Construction Surveying Manual.pdf

PDF 351 KB Posted

Attached to
RFP # 25253003 JNU Egan Yandukin Intersection Improvements- Design Services
Solicitation number
RFP # 25253003
Issued by
Juneau City and Borough, Alaska

About this file

This document is the Alaska Construction Surveying Requirements (US Customary Units) published by the Alaska Department of Transportation and Public Facilities. It outlines the survey accuracy, frequency, materials, and documentation requirements for various elements of construction projects undertaken by the state. The manual covers requirements for survey accuracy and frequency for items such as stationing, benchmarks, blue/red tops, slope stakes, culverts, and other infrastructure. It also provides guidance on typical alignment, clearing, leveling, and culvert notes to be included. The manual specifies the materials to be used for survey points, including hubs, stakes, and rebar. This document serves as the technical specification for survey activities on Alaska DOT construction projects.

The manual does not include pricing terms, funding sources, set-asides, or incumbent information. It is a technical reference guide focused solely on the survey requirements for state construction projects in Alaska.

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Alaska Department of Transportation and Public Facilities

Alaska Construction Surveying Requirements (US Customary Units)

Alaska Construction Surveying Requirements (US Customary Units)

Table of Contents

Description Page

1. Survey accuracy requirements

2. Survey frequency requirements

3. Typical section drawing

4. Survey point materials requirements

5. Typical alignment notes

6. Typical clearing notes

7. Typical level notes

8. Typical slope stake notes

9. Typical culvert notes

10. Typical culvert camber diagram

11. Typical blue or red tops and grade stake notes 11

Alaska Construction Surveying Requirements i June 2, 2003

1. Survey accuracy requirements

Third order survey

Use a 1/5000 horizontal closure.

Use an angle closure of 30 N seconds, where N equals the number of angles in the traverse.

An Alaska-registered professional land surveyor must perform or supervise replacement of survey monuments (property, USGS, USC&GS, BLM, etc.) or establishment of monuments (including centerline).

All monument work must comply with AS 34.65.040 and meet standards in the latest version of the Alaska Society of Professional Land Surveyors’ Standards of Practice Manual.

The allowable vertical error for misclosure is e = 0.05 M e = maximum misclosure in feet, M

= length of the level circuit in miles.

Table 1—Survey accuracy requirements (in feet)

Stationing HI Closure Horizontal

Angle Distance To center line

Grade

Additional cross sections 1.0 0.01 0.04 ** 0.1 0.1 Benches 0.01 0.02 Blue tops*** 1.0 0.01 0.04 0.1 0.02 Bridges * 0.01 0.02 0.01 Centerline * * Clearing & Grubbing 1.0 1.0 Culverts 1.0 0.01 0.04 ** 0.1 0.1 Curb & gutter 1.0 0.01 0.02 0.1 0.02 Grade stakes 1.0 0.1 0.1 Guardrail 1.0 0.1 Manholes, catch basins & inlets 1.0 0.01 0.02 0.1 0.02 Monuments * * Red tops*** 1.0 0.01 0.02 0.1 0.05 Riprap 1.0 0.1 0.04 1.0 0.1 Signs 1.0 0.1 Slope stakes & RP’s 1.0 0.01 0.04 ** 0.1 0.1 Under drains & sewer 1.0 0.01 0.02 0.1 0.02

* Third order survey **Right angle prism or transit angles from center line *** Use blue tops for top of base course and red tops for the bottom of base course.

Alaska Construction Surveying Requirements 1 June 2, 2003

1. Survey frequency requirements

Table 2—Survey frequency requirements (in feet)

Tangents Curves Interchange ramps Stake each per plan

See special instructions on sample notes

Additional cross sections * * * Bench marks X Blue tops 100 100** 25 X Blue tops within 100 feet both sides of railroad track crossings and bridge approaches

25 25 25 X

Bridges X X Center line 100 100** 25 Clearing 100 100** 25 X Culverts X X Curb and gutter 25 25 25 Grade stakes 100 100** 50 Guardrail 25 25 25 Manholes, catch basins & inlets X Monuments X Red tops 100 100** 25 X Riprap 50 50 50 Signs X Slope stake / cross sections 100 100** 25 X Under drains and sewers 50 25 25

* Establish additional cross sections and slope stakes at all breaks in topography and where structures begin and end.

**Curves shall be staked on 50-foot stations if the curve is greater than six degrees.

June 2, 2003 2 Alaska Construction Surveying Requirements

2. Typical Section Drawing

Alaska Construction Surveying Requirements 3 June 2, 2003

3. Survey point materials requirements

These are minimum requirements; larger sizes may be necessary.

Use only stakes with planed sides.

Table 3—Survey point materials requirements la th o r w hi sk er s

2” x x 8” h ub

2” x x h

1” x x st ak e

1” x x st ak e la th

H a nd ta ck d na il d na il

½ x re ba r

Benchmarks

X

Blue tops X X Centerline P.C., P.T., P.O.T. X X X * X* Centerline reference points X X X * X * Centerline station X X Clearing X Culvert stake X X X Culvert stake references X X X Curb and gutter X X X Guardrail X Major structures X X * X * X X * X * Red tops X X Signs X Slope stake X X Slope stake references X X X

* Optional depending on conditions, and to be determined by the Project Engineer.

June 2, 2003 4 Alaska Construction Surveying Requirements

4. Typical alignment notes

The Chief of Parties must prepare the alignment book before actual staking.

Don’t use swing ties for reference points.

Use three point right angle ties, two to the right and one left, or vice versa.

Reference P.C., P.I., P.T., and P.O.T.

Alaska Construction Surveying Requirements 5 June 2, 2003

5. Typical clearing notes

Exclude areas not needing clearing.

Draw a diagram as required to show unusual or confusing areas.

June 2, 2003 6 Alaska Construction Surveying Requirements

6. Typical level notes

Balance back sights and foresights.

Establish all benchmarks and take the centerline profile before doing any staking involving elevations.

Don’t set benchmarks in utility poles.

Don’t use side shots on benchmarks.

Use the turn through method when establishing benchmarks.

Re-check benchmarks after each major freeze/thaw cycle and/or any environmental event that may change the benchmark elevation.

Do not use double rodding.

Run separate level loops between all benchmarks.

Set benchmarks in trees of at least six-inch diameter, unless approved by the Project Engineer.

Correct errors in benchmark elevations so they will not affect the elevations of succeeding benchmarks.

Consult with the Project Engineer before placing benchmarks in areas of permafrost or other unstable ground.

Establish benchmarks at intervals and locations consistent with good engineering practice, and generally not more than 1000 feet.

Completely describe benchmarks when establishing or re-establishing their elevation.

Give centerline stationing, offset, benchmark projection, and observable benchmark characteristics. When checking into or out of benchmarks, note the book and page number that contains the most recent elevation establishment for that benchmark.

Write the station on the top twelve inches facing centerline, with numerals a minimum of one inch in height.

June 2, 2003 7 Alaska Construction Surveying Requirements

7. Typical slope stake notes

Enter the station, elevations, shoulder distance or ditch distances, and slope in the slope stake book before staking begins.

In areas where slides or overbreak are anticipated, extend the sections beyond the construction limits.

Slope-stake each section that is cross-sectioned.

Final re-cross sections are required where there are overbreaks, undercuts, etc. Re-cross section book and page numbers shall be noted on the original cross-section and slope staking page for the relevant stations.

Use a hand level only for one turn up or down from the instrument.

Clearly note hand level turns.

Use a reference point that is 10-20 feet beyond the slope stake.

The reference point must show the cut or fill to the slope stake and must include the slope stake information.

Slope stake all abrupt changes in typical sections.

Position all laths to face centerline.

Include at least the following information on the stake: (1) where to begin the cut or fill (2) the slope ratio (3) the depth of cut or height of fill and (4) the station.

Alaska Construction Surveying Requirements 8 June 2, 2003

8. Typical culvert notes

Show at least the following information on culvert stakes station size length type of pipe (e.g., 24” x 80’ CMP) cut or fill from top of hub to inlet & outlet skew angle horizontal distance from hub to end of pipe gradient of pipe drop of pipe

Ensure that all culverts have a minimum camber equal to 1% of the length of the pipe, unless the Project Engineer directs otherwise.

Develop a culvert camber diagram showing each section of pipe and its elevation and offset.

June 2, 2003 9 Alaska Construction Surveying Requirements

9. Typical culvert camber diagram

June 2, 2003 10 Alaska Construction Surveying Requirements

10. Typical blue or red tops and grade stake notes

Place blue and red tops at each break in typical section and on centerline.

Use blue tops for top of base course.

Use red tops for the bottom of the base course.

Evenly space red/blue tops at and between crown section break points with a maximum spacing of

25 feet between red/blue tops.

Establish horizontal control from centerline references and vertical control from benchmarks.

Place blue tops at the same interval as slope stakes.

Stake all curve transitions.

Alaska Construction Surveying Requirements 11 June 2, 2003

Table of Contents
Description
Page
Survey accuracy requirements
Third order survey
Table 1—Survey accuracy requirements \(in feet\�

Survey frequency requirements

Table 2—Survey frequency requirements \(in feet�

Typical Section Drawing
Survey point materials requirements

Table 3—Survey point materials requirements

Typical alignment notes
Typical clearing notes
Typical level notes
Typical slope stake notes
Typical culvert notes
Typical culvert camber diagram
�
Typical blue or red tops and grade stake notes

File details come from the government source that posted it. Updated .