Exhibit A - Draft CDRLs.docx

DOCX document 911 KB Posted

Attached to
DRAFT: NAWCAD WOLF LIFETIME SUPPORT ENGINEERING (LSE)
Solicitation number
N0042124R0016
Issued by

About this file

This document is a set of Contract Data Requirements Lists (CDRLs) for a federal contract opportunity. The CDRLs detail the various deliverables required under the contract, including:

  • Monthly Technical Progress Reports, Segregation of Cost and Invoice Reporting, Organizational Conflict of Interest Mitigation Plan and Non-Disclosure Agreement Status Certification, Period Close-Out Reports, Trip/Travel Reports, Government Property Inventory Reports, Phase-Out Transition Plans, Quality Assurance Program Plans, Test Plans and Procedures, Configuration Audit Summary Reports, Readiness Test Reports, and various other technical documentation and analysis reports.

The CDRLs specify the frequency, due dates, distribution, and other requirements for each deliverable. This appears to be in support of a follow-on procurement for engineering and technical services to support production, Lifetime Support Engineering (LSE), and In-Service Engineering (ISE) for Radio Communication Systems (RCS) and C5ISR systems on U.S. Navy surface combatants. The overall contract opportunity is being competed under a full and open competition with a NAICS code of 541330 (Engineering Services).

View the file

Other files

File Type Posted
Att 08 TDL CDRL Att COR customer_TPOC.xlsx XLSX spreadsheet
Att C2 - Cost Price Narrative.docx DOCX document
Att 03 Data Item Transmittal Form.pdf PDF
Att 07 Wage Determinations.pdf PDF
N00421-24-R-0016.pdf PDF
Att 06 OCI List.pdf PDF
Att S1 - SBPCD.docx DOCX document
Att 04 List of Authorized Key Personnel.pdf PDF
Att 11 COR Designation Letter.pdf PDF
Att C1 - Cost Workbook.xlsx XLSX spreadsheet
Att 05 List of Approved Subcontractors.pdf PDF
Att 02 CSP.pdf PDF
Att 09 Draft TDL CDRL Att COR Only.xlsx XLSX spreadsheet
Att 01 Draft DD254.pdf PDF
Att T2 - Workforce.docx DOCX document
Att 10 Small Business Subcontracting Plan.pdf PDF
Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACT DATA REQUIREMENTS LIST (CDRL)

(1 Data Item) Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.
B. EXHIBIT
C. CATEGORY:
0001
A
TDP______
TM_______
OTHER MGMT______________
D. SYSTEM/ITEM
E. CONTRACT/PR NO.
F. CONTRACTOR
SAIW Lifetime Support Engineering
TBD
TBD
1. DATA ITEM NO.
2. TITLE OF DATA ITEM
3. SUBTITLE
A001
Contracting Officer’s Representative (COR) Management Report for Technical Direction Letters (TDLs)
Segregation of Cost and Invoice Requirements Reporting for

TDLs

4. AUTHORITY (Data Acquisition Document No.)
5. CONTRACT REFERENCE
6. REQUIRING OFFICE
DI-MGMT-81864A NOT 1 (See Blk 16)
SOW Para 3.1.3.1, 3.1.5.1.4, 3.1.9
NAWCAD WOLF SAIW
7. DD 250 REQ
9. DIST STATEMENTREQUIRED
10. FREQUENCY
12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION

LT (See Blk16)

See Blk 16
See Blk 16
a. ADDRESSEE
b. COPIES
8. APP CODE
D
11. AS OF DATE
13. DATE OF SUBSEQUENTSUBMISSION
Draft
Final

N/A (See Blk16)

See Blk 16
See Blk 16
Reg
Repro
16. REMARKS
COR
1
0

Blk 4: The Contractor shall use the format listed in attachment 09 Excel template “COR only” and attachment 08 Excel template “COR customer_TPOC” of section J of the Contract. The Contractor shall segregate costs incurred on the task order (TO) at the lowest level of performance by TDL or the lowest level subtask stated in the TDL and invoicing shall be in accordance with Section G Payment Instructions. In addition, the Contractor shall also include summaries of work charged during the period covered; percentage of funds invoiced, expended, and budgeted; and an Estimate at Completion (EAC) at the level identified within each TDL to represent the estimated cost of tasking for the Period of Performance (PoP) of the TDL. For this CDRL the Contractor shall not submit data or invoices on a Contract Line Item Number (CLIN) or total contract basis.

Blk 7: Deliverable submissions shall be submitted to the distribution list under block 14 and via the Data Item Transmittal/Acceptance/Rejection form (See Contract Section J Attachments).

Blk 8: This CDRL format will not require Government approval. However, if the COR communicates errors found in either the data deliverable or the format, the COR will determine if immediate correction is warranted or can be corrected in the next deliverable submission.

Blk 9: Apply and use distribution statements in accordance with the Distribution Statement shown in Section C, SOW, Paragraph 3.2.4

Blks 10, 11, 12, and 13: The first data submission is due 10 business days after the first full month of contract performance and shall include data from contract award through the end of the first month of performance; this data shall also be submitted with the first invoice. Subsequent monthly data deliverables shall be submitted within 10 business days of the preceding month and with each monthly invoice. The data deliverable shall reflect the exact dollar amount and PoP as shown on the invoice. All data submittals shall be distributed to those identified in block 14.

Blk 14: Distribution and submittal by electronic media via email whenever possible. Electronic deliverables shall be compatible with the current authorized Navy Marine Corps Intranet (NMCI) version of Microsoft Office or Adobe Acrobat unless otherwise approved by the Government. Deliver to the Contracting Officer’s Representative (COR), Procurement Group Procuring Contracting Officer (PCO) and Project Lead/Technical Point of Contact (TPOC).

Format approval:

N/A

Monthly Data Deliverables:

“COR only” deliverable: COR and Naval Air Warfare Center Aircraft Division (NAWCAD) Procurement Group PCO “COR customer_TPOC”: COR, NAWCAD Procurement Group PCO, and Project Lead/TPOC Procurement Group PCO

Project Lead/TPOC

(See Blk 16)

15.TOTAL▬▬▬▬►
0
3
0
G. PREPARED BY
H. DATE
I. APPROVED BY
J. DATE

Brittany N. Ramirez

Contracting Officer’s Representative

DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page _1_ of _46_Pages.18. ESTIMATED TOTAL PRICE

17. PRICE GROUP

INSTRUCTIONS FOR COMPLETING DD FORM 1423

(See DoD 5010.12-M for detailed instructions.)

FOR GOVERNMENT PERSONNEL
FOR CONTRACTOR PERSONNEL

Item A. Self-explanatory.

Item B. Self-explanatory.

Item C. Mark (X) appropriate category: TDP - Technical Data Package; TM - Technical Manual; Other - other category of data, such as “Provisioning”, “Configuration Management”, etc.

Item D. Enter name of system/item being acquired that data will support.

Item E. Self-explanatory (to be filled in after contract award).

Item F. Self-explanatory (to be filled in after contract award).

Item G. Signature of preparer of CDRL.

Item H. Date CDRL was prepared.

Item I. Signature of CDRL approval authority.

Item J. Data CDRL was approved.

Item 1. See DoD FAR Supplement Subpart 4.71 for proper numbering.

Item 2. Enter title as it appears on data acquisition document cited in item 4.

Item 3. Enter subtitle of data item for further definition of data item (optional entry).

Item 4. Enter Data Item Description (DID) number, military specification number, or military standard number listed on the ASSIST website), or onetime DID number, that defines data content and format requirements.

Item 5. Enter reference to tasking in contract that generates requirement for the data item (e.g., Statement of Work paragraph number).

Item 6. Enter technical office responsible for ensuring adequacy of the data item.

Item 7. Specify requirement for inspection/acceptance of the data item by the Government.

Item 8. Specify requirement for approval of a draft before preparation of the final data item.

Item 9. For technical data, specify requirement for contractor to mark the appropriate distribution statement on the data (ref. DoD 5230.24).

Item 10. Specify number of time data items are to be delivered.

Item 11. Specify as-of date of data item, when applicable.

Item 12. Specify when first submittal is required.

Item 13. Specify when subsequent submittals are required, when applicable.

Item 14. Enter addresses and number of draft/final copies to be delivered to each addressee. Explain reproducible copies in item 16.

Item 15. Enter total number of draft/final copies to be delivered.

Item 16. Use for additional/clarifying information for Items 1 through 12. Examples are: Tailoring of documents cited in item 4; Clarification of submittal dates in items 12 and 13; Explanation of reproducible copies in item 14.; Desired medium for delivery of the data item.

Item 17. Specify appropriate price group from one of the following groups of effort in developing estimated prices for each data item on the DD Form 1423.

a. Group I. Definition - Data which is not otherwise essential to the Contractor’s performance of the primary contracted effort (production, development, testing, and administration) but which is required by DD Form 1423.

Estimated Price - Costs to be included under Group I are those applicable to preparing and assembling the data item in conformance with Government requirements, and the administration and other expenses related to reproducing and delivering such data items to the Government.

b. Group II. Definition - Data which is essential to the performance of the primary contracted effort but the Contractor is required to perform additional work to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, or the data item.

Estimated Price - Cost to be included under Group II are those incurred over and above the cost of the essential data item without conforming to Government requirements, and the administrative and other expenses related to reproducing and delivering such data item to the Government.

c. Group III. Definition - Data which the Contractor must develop for his internal use in performance of the primary contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of content, format, frequency or submittal, preparation, control, and quality of the data item.

Estimated Price - Cost to be included under Group III are the administrative and other expenses related to reproducing and delivering such data item to the Government.

d. Group IV. Definition - Data which is developed by the Contractor as part of his normal operating procedures and his effort in supplying these data to the Government is minimal.

Estimated Price - Group IV Item should normally be shown on the DD Form 1423 at no cost.

Item 18. For each data item, enter an amount equal to that portion of the total price which is estimated to be attributable to the production or development for the Government of that item of data. These estimated data prices shall be developed only from those costs which will be incurred as a direct result of the requirement to supply the data, over and above those costs which would otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any amount for rights in data. The Governments’ right to use the data shall be governed by the pertinent provisions of the contract.

DD FORM 1423-1 (BACK), FEB 2001

CONTRACT DATA REQUIREMENTS LIST (CDRL)

(1 Data Item) Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.
B. EXHIBIT
C. CATEGORY:
0001
A
TDP_______
TM_______
OTHER _MGMT____________________
D. SYSTEM/ITEM
E. CONTRACT/PR NO.
F. CONTRACTOR
SAIW Lifetime Support Engineering
TBD
TBD
1. DATA ITEM NO.
2. TITLE OF DATA ITEM
3. SUBTITLE
A002
Status Report
Monthly Technical Progress Report
4. AUTHORITY (Data Acquisition Document No.)
5. CONTRACT REFERENCE
6. REQUIRING OFFICE
DI-MGMT-80368A (See Blk 16)
SOW Para 3.1.3.1 and 3.1.3.3
NAWCAD WOLF SAIW
7. DD 250 REQ
9. DIST STATEMENTREQUIRED
10. FREQUENCY
12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION

LT

MTHLY
See Blk 16
a. ADDRESSEE
b. COPIES
8. APP CODE
D
11. AS OF DATE
13. DATE OF SUBSEQUENTSUBMISSION
Draft
Final

N/A (See Blk 16)

EOM
10 DARP (See Blk 16)
Reg
Repro
16. REMARKS
COR
0
1
0

Blk 4: The Contractor shall address the Data Item Description (DID) requirements as applicable with the exception of paragraph 3.2.3 “Itemized man-hours and costs” within the DID, as this information will be delivered in CDRL A001 and A035.

Blk 8: This CDRL will not require Government approval. However, if the COR communicates errors found in either the data deliverable or the format, the COR will determine if immediate correction is warranted or can be corrected in the next deliverable submission.

Blk 9: Apply and use distribution statements in accordance with the Distribution Statement shown in Section C, SOW, Paragraph 3.2.4

Blk 12: Submit within five business days of the first full month of performance.

Blk 13: Reporting period is the last day of each month.

Blk 14: Distribution and submittal by electronic media via email whenever possible. Electronic deliverables shall be compatible with the current authorized Navy Marine Corps Intranet (NMCI) version of Microsoft Office or Adobe Acrobat unless otherwise approved by the Government. Deliver to the Contracting Officer’s Representative (COR) and Project Lead/Technical Point of Contact (TPOC).

Project Lead/TPOC
0
1
0

(See Blk 16)

15.TOTAL▬▬▬▬►
0
2
0
G. PREPARED BY
H. DATE
I. APPROVED BY
J. DATE

Brittany N. Ramirez

Contracting Officer’s Representative

DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page _2_ of _46_Pages.18. ESTIMATED TOTAL PRICE

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.
B. EXHIBIT
C. CATEGORY:
0001
A
TDP_______
TM_______
OTHER _MISC____________________
D. SYSTEM/ITEM
E. CONTRACT/PR NO.
F. CONTRACTOR
SAIW Lifetime Support Engineering
TBD
TBD
1. DATA ITEM NO.
2. TITLE OF DATA ITEM
3. SUBTITLE
A003
Certification Data Report
Organizational Conflict of Interest (OCI) Mitigation Plan & Non-Disclosure Agreement (NDA) Status Certification
4. AUTHORITY (Data Acquisition Document No.)
5. CONTRACT REFERENCE
6. REQUIRING OFFICE
DI-MISC-82386 (See Blk 16)
SOW Para 3.1.3.2
NAWCAD WOLF SAIW
7. DD 250 REQ
9. DIST STATEMENTREQUIRED
10. FREQUENCY
12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION

XX (See Blk 16)

ASREQ (See Blk 16)
See Blk 16
a. ADDRESSEE
b. COPIES
8. APP CODE
D
11. AS OF DATE
13. DATE OF SUBSEQUENTSUBMISSION
Draft
Final

A (See Blk 16)

ASREQ
See Blk 16
Reg
Repro
16. REMARKS
COR
1
1
0

Blk 4: Contractor format is acceptable but shall include all required information as documented in Clause 5252.209-9510.

Blks 7 & 8: Government review and approval of the initial OCI Mitigation Plan will occur as part of the evaluation process (if applicable) and will not be required for initial submission of this CDRL. Updates required as a result of an OCI arising during performance will be executed in accordance with the guidance provided for Blk 13.

Blk 9: Apply and use distribution statements in accordance with the Distribution Statement shown in Section C, SOW, Paragraph 3.2.4

Blks 10 & 12: The Contractor shall submit certification of compliance with the OCI Mitigation Plan to include a company-to-company NDA execution status within 20 business days of Contract/Task Order (TO) award.

Blk 13: The Contractor shall resubmit within five business days of any changes in either compliance with the OCI Mitigation Plan or to company-to-company NDA status. If an OCI was not identified during the solicitation phase and one arises during performance, revision and resubmission of the OCI Mitigation Plan is required within 10 business days of the OCI arising. The Government will review and respond within 10 business days. Government-provided feedback shall be adjudicated within five business days.

Blk 14: Distribution and submittal by electronic media via email whenever possible. Electronic deliverables shall be compatible with the current authorized Navy Marine Corps Intranet (NMCI) version of Microsoft Office or Adobe Acrobat unless otherwise approved by the Government. Deliver to the Contracting Officer’s Representative (COR) as defined in the Contract.

(See Blk 16)

15.TOTAL▬▬▬▬►
1
1
0
G. PREPARED BY
H. DATE
I. APPROVED BY
J. DATE

Brittany N. Ramirez

Contracting Officer’s Representative

DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page _3_ of _46_Pages.18. ESTIMATED TOTAL PRICE

CONTRACT DATA REQUIREMENTS LIST (CDRL)

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.
B. EXHIBIT
C. CATEGORY:
0001
A
TDP_______
TM_______
OTHER _MISC____________________
D. SYSTEM/ITEM
E. CONTRACT/PR NO.
F. CONTRACTOR
SAIW Lifetime Support Engineering
TBD
TBD
1. DATA ITEM NO.
2. TITLE OF DATA ITEM
3. SUBTITLE
A004
Technical Information Report
Period Close-Out Report
4. AUTHORITY (Data Acquisition Document No.)
5. CONTRACT REFERENCE
6. REQUIRING OFFICE
DI-MISC-80652 NOT 1 (See Blk 16)
SOW Para 3.1.3.4, 3.3.2.7.4
NAWCAD WOLF SAIW
7. DD 250 REQ
9. DIST STATEMENTREQUIRED
10. FREQUENCY
12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION

XX (See Blk 16)

ASREQ (See Blk 16)
See Blk 16
a. ADDRESSEE
b. COPIES
8. APP CODE
D
11. AS OF DATE
13. DATE OF SUBSEQUENTSUBMISSION
Draft
Final

A (See Blk 16)

See Blk 16
See Blk 16
Reg
Repro
16. REMARKS
COR
1
1
0

Blk 4: Contractor format is acceptable. At a minimum, the report shall include expenditures data, budgeted versus actual, contract deliverable(s) status, disposition of contractor furnished materials, patent report, security clearance status, small business actuals versus goals, a list and disposition status of Government Furnished Property (GFP) and material, and outside services employed in completion of the task. The closeout report shall be signed by the Contractor's Program Manager.

Blk 7 and 8: The Government will have 30 business days to review and provide any written feedback. If required, the Contractor shall submit the final deliverable within 10 business days of receipt of Government feedback. If the Government does not provide comments within 30 business days of submission the CDRL is considered accepted.

Blk 9: Apply and use distribution statements in accordance with the Distribution Statement shown in Section C, SOW, Paragraph 3.2.4

Blks 10, 11, 12, 13: Within 90 calendar days after completing each period. Final due 10 days after receipt of Government comments on draft submission. Government has 30 days to comment. If the Government does not reply within 30 days, the CDRL is considered accepted.

Blk 14: Distribution and submittal by electronic media via email whenever possible. Electronic deliverables shall be compatible with the current authorized Navy Marine Corps Intranet (NMCI) version of Microsoft Office or Adobe Acrobat unless otherwise approved by the Government. Deliver to the Contracting Officer’s Representative (COR) as defined in the Contract.

(See Blk 16)

15.TOTAL▬▬▬▬►
1
1
0
G. PREPARED BY
H. DATE
I. APPROVED BY
J. DATE

Brittany N. Ramirez

Contracting Officer’s Representative

DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page _4_ of _46_Pages.18. ESTIMATED TOTAL PRICE

CONTRACT DATA REQUIREMENTS LIST (CDRL)

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.
B. EXHIBIT
C. CATEGORY:
0001, 0008
A
TDP_______
TM_______
OTHER _MISC____________________
D. SYSTEM/ITEM
E. CONTRACT/PR NO.
F. CONTRACTOR
SAIW Lifetime Support Engineering
TBD
TBD
1. DATA ITEM NO.
2. TITLE OF DATA ITEM
3. SUBTITLE
A005
Trip/Travel Report
4. AUTHORITY (Data Acquisition Document No.)
5. CONTRACT REFERENCE
6. REQUIRING OFFICE
DI-MISC-81943 NOT 1 (See Blk 16)
SOW Para 3.1.5.1.3, 3.3.1.10.11
NAWCAD WOLF SAIW
7. DD 250 REQ
9. DIST STATEMENTREQUIRED
10. FREQUENCY
12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION

LT

ASREQ (See Blk 16)
See Blk 16
a. ADDRESSEE
b. COPIES
8. APP CODE
D
11. AS OF DATE
13. DATE OF SUBSEQUENTSUBMISSION
Draft
Final

N/A

N/A
See Blk 16
Reg
Repro
16. REMARKS
COR
0
1
0

Blk 4: The Contractor shall address the Data Item Description (DID) requirements as applicable including the Government Point of Contact (POC) at the travel location and the date travel was approved. The Contractor may include all travelers on one trip/travel report per travel occurrence.

Blk 9: Apply and use distribution statements in accordance with the Distribution Statement shown in Section C, SOW, Paragraph 3.2.4

Blks 10, 12, and 13: The Contractor shall submit the deliverable within 10 business days following the completion of each trip.

Blk 14: Distribution and submittal by electronic media via email whenever possible. Electronic deliverables shall be compatible with the current authorized Navy Marine Corps Intranet (NMCI) version of Microsoft Office or Adobe Acrobat unless otherwise approved by the Government. Deliver to the Contracting Officer’s Representative (COR) as defined in the Contract.

(See Blk 16)

15.TOTAL▬▬▬▬►
0
1
0
G. PREPARED BY
H. DATE
I. APPROVED BY
J. DATE

Brittany N. Ramirez

Contracting Officer’s Representative

DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page _5_ of _46_Pages.18. ESTIMATED TOTAL PRICE

CONTRACT DATA REQUIREMENTS LIST (CDRL)

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.
B. EXHIBIT
C. CATEGORY:
0001
A
TDP_______
TM_______
OTHER _MGMT____________________
D. SYSTEM/ITEM
E. CONTRACT/PR NO.
F. CONTRACTOR
SAIW Lifetime Support Engineering
TBD
TBD
1. DATA ITEM NO.
2. TITLE OF DATA ITEM
3. SUBTITLE
A006
Government Property (GP) Inventory Report
Contractor Acquired Property (CAP)
4. AUTHORITY (Data Acquisition Document No.)
5. CONTRACT REFERENCE
6. REQUIRING OFFICE
DI-MGMT-80441D
SOW Para 3.1.5.2, 3.1.5.2.1
NAWCAD WOLF SAIW
7. DD 250 REQ
9. DIST STATEMENTREQUIRED
10. FREQUENCY
12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION

XX (See Blk 16)

ONE/R
30 DPT EOC
a. ADDRESSEE
b. COPIES
8. APP CODE
D
11. AS OF DATE
13. DATE OF SUBSEQUENTSUBMISSION
Draft
Final

A (See Blk 16)

N/A
N/A
Reg
Repro
16. REMARKS
COR
0
1
0

Blks 7 and 8: The Government will have 10 business days to review and provide any written feedback. If required, the Contractor shall submit the final deliverable within five business days of receipt of Government feedback. If the Government does not provide comments within 10 business days of submission the CDRL is considered accepted.

Blk 9: Apply and use distribution statements in accordance with the Distribution Statement shown in Section C, SOW, Paragraph 3.2.4

Blk 14: Distribution and submittal by electronic media via email whenever possible. Electronic deliverables shall be compatible with the current authorized Navy Marine Corps Intranet (NMCI) version of Microsoft Office or Adobe Acrobat unless otherwise approved by the Government. Deliver to the Contracting Officer’s Representative (COR) as defined in the Contract.

(See Blk 16)

15.TOTAL▬▬▬▬►
0
1
0
G. PREPARED BY
H. DATE
I. APPROVED BY
J. DATE

Brittany N. Ramirez

Contracting Officer’s Representative

DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page _6_ of _46_Pages.18. ESTIMATED TOTAL PRICE

CONTRACT DATA REQUIREMENTS LIST (CDRL)

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.
B. EXHIBIT
C. CATEGORY:
0001
A
TDP_______
TM_______
OTHER _MGMT____________________
D. SYSTEM/ITEM
E. CONTRACT/PR NO.
F. CONTRACTOR
SAIW Lifetime Support Engineering
TBD
TBD
1. DATA ITEM NO.
2. TITLE OF DATA ITEM
3. SUBTITLE
A007
Phase-Out Transition Plan
4. AUTHORITY (Data Acquisition Document No.)
5. CONTRACT REFERENCE
6. REQUIRING OFFICE
DI-MGMT-81945A (See Blk 16)
SOW Para 3.1.8
NAWCAD WOLF SAIW
7. DD 250 REQ
9. DIST STATEMENTREQUIRED
10. FREQUENCY
12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION

XX (See Blk 16)

ONE/R
180 DPT EOC
a. ADDRESSEE
b. COPIES
8. APP CODE
D
11. AS OF DATE
13. DATE OF SUBSEQUENTSUBMISSION
Draft
Final

A (See Blk 16)

N/A
N/A
Reg
Repro
16. REMARKS
COR
1
1
0

Blk 4: The Contractor format is acceptable as long as the Data Item Description (DID) requirements are addressed as well as the following:

a) Work turnover. The Contractor shall provide a plan of action to effectively transfer tasked work that is in process at the expiration or termination of the Contract to the successor company and establish and maintain effective communication with the incoming Contractor or Government personnel for the period of transition via weekly status meetings.

b) Quality Assurance (QA). The Contractor shall provide a plan of action to ensure continuation of quality review processes during the transition period to the successor company.

c) Risk mitigation strategies. The Contractor shall provide a plan of action to mitigate contract performance risks (quality and schedule) encountered during the transition period.

d) Data/information transfer. The Contractor shall provide a plan of action for the efficient inventory and transfer of program data to the successor company.

Blks 7 and 8: The Government will have 15 business days to review and provide any written feedback. If required, the Contractor shall submit the final deliverable within five business days of receipt of Government feedback. If the Government does not provide comments within 15 business days of submission the CDRL is considered accepted.

Blk 9: Apply and use distribution statements in accordance with the Distribution Statement shown in Section C, SOW, Paragraph 3.2.4

Blk 14: Distribution and submittal by electronic media via email whenever possible. Electronic deliverables shall be compatible with the current authorized Navy Marine Corps Intranet (NMCI) version of Microsoft Office or Adobe Acrobat unless otherwise approved by the Government. Deliver to the Contracting Officer’s Representative (COR) and Contracting Officer (KO) as defined in the Contract.

KO
1
1
0

(See Blk 16)

15.TOTAL▬▬▬▬►
2
2
0
G. PREPARED BY
H. DATE
I. APPROVED BY
J. DATE

Brittany N. Ramirez

Contracting Officer’s Representative

DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page _7_ of _46_Pages.18. ESTIMATED TOTAL PRICE

CONTRACT DATA REQUIREMENTS LIST (CDRL)

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.
B. EXHIBIT
C. CATEGORY:
0001
A
TDP_______
TM_______
OTHER _QCIC____________________
D. SYSTEM/ITEM
E. CONTRACT/PR NO.
F. CONTRACTOR
SAIW Lifetime Support Engineering
TBD
TBD
1. DATA ITEM NO.
2. TITLE OF DATA ITEM
3. SUBTITLE
A008
Quality Assurance Program Plan (QAPP)
4. AUTHORITY (Data Acquisition Document No.)
5. CONTRACT REFERENCE
6. REQUIRING OFFICE
DI-QCIC-81794A (See Blk 16)
SOW Para 3.1.10.1
NAWCAD WOLF SAIW
7. DD 250 REQ
9. DIST STATEMENTREQUIRED
10. FREQUENCY
12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION

XX (See Blk 16)

ONE/R
45 DAC
a. ADDRESSEE
b. COPIES
8. APP CODE
D
11. AS OF DATE
13. DATE OF SUBSEQUENTSUBMISSION
Draft
Final

A (See Blk 16)

N/A
N/A
Reg
Repro
16. REMARKS
COR
1
1
0

Blk 4: The QAPP shall address all areas of work to be performed under the Contract to include hardware and software systems engineering, integration and installation, configuration management, logistics, and the Contractor’s method for monitoring and reporting on the identified metrics.

Blks 7 and 8: The Government will have 15 business days to review and provide any written feedback. If required, the Contractor shall submit the final deliverable within 10 business days of receipt of Government feedback. If the Government does not provide comments within 30 calendar days of submission the CDRL is considered accepted.

Blk 9: Apply and use distribution statements in accordance with the Distribution Statement shown in Section C, SOW, Paragraph 3.2.4

Blk 14: Distribution and submittal by electronic media via email whenever possible. Electronic deliverables shall be compatible with the current authorized Navy Marine Corps Intranet (NMCI) version of Microsoft Office or Adobe Acrobat unless otherwise approved by the Government. Deliver to the Contracting Officer’s Representative (COR) as defined in the Contract.

(See Blk 16)

15.TOTAL▬▬▬▬►
1
1
0
G. PREPARED BY
H. DATE
I. APPROVED BY
J. DATE

Brittany N. Ramirez

Contracting Officer’s Representative

DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page _8_ of _46_Pages.18. ESTIMATED TOTAL PRICE

CONTRACT DATA REQUIREMENTS LIST (CDRL)

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.
B. EXHIBIT
C. CATEGORY:
0001
A
TDP_______
TM_______
OTHER _QCIC____________________
D. SYSTEM/ITEM
E. CONTRACT/PR NO.
F. CONTRACTOR
SAIW Lifetime Support Engineering
TBD
TBD
1. DATA ITEM NO.
2. TITLE OF DATA ITEM
3. SUBTITLE
A009
Inspection and Test Plan
Inspection System Plan
4. AUTHORITY (Data Acquisition Document No.)
5. CONTRACT REFERENCE
6. REQUIRING OFFICE
DI-QCIC-81110 NOT 2
SOW Para 3.1.10.2
NAWCAD WOLF SAIW
7. DD 250 REQ
9. DIST STATEMENTREQUIRED
10. FREQUENCY
12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION

XX (See Blk 16)

ONE/R
60 DAC
a. ADDRESSEE
b. COPIES
8. APP CODE
D
11. AS OF DATE
13. DATE OF SUBSEQUENTSUBMISSION
Draft
Final

A (See Blk 16)

N/A
N/A
Reg
Repro
16. REMARKS
COR
1
1
0

Blks 7 and 8: The Government will have 15 business days to review and provide any written feedback. If required, the Contractor shall submit the final deliverable within 10 business days of receipt of Government feedback. If the Government does not provide comments within 15 business days of submission the CDRL is considered accepted.

Blk 9: Apply and use distribution statements in accordance with the Distribution Statement shown in Section C, SOW, Paragraph 3.2.4

Blk 14: Distribution and submittal by electronic media via email whenever possible. Electronic deliverables shall be compatible with the current authorized Navy Marine Corps Intranet (NMCI) version of Microsoft Office or Adobe Acrobat unless otherwise approved by the Government. Deliver to the Contracting Officer’s Representative (COR) as defined in the Contract.

(See Blk 16)

15.TOTAL▬▬▬▬►
1
1
0
G. PREPARED BY
H. DATE
I. APPROVED BY
J. DATE

Brittany N. Ramirez

Contracting Officer’s Representative

DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page _9_ of _46_Pages.18. ESTIMATED TOTAL PRICE

CONTRACT DATA REQUIREMENTS LIST (CDRL)

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.
B. EXHIBIT
C. CATEGORY:
0001
A
TDP_______
TM_______
OTHER _MISC____________________
D. SYSTEM/ITEM
E. CONTRACT/PR NO.
F. CONTRACTOR
SAIW Lifetime Support Engineering
TBD
TBD
1. DATA ITEM NO.
2. TITLE OF DATA ITEM
3. SUBTITLE
A010
Technical Report – Study/Services
Analysis and Findings Report
4. AUTHORITY (Data Acquisition Document No.)
5. CONTRACT REFERENCE
6. REQUIRING OFFICE
DI-MISC-80508B (See Blk 16)
SOW Para 3.1.10.3
NAWCAD WOLF SAIW
7. DD 250 REQ
9. DIST STATEMENTREQUIRED
10. FREQUENCY
12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION

XX (See Blk 16)

ASREQ (See Blk 16)
ASREQ (See Blk 16)
a. ADDRESSEE
b. COPIES
8. APP CODE
D
11. AS OF DATE
13. DATE OF SUBSEQUENTSUBMISSION
Draft
Final

A (See Blk 16)

N/A
ASREQ (See Blk 16)
Reg
Repro
16. REMARKS
COR
1
1
0

Blk 4: Contractor format is acceptable if all mandatory data points from the Data Item Description (DID) are covered.

Blks 7 and 8: The Government will have 10 business days to review and provide any written feedback. If required, the Contractor shall submit the final deliverable within five business days of receipt of Government feedback. If the Government does not provide comments within 10 business days of submission the CDRL is considered accepted.

Blk 9: Apply and use distribution statements in accordance with the Distribution Statement shown in Section C, SOW, Paragraph 3.2.4

Blks 10, 12, and 13: The Contractor shall submit the deliverable within five business days after the Government identifies the requirement in writing.

Blk 14: Distribution and submittal by electronic media via email whenever possible. Electronic deliverables shall be compatible with the current authorized Navy Marine Corps Intranet (NMCI) version of Microsoft Office or Adobe Acrobat unless otherwise approved by the Government. Deliver to the Contracting Officer’s Representative (COR) as defined in the Contract.

(See Blk 16)

15.TOTAL▬▬▬▬►
1
1
0
G. PREPARED BY
H. DATE
I. APPROVED BY
J. DATE

Brittany N. Ramirez

Contracting Officer’s Representative

DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page _10_ of _46_Pages.18. ESTIMATED TOTAL PRICE

CONTRACT DATA REQUIREMENTS LIST (CDRL)

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.
B. EXHIBIT
C. CATEGORY:
0001
A
TDP_______
TM_______
OTHER _MGMT____________________
D. SYSTEM/ITEM
E. CONTRACT/PR NO.
F. CONTRACTOR
SAIW Lifetime Support Engineering
TBD
TBD
1. DATA ITEM NO.
2. TITLE OF DATA ITEM
3. SUBTITLE
A011
Technical and Management Work Plan
Program Plans for Implementation of Statement Of Work (SOW) and Technical Direction Letters (TDLs)
4. AUTHORITY (Data Acquisition Document No.)
5. CONTRACT REFERENCE
6. REQUIRING OFFICE
DI-MGMT-81117A
SOW Para 3.3.2.7.4
NAWCAD WOLF SAIW
7. DD 250 REQ
9. DIST STATEMENTREQUIRED
10. FREQUENCY
12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION

XX (See Blk 16)

ASREQ (See Blk 16)
See Blk 16
a. ADDRESSEE
b. COPIES
8. APP CODE
D
11. AS OF DATE
13. DATE OF SUBSEQUENTSUBMISSION
Draft
Final

A (See Blk 16)

N/A
See Blk 16
Reg
Repro
16. REMARKS
COR
1
1
0

Blks 7 and 8: The Government will have 10 business days to review and provide any written feedback. If required, the Contractor shall submit the final deliverable within five business days of receipt of Government feedback. If the Government does not provide comments within 30 business days of submission the CDRL is considered accepted.

Blk 9: Apply and use distribution statements in accordance with the Distribution Statement shown in Section C, SOW, Paragraph 3.2.4

Blks 10, 12, 13: The Contractor shall submit the deliverable within 30 calendar days after the Government identifies the requirement in writing.

Blk 14: Distribution and submittal by electronic media via email whenever possible. Electronic deliverables shall be compatible with the current authorized Navy Marine Corps Intranet (NMCI) version of Microsoft Office or Adobe Acrobat unless otherwise approved by the Government. Deliver to the Contracting Officer’s Representative (COR) as defined in the Contract.

(See Blk 16)

15.TOTAL▬▬▬▬►
1
1
0
G. PREPARED BY
H. DATE
I. APPROVED BY
J. DATE

Brittany N. Ramirez

Contracting Officer’s Representative

DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page _11_ of _46_Pages.18. ESTIMATED TOTAL PRICE

CONTRACT DATA REQUIREMENTS LIST (CDRL)

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.
B. EXHIBIT
C. CATEGORY:
0001
A
TDP_______
TM_______
OTHER _MGMT____________________
D. SYSTEM/ITEM
E. CONTRACT/PR NO.
F. CONTRACTOR
SAIW Lifetime Support Engineering
TBD
TBD
1. DATA ITEM NO.
2. TITLE OF DATA ITEM
3. SUBTITLE
A012
NAVAIR Operations Security (OPSEC) Plan
4. AUTHORITY (Data Acquisition Document No.)
5. CONTRACT REFERENCE
6. REQUIRING OFFICE
DI-MGMT-81999A (See Blk 16)
SOW Para 3.2.5
NAWCAD WOLF SAIW
7. DD 250 REQ
9. DIST STATEMENTREQUIRED
10. FREQUENCY
12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION

XX (See Blk 16)

ONE/R
90 DAC
a. ADDRESSEE
b. COPIES
8. APP CODE
D
11. AS OF DATE
13. DATE OF SUBSEQUENTSUBMISSION
Draft
Final

A (See Blk 16)

N/A
N/A
Reg
Repro
16. REMARKS
COR
1
1
0

Blk 4: Contractor format is acceptable if all mandatory data points from the Data Item Description (DID) are covered. Use the definition of sensitive information given in Public Law 100.235. Use National Security Decision Directive (NSDD) 298 for the concept of Operation Security.

Blks 7 and 8: The Government will have 10 business days to review and provide any written feedback. If required, the Contractor shall submit the final deliverable within five business days of receipt of Government feedback. If the Government does not provide comments within 30 business days of submission the CDRL is considered accepted.

Blk 9: Apply and use distribution statements in accordance with the Distribution Statement shown in Block 13 of DD Form 254 and the guidance of SECNAVINST 5510.36.

Blk 14: Distribution and submittal by electronic media via email whenever possible. Electronic deliverables shall be compatible with the current authorized Navy Marine Corps Intranet (NMCI) version of Microsoft Office or Adobe Acrobat unless otherwise approved by the Government. Deliver to the Contracting Officer’s Representative (COR) as defined in the Contract.

(See Blk 16)

15.TOTAL▬▬▬▬►
1
1
0
G. PREPARED BY
H. DATE
I. APPROVED BY
J. DATE

Brittany N. Ramirez

Contracting Officer’s Representative

DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page _12_ of _46_Pages.18. ESTIMATED TOTAL PRICE

CONTRACT DATA REQUIREMENTS LIST (CDRL)

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.
B. EXHIBIT
C. CATEGORY:
0001
A
TDP_______
TM_______
OTHER _MISC____________________
D. SYSTEM/ITEM
E. CONTRACT/PR NO.
F. CONTRACTOR
SAIW Lifetime Support Engineering
TBD
TBD
1. DATA ITEM NO.
2. TITLE OF DATA ITEM
3. SUBTITLE
A013
Technical Report – Study/Services
Commercial Off The Shelf (COTS) – Feasibility Studies of Emerging Technologies
4. AUTHORITY (Data Acquisition Document No.)
5. CONTRACT REFERENCE
6. REQUIRING OFFICE
DI-MISC-80508B
SOW Para 3.3.1.1.1, 3.3.1.2.1, 3.3.1.3.1, 3.3.1.3.2
NAWCAD WOLF SAIW
7. DD 250 REQ
9. DIST STATEMENTREQUIRED
10. FREQUENCY
12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION

XX (See Blk 16)

ASREQ
ASREQ (See Blk 16)
a. ADDRESSEE
b. COPIES
8. APP CODE
D
11. AS OF DATE
13. DATE OF SUBSEQUENTSUBMISSION
Draft
Final

A (See Blk 16)

ASREQ (See Blk 16)
ASREQ (See Blk 16)
Reg
Repro
16. REMARKS
COR
0
1
0

Blks 7 and 8: The Government will have 10 business days to review and provide any written feedback. If required, the Contractor shall submit the final deliverable within five business days of receipt of Government feedback. If the Government does not provide comments within 30 business days of submission the CDRL is considered accepted.

Blk 9: Apply and use distribution statements in accordance with the Distribution Statement shown in Section C, SOW, Paragraph 3.2.4

Blks 11, 12, and 13: Contractor shall submit within 30 business days of receiving request.

Blk 14: Distribution and submittal by electronic media via email whenever possible. Electronic deliverables shall be compatible with the current authorized Navy Marine Corps Intranet (NMCI) version of Microsoft Office or Adobe Acrobat unless otherwise approved by the Government. Deliver to the Contracting Officer’s Representative (COR) as defined in the Contract.

(See Blk 16)

15.TOTAL▬▬▬▬►
0
1
0
G. PREPARED BY
H. DATE
I. APPROVED BY
J. DATE

Brittany N. Ramirez

Contracting Officer’s Representative

DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page _13_ of _46_Pages.18. ESTIMATED TOTAL PRICE

CONTRACT DATA REQUIREMENTS LIST (CDRL)

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.
B. EXHIBIT
C. CATEGORY:
0001
A
TDP_______
TM_______
OTHER _DRPR____________________
D. SYSTEM/ITEM
E. CONTRACT/PR NO.
F. CONTRACTOR
SAIW Lifetime Support Engineering
TBD
TBD
1. DATA ITEM NO.
2. TITLE OF DATA ITEM
3. SUBTITLE
A014
Installation Control Drawings
4. AUTHORITY (Data Acquisition Document No.)
5. CONTRACT REFERENCE
6. REQUIRING OFFICE
DI-DRPR-81242 NOT 1
SOW Para 3.3.1.4.2, 3.3.1.7.1, 3.3.2.5.2
NAWCAD WOLF SAIW
7. DD 250 REQ
9. DIST STATEMENTREQUIRED
10. FREQUENCY
12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION

XX (See Blk 16)

ASREQ (See Blk 16)
See Blk 16
a. ADDRESSEE
b. COPIES
8. APP CODE
D
11. AS OF DATE
13. DATE OF SUBSEQUENTSUBMISSION
Draft
Final

A (See Blk 16)

N/A
See Blk 16
Reg
Repro
16. REMARKS
COR
1
1
0

Blks 7 and 8: The Government will have 30 calendar days to review and provide any written feedback. If required, the Contractor shall submit the final deliverable within 10 calendar days of receipt of Government feedback. If the Government does not provide comments within 30 calendar days of submission the CDRL is considered accepted.

Blk 9: Apply and use distribution statements in accordance with the Distribution Statement shown in Section C, SOW, Paragraph 3.2.4

Blks 10, 12, 13: The Contractor shall submit within 30 calendar days upon completion of requirement.

Blk 14: Distribution and submittal by electronic media via email whenever possible. Electronic deliverables shall be compatible with the current authorized Navy Marine Corps Intranet (NMCI) version of Microsoft Office or Adobe Acrobat unless otherwise approved by the Government. Deliver to the Contracting Officer’s Representative (COR) as defined in the Contract.

(See Blk 16)

15.TOTAL▬▬▬▬►
1
1
0
G. PREPARED BY
H. DATE
I. APPROVED BY
J. DATE

Brittany N. Ramirez

Contracting Officer’s Representative

DD FORM 1423-1, FEB 2001…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .