Att 08 TDL CDRL Att COR customer_TPOC.xlsx
XLSX spreadsheet 46 KB Posted
- Solicitation number
- N0042124R0016
About this file
This document appears to be an attachment, titled "Att 08 TDL CDRL Att COR customer_TPOC.xlsx", which provides a template for the Contractor's Monthly Report under the referenced federal contract. The template includes sections for reporting technical progress, problem areas, schedule status, deliverable status, and plans for the next reporting period. It also includes detailed cost information, such as funded amounts, expenditures to date, estimates at completion, and commitments, broken down by labor, travel, material, and other direct costs.
The related federal contract opportunity is a draft solicitation for the Naval Air Warfare Center Aircraft Division (NAWCAD) Webster Outlying Field (WOLF) Ship & Air Integrated Warfare (SAIW) Division Lifetime Support Engineering (LSE) requirement, solicitation number N00421-24-R-0016. This is a follow-on procurement for engineering and technical services to support the production, lifetime support, and in-service engineering for Radio Communication System (RCS) and Command, Control, Communications, Computers, Combat Systems, Intelligence, Surveillance, and Reconnaissance (C5ISR) systems aboard U.S. Navy surface combatants and at associated shore sites. The North American Industry Classification System (NAICS) code is 541330, Engineering Services, with a small business size standard of $47,000,000. The Government is requesting comments and questions on the draft solicitation by 11:00AM on 4 April 2024.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Att C2 - Cost Price Narrative.docx | DOCX document | |
| Att 03 Data Item Transmittal Form.pdf | ||
| Att 07 Wage Determinations.pdf | ||
| N00421-24-R-0016.pdf | ||
| Att 06 OCI List.pdf | ||
| Att S1 - SBPCD.docx | DOCX document | |
| Att 04 List of Authorized Key Personnel.pdf | ||
| Att 11 COR Designation Letter.pdf | ||
| Att C1 - Cost Workbook.xlsx | XLSX spreadsheet | |
| Att 05 List of Approved Subcontractors.pdf | ||
| Att 02 CSP.pdf | ||
| Att 09 Draft TDL CDRL Att COR Only.xlsx | XLSX spreadsheet | |
| Att 01 Draft DD254.pdf | ||
| Exhibit A - Draft CDRLs.docx | DOCX document | |
| Att T2 - Workforce.docx | DOCX document | |
| Att 10 Small Business Subcontracting Plan.pdf |
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Title Page
| TDL CDRL attachment customer/TPOC & COR January 2024 | |
| Contractor's Name | |
| Contractor's Address | |
| Title of Report | |
| CDRL # | |
| Date of Report | |
| Period Covered by Report | |
| Contract number | |
| Name of issuing Government Agency | |
| Program/System Nomenclature | |
| Security Classification or other appropriate markings |
CDRL# & Title TO Number
TDL 1 Breakout One tab per TDL
| TDL CDRL attachment customer/TPOC & COR January 2024 |
| Prime Contract No |
| TO Number |
| Invoice Number |
| Invoice Date |
| PoP Start |
| PoP End |
| Billing Period |
| LABOR | Travel | Material | Other ODC | ||||||||||||||||||||||||||||||
| Project Name | CLIN | TDL # | Subtask # (If Applicable) | Description | LCAT | Employee Identifier | Date Issued | Estimated Amount $ | Estimated HRS | Funding Received $ | Funded Hrs | Expenditures to Date | Funding Balance | Funded HRS Bal | Outstanding Commitments | Cost Incurred To-Date (Total) | Current Reg Hrs | Current UT/TTA Hrs | Total Current Hrs | Cumulative Reg Hrs | Cumulative UT/TTA Hrs | Total Cumulative Hrs | EAC | Projected date for 75% notification (Based on expenditure to-date) | Current Travel | Cumulative Travel | Outstanding Commitments | Current Material | Cumulative Material | Outstanding Commitments | Current Other ODC | Cumulative Other ODC | Outstanding Commitments |
| TDL1 | SME SPT LOE 12 mo | Analyst, Senior | 50012345 | 1-Oct-20 | $ 150,000.00 | 1250.00 | $ 75,000.00 | 625 | $ 37,500.00 | $ 37,500.00 | 145 | $ 3,600.00 | $ 41,100.00 | 160 | 0 | 160 | 480 | 10 | 490 | $ 1,248.00 | 25-Mar-21 | 0 | 0 | 1350 | 0 | 0 | 0 | 0 | 0 | 0 |
| Material Purchases | |||||||||||||
| Item Name | Subtask (if applicable) | PO# | Description | Invoice Number | Purpose | Vendor | Quantity | Unit Price | Estimated Cost | Actual Cost | Variance (between estimated and actual costs) | Gov Approver if required by Contract | Disposition |
Cumulative Total:
| Travel | |||||||||||
| Traveler | Subtask (if applicable) | Destination | Purpose | Date of Travel | Length (days) | Estimated Cost | Actual Cost | Variance (between estimated and actual costs) | Justification | Government approver | Government approval date |
Cumulative Total:
Field Services or other ODC fields to be added based on specific procurement requirement
| Month 1 | Month 2 | Month 3 | Month 4 | Month 5 | Month 6 | Month 7 | Month 8 | Month 9 | Month 10 | Month 11 | Month 12 | |
| FUNDED | $ 25,000.00 | $ 25,000.00 | $ 25,000.00 | $ 120,000.00 | $ 350,000.00 | $ 15,000,000.00 | $ 15,000,000.00 | $ 15,000,000.00 | $ 15,000,000.00 | $ 15,000,000.00 | $ 15,000,000.00 | $ 15,000,000.00 |
| Expenditures to Date | $ 15,000.00 | $ 22,500.00 | $ 24,500.00 | $ 50,000.00 | $ 75,000.00 | $ 100,000.00 | $ 13,000,000.00 | $ 14,000,000.00 | $ 14,100,000.00 | $ 14,589,000.00 | $ 15,552,412.00 | $ 15,860,000.00 |
| EAC | $ 15,000,000.00 | $ 15,000,000.00 | $ 15,860,000.00 | $ 15,860,000.00 | $ 15,860,000.00 | $ 15,860,000.00 | $ 15,860,000.00 | $ 15,860,000.00 | $ 15,860,000.00 | $ 15,860,000.00 | $ 15,860,000.00 | $ 15,860,000.00 |
| Estimate | $ 15,000,000.00 | $ 15,000,000.00 | $ 15,000,000.00 | $ 15,000,000.00 | $ 15,000,000.00 | $ 15,000,000.00 | $ 15,000,000.00 | $ 15,000,000.00 | $ 15,000,000.00 | $ 15,000,000.00 | $ 15,000,000.00 | $ 15,000,000.00 |
| a. Description of the progress made against milestones during the reporting period. Specifically address the value-added tasks performed by the prime contractor when work is performed by a subcontractor; clearly identify the key and non-key personnel performing the tasks described. |
b. Identification of problem areas affecting technical, scheduling, or costs elements with background and any recommendations for solutions beyond the scope of the contract. Specifically, address results, positive or negative, obtained related to previously-identified program areas, with conclusions and recommendations for solutions.
c. Whether the task is on schedule, ahead of schedule, or behind schedule. Discuss what steps are being or will be taken to complete all requirements on time if possible, or provide a proposed revised schedule based on best current estimates if behind schedule.
d. The status of all assigned deliverables, including title, CDRL number, due date, date delivered, Contractor point of contact and description or title of deliverable(s). The report for each contract period shall include a cumulative list of all deliverable items provided.
Plans and recommendations for activities at TDL level during the next reporting period;
l. Identify any new subcontractors approved during the reporting period and any proposed subcontractors/consultants for the next reporting period. Their capability set and areas of expertise shall be thoroughly addressed.
FUNDED Month 1 Month 2 Month 3 Month 4 Month 5 Month 6 Month 7 Month 8 Month 9 Month 10 Month 11 Month 12 25000 25000 25000 120000 350000 15000000 15000000 15000000 15000000 15000000 15000000 15000000 Expenditures to Date Month 1 Month 2 Month 3 Month 4 Month 5 Month 6 Month 7 Month 8 Month 9 Month 10 Month 11 Month 12 15000 22500 24500 50000 75000 100000 13000000 14000000 14100000 14589000 15552412 15860000 EAC Month 1 Month 2 Month 3 Month 4 Month 5 Month 6 Month 7 Month 8 Month 9 Month 10 Month 11 Month 12 15000000 15000000 15860000 15860000 15860000 15860000 15860000 15860000 15860000 15860000 15860000 15860000 Estimate Month 1 Month 2 Month 3 Month 4 Month 5 Month 6 Month 7 Month 8 Month 9 Month 10 Month 11 Month 12 15000000 15000000 15000000 15000000 15000000 15000000 15000000 15000000 15000000 15000000 15000000 15000000
Sheet1
TDL 2 Breakout
| TDL CDRL attachment customer/TPOC & COR January 2024 | |||||||||||||||||||||||||||||||
| Prime Contract No | |||||||||||||||||||||||||||||||
| TO Number | |||||||||||||||||||||||||||||||
| Invoice Number | |||||||||||||||||||||||||||||||
| Invoice Date | |||||||||||||||||||||||||||||||
| PoP Start | |||||||||||||||||||||||||||||||
| PoP End | |||||||||||||||||||||||||||||||
| Billing Period | |||||||||||||||||||||||||||||||
| LABOR | Travel | Material | Other ODC | ||||||||||||||||||||||||||||
| Project Name | CLIN | TDL # | Subtask # (If Applicable) | Description | Date Issued | Estimated Amount $ | Estimated HRS | Funding Received $ | Funded Hrs | Expenditures to Date | Funding Balance | Funded HRS Bal | Outstanding Commitments | Cost Incurred To-Date (Total) | Current Reg Hrs | Current UT/TTA Hrs | Total Current Hrs | Cumulative Reg Hrs | Cumulative UT/TTA Hrs | Total Cumulative Hrs | EAC | Projected date for 75% notification (Based on expenditure to-date) | Current Travel | Cumulative Travel | Outstanding Commitments | Current Material | Cumulative Material | Outstanding Commitments | Current Other ODC | Cumulative Other ODC | Outstanding Commitments |
| TDL 2 | |||||||||||||||||||||||||||||||
| Subtask 1 | |||||||||||||||||||||||||||||||
| Subtask 2 | |||||||||||||||||||||||||||||||
| TDL 2 Total: |
| Material Purchases | |||||||||||||
| Item Name | Subtask (if applicable) | PO# | Description | Invoice Number | Purpose | Vendor | Quantity | Unit Price | Estimated Cost | Actual Cost | Variance (between estimated and actual costs) | Gov Approver if required by Contract | Disposition |
Cumulative Total:
| Travel | |||||||||||
| Traveler | Subtask (if applicable) | Destination | Purpose | Date of Travel | Length (days) | Estimated Cost | Actual Cost | Variance (between estimated and actual costs) | Justification | Government approver | Government approval date |
Cumulative Total:
Field Services or other ODC fields to be added based on specific procurement requirement
| Month 1 | Month 2 | Month 3 | Month 4 | Month 5 | Month 6 | Month 7 | Month 8 | Month 9 | Month 10 | Month 11 | Month 12 | |
| FUNDED | $25,000.00 | $25,000.00 | $25,000.00 | $120,000.00 | $350,000.00 | $15,000,000.00 | $15,000,000.00 | $15,000,000.00 | $15,000,000.00 | $15,000,000.00 | $15,000,000.00 | $15,000,000.00 |
| Expenditures to Date | $15,000.00 | $22,500.00 | $24,500.00 | $50,000.00 | $75,000.00 | $100,000.00 | $13,000,000.00 | $14,000,000.00 | $14,100,000.00 | $14,589,000.00 | $15,552,412.00 | $15,860,000.00 |
| EAC | $15,000,000.00 | $15,000,000.00 | $15,860,000.00 | $15,860,000.00 | $15,860,000.00 | $15,860,000.00 | $15,860,000.00 | $15,860,000.00 | $15,860,000.00 | $15,860,000.00 | $15,860,000.00 | $15,860,000.00 |
| Estimate | $ 15,000,000.00 | $ 15,000,000.00 | $ 15,000,000.00 | $ 15,000,000.00 | $ 15,000,000.00 | $ 15,000,000.00 | $ 15,000,000.00 | $ 15,000,000.00 | $ 15,000,000.00 | $ 15,000,000.00 | $ 15,000,000.00 | $ 15,000,000.00 |
| a. Description of the progress made against milestones during the reporting period. Specifically address the value-added tasks performed by the prime contractor when work is performed by a subcontractor; clearly identify the key and non-key personnel performing the tasks described. |
b. Identification of problem areas affecting technical, scheduling or costs elements, with background and any recommendations for solutions beyond the scope of the contract. Specifically, address results, positive or negative, obtained related to previously-identified program areas, with conclusions and recommendations for solutions.
c. Whether the task is on schedule, ahead of schedule, or behind schedule. Discuss what steps are being or will be taken to complete all requirements on time if possible, or provide a proposed revised schedule based on best current estimates if behind schedule.
d. The status of all assigned deliverables, including title, CDRL number, due date, date delivered, Contractor point of contact and description or title of deliverable(s). The report for each contract period shall include a cumulative list of all deliverable items provided.
Plans and recommendations for activities @ TDL level during the next reporting period;
l. Identify any new subcontractors approved during the reporting period and any proposed subcontractors/consultants for the next reporting period. Their capability set and areas of expertise shall be thoroughly addressed.
FUNDED Month 1 Month 2 Month 3 Month 4 Month 5 Month 6 Month 7 Month 8 Month 9 Month 10 Month 11 Month 12 25000 25000 25000 120000 350000 15000000 15000000 15000000 15000000 15000000 15000000 15000000 Expenditures to Date Month 1 Month 2 Month 3 Month 4 Month 5 Month 6 Month 7 Month 8 Month 9 Month 10 Month 11 Month 12 15000 22500 24500 50000 75000 100000 13000000 14000000 14100000 14589000 15552412 15860000 EAC Month 1 Month 2 Month 3 Month 4 Month 5 Month 6 Month 7 Month 8 Month 9 Month 10 Month 11 Month 12 15000000 15000000 15860000 15860000 15860000 15860000 15860000 15860000 15860000 15860000 15860000 15860000 Estimate Month 1 Month 2 Month 3 Month 4 Month 5 Month 6 Month 7 Month 8 Month 9 Month 10 Month 11 Month 12 15000000 15000000 15000000 15000000 15000000 15000000 15000000 15000000 15000000 15000000 15000000 15000000
File details come from the government source that posted it. Updated .