This document appears to be an attachment, titled "Att 08 TDL CDRL Att COR customer_TPOC.xlsx", which provides a template for the Contractor's Monthly Report under the referenced federal contract. The template includes sections for reporting technical progress, problem areas, schedule status, deliverable status, and plans for the next reporting period. It also includes detailed cost information, such as funded amounts, expenditures to date, estimates at completion, and commitments, broken down by labor, travel, material, and other direct costs.

The related federal contract opportunity is a draft solicitation for the Naval Air Warfare Center Aircraft Division (NAWCAD) Webster Outlying Field (WOLF) Ship & Air Integrated Warfare (SAIW) Division Lifetime Support Engineering (LSE) requirement, solicitation number N00421-24-R-0016. This is a follow-on procurement for engineering and technical services to support the production, lifetime support, and in-service engineering for Radio Communication System (RCS) and Command, Control, Communications, Computers, Combat Systems, Intelligence, Surveillance, and Reconnaissance (C5ISR) systems aboard U.S. Navy surface combatants and at associated shore sites. The North American Industry Classification System (NAICS) code is 541330, Engineering Services, with a small business size standard of $47,000,000. The Government is requesting comments and questions on the draft solicitation by 11:00AM on 4 April 2024.

View the file

Other files

File Type Posted
Att C2 - Cost Price Narrative.docx DOCX document
Att 03 Data Item Transmittal Form.pdf PDF
Att 07 Wage Determinations.pdf PDF
N00421-24-R-0016.pdf PDF
Att 06 OCI List.pdf PDF
Att S1 - SBPCD.docx DOCX document
Att 04 List of Authorized Key Personnel.pdf PDF
Att 11 COR Designation Letter.pdf PDF
Att C1 - Cost Workbook.xlsx XLSX spreadsheet
Att 05 List of Approved Subcontractors.pdf PDF
Att 02 CSP.pdf PDF
Att 09 Draft TDL CDRL Att COR Only.xlsx XLSX spreadsheet
Att 01 Draft DD254.pdf PDF
Exhibit A - Draft CDRLs.docx DOCX document
Att T2 - Workforce.docx DOCX document
Att 10 Small Business Subcontracting Plan.pdf PDF
Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Title Page

TDL CDRL attachment customer/TPOC & COR January 2024
Contractor's Name
Contractor's Address
Title of Report
CDRL #
Date of Report
Period Covered by Report
Contract number
Name of issuing Government Agency
Program/System Nomenclature
Security Classification or other appropriate markings

CDRL# & Title TO Number

TDL 1 Breakout One tab per TDL

TDL CDRL attachment customer/TPOC & COR January 2024
Prime Contract No
TO Number
Invoice Number
Invoice Date
PoP Start
PoP End
Billing Period
LABORTravelMaterialOther ODC
Project NameCLINTDL #Subtask # (If Applicable)DescriptionLCATEmployee IdentifierDate IssuedEstimated Amount $Estimated HRSFunding Received $Funded HrsExpenditures to DateFunding BalanceFunded HRS BalOutstanding CommitmentsCost Incurred To-Date (Total)Current Reg HrsCurrent UT/TTA HrsTotal Current HrsCumulative Reg HrsCumulative UT/TTA HrsTotal Cumulative HrsEACProjected date for 75% notification (Based on expenditure to-date)Current TravelCumulative TravelOutstanding CommitmentsCurrent MaterialCumulative MaterialOutstanding CommitmentsCurrent Other ODCCumulative Other ODCOutstanding Commitments
TDL1SME SPT LOE 12 moAnalyst, Senior500123451-Oct-20$ 150,000.001250.00$ 75,000.00625$ 37,500.00$ 37,500.00145$ 3,600.00$ 41,100.00160016048010490$ 1,248.0025-Mar-21001350000000
Material Purchases
Item NameSubtask (if applicable)PO#DescriptionInvoice NumberPurposeVendorQuantityUnit PriceEstimated CostActual CostVariance (between estimated and actual costs)Gov Approver if required by ContractDisposition

Cumulative Total:

Travel
TravelerSubtask (if applicable)DestinationPurposeDate of TravelLength (days)Estimated CostActual CostVariance (between estimated and actual costs)JustificationGovernment approverGovernment approval date

Cumulative Total:

Field Services or other ODC fields to be added based on specific procurement requirement

Month 1Month 2Month 3Month 4Month 5Month 6Month 7Month 8Month 9Month 10Month 11Month 12
FUNDED$ 25,000.00$ 25,000.00$ 25,000.00$ 120,000.00$ 350,000.00$ 15,000,000.00$ 15,000,000.00$ 15,000,000.00$ 15,000,000.00$ 15,000,000.00$ 15,000,000.00$ 15,000,000.00
Expenditures to Date$ 15,000.00$ 22,500.00$ 24,500.00$ 50,000.00$ 75,000.00$ 100,000.00$ 13,000,000.00$ 14,000,000.00$ 14,100,000.00$ 14,589,000.00$ 15,552,412.00$ 15,860,000.00
EAC$ 15,000,000.00$ 15,000,000.00$ 15,860,000.00$ 15,860,000.00$ 15,860,000.00$ 15,860,000.00$ 15,860,000.00$ 15,860,000.00$ 15,860,000.00$ 15,860,000.00$ 15,860,000.00$ 15,860,000.00
Estimate$ 15,000,000.00$ 15,000,000.00$ 15,000,000.00$ 15,000,000.00$ 15,000,000.00$ 15,000,000.00$ 15,000,000.00$ 15,000,000.00$ 15,000,000.00$ 15,000,000.00$ 15,000,000.00$ 15,000,000.00
a. Description of the progress made against milestones during the reporting period. Specifically address the value-added tasks performed by the prime contractor when work is performed by a subcontractor; clearly identify the key and non-key personnel performing the tasks described.

b. Identification of problem areas affecting technical, scheduling, or costs elements with background and any recommendations for solutions beyond the scope of the contract. Specifically, address results, positive or negative, obtained related to previously-identified program areas, with conclusions and recommendations for solutions.

c. Whether the task is on schedule, ahead of schedule, or behind schedule. Discuss what steps are being or will be taken to complete all requirements on time if possible, or provide a proposed revised schedule based on best current estimates if behind schedule.

d. The status of all assigned deliverables, including title, CDRL number, due date, date delivered, Contractor point of contact and description or title of deliverable(s). The report for each contract period shall include a cumulative list of all deliverable items provided.

Plans and recommendations for activities at TDL level during the next reporting period;

l. Identify any new subcontractors approved during the reporting period and any proposed subcontractors/consultants for the next reporting period. Their capability set and areas of expertise shall be thoroughly addressed.

FUNDED Month 1 Month 2 Month 3 Month 4 Month 5 Month 6 Month 7 Month 8 Month 9 Month 10 Month 11 Month 12 25000 25000 25000 120000 350000 15000000 15000000 15000000 15000000 15000000 15000000 15000000 Expenditures to Date Month 1 Month 2 Month 3 Month 4 Month 5 Month 6 Month 7 Month 8 Month 9 Month 10 Month 11 Month 12 15000 22500 24500 50000 75000 100000 13000000 14000000 14100000 14589000 15552412 15860000 EAC Month 1 Month 2 Month 3 Month 4 Month 5 Month 6 Month 7 Month 8 Month 9 Month 10 Month 11 Month 12 15000000 15000000 15860000 15860000 15860000 15860000 15860000 15860000 15860000 15860000 15860000 15860000 Estimate Month 1 Month 2 Month 3 Month 4 Month 5 Month 6 Month 7 Month 8 Month 9 Month 10 Month 11 Month 12 15000000 15000000 15000000 15000000 15000000 15000000 15000000 15000000 15000000 15000000 15000000 15000000

Sheet1

TDL 2 Breakout

TDL CDRL attachment customer/TPOC & COR January 2024
Prime Contract No
TO Number
Invoice Number
Invoice Date
PoP Start
PoP End
Billing Period
LABORTravelMaterialOther ODC
Project NameCLINTDL #Subtask # (If Applicable)DescriptionDate IssuedEstimated Amount $Estimated HRSFunding Received $Funded HrsExpenditures to DateFunding BalanceFunded HRS BalOutstanding CommitmentsCost Incurred To-Date (Total)Current Reg HrsCurrent UT/TTA HrsTotal Current HrsCumulative Reg HrsCumulative UT/TTA HrsTotal Cumulative HrsEACProjected date for 75% notification (Based on expenditure to-date)Current TravelCumulative TravelOutstanding CommitmentsCurrent MaterialCumulative MaterialOutstanding CommitmentsCurrent Other ODCCumulative Other ODCOutstanding Commitments
TDL 2
Subtask 1
Subtask 2
TDL 2 Total:
Material Purchases
Item NameSubtask (if applicable)PO#DescriptionInvoice NumberPurposeVendorQuantityUnit PriceEstimated CostActual CostVariance (between estimated and actual costs)Gov Approver if required by ContractDisposition

Cumulative Total:

Travel
TravelerSubtask (if applicable)DestinationPurposeDate of TravelLength (days)Estimated CostActual CostVariance (between estimated and actual costs)JustificationGovernment approverGovernment approval date

Cumulative Total:

Field Services or other ODC fields to be added based on specific procurement requirement

Month 1Month 2Month 3Month 4Month 5Month 6Month 7Month 8Month 9Month 10Month 11Month 12
FUNDED$25,000.00$25,000.00$25,000.00$120,000.00$350,000.00$15,000,000.00$15,000,000.00$15,000,000.00$15,000,000.00$15,000,000.00$15,000,000.00$15,000,000.00
Expenditures to Date$15,000.00$22,500.00$24,500.00$50,000.00$75,000.00$100,000.00$13,000,000.00$14,000,000.00$14,100,000.00$14,589,000.00$15,552,412.00$15,860,000.00
EAC$15,000,000.00$15,000,000.00$15,860,000.00$15,860,000.00$15,860,000.00$15,860,000.00$15,860,000.00$15,860,000.00$15,860,000.00$15,860,000.00$15,860,000.00$15,860,000.00
Estimate$ 15,000,000.00$ 15,000,000.00$ 15,000,000.00$ 15,000,000.00$ 15,000,000.00$ 15,000,000.00$ 15,000,000.00$ 15,000,000.00$ 15,000,000.00$ 15,000,000.00$ 15,000,000.00$ 15,000,000.00
a. Description of the progress made against milestones during the reporting period. Specifically address the value-added tasks performed by the prime contractor when work is performed by a subcontractor; clearly identify the key and non-key personnel performing the tasks described.

b. Identification of problem areas affecting technical, scheduling or costs elements, with background and any recommendations for solutions beyond the scope of the contract. Specifically, address results, positive or negative, obtained related to previously-identified program areas, with conclusions and recommendations for solutions.

c. Whether the task is on schedule, ahead of schedule, or behind schedule. Discuss what steps are being or will be taken to complete all requirements on time if possible, or provide a proposed revised schedule based on best current estimates if behind schedule.

d. The status of all assigned deliverables, including title, CDRL number, due date, date delivered, Contractor point of contact and description or title of deliverable(s). The report for each contract period shall include a cumulative list of all deliverable items provided.

Plans and recommendations for activities @ TDL level during the next reporting period;

l. Identify any new subcontractors approved during the reporting period and any proposed subcontractors/consultants for the next reporting period. Their capability set and areas of expertise shall be thoroughly addressed.

FUNDED Month 1 Month 2 Month 3 Month 4 Month 5 Month 6 Month 7 Month 8 Month 9 Month 10 Month 11 Month 12 25000 25000 25000 120000 350000 15000000 15000000 15000000 15000000 15000000 15000000 15000000 Expenditures to Date Month 1 Month 2 Month 3 Month 4 Month 5 Month 6 Month 7 Month 8 Month 9 Month 10 Month 11 Month 12 15000 22500 24500 50000 75000 100000 13000000 14000000 14100000 14589000 15552412 15860000 EAC Month 1 Month 2 Month 3 Month 4 Month 5 Month 6 Month 7 Month 8 Month 9 Month 10 Month 11 Month 12 15000000 15000000 15860000 15860000 15860000 15860000 15860000 15860000 15860000 15860000 15860000 15860000 Estimate Month 1 Month 2 Month 3 Month 4 Month 5 Month 6 Month 7 Month 8 Month 9 Month 10 Month 11 Month 12 15000000 15000000 15000000 15000000 15000000 15000000 15000000 15000000 15000000 15000000 15000000 15000000