Summary

This is a price proposal exhibit (Exhibit A) for a disaster debris removal and emergency response services contract. The document presents a comprehensive unit rate and time-and-materials pricing schedule for debris management services including vegetative debris removal, construction and demolition (C&D) debris handling, white goods processing, special waste management, hazardous stump and tree removal, structure demolition, debris processing, debris management site operations, and final disposal services. The pricing structure is tiered by haul distance (0-15 miles, >15-30 miles, >30-60 miles, and >60 miles) for most debris removal services. Services are priced per cubic yard, per unit, per pound, per linear foot, per day, or per gallon depending on the service type.

The proposal includes an extensive equipment pricing schedule for time-and-materials billing, covering heavy equipment (loaders, excavators, dozers, cranes), hauling vehicles (dump trucks and trailers ranging from 5 to 75+ cubic yards), transportation vehicles, personnel classifications (operators, supervisors, laborers, inspectors), and miscellaneous items (traffic control, storage containers, portable facilities). Additional sections provide pricing for emergency response equipment including generators (15-1800 KW), pumps (1000-5000 GPM capacity), lighting towers (500-4000 watt), communications towers, emergency piping and storage tanks, and fuel delivery with daily adjustment pricing for diesel, gasoline (87/89/93 octane), and propane. The fuel pricing structure requires vendors to provide actual costs with daily adjustments, fixed delivery charges, and specified delivery response times (within 24 hours, 72 hours, or 7 days).

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EXHIBIT A: Unit Rates

DESCRIPTION OF SERVICE UNIT UNIT PRICE

a Pick up vegetative debris from ROW and haul to Debris DMS). (0 to 15 miles) CUBIC YARD $ b Pick up vegetative debris from ROW and haul to DMS. (>15 to 30 miles) CUBIC YARD $ c Pick up vegetative debris from ROW and haul to DMS. (>30 to 60 miles) CUBIC YARD $ d Pick up vegetative debris from ROW and haul to DMS. (>60 miles) CUBIC YARD $ e Pick up vegetative debris from ROW and haul to Temporary Debris Aggregation Site (TDAS) (0 to 15 miles) CUBIC YARD $ f Pick up vegetative debris from TDAS and haul to DMS or Final Disposal (0 to 15 miles) CUBIC YARD $ g Pick up vegetative debris from TDAS and haul to DMS or Final Disposal (>15 to 30 miles) CUBIC YARD $ h Pick up vegetative debris from TDAS and haul to DMS or Final Disposal (>30 to 60 miles) CUBIC YARD $ a Pick up C&D or Mixed debris materials from ROW and haul to DMS. (0 to 15 miles) CUBIC YARD $ b Pick up C&D or Mixed debris materials from ROW and haul to DMS. (>15 to 30 miles.) CUBIC YARD $ c Pick up C&D or Mixed debris materials from ROW and haul to DMS. (>30 to 60 miles.) CUBIC YARD $ d Pick up C&D or Mixed debris materials from ROW and haul to DMS. (>60 miles.) CUBIC YARD $ e Pick up C&D or Mixed debris materials from ROW and haul to LANDFILL. (0 to 15 miles) CUBIC YARD $ f Pick up C&D or Mixed debris materials from ROW and haul to LANDFILL. (>15 to 30 miles) CUBIC YARD $ g Pick up C&D or Mixed debris or Mixed from ROW and haul to LANDFILL. (>30 to 60 miles) CUBIC YARD $ h Pick up C&D or Mixed debris materials from ROW and haul to LANDFILL. (>60 miles) CUBIC YARD $ a Pick up C&D or Mixed debris materials from ROW and haul to DMS. (0 to 15 miles) CUBIC YARD $ b Pick up C&D or Mixed debris materials from ROW and haul to DMS. (>15 to 30 miles.) CUBIC YARD $ c Pick up C&D or Mixed debris materialsfrom ROW and haul to DMS. (>30 to 60 miles.) CUBIC YARD $ d Pick up C&D or Mixed debris materials from ROW and haul to DMS. (>60 miles.) CUBIC YARD $ e Pick up C&D or Mixed debris materials from ROW and haul to LANDFILL. (0 to 15 miles) CUBIC YARD $ f Pick up C&D or Mixed debris materials from ROW and haul to LANDFILL. (>15 to 30 miles) CUBIC YARD $

2. CONSTRUCTION & DEMOLITION DEBRIS (C&D) and MIXED DEBRIS (Asbestos)

1. VEGETATIVE DEBRIS

2. CONSTRUCTION & DEMOLITION DEBRIS (C&D) and MIXED DEBRIS (Non-Asbestos) g Pick up C&D or Mixed debris materials from ROW and haul to LANDFILL. (>30 to 60 miles) CUBIC YARD $ h Pick up C&D or Mixed debris materials from ROW and haul to LANDFILL. (>60 miles) CUBIC YARD $ a Remove and transport from ROW to DMS. PER UNIT $ b Remove and transport from ROW to Recycling Facility or approved disposal facility. PER UNIT $ c Transport from DMS to Recycling Facility or approved disposal facility. PER UNIT $ d Freon Removal / Recycling and Management PER UNIT $

4. SPECIAL WASTE

a Electronic waste removal from ROW and dispose at City approved site. PER UNIT $ b Household hazardous waste removal from ROW and dispose at City approved site. PER POUND $ c Hazardous waste removal from ROW and dispose at City approved site. PER POUND $ d Derelict vehicle removal, transfer / tow of typical passenger car. EACH $ e Derelict vessel removal and transportation to secure storage site. (Vessels under 25 feet) EACH $ f Derelict vessel removal and transportation to secure storage site. (Vessels 25 feet and greater) EACH $ g Operation of secure storage site for derelict vehicles/vessels. PER DAY $ h Vessel and Vehicle Fluids Management - draining / removal of fluids from vessel / vehicle, storage of fluids and transportation to a disposal / recycling facility PER GALLON $ i Vessel and Vehicle Hazardous Materials Management - removal of hazardous materials from vessel / vehicle, (e.g. batteries), storage of same and transportation to a disposal / recycling facility

PER GALLON $

j Crushing of Vessels for Disposal PER FOOT $ k Waterway Debris Removal - removal of storm debris from marine environments, including canals, streams and waterfronts CUBIC YARD $ l Concrete Removal - Load and haul broken concrete from ROW and dispose at City approved site (0 to 15 miles) CUBIC YARD $ m Concrete Removal - Load and haul broken concrete from ROW and dispose at City approved site (>15 to 30 miles) CUBIC YARD $ n Concrete Removal - Load and haul broken concrete from ROW and dispose at City approved site (>30 to 60 miles) CUBIC YARD $ o Concrete Removal - Load and haul broken concrete from ROW and dispose at City approved site (>60 miles) CUBIC YARD $ p q Soil, Mud, Silt or Sand - Load and from location and dispose at City approved site (0 to 15 miles) CUBIC YARD $ r Soil, Mud, Silt or Sand - Load and from location and dispose at City approved site (>15 to 30 miles) CUBIC YARD $

3. WHITE GOODS

s Soil, Mud, Silt or Sand - Load and from location and dispose at City approved site (>30 to 60 miles) CUBIC YARD $ t Soil, Mud, Silt or Sand - Load and from location and dispose at City approved site (>60 miles) CUBIC YARD $ u Sand and Soil Screening & Collection: Removal and screening of debris- laden sand from public property, stockpiling debris at DMS, and replacing screened sand at City designated location.

CUBIC YARD $

v Removal and disposal of animal carcasses PER POUND $ a Removal of hazardous stump from ROW or public property and transportation to DMS. 24" to 36" diameter. EACH $ b Removal of hazardous stump from ROW or public property and transportaton to DMS. >36" to 48" diameter. EACH $ c Removal of hazardous stump from ROW or public property and transportation to DMS. >48" diameter. EACH $ d Backfill - supply and placement of clean fill dirt into holes created by stump removal in the ROW. CUBIC YARD $ e Removal of hazardous trees (leaning or damaged) from ROW or public property that are 13" to 24" with the trunk measured at DBH. EACH $ f Removal of hazardous trees (leaning or damaged) from ROW or public property that are >24" to 36" with the trunk measured at DBH. EACH $ g Removal of hazardous trees (leaning or damaged) from ROW or public property that are >36" to 48" with the trunk measured at DBH. EACH $ h Removal of hazardous trees (leaning or damaged) from ROW or public property that are >48" with the trunk measured at DBH. EACH $ i Removal of hazardous hanging limbs from ROW or public property that are >2 inches. PER TREE $ a 0 to 15 miles one-way haul CUBIC YARD $ b >15 to 30 miles one-way haul CUBIC YARD $ c >30 to 60 miles one-way haul CUBIC YARD $ d >60 miles one-way haul CUBIC YARD $ d 0 to 15 miles one-way haul CUBIC YARD $ e >15 to 30 miles one-way haul CUBIC YARD $ f >30 to 60 miles one-way haul CUBIC YARD $ g >60 miles one-way haul CUBIC YARD $

5. HAZARDOUS STUMPS and HAZARDOUS TREES

6. DEMOLITION OF STRUCTURES

7. PROCESSING / REDUCING DEBRIS & DEBRIS SITE MANAGEMENT

Structure demolition with construction and demolition debris loaded at the designated work zone and hauled to a City approved landfill. Contractor shall disconnect and cap the sewer and water line and coordinate all required disconnects by private utility companies. Search safely accessible structures, including garages and detached outbuildings, and remove all white goods, electronic waste, and household hazardous waste for ROW collection. Does not include removal of concrete slabs.

Structure demolition with regulated asbestos containing (RACM) construction and demolition debris loaded at the designated work zone and hauled to a City approved landfill. Contractor shall disconnect and cap the sewer and water line and coordinate all required disconnects by private utility companies. Search safely accessible structures, including garages and detached outbuildings, and remove all white goods, electronic waste, household hazardous waste for ROW collection. Does not include removal of concrete slabs.

a Grinding / chipping vegetative debris, based on incoming cubic yards. CUBIC YARD $ b Burning vegetative debris, based on incoming cubic yards. CUBIC YARD $ c Processing and/or compacting C&D materials and mixed debris, based on incoming cubic yards. CUBIC YARD $ d Processing and/or compacting concrete materials and masonry, based on incoming cubic yards. CUBIC YARD $ a Debris Management Site (DMS) Management, includes the cost of site preparation, site management, acceptance, erosion control, and site closeout based on incoming cubic yards.

CUBIC YARD $

9. FINAL DISPOSAL - Disposal Fees shall be passed through to the City without markup.

a Load and Transport processed vegetative debris from DMS to final disposal. (0 to 15 miles) CUBIC YARD $ b Load and Transport processed vegetative debris from DMS to final disposal. (>15 to 30 miles) CUBIC YARD $ c Load and Transport processed vegetative debris from DMS to final disposal. (>30 to 60 miles) CUBIC YARD $ d Load and Transport processed vegetative debris from DMS to final disposal. (>60 miles) CUBIC YARD $ e Load and Transport compacted C & D and Mixed Materials from DMS to final disposal. (0 to 15 miles) CUBIC YARD $ f Load and Transport compacted C & D and Mixed Materials from DMS to final disposal. (>15 to 30 miles) CUBIC YARD $ g Load and Transport compacted C & D and Mixed Materials from DMS to final disposal. (>30 to 60 miles) CUBIC YARD $ h Load and Transport compacted C & D and Mixed Materials from DMS to final disposal. (>60 miles) CUBIC YARD $ i a Cleaning and clearing of storm drain lines. Drain line diameter 0 to 15 inches. PER LINEAR FOOT $ b Cleaning and clearing of storm drain lines. Drain line diameter >15 to 36 inches. PER LINEAR FOOT $ c Cleaning and clearing of storm drain lines. Drain line diameter >36 inches. PER LINEAR FOOT $ d Debris to be place at the ROW for collection as storm debris. CUBIC YARD $ e Cleaning and clearing of catch basins and inlets. 4' x 4' EACH $ f Cleaning and clearing of catch basins and inlets. 8' x 8' EACH $ g Cleaning and clearing of catch basins and inlets. 10' X 10' EACH $ h Cleaning and clearing of catch basins and inlets. 20' x 20' EACH $

8. DEBRIS MANAGEMENT SITE MANAGEMENT

10. OTHER DEBRIS SERVICES

EXHIBIT A: Time Materials

EQUIPMENT LIST

Number Description Type or Size Unit Unit Price

Heavy Equipment (Operator, fuel, maintenance included) Skid-Steer Loader (Mini-Loader) Bobcat 753/Cat 216/JD 313 Hour $ Extendaboom Forklift w/ debris grapple Bobcat V638/CatTL642 Hour $ Backhoe, Wheel Loader, 1.0-1.5 CY Cat 416E Hour $ Backhoe, Wheel Loader, 2.0-3.0 CY Cat 430E Hour $ Backhoe, Extend-a-hoe (1.0 CY, 4WD, extendable) JD310J/Cat 420E Hour $ Wheel Loaders, 1.0-1.5 CY Cat 908/JD 304/Case 321 Hour $ Wheel Loaders, 2.5-3.0 CY Cat 930/JD 544//Vol L70 Hour $ Wheel Loaders, 3.0-4.5 CY Cat 950/JD 644 Hour $ Wheel Loaders, 4.5-6.0 CY Cat 966/JD 744/Vol L150 Hour $ Wheel Loaders, 6.0-7.0 CY Cat 980/JD 844/Vol L180 Hour $ Tracked Loader (Trackhoe w/ misc. attachments) Cat 320/JD 690/Kob ED190 Hour $ Towed Loader w/ Tractor Prentice 210 Hour $ Knuckleboom Loader Truck (Self-Loading) 25-35 CY Body Hour $ Knuckleboom Loader Truck (Self-Loading) 35-45 CY Body Hour $ Dozer, Tracked Cat D4 Hour $ Dozer, Tracked Cat D5 Hour $ Dozer, Tracked Cat D6 Hour $ Dozer, Tracked Cat D7 Hour $ Dozer, Tracked Cat D8 Hour $ Dozer, Tracked Cat D10T Hour $ Hydraulic Excavators, 1.5 CY Cat 320 Hour $ Hydraulic Excavators, 2.5 CY Cat 325 Hour $ Hydraulic Excavators, 3.5> CY Cat 330 Hour $ Excavator/Trackhoe, Rubber Tire (w/ debris grapple) Cat 315C/JD 160C/Vol EC160 Hour $ Tractor w/ Box Blade (30-70 Hp) JD 210L/Case 570M Hour $ Motor Grader (w/ min 12' blade) Cat 120G Hour $ Off Road Truck (15-20 cy, 24MT) Cat 725/JD 250D/Vol A25 Hour $ 30 Ton Crane Terex RT 335 (30MT), equal Hour $ 50 Ton Crane Terex RT 550 (50MT), equal Hour $ 100 Ton Crane (8 hr minimum) Terex HC110, KobCK1000 Hour $ Bucket Truck Up to 50' reach Hour $

Bucket Truck 40' to 75' reach Hour $ Trash Transfer Trailer w/ Tractor 110 Yard Hour $ Mechanized Broom Street Sweeper Hour $ Water Truck 2000 Gallon Hour $ Service/Fuel Truck Multi Hour $ Diesel Forklift, 5k 5K Hour $ Personnel Forklift, 5k 5K Hour $ Forklift 1 6000 lb Hour $ Forklift 2 8000 lb Hour $ Forklift 3 10,000 lb Hour $ Forklift 4 15,000 lb Hour $ Forklift 5 25,000-35,000 lb Hour $ Extended Boom Forklift 44,000 lb Hour $ Forklift Carpet Poles N/A Day $ Forklift Loading Ramps N/A Day $ Pallet Grabber w/ Chains Hour $ Pallet Jack N/A Hour $ Electric Pallet Jack N/A Hour $ Dock Plates N/A Day $ Straight Mast Forklift Rough Terrain Hour $ Shooting Boom Forklift, 5k Rough Terrain, 5k Hour $ Shooting Boom Forklift, 6k Rough Terrain, 6k Hour $ Shooting Boom Forklift, 8k Rough Terrain, 8k Hour $ Shooting Boom Forklift, 9k Rough Terrain, 9k Hour $ Shooting Boom Forklift, 10k Rough Terrain, 10k Hour $ Forklift Propane Tank N/A Day $ Portable Loading Dock (w/ ramp and stairs) 20 x 20 Hour $ Soil Compactor 81 HP+ Case/Cat/Wacker Hour $ Soil Compactor 80 HP Case/Cat/Wacker Hour $ Soil Compactor, Towed Unit Wacker Hour $ Stump Grinder (30" diameter or less) Vermeer 252 Hour $ Stump Grinder (greater than 30" diameter) Vermeer 752 Hour $ Stump Grinder Vermeer 60TX Hour $ Chipper w/ 2 man crew Morbark Storm Hour $

Chipper/Mulcher (8" Throat) Vermeer Hour $ Chipper/Mulcher (12" Throat) Vermeer Hour $ 12-Foot Tub Grinder Morbark 1200/650 HP Hour $ 13-Foot Tub Grinder Morbark 1300/850 HP Hour $ 14-Foot Tub Grinder Diamond Z 1463/1600 HP Hour $ Air Curtain Pit Burner (Self-contained) N/A Hour $ Air Curtain Refractory Incinerator N/A Hour $ 12T Lowboy Trailer (Equip.Transport w/ Tractor) 12 Ton Hour $ 35T Lowboy Trailer (Equip. Transport w/ Tractor) 35 Ton Hour $ 50T Lowboy Trailer (Equip.Transport w/ Tractor) 50 Ton Hour $ Truck Mounted Winch Tow Truck Hour $ Log Skidder Cat 525B/JD 648E/G III Hour $ Waste Collection Rear Loader Truck N/A Hour $ Vacuum Truck/Jetter 3500 Gallon Hour $ Crash Truck w/Impact Attenuator N/A Hour $ Power Screen N/A Hour $ Stacking Conveyor N/A Hour $ Hauling Vehicles (Operator, fuel, maintenance included) Dump Truck 5 to 15 CY Hour $ Dump Truck 16 to 24 CY Hour $ Dump Truck 25 to 34 CY Hour $ Dump Truck (Trailer Dump w/ Tractor) 35 to 44 CY Hour $ Dump Truck (Trailer Dump w/ Tractor) 45 to 54 CY Hour $ Dump Truck (Trailer Dump w/ Tractor) 55 to 64 CY Hour $ Dump Truck (Trailer Dump w/ Tractor) 65 to 74 CY Hour $ Dump Truck (Trailer Dump w/ Tractor) > 75 CY Hour $ Walking Floor Trailer w/ Tractor 100 CY Hour $ Tractor w/ 42' Flatbed Trailer (Without Driver) 42' Flatbed (w/o Driver) Hour $ Tractor w/ 42' Flatbed Trailer (With Driver) 42' Flatbed (w/ Driver) Hour $ Flatbed Trailer Straight Truck (Without Driver) 26,000lb GWV Hour $ Flatbed Trailer Straight Truck (With Driver) 26,000lb GWV Hour $ Transportation Vehicles (Operator, fuel, maintenance NOT included; loaned vehicles, insurance included) Pickup Truck 1/2 Ton Day $ Pickup Truck 3/4 Ton Day $

Pickup Truck 1 Ton (4x4) Day $ Box Truck 3/4 Ton Day $ Utility Van 3/4 Ton Day $ Passenger Van 9 Passenger Day $ Passenger Car Full size Day $ Response Trailer 20 Foot Day $ Response Trailer 30 Foot Day $ Flatbed Trailer (40 ft) GWV to 450 Day $ Mobile Fleet Repair Equipment Config Day $ Personnel/Equipment Project Operations Manager Individual Hour $ Superintendent with Cell/Truck Individual Hour $ Supervisor with Cell/Truck Individual Hour $ Foreman with Cell/Truck Individual Hour $ Inspector with Cell/Vehicle Individual Hour $ Health/Safety or QC Manager with Pickup Truck Individual Hour $ Safety Superintendent Individual Hour $ Mechanic with Truck and Tools Individual Hour $ Climber with Gear Individual Hour $ Labor/Operator with Chainsaw/Tools/Cellphone Individual Hour $ Laborer with Tools/Cellphone Individual Hour $ Traffic Control Personnel with Radio Individual Hour $ Ticket Writers Individual Hour $ Survey Personnel with Vehicle Individual Hour $ Project Engineer Individual Hour $ Equipment Operator Individual Hour $ Truck Driver with cellphone and radio Individual Hour $ Security Person (Unarmed) with cellphone and radio Individual Hour $ Security Person (Armed) with cellphone and radio Individual Hour $ Administrative Assistant Individual Hour $ Clerical Individual Hour $ Miscellaneous Equipment/Items (Fuel, maintenance included, where applicable) Transfer/Tow, handle of Typical Passenger Vehicle 2 Axle/4 Wheel (1Ton) Each $ Transfer/Tow, handle of Recreational Vessel Up to 24' in length Each $ Transfer/Tow, handle of Recreational Vessel 24.1' to 48' in length Each $

Traffic Control, Temp Single Lane Closure N/A Hour $ Traffic Control, Temp Road Closure N/A Hour $ Weighing Scales, Truck, Certified Portable Hour $ Office Trailer 40 Foot Day $ Storage Container 40 Foot Day $ Portable Eyewash Station OSHA Spec Day $ First Aid Station OSHA Spec Day $ Portable Toilet (Port a John) Single Week $ Observation Tower USACE Spec Each $

Emergency Road Clearance - Initial 70-hour First Push Phase Personnel & Equipment (Operator, fuel, maintenance included) Small Loader or Lrg. Skidsteer, (Push machine, wheeled or rubber tracked) Hour $ Knuckleboom Loader Truck (Self-Loading-25-35 CY) Hour $ Wheel Loader 2.5-3.0 cy Cat 930 /JD 544 / Vol L70 Hour $ Dump Truck (16 to 24 CY) Hour $ Road Clearance Crew (2 chainsaw operators, 1 Flagger-Tosser, 1 Supervisor) Hour $ Supervisor with Truck (1 man, will assist toss operations) Hour $ Operators with Chainsaw (2 or 1 man crew, cut and toss) Hour $ Laborer with Tools (1 man, toss) Hour $ Traffic Control/Safety Personnel (2 man crew, as needed) Hour $

EXHIBIT A: Emergency Generators

EMERGENCY RESPONSE EQUIPMENT

GENERATORS

Size (KW) Three-Phase Voltage Requirement

Daily Weekly Monthly

15 240 $ $ $ 20 240 $ $ $ 25 240 $ $ $ 35 240 $ $ $ 40 480/240 $ $ $ 50 480/241 $ $ $ 60 480/242 $ $ $ 75 480/243 $ $ $ 100 480/244 $ $ $ 125 480/245 $ $ $ 150 480 $ $ $ 250 480 $ $ $ 500 480 $ $ $ 1800 480 $ $ $

Pricing to include all costs including but not limited to shipping, setting, operation, maintenance, fueling, insurance, security and recovery.

EXHIBIT A: Emergency Pumps

Pumps Size Nominal Performance Daily Weekly Monthly

4x4 High volume diesel powered suction lif trash pump with speed adjustment and on/off level control

1000 GPM Max, 150 feet TDH Max $ $ $

6x6 High volume diesel powered suction lift trash pump with speed adjustment and on/off control

2600 GPM Max, 160 Feet TDH Max $ $ $

8x8 High volume diesel powered suction lift trash pump with speed adjustment and on/off lever control

3000 GPM Max, 150 Feet TDH Max $ $ $

12x12 High volume diesel powered suction lift trash pump with speed adjustment and on/off level control

5000 GPM Max, 100 Feet TDH Max $ $ $

Pricing to include all costs including but not limited to shipping, setting, operation, maintenance, fueling, insurance, security and recovery.

EXHIBIT A: Lighting Towers

Number Description Type / Size Daily Weekly Monthly

Light Tower (Portable light plant) 500 Watt Range $ $ $ Light Tower (Portable light plant) 1000 Watt Range $ $ $ Light Tower (Portable light plant) 2000 Watt Range $ $ $ Light Tower (Portable light plant) 4000 Watt Range $ $ $ Light Tower (Portable light plant w/ Generator) 500 Watt Range (w/Gen) $ $ $ Light Tower (Portable light plant w/ Generator) 1000 Watt Range (w/Gen) $ $ $ Light Tower (Portable light plant w/ Generator) 2000 Watt Range (w/Gen) $ $ $ Light Tower (Portable light plant w/ Generator) 4000 Watt Range (w/Gen) $ $ $

Pricing to include all costs including but not limited to shipping, setting, operation, maintenance, fueling, insurance, security and recovery.

EXHIBIT A: Communications Tower

Number Description Type / Size Daily Weekly Monthly

Communications Tower - list types and sizes $ $ $

Pricing to include all costs including but not limited to shipping, setting, operation, maintenance, fueling, insurance, security and recovery.

EXHIBIT A: Emergency Pipes and Tanks

Pipes and Tanks Description Size Daily Weekly Monthly

COMPOSITE QUICK

CONNECT SUCTION

HOSE, 8 Foot Length, 20 PSI Minimum, Price per Section 4 inch $ $ $

6 inch $ $ $ 8 inch $ $ $ 12 inch $ $ $

QUICK CONNECT

DISCHARGE HOSE, 50

Foot Length, 50 PSI Minimum, Price per Section 4 Inch $ $ $

6 Inch $ $ $ 8 Inch $ $ $

QUICK CONNECT RIGID

PIPING, 10 Foot Length, 175 PSI Minimum, Price per Section 4 Inch $ $ $

6 Inch $ $ $ 8 Inch $ $ $ 12 inch $ $ $

Roll-Off-Emergency Wastewater Storage Tanks

Nominal 22,000 Gallon Each $ $ $

Pricing to include all costs including but not limited to shipping, setting, operation, maintenance, fueling, insurance, security and recovery.

EXHIBIT A: Fuel Pricing

FUEL PRICING REQUIREMENTS

ITEM FUEL TYPE UNIT COST PER

GALLON

DELIVERED

WITHIN

24 HRS

WITHIN

72 HRS

WITHIN

7 DAYS

1 Diesel gallon $ 2 Gas, 87 Octane gallon $ 3 Gas, 89 Octane gallon $ 4 Gas, 93 Octane gallon $ 5 Propane pound $

1. Actual Fuel Cost per unit will adjust daily and will include all applicable state and federal taxes.

2. Fixed Price Delivery Charge will be added to Actual Fuel Cost.

3. Vendors must provide a delivery response time for each item listed in this Section.

Unit Rates
T&M 1st Push
Emergency Generators
Emergency Pumps
Lighting Towers
Communications Tower
Emergency Pipes and Tanks
Fuel Pricing