Att C1 - Cost Workbook.xlsx
XLSX spreadsheet 296 KB Posted
- Solicitation number
- N0042124R0016
About this file
This document is a DRAFT Solicitation for the Naval Air Warfare Center Aircraft Division (NAWCAD) Webster Outlying Field (WOLF) Ship & Air Integrated Warfare (SAIW) Division Lifetime Support Engineering (LSE) requirement. The procurement will be a full and open competition under NAICS code 541330, Engineering Services, with a small business size standard of $47,000,000. The requirement is to provide engineering and technical services to support the production, LSE, and In-Service Engineering for Radio Communication Systems and C5ISR systems aboard U.S. Navy surface combatants and shore sites. This is a follow-on procurement to N00421-20-D-0004. The Government requests all comments and questions be submitted by 11:00AM on 4 April 2024.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Att 08 TDL CDRL Att COR customer_TPOC.xlsx | XLSX spreadsheet | |
| Att C2 - Cost Price Narrative.docx | DOCX document | |
| Att 03 Data Item Transmittal Form.pdf | ||
| Att 07 Wage Determinations.pdf | ||
| N00421-24-R-0016.pdf | ||
| Att 06 OCI List.pdf | ||
| Att S1 - SBPCD.docx | DOCX document | |
| Att 04 List of Authorized Key Personnel.pdf | ||
| Att 11 COR Designation Letter.pdf | ||
| Att 05 List of Approved Subcontractors.pdf | ||
| Att 02 CSP.pdf | ||
| Att 09 Draft TDL CDRL Att COR Only.xlsx | XLSX spreadsheet | |
| Att 01 Draft DD254.pdf | ||
| Exhibit A - Draft CDRLs.docx | DOCX document | |
| Att T2 - Workforce.docx | DOCX document | |
| Att 10 Small Business Subcontracting Plan.pdf |
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Instructions
| Attachment C1 Instructions |
| Green Cells are Formula Based |
| Yellow Cells require an Input |
| Only one workbook shall be prepared for the entire period of performance (one workbook for each Prime and one for each Subcontractor) |
The worksheets of the workbook should all be formatted for printing on letter-size paper, without requiring "adjustments." It may be formatted for either landscape or portrait.
DO NOT FORMAT FOR LEGAL SIZE PAPER.
| All cells shall be unprotected and unlocked, with formulae intact to show mathematical operations. |
| All dollar figures shall be carried out no further than two decimal places. (ex $25.50) |
| Instructions for Prime Contractor: | ||||
| Base Year Column | Subsequent Year Columns | |||
| Indirect Rates and Fee Instructions | ||||
| 1 | Enter Prime Offeror's name into cell A3. | |||
| 2 | Fill in all Indirect Rates in the Indirect Rates and Fee Worksheet, these rates will be pulled into the Cost Summary Spreadsheet, ensure formula are still intact. | D | E, F, G, H | |
| Cost Summary Worksheet Instructions | ||||
| 3 | Enter Prime Offerors's name into cell A3. | A | N/A | |
| 4 | Enter all Prime current or contingent employee names (or the word "Prospective") in Column A on the Cost Summary Worksheet (starting at row 10). If necessary, insert additional rows--but ensure integrity of formulas. Labor categories with more than one person being proposed shall be listed multiple times (one row per employee). For example, if the offeror proposes four Computer Systems Analysts, then the labor category Computer Systems Analysts shall be listed four times along with their applicable rates and information. | A | N/A | |
| 5 | Use the drop down in Column B to enter the Labor Category from the RFP that you will be utilizing. By utilizing this drop-down, the minimum realistic rate, as stated in the Minimum Direct Labor Rates worksheet will fill in, in Column G. Please see solicitation for additional guidance regarding the minimum realistic rate. Note - DO NOT use the drag feature to pull down a labor category to a subsequent row. This will not allow the formulas to work properly. | B | N/A | |
| 6 | Enter all Prime labor categories in Column C (starting at row 10). In column C, the Offeror should insert the title of the labor category it will be utilizing. The Offeror is not required to utilize the Government's labor categories, however, each proposed labor category should appear in the column beside the government labor category it is comparable to. Please note, in evaluation, the Offeror's proposal will be compared to the RFP in terms of hours and labor categories. | C | N/A | |
| 7 | In Column D, the Offeror shall select "BLS" if Column B is a BLS labor category or "SCA" if Column B is an SCA labor category. This dropdown will allow the escalation formulas in Columns M, R, W, and AB to calculate properly. | D | Formula Driven - M, R, W, AB | |
| 8 | In Column E, the Offeror shall insert a "K" if the employee will be performing at the Contractor's facility or a "G" if they will be performing in Government spaces, or a "T" if you have a differing OH rate that you utilize for that particular person. NOTE - If this procurement has various Govt Site locations (example, WOLF and Pax River), utilize "G" for both locations, a distinction does not need to be made between these sites for evaluation purposes. | E | N/A | |
| 9 | In Column F, identify for the specific individual whether their fully burdened rate is calculated using the full-time or part-time fringe rate. Enter "F" for full-time or "P" for part-time. | F | N/A | |
| 10 | In Column H, insert the direct labor rate for each row. If the rate that you are proposing is less than the minimum direct labor rate as included in the Minimun Direct Labor Rates worksheet, the cell will turn red. If this happens for a prospecitive employee, an explanation should be included in your cost narrative. Note, subsequent rate Columns (M, R, W and AB) are formula based and are calculated using the escalation for that year. Ensure Formulas are intact. | H | Formula Driven - M, R, W, AB | |
| 11 | In Column I, enter the labor hours for each row. Enter hours for each subsequent year (Columns N, S, X, AC) | I | N, S, X, AC | |
| 12 | This workbook includes hidden columns to assist with the correct application of indirect rates (two Columns after each Amount column for each year). If, per your accounting practices, you DO NOT apply overhead to your fringe rate, you can delete the calculations included in the hidden columns that assist with adding overhead to Fringe. | Formula Driven - K, L | Formula Driven - P, Q, U, V, Z, AA, AE, AF | |
| 13 | Escalation has been autopopulated based on the RFP. If, in accordance with the RFP, you are utilizing a rate that differs than that has already been filled in, you may change the value in the cell and provide an explanation in your cost narrative. | N/A | N, S, X, AC | |
| 14 | For each Subcontractor, enter the employee name (or the word "Prospective"), labor category, site, fully burdened rate and hours | A, B, D, E, F, H, I | M, N, R, S, W, X, AB, AC | |
| 15 | The minimum rate is blacked out in Column G for the subcontractors. The minimum rate is analyzed at the direct labor rate, however, the rates included for the subcontractor's in the Prime's submission will be fully burdened labor rates. | G | N/A | |
| 16 | Please note if more subcontractors are needed, the offeror may add additional rows to accommodate them, but ensure integrity of formulas. If fewer subcontractors are needed, hide the rows instead of deleting them. | |||
| 17 | Under Other Direct Costs, the Prime Offeror should enter the proposed ODC costs in Columns J, O, T, Y, AD | J | O, T, Y, AD | |
| 18 | Check to ensure the indirects are applied appropriately to ODCs. If the formulas that are utilized do not match your accounting practices, either adjust in the Indirects Rates and Fee tab or adjust the formula and note why changes were made in the Attachment C2 - Cost/Price Narrative. | J | O, T, Y, AD | |
| 19 | In accordance with HTXT.232-9510 PAYMENT OF FIXED FEE, the resultant contract payment of fixed fee will be dollars per hour (based on the fixed fee divided by the level of effort in hours). Cell B291, calculates the fee per hour as required to only two decimal places. The value stated in cell B291 will be used to populate the fee per hour value within HTXT.232-9510. The Offeror shall ensure the fee ceiling value calculated in cell C291 matches the value calculated in cell AH254. In order to do this the Offeror shall hard code the Fixed Fee values calculated in Rows 252 and 253 Columns J, O, T, Y, & AD to two decimal places. Doing this will ensure that the Offeror is able to earn the full fee if all level of effort (hours) is executed during contract performance. Following these directions will also ensure that the fee ceiling for CLINs on resultant TOs can be calculated correctly with no errors due to rounding. | J | O, T, Y, AD | |
| Fully Burdened Labor Rates Worksheet Instructions | ||||
| 20 | Enter Prime Offerors's name into cell A3. | A | N/A | |
| 21 | Enter employee names (starting at row 10). For Prospective hires enter the cell reference from Column A of the Cost Summary Worksheet under applicable Prime Contractor or Subcontractor header. If necessary, insert additional rows--but ensure integrity of formulas. | A | N/A | |
| 22 | Use the drop down in Column B to enter the Labor Category which matches the Cost Summary Worksheet. Note - the Labor Category used in B9 of the Cost Summary worksheet should match the Labor Category used in B9 of the Fully Burdened Labor Rates worksheet. | B | N/A | |
| 23 | Enter the Fully Burdened Labor Rate rounded to two decimal places for each year for every employee. | |||
| Fully Burdened Labor Rates shall include indirect rates, fee, and subcontractor pass-through costs where applicable. For Subcontractor labor, the fully burdened labor rates shall be inclusive of any pass-through charges (e.g., subcontractor handling, fixed fee on subcontractor labor, etc.) applied by the Prime Contractor. They should not include Fully Burdened Other Direct Costs (ODCs) such as Materials, Travel, and Cost of Money costs. | C | F, I, L, O, R | ||
| 24 | Enter the labor hours for each year for every employee ensuring the values match the Cost Summary Worksheet. | D | G, J, M, P, S | |
| 25 | The Annual Fully Burdened amount by employee is calculated by multiplying the Fully Burdened Labor Rate by the number of hours proposed by year. This should auto calculate however, if additional rows are added please ensure the formulas are intact. | E | H, K, M, Q, T | |
| Total Compensation Plan Worksheet Instructions - Reserved | ||||
| 26 | Enter Prime Contractor's name into cell A3. | |||
| 27 | In Column B, include Yes or No to note if that benefit is provided by your company as part of your total compensation plan. | N/A | N/A | |
| Composite Rates-Term(On) and Composite Rates-Term(Off) Worksheet Instructions | ||||
| 28 | The Prime Offeror shall verify hourly burdened composite labor rates are accurate and calculating properly. Additional instructions are provided on the "Composite Rates" worksheets themselves. Hourly burdened composite labor rates are defined in Section L, Part B, Paragraph 3.1.4 and 3.3.4. Please notate in the Attachment C2 - Cost/Price Narrative, Part XII if any changes were made to either of the "Composite Rates" worksheets. |
| Instructions for Subcontractors: | |||
| Green Cells are Formula Based | |||
| Yellow Cells require an Input | |||
| For your (the subcontractor) cost build up, you will utilize the "Prime" section of the Cost Summary worksheet. For all intents and purposes (other than A3) where it says Prime, you can replace "Prime" with subcontractor, or your company name. | |||
| Base Year Column | Subsequent Year Columns | ||
| Indirect Rates and Fee Instructions | |||
| 1 | Enter Prime Offerors's name into cell A3. |
Enter Subcontractor's name into cell A4.
| 2 | Fill in all Indirect Rates in the Indirect Rates and Fee Worksheet, these rates will be pulled into the Cost Summary Spreadsheet, ensure formula are still intact. | D | E, F, G, H | |
| Cost Summary Worksheet Instructions | ||||
| 3 | Enter Prime Offerors's name into cell A3. | |||
| Enter Subcontractor's name into cell A4. | A | N/A | ||
| 4 | Enter all Subcontractor employee names (or the word "Prospective") in Column A on the Cost Summary Worksheet (starting at row 10). If necessary, insert additional rows--but ensure integrity of formulas. Labor categories with more than one person being proposed shall be listed multiple times (one row per employee). For example, if the offeror proposes four Computer Systems Analysts, then the labor category Computer Systems Analysts shall be listed four times along with their applicable rates and information. | A | N/A | |
| 5 | Use the drop down in Column B to enter the Labor Category from the RFP that you will be utilizing. By utilizing this drop-down, the minimum realistic rate, as stated in the Minimum Direct Labor Rates worksheet will fill in, in column G. Please see solicitation for additional guidance regarding the minimum realistic rate. | B | N/A | |
| 6 | Enter all Subcontractor labor categories in Column C (starting at row 10). In Column C, the Offeror should insert the title of the labor category it will be utilizing. The Offeror is not required to utilize the Government's labor categories, however, each proposed labor category should appear in the column beside the government labor category it is comparable to. Please note, in evaluation, the Offeror's proposal will be compared to the RFP in terms of hours and labor categories. | C | N/A | |
| 7 | In Column D, the Offeror shall select "BLS" if Column B is a BLS labor category or "SCA" if Column B is an SCA labor category. This dropdown will allow the escalation formulas in Columns M, R, W, and AB to calculate properly. | D | Formula Driven - M, R, W, AB | |
| 8 | In Column E, the Offeror shall insert a "K" if the worker will be performing at the Contractor's facility or a "G" if they will be performing in Government spaces, or a "T" if you have a differing OH rate that you utilize for that particular person. NOTE - If this procurement has various Govt Site locations (example, WOLF and Pax River), utilize "G" for both locations, a distinction does not need to be made between these sites for evaluation purposes. | E | N/A | |
| 9 | In Column F, identify for the specific individual whether their fully burdened rate is calculated using the full-time or part-time fringe rate. Enter "F" for full-time or "P" for part-time. | F | N/A | |
| 10 | In Column H, insert the direct labor rate for each row. If the rate that you are proposing is less than the minimum direct labor rate as included in the Minimun Direct Labor Rates worksheet, the cell will turn red. If this happens for a prospecitive employee, an explaination should be included in your cost narrative. Note, subsequent rate Columns (M, R, W, and AB) are formula based and are calculated using the escalation for that year. | H | Formula Driven - M, R, W, AB | |
| 11 | In Column I, enter the labor hours for each row. Enter hours for each subsequent year (Columns N, S, X, AC) | I | N, S, X, AC | |
| 12 | This workbook includes hidden columns to assist with the correct application of indirect rates (two columns after each Amount column for each year). If, per your accounting practices, you DO NOT apply overhead to your fringe rate, you can delete the calculations included in the hidden columns that assist with adding overhead to Fringe. | Formula Driven - K, L | Formula Driven - P, Q, U, V, Z, AA, AE, AF | |
| 13 | Escalation has been autopopulated based on the RFP. If, in accordance with the RFP, you are utilizing a rate that differs than that has already been filled in, you may change the value in the cell and provide an explaination in your cost narrative. | N/A | N, S, X, AC | |
| Total Compensation Plan Worksheet Instructions | ||||
| 14 | Enter Prime Offerors's name into cell A3. |
Enter Subcontractor's name into cell A4.
15 In Column B, include Yes or No to note if that benefit is provided by your company as part of your total compensation plan N/A N/A
Indirect Rates and Fee
INDIRECT COST SUMMARY
| Prime Offeror Name: | |||||||
| Subcontractor Name (if applicable): | |||||||
| Indirect Rates (%) | |||||||
| Indirect Cost Category | Year 1 | Year 2 | Year 3 | Year 4 | Year 5 | ||
| Fringe | |||||||
| F | Fringe: Full Time | ||||||
| P | Fringe: Part Time |
| Overhead* | |
| KTR | KTR Site OH |
| G | Gov Site OH |
| T | Other Site OH |
| G&A | |
| G&A | |
| G&A on ODCs |
| Subcontractor Handling | |
| Material Handling (on ODC) | |
| Material Handling (on sub) | |
| SubcontractsHandling |
| Fee | |
| Fee on Prime labor | |
| Fee on Sub labor |
*Note, this procurement does not designate any other sites than Government and KTR site. The "Other Site" Overhead option is included in case the Contractor has multiple OH rates beyond Government and KTR site.
Cost Summary
COST SUMMARY SPREADSHEET
| Prime Offeror Name: | |||||||||||||||||||||||||||||||||||||||||||
| Subcontractor Name (if applicable): | BLS Escalation | 3.80% | BLS Escalation | 3.80% | BLS Escalation | 3.80% | BLS Escalation | 3.80% | |||||||||||||||||||||||||||||||||||
| SCA Escalation | 1.12% | SCA Escalation | 1.12% | SCA Escalation | 1.12% | SCA Escalation | 1.12% | ||||||||||||||||||||||||||||||||||||
| Year 1 | Extra columns to apply overhead to Fringe | Year 2 | Extra columns to apply overhead to Fringe | Year 3 | Extra columns to apply overhead to Fringe | Year 4 | Extra columns to apply overhead to Fringe | Year 5 | Extra columns to apply overhead to Fringe | Total for All Years | |||||||||||||||||||||||||||||||||
| Cost Elements | Government Labor Category | Proposed Labor Category | BLS or SCA | Site (K, G, T) | Location | F/P | Minimum Direct Labor Rate | Rate | 1 | Hours | 1 | Amount | 1 | Overhead on Fringe Calc. | 1 | Fringe Amount | 1 | Rate | 2 | Hours | 2 | Amount | 2 | Overhead on Fringe Calc. | 2 | Fringe Amount | 2 | Rate | 3 | Hours | 3 | Amount | 3 | Overhead on Fringe Calc. | 3 | Fringe Amount | 3 | Rate | 4 | Hours | 4 | Amount | 4 | Overhead on Fringe Calc. | 4 | Fringe Amount | 4 | Rate | 5 | Hours | 5 | Amount | 5 | Overhead on Fringe Calc. | 5 | Fringe Amount | 5 | Hours | Total | Amount | Total | Row | Column1 | Column2 | Column3 | Column4 | Column5 | Column6 | Column7 | |
| Prime Contractor Labor Cost | 8 | ||||||||||||||||||||||||||||||||||||||||||
| Prime Contractor Direct Labor | 9 | ||||||||||||||||||||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | - 0 | $ - 0 | 10 | |||||||||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | - 0 | $ - 0 | 11 | |||||||||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | - 0 | $ - 0 | 12 | |||||||||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | - 0 | $ - 0 | 13 | |||||||||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | - 0 | $ - 0 | 14 | |||||||||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | - 0 | $ - 0 | 15 | |||||||||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | - 0 | $ - 0 | 16 | |||||||||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | - 0 | $ - 0 | 17 | |||||||||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | - 0 | $ - 0 | 18 | |||||||||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | - 0 | $ - 0 | 19 | |||||||||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | - 0 | $ - 0 | 20 | |||||||||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | - 0 | $ - 0 | 21 | |||||||||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | - 0 | $ - 0 | 22 | |||||||||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | - 0 | $ - 0 | 23 | |||||||||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | - 0 | $ - 0 | 24 | |||||||||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | - 0 | $ - 0 | 25 | |||||||||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | - 0 | $ - 0 | 26 | |||||||||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | - 0 | $ - 0 | 27 | |||||||||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | - 0 | $ - 0 | 28 | |||||||||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | - 0 | $ - 0 | 29 | |||||||||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | - 0 | $ - 0 | 30 | |||||||||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | - 0 | $ - 0 | 31 | |||||||||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | - 0 | $ - 0 | 32 | |||||||||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | - 0 | $ - 0 | 33 | |||||||||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | - 0 | $ - 0 | 34 | |||||||||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | - 0 | $ - 0 | 35 | |||||||||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | - 0 | $ - 0 | 36 | |||||||||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | - 0 | $ - 0 | 37 | |||||||||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | - 0 | $ - 0 | 38 | |||||||||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | - 0 | $ - 0 | 39 | |||||||||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | - 0 | $ - 0 | 40 | |||||||||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | - 0 | $ - 0 | 41 | |||||||||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | - 0 | $ - 0 | 42 | |||||||||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | - 0 | $ - 0 | 43 | |||||||||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | - 0 | $ - 0 | 44 | |||||||||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | - 0 | $ - 0 | 45 | |||||||||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | - 0 | $ - 0 | 46 | |||||||||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | - 0 | $ - 0 | 47 | |||||||||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | - 0 | $ - 0 | 48 | |||||||||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | - 0 | $ - 0 | 49 | |||||||||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | - 0 | $ - 0 | 50 | |||||||||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | - 0 | $ - 0 | 51 | |||||||||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | - 0 | $ - 0 | 52 | |||||||||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | - 0 | $ - 0 | 53 | |||||||||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | - 0 | $ - 0 | 54 | |||||||||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | - 0 | $ - 0 | 55 | |||||||||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | - 0 | $ - 0 | 56 | |||||||||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | - 0 | $ - 0 | 57 | |||||||||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | - 0 | $ - 0 | 58 | |||||||||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | - 0 | $ - 0 | 59 | |||||||||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | - 0 | $ - 0 | 60 | |||||||||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | - 0 | $ - 0 | 61 | |||||||||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | - 0 | $ - 0 | 62 | |||||||||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | - 0 | $ - 0 | 63 | |||||||||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | - 0 | $ - 0 | 64 | |||||||||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | - 0 | $ - 0 | 65 | |||||||||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | - 0 | $ - 0 | 66 | |||||||||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | - 0 | $ - 0 | 67 | |||||||||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | - 0 | $ - 0 | 68 | |||||||||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | - 0 | $ - 0 | 69 | |||||||||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | - 0 | $ - 0 | 70 | |||||||||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | - 0 | $ - 0 | 71 | |||||||||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | - 0 | $ - 0 | 72 | |||||||||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | - 0 | $ - 0 | 73 | |||||||||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | - 0 | $ - 0 | 74 | |||||||||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | - 0 | $ - 0 | 75 | |||||||||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | - 0 | $ - 0 | 76 | |||||||||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | - 0 | $ - 0 | 77 | |||||||||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | - 0 | $ - 0 | 78 | |||||||||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | - 0 | $ - 0 | 79 | |||||||||||||||||||||||||||||||
| $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | - 0 | $ - 0 | 80 | ||||||||||||||||||||||||||||||||
| Total Direct Labor Cost | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | 81 | ||||||||||||||||||||||||||||||
| Overhead on Fringe Calculation | $0.00 | Overhead on Fringe Calculation | Overhead on Fringe Calculation | Overhead on Fringe Calculation | Overhead on Fringe Calculation | 82 | |||||||||||||||||||||||||||||||||||||
| Prime Indirect Labor Cost | Base | Fringe Base KTR Site | Fringe Amount | Base | Fringe Base KTR Site | Fringe Amount | Base | Fringe Base KTR Site | Fringe Amount | Base | Fringe Base KTR Site | Fringe Amount | Base | Fringe Base KTR Site | Fringe Amount | 83 | |||||||||||||||||||||||||||
| Overhead | KTR | K | 0.00% | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 84 | ||||||||||||||
| Overhead | Govt | G | 0.00% | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 85 | ||||||||||||||
| Overhead | Other | T | 0.00% | $ - 0 | $ - 0 | Fringe Base Govt Site | Fringe Amount | 0.00% | $ - 0 | $ - 0 | Fringe Base Govt Site | Fringe Amount | 0.00% | $ - 0 | $ - 0 | Fringe Base Govt Site | Fringe Amount | 0.00% | $ - 0 | $ - 0 | Fringe Base Govt Site | Fringe Amount | 0.00% | $ - 0 | $ - 0 | Fringe Base Govt Site | Fringe Amount | 86 | |||||||||||||||
| Subtotal Overhead | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 87 | ||||||||||||||||||||||||||||||||||||
| Fringe Benefits | Full Time | F | 0.00% | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 88 | ||||||||||||||
| Fringe Benefits | Part Time | P | 0.00% | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 89 | ||||||||||||||
| Subtotal Fringe Benefits | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 90 | ||||||||||||||||||||||||||||||||||||
| Subtotal | $ - 0 | Fringe Base Telework | Fringe Amount | $ - 0 | Fringe Base Telework | Fringe Amount | $ - 0 | Fringe Base Telework | Fringe Amount | $ - 0 | Fringe Base Telework | Fringe Amount | $ - 0 | Fringe Base Telework | Fringe Amount | $ - 0 | 91 | ||||||||||||||||||||||||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 92 | |||||||||||||||||||||||||||||||||
| Premium | |||||||||||||||||||||||||||||||||||||||||||
| Hanson, Jennifer T CIV AIR, 2.0: This is a placeholder to add a formula for overtime. | Overtime Premium | - 0 | $ - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 93 | ||||||||||||||||||||
| G&A | G&A | 0.00% | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | $ - 0 | 94 | |||||||||||||||||||||||||
| Total Indirect Labor Cost | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 95 | ||||||||||||||||||||||||||||||||||||
| Total Direct and Indirect Labor cost | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 96 | ||||||||||||||||||||||||||||||||||||
| Base | Base | Base | Base | Base | 97 | ||||||||||||||||||||||||||||||||||||||
| FCCOM | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 98 | |||||||||||||||||||||||||||||||
| Total Prime Contractor Labor Cost | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 99 | ||||||||||||||||||||||||||||||||||||
| 100 | |||||||||||||||||||||||||||||||||||||||||||
| Subcontractor Labor Cost | 101 | ||||||||||||||||||||||||||||||||||||||||||
| 102 | |||||||||||||||||||||||||||||||||||||||||||
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 103 | |||||||||||||||||||||||||||||||||||
| Subcontractor (Name) | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | 104 | ||||||||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | 105 | |||||||||||||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | 106 | |||||||||||||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | 107 | |||||||||||||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | 108 | |||||||||||||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | 109 | |||||||||||||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | 110 | |||||||||||||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | 111 | |||||||||||||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | 112 | |||||||||||||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | 113 | |||||||||||||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | 114 | |||||||||||||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | 115 | |||||||||||||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | 116 | |||||||||||||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | 117 | |||||||||||||||||||||||||||||||||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | 118 | ||||||||||||||||||||||||||||||||||||
| Subcontractor (Name) | - 0 | $ - 0 | 0 | - 0 | $ - 0 | 0 | - 0 | $ - 0 | 0 | - 0 | $ - 0 | 0 | - 0 | $ - 0 | - 0 | $ - 0 | 119 | ||||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | 120 | |||||||||||||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | 121 | |||||||||||||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | 122 | |||||||||||||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | 123 | |||||||||||||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | 124 | |||||||||||||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | 125 | |||||||||||||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | 126 | |||||||||||||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | 127 | |||||||||||||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | 128 | |||||||||||||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | 129 | |||||||||||||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | 130 | |||||||||||||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | 131 | |||||||||||||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | 132 | |||||||||||||||||||||||||||||||||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | 133 | ||||||||||||||||||||||||||||||||||||
| Subcontractor (Name) | - 0 | $ - 0 | 0 | - 0 | $ - 0 | 0 | - 0 | $ - 0 | 0 | - 0 | $ - 0 | 0 | - 0 | $ - 0 | - 0 | $ - 0 | 134 | ||||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | 135 | |||||||||||||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | 136 | |||||||||||||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | 137 | |||||||||||||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | 138 | |||||||||||||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | 139 | |||||||||||||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | 140 | |||||||||||||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | 141 | |||||||||||||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | 142 | |||||||||||||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | 143 | |||||||||||||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | 144 | |||||||||||||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | 145 | |||||||||||||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | 146 | |||||||||||||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | 147 | |||||||||||||||||||||||||||||||||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | 148 | ||||||||||||||||||||||||||||||||||||
| Subcontractor (Name) | - 0 | $ - 0 | 0 | - 0 | $ - 0 | 0 | - 0 | $ - 0 | 0 | - 0 | $ - 0 | 0 | - 0 | $ - 0 | - 0 | $ - 0 | 149 | ||||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | 150 | |||||||||||||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | 151 | |||||||||||||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | 152 | |||||||||||||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | 153 | |||||||||||||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | 154 | |||||||||||||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | 155 | |||||||||||||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | 156 | |||||||||||||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | 157 | |||||||||||||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | 158 | |||||||||||||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | 159 | |||||||||||||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | 160 | |||||||||||||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | 161 | |||||||||||||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | 162 | |||||||||||||||||||||||||||||||||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | 163 | ||||||||||||||||||||||||||||||||||||
| Subcontractor (Name) | - 0 | $ - 0 | - 0 | $ - 0 | 0 | - 0 | $ - 0 | 0 | - 0 | $ - 0 | 0 | - 0 | $ - 0 | - 0 | $ - 0 | 164 | |||||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | 165 | |||||||||||||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | 166 | |||||||||||||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | 167 | |||||||||||||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | 168 | |||||||||||||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | 169 | |||||||||||||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | 170 | |||||||||||||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | 171 | |||||||||||||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | 172 | |||||||||||||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | 173 | |||||||||||||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | 174 | |||||||||||||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | 175 | |||||||||||||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | 176 | |||||||||||||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | 177 | |||||||||||||||||||||||||||||||||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | 178 | ||||||||||||||||||||||||||||||||||||
| Subcontractor (Name) | - 0 | $ - 0 | - 0 | $ - 0 | 0 | - 0 | $ - 0 | 0 | - 0 | $ - 0 | 0 | - 0 | $ - 0 | - 0 | $ - 0 | 179 | |||||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | 180 | |||||||||||||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | 181 | |||||||||||||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | 182 | |||||||||||||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | 183 | |||||||||||||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | 184 | |||||||||||||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | 185 | |||||||||||||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | 186 | |||||||||||||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | 187 | |||||||||||||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | 188 | |||||||||||||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | 189 | |||||||||||||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | 190 | |||||||||||||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | 191 | |||||||||||||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | 192 | |||||||||||||||||||||||||||||||||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | 193 | ||||||||||||||||||||||||||||||||||||
| Subcontractor (Name) | - 0 | $ - 0 | - 0 | $ - 0 | 0 | - 0 | $ - 0 | 0 | - 0 | $ - 0 | 0 | - 0 | $ - 0 | - 0 | $ - 0 | 194 | |||||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | 195 | |||||||||||||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | 196 | |||||||||||||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | 197 | |||||||||||||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | 198 | |||||||||||||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | 199 | |||||||||||||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | 200 | |||||||||||||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | 201 | |||||||||||||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | 202 | |||||||||||||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | 203 | |||||||||||||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | 204 | |||||||||||||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | 205 | |||||||||||||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | 206 | |||||||||||||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | 207 | |||||||||||||||||||||||||||||||||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | 208 | ||||||||||||||||||||||||||||||||||||
| Subcontractor (Name) | - 0 | $ - 0 | - 0 | $ - 0 | 0 | - 0 | $ - 0 | 0 | - 0 | $ - 0 | 0 | - 0 | $ - 0 | - 0 | $ - 0 | 209 | |||||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | 210 | |||||||||||||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | 211 | |||||||||||||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | 212 | |||||||||||||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | 213 | |||||||||||||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | 214 | |||||||||||||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | 215 | |||||||||||||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | 216 | |||||||||||||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | 217 | |||||||||||||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | 218 | |||||||||||||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | 219 | |||||||||||||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | 220 | |||||||||||||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | 221 | |||||||||||||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | 222 | |||||||||||||||||||||||||||||||||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | 223 | ||||||||||||||||||||||||||||||||||||
| Subcontractor (Name) | - 0 | $ - 0 | - 0 | $ - 0 | 0 | - 0 | $ - 0 | 0 | - 0 | $ - 0 | 0 | - 0 | $ - 0 | - 0 | $ - 0 | 224 | |||||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | 225 | |||||||||||||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | 226 | |||||||||||||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | 227 | |||||||||||||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | 228 | |||||||||||||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | 229 | |||||||||||||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | 230 | |||||||||||||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | 231 | |||||||||||||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | 232 | |||||||||||||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | 233 | |||||||||||||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | 234 | |||||||||||||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | 235 | |||||||||||||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | 236 | |||||||||||||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | 237 | |||||||||||||||||||||||||||||||||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | 238 | ||||||||||||||||||||||||||||||||||||
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 239 | |||||||||||||||||||||||||||||||||||
| Total proposed subcontractor cost (w/sub fee) | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | 240 | ||||||||||||||||||||||||||||||
| Prime contractor pass through (not including prime fee) | 241 | ||||||||||||||||||||||||||||||||||||||||||
| Handling | Material Handling (on sub) | 0.00% | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | $ - 0 | 242 | |||||||||||||||||||||||||
| Handling | SubcontractsHandling(SH) | 0.00% | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | $ - 0 | 243 | |||||||||||||||||||||||||
| G&A | G&A | 0.00% | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | $ - 0 | 244 | |||||||||||||||||||||||||
| Other (if any) | 245 | ||||||||||||||||||||||||||||||||||||||||||
| Total pass through (not including fee) | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 246 | ||||||||||||||||||||||||||||||||||||
| Total Subcontractor Cost including pass through | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 247 | ||||||||||||||||||||||||||||||||||||
| 248 | |||||||||||||||||||||||||||||||||||||||||||
| Total Labor Cost (Prime and Subcontractor Labor) | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | 249 | ||||||||||||||||||||||||||||||
| 250 | |||||||||||||||||||||||||||||||||||||||||||
| Fixed Fee | Base | Base | Base | Base | Base | 251 | |||||||||||||||||||||||||||||||||||||
| Prime Contractor Fee for Prime Contractor Labor | 0.00% | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | $ - 0 | 252 | ||||||||||||||||||||||||||
| Prime Contractor Fee for Subcontractor Labor * | 0.00% | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | $ - 0 | 253 | ||||||||||||||||||||||||||
| Total Fee (for Prime and Subcontractor Labor) | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 254 | ||||||||||||||||||||||||||||||||||||
| 255 | |||||||||||||||||||||||||||||||||||||||||||
| Total Labor Cost Plus Fixed Fee (CPFF) | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 256 | ||||||||||||||||||||||||||||||||||||
| 257 | |||||||||||||||||||||||||||||||||||||||||||
| Other Direct Costs | 258 | ||||||||||||||||||||||||||||||||||||||||||
| Other Direct Costs (ODCs) | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 259 | ||||||||||||||||||||||||||||||||||||
| Material | $ - 0 | 260 | |||||||||||||||||||||||||||||||||||||||||
| Field Services | $ - 0 | 261 | |||||||||||||||||||||||||||||||||||||||||
| Travel | $ - 0 | 262 | |||||||||||||||||||||||||||||||||||||||||
| 263 | |||||||||||||||||||||||||||||||||||||||||||
| Any adders to ODCs such as G&A (cost only - no fee) | Base | Base | Base | Base | Base | 264 | |||||||||||||||||||||||||||||||||||||
| Handling | Material Handing (on ODC) | 0.00% | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | $ - 0 | 265 | |||||||||||||||||||||||||
| G&A | G&A | 0.00% | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | $ - 0 | 266 | |||||||||||||||||||||||||
| Total ODCs | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 267 | ||||||||||||||||||||||||||||||||||||
| 268 | |||||||||||||||||||||||||||||||||||||||||||
| 269 | |||||||||||||||||||||||||||||||||||||||||||
| Total CPFF all CLINs (Labor and ODCs) | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | 270 |
| Pass Through Analysis - Total for All Years | Amount | Percent |
| Subcontractor proposed cost and fee | $0 | |
| Pass Through Amount (not including fee) | $0 | |
| Prime Contractor Fee for Subcontractor Labor * | $0 | |
| Total Pass Through Amount (including fee) | $0 | ERROR:#DIV/0! |
| Fee Analysis - Total for All Years | Amount | Percent |
| Prime Contractor Labor Cost | $0 | |
| Fixed Fee for Labor Performed by Prime Contractor | $0 | ERROR:#DIV/0! |
| Fee Per Hour Calculation | |||
| See instructions tab for more info | |||
| Step 1 | Step 2 | Step 3 | |
| Fee Per Hour based on "Total Fee ( for Prime and Subcontractor Labor)" / Total Proposed Labor Hours | Fee Per Hour to use in | ||
| HTXT.232-9510 | Fee Ceiling Value | ||
| ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! |
&"Times New Roman,Bold"UNCLASSIFIED
&"Times New Roman,Regular"&8 Source Selection Information - See FAR 2.101 and 3.104 &"Times New Roman,Bold"UNCLASSIFIED &"Times New Roman,Regular"&P of &N
Fully Burdened Labor Rates
FULLY BURDENED LABOR RATES SPREADSHEET
| Prime Offeror Name: |
| Subcontractor Name (if applicable): |
| Fully Burdened Labor Rates | Year 1 | Year 2 | Year 3 | Year 4 | Year 5 | |||||||||||
| Government Labor Category | Rate | 1 | Hours | 1 | Amount | 1 | Rate | 2 | Hours | 2 | Amount | 2 | Rate | 3 | Hours | 3 | Amount | 3 | Rate | 4 | Hours | 4 | Amount | 4 | Rate | 5 | Hours | 5 | Amount | 5 | |
| Prime Contractor | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||||||
| Employee Name or Prospective | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||||||
| Employee Name or Prospective | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||||||
| Employee Name or Prospective | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||||||
| Employee Name or Prospective | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||||||
| Employee Name or Prospective | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||||||
| Employee Name or Prospective | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||||||
| Employee Name or Prospective | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||||||
| Employee Name or Prospective | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||||||
| Employee Name or Prospective | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||||||
| Employee Name or Prospective | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||||||
| Employee Name or Prospective | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||||||
| Employee Name or Prospective | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||||||
| Employee Name or Prospective | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||||||
| Employee Name or Prospective | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||||||
| Employee Name or Prospective | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||||||
| Employee Name or Prospective | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||||||
| Employee Name or Prospective | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||||||
| Employee Name or Prospective | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||||||
| Employee Name or Prospective | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||||||
| Employee Name or Prospective | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||||||
| Employee Name or Prospective | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||||||
| Employee Name or Prospective | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||||||
| Employee Name or Prospective | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||||||
| Employee Name or Prospective | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||||||
| Employee Name or Prospective | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||||||
| Employee Name or Prospective | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||||||
| Employee Name or Prospective | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||||||
| Employee Name or Prospective | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||||||
| Employee Name or Prospective | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||||||
| Employee Name or Prospective | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||||||
| Employee Name or Prospective | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||||||
| Employee Name or Prospective | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||||||
| Employee Name or Prospective | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||||||
| Employee Name or Prospective | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||||||
| Employee Name or Prospective | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||||||
| Employee Name or Prospective | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||||||
| Employee Name or Prospective | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||||||
| Employee Name or Prospective | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||||||
| Employee Name or Prospective | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||||||
| Employee Name or Prospective | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||||||
| Employee Name or Prospective | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||||||
| Employee Name or Prospective | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||||||
| Employee Name or Prospective | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||||||
| Employee Name or Prospective | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||||||
| Employee Name or Prospective | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||||||
| Employee Name or Prospective | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .