This document is a Contract Data Requirements List (CDRL) for the Integrated Lifecycle Sustainment and Depot-Level Repair Services contract, listing multiple data deliverable items for the Naval Surface Warfare Center, Port Hueneme Division (NSWCPHD). The CDRL contains 16 separate data item entries (A001-A00R) with unique requirements for various reports and documentation, including briefing materials, meeting minutes, management reports, personnel rosters, technical reports, quality assurance documents, and other administrative and technical deliverables.

Each CDRL entry specifies detailed submission guidelines, including frequency (monthly, as required), distribution requirements, and specific formatting instructions. The documents must be electronically submitted via email to the Contracting Officer's Representative (COR) and Procuring Contracting Officer (PCO), using NMCI-compatible Microsoft Office formats. All deliverables must comply with Controlled Unclassified Information (CUI) guidelines and include appropriate classification markings. The contract line items cover contract numbers 0001-0003 and 1001-4003, with most first submissions scheduled for April or June 2025 and subsequent submissions aligned with the Statement of Work requirements.

View the file

Other files

File Type Posted
Solicitation_N6339425R0007_0003_Conformed_20250806.pdf PDF
Solicitation_N6339425R0007_0003_Conformed.pdf PDF
Amendment 0003_Solicitation_N6339425R0007_20250805.pdf PDF
Attachment JS_04_Staffing Plan_LOE_LCATs_20250804.xlsx XLSX spreadsheet
Solicitation_N6339425R0007_0002_Conformed.pdf PDF
Amendment 0002_Solicitation_N6339425R0007.pdf PDF
25R0007_Solicitation_Amendment_2_Question.xlsx XLSX spreadsheet
Attachment JS.06_Past_Performance+Reference_20250716.docx DOCX document
Amendment 0001_Solicitation_N6339425R0007.pdf PDF
Solicitation_N6339425R0007_0001_Conformed.pdf PDF
Attachment JS_04_Staffing Plan_LOE_LCATs_20250701.xlsx XLSX spreadsheet
Attachment J_11 Wage determination.pdf PDF
25R0007_Solicitation_Questions_1-7_20250701.xlsx XLSX spreadsheet
N6339425R0007_Solicitation_ILS_DLR.pdf PDF
Attachment J.03_QASP.docx DOCX document
Attachment J.05_Key_Personnel_Quals.docx DOCX document
Attachment JS.06_Past_Performance+Reference.docx DOCX document
Attachment J.08_GFP.xlsx XLSX spreadsheet
Attachment J.09_GFI.pdf PDF
Attachment JS.07_Cost+Proposal.xlsx XLSX spreadsheet
Attachment J.10_TripInformationForm.xlsx XLSX spreadsheet
Attachment J.02_DD_Form_254.pdf PDF
Attachment J.01_Material Master List.docx DOCX document
Attachment JS.04_Staffing Plan.xlsx XLSX spreadsheet
Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page of Pages Adobe Professional 8.0

17. PRICEGROUP

18. ESTIMATED

TOTAL PRICE

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved OMB No.0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C.CATEGORY:

TDP TM OTHER

D. SYSTEM/ITEM E. CONTRACT/PRNO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6.REQUIRINGOFFICE

7. DD 250 REQ 9. DIST STATEMENT

REQUIRED

10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE 11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION Draft

Final

Reg Repro

16. REMARKS

15. TOTAL

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

0001-0003 & 1001-4003 A MGMT

INTEGRATED LIFECYCLE SUSTAINMENT AND DEPOT-LEVEL REPAIR SERVICES CDRL-PHD-N03-2025-0001 TBD

A001

BRIEFING MATERIAL

DI-MGMT-81605 SOW 4.3 AND 6.3.2 PHD-N03-NSWCPHD

LT

SEE BLOCK 16

(See Block 16) SEE BLOCK 16

N/A SEE BLOCK 16 SEE BLOCK 16

PCO, CODE 0232

PHD-N03-NSWCPHD

1 1

DE JESUS, MATTHEW D. 04/08/2025

NSP

1 1

Contractor format is acceptable.

Block 9: Mark Controlled Unclassified Information (CUI) according to the DoDI 5200.48, March 6, 2020, and Distribution Statements on Technical Documents according to DoDI 5230.24, August 23, 2012. If a data submission requires a distribution statement, the contractor shall ensure that the deliverable contains the appropriate classification markings and distribution statement.

Block 10: The contractor shall submit and or re-work deliverable in accordance with the Statement of Work.

Block 11: The contractor shall submit and or re-work deliverable in accordance with the Statement of Work.

Block 12: The contractor shall submit and or re-work deliverable in accordance with the Statement of Work.

Block 13: The contractor shall submit and or re-work deliverable in accordance with the Statement of Work.

Block 14: The deliverable shall be sent via electronic mail to the Contracting Officer's Representative (COR) and Procuring Contracting Officer (PCO) specified in Section G of the contract, using the most recent NMCI-compatible Microsoft Office Suite of products (or a Microsoft Office-compatible format).

0 2 2

6/23/2025CEGLIA, ANTOINETTE

INSTRUCTIONS FOR COMPLETING DD FORM1423

(See DoD 5010.12-M for detailed instructions.)

FOR GOVERNMENT PERSONNEL

Item A. Self-explanatory.

Item B. Self-explanatory.

Item C. Mark (X) appropriate category: TDP - Technical Data Package;

TM - Technical Manual; Other - other category of data, such as "Provisioning,""Configuration Management," etc.

Item D. Enter name of system/item being acquired that data will support.

Item E. Self-explanatory (to be filled in after contract award).

Item F. Self-explanatory (to be filled in after contract award).

Item G. Signature of preparer of CDRL.

Item H. Date CDRL was prepared.

Item I. Signature of CDRL approval authority.

Item J. Date CDRL was approved.

Item 1. See DoD FAR Supplement Subpart 4.71 for proper numbering.

Item 2. Enter title as it appears on data acquisition document cited in Item 4.

Item 3. Enter subtitle of data item for further definition of data item (optional entry).

Item 4. Enter Data Item Description (DID) number, military specification number, or military standard number listed in DoD 5010.12-L (AMSDL), or one-time DID number, that defines data content and format requirements.

Item 5. Enter reference to tasking in contract that generates requirement for the data item (e.g., Statement of Work paragraph number).

Item 6. Enter technical office responsible for ensuring adequacy of the data item.

Item 7. Specify requirement for inspection/acceptance of the data item by the Government.

Item 8. Specify requirement for approval of a draft before preparation of the final data item.

Item 9. For technical data, specify requirement for contractor to mark the appropriate distribution statement on the data (ref. DoDD 5230.24).

Item 10. Specify number of times data items are to be delivered.

Item 11. Specify as-of date of data item, when applicable.

Item 12. Specify when first submittal is required.

Item 13. Specify when subsequent submittals are required, when applicable.

Item 14. Enter addressees and number of draft/final copies to be delivered to each addressee. Explain reproducible copies in Item16.

Item 15. Enter total number of draft/final copies to be delivered.

Item 16. Use for additional/clarifying information for Items 1 through 15.

Examples are: Tailoring of documents cited in Item 4; Clarification of submittal dates in Items 12 and 13; Explanation of reproducible copies in Item 14.; Desired medium for delivery of the data item.

FOR THE CONTRACTOR

Item 17. Specify appropriate price group from one of the following groups of effort in developing estimated prices for each data item listed on the DD Form 1423.

a. Group I. Definition - Data which is not otherwise essential to the contractor's performance of the primary contracted effort (production, development, testing, and administration) but which is required by DD Form 1423.

Estimated Price - Costs to be included under Group I are those applicable to preparing and assembling the data item in conformance with Government requirements, and the administration and other expenses related to reproducing and delivering such data items to the Government.

b. Group II. Definition - Data which is essential to the performance of the primary contracted effort but the contractor is required to perform additional work to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, or quality of the data item.

Estimated Price - Costs to be included under Group II are those incurred over and above the cost of the essential data item without conforming to Government requirements, and the administrative and other expenses related to reproducing and delivering such data item to the Government.

c. Group III. Definition - Data which the contractor must develop for his internal use in performance of the primary contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, and quality of the data item.

Estimated Price - Costs to be included under Group III are the administrative and other expenses related to reproducing and delivering such data item to the Government.

d. Group IV. Definition - Data which is developed by the contractor as part of his normal operating procedures and his effort in supplying these data to the Government is minimal.

Estimated Price - Group IV items should normally be shown on the DD Form 1423 at no cost.

Item 18. For each data item, enter an amount equal to that portion of the total price which is estimated to be attributable to the production or development for the Government of that item of data.

These estimated data prices shall be developed only from those costs which will be incurred as a direct result of the requirement to supply the data, over and above those costs which would otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any amount for rights in data. The Government's right to use the data shall be governed by the pertinent provisions of the contract.

DD FORM 1423-1 (BACK), FEB 2001

17. PRICEGROUP

18. ESTIMATED

TOTAL PRICE

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved OMB No.0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C.CATEGORY:

TDP TM OTHER

D. SYSTEM/ITEM E. CONTRACT/PRNO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6.REQUIRINGOFFICE

7. DD 250 REQ 9. DIST STATEMENT

REQUIRED

10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE 11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION Draft

Final

Reg Repro

16. REMARKS

15. TOTAL

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

0001-0003 & 1001-4003 A ADMN

INTEGRATED LIFECYCLE SUSTAINMENT AND DEPOT-LEVEL REPAIR SERVICES CDRL-PHD-N03-2025-0001 TBD

A002

MEETING MINUTES

DI-ADMN-81250C SOW 4.3 AND 6.3.2 PHD-N03-NSWCPHD

LT

SEE BLOCK 16

(See Block 16) SEE BLOCK 16

N/A SEE BLOCK 16 SEE BLOCK 16

PCO, CODE 0232

PHD-N03-NSWCPHD

1 1

DE JESUS, MATTHEW D. 04/03/2025

NSP

1 1

Contractor format is acceptable.

Block 9: Mark Controlled Unclassified Information (CUI) according to the DoDI 5200.48, March 6, 2020, and Distribution Statements on Technical Documents according to DoDI 5230.24, August 23, 2012. If a data submission requires a distribution statement, the contractor shall ensure that the deliverable contains the appropriate classification markings and distribution statement.

Block 10: The contractor shall submit and or re-work deliverable in accordance with the Statement of Work.

Block 11: The contractor shall submit and or re-work deliverable in accordance with the Statement of Work.

Block 12: The contractor shall submit and or re-work deliverable in accordance with the Statement of Work.

Block 13: The contractor shall submit and or re-work deliverable in accordance with the Statement of Work.

Block 14: The deliverable shall be sent via electronic mail to the Contracting Officer's Representative (COR) and Procuring Contracting Officer (PCO) specified in Section G of the contract, using the most recent NMCI-compatible Microsoft Office Suite of products (or a Microsoft Office-compatible format).

CEGLIA, ANTOINETTE 6/23/2025

17. PRICEGROUP

18. ESTIMATED

TOTAL PRICE

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved OMB No.0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C.CATEGORY:

TDP TM OTHER

D. SYSTEM/ITEM E. CONTRACT/PRNO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6.REQUIRINGOFFICE

7. DD 250 REQ 9. DIST STATEMENT

REQUIRED

10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE 11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION Draft

Final

Reg Repro

16. REMARKS

15. TOTAL

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

0001-0003 & 1001-4003 A MGMT

INTEGRATED LIFECYCLE SUSTAINMENT AND DEPOT-LEVEL REPAIR SERVICES CDRL-PHD-N03-2025-0001 TBD

A003

CONTRACTING OFFICER'S MANAGEMENT REPORT

DI-MGMT-81864A SOW 5.1.6 PHD-N03-NSWCPHD

LT

SEE BLOCK 16

MTHLY SEE BLOCK 16

N/A SEE BLOCK 16 SEE BLOCK 16

PCO, 0232

PHD-N03-NSWCPHD

1 1

DE JESUS, MATTHEW D. 04/03/2025

NSP

1 1

Contractor format is acceptable.

Block 9: Mark Controlled Unclassified Information (CUI) according to the DoDI 5200.48, March 6, 2020, and Distribution Statements on Technical Documents according to DoDI 5230.24, August 23, 2012. If a data submission requires a distribution statement, the contractor shall ensure that the deliverable contains the appropriate classification markings and distribution statement.

Block 11: The contractor shall submit and or re-work deliverable in accordance with the Statement of Work.

Block 12: The contractor shall submit and or re-work deliverable in accordance with the Statement of Work.

Block 13: The contractor shall submit and or re-work deliverable in accordance with the Statement of Work.

Block 14: The deliverable shall be sent via electronic mail to the Contracting Officer's Representative (COR) and Procuring Contracting Officer (PCO) specified in Section G of the contract, using the most recent NMCI-compatible Microsoft Office Suite of products (or a Microsoft Office-compatible format).

17. PRICEGROUP

18. ESTIMATED

TOTAL PRICE

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved OMB No.0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C.CATEGORY:

TDP TM OTHER

D. SYSTEM/ITEM E. CONTRACT/PRNO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6.REQUIRINGOFFICE

7. DD 250 REQ 9. DIST STATEMENT

REQUIRED

10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE 11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION Draft

Final

Reg Repro

16. REMARKS

15. TOTAL

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

0001-0003 & 1001-4003 A MGMT

INTEGRATED LIFECYCLE SUSTAINMENT AND DEPOT-LEVEL REPAIR SERVICES CDRL-PHD-N03-2025-0001 TBD

A004

CONTRACTOR'S PERSONNEL ROSTER

DI-MGMT-81834A SOW 5.1.7 AND 5.1.8 PHD-N03-NSWCPHD

LT

SEE BLOCK 16

MTHLY SEE BLOCK 16

N/A SEE BLOCK 16 SEE BLOCK 16

PCO, CODE 0232

PHD-N03-NSWCPHD

1 1

DE JESUS, MATTHEW D. 04/03/2025

NSP

1 1

Contractor format is acceptable.

Block 9: Mark Controlled Unclassified Information (CUI) according to the DoDI 5200.48, March 6, 2020, and Distribution Statements on Technical Documents according to DoDI 5230.24, August 23, 2012. If a data submission requires a distribution statement, the contractor shall ensure that the deliverable contains the appropriate classification markings and distribution statement.

Block 11: The contractor shall submit and or re-work deliverable in accordance with the Statement of Work.

Block 12: The contractor shall submit and or re-work deliverable in accordance with the Statement of Work.

Block 13: The contractor shall submit and or re-work deliverable in accordance with the Statement of Work.

Block 14: The deliverable shall be sent via electronic mail to the Contracting Officer's Representative (COR) and Procuring Contracting Officer (PCO) specified in Section G of the contract, using the most recent NMCI-compatible Microsoft Office Suite of products (or a Microsoft Office-compatible format).

17. PRICEGROUP

18. ESTIMATED

TOTAL PRICE

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved OMB No.0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C.CATEGORY:

TDP TM OTHER

D. SYSTEM/ITEM E. CONTRACT/PRNO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6.REQUIRINGOFFICE

7. DD 250 REQ 9. DIST STATEMENT

REQUIRED

10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE 11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION Draft

Final

Reg Repro

16. REMARKS

15. TOTAL

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

0001-0003 & 1001-4003 A MGMT

INTEGRATED LIFECYCLE SUSTAINMENT AND DEPOT-LEVEL REPAIR SERVICES CDRL-PHD-N03-2025-0001 TBD

A005

CONDITION FOUND REPORT (CFR)

DI-MGMT-81648A SOW 5.1.16 PHD-N03-NSWCPHD

LT

SEE BLOCK 16

(See Block 16) SEE BLOCK 16

N/A SEE BLOCK 16 SEE BLOCK 16

PCO, CODE 0232

PHD-N03-NSWCPHD

1 1

DE JESUS, MATTHEW D. 04/03/2025

NSP

1 1

Contractor format is acceptable.

Block 9: Mark Controlled Unclassified Information (CUI) according to the DoDI 5200.48, March 6, 2020, and Distribution Statements on Technical Documents according to DoDI 5230.24, August 23, 2012. If a data submission requires a distribution statement, the contractor shall ensure that the deliverable contains the appropriate classification markings and distribution statement.

Block 10: The contractor shall submit and or re-work deliverable in accordance with the Statement of Work.

Block 11: The contractor shall submit and or re-work deliverable in accordance with the Statement of Work.

Block 12: The contractor shall submit and or re-work deliverable in accordance with the Statement of Work.

Block 13: The contractor shall submit and or re-work deliverable in accordance with the Statement of Work.

Block 14: The deliverable shall be sent via electronic mail to the Contracting Officer's Representative (COR) and Procuring Contracting Officer (PCO) specified in Section G of the contract, using the most recent NMCI-compatible Microsoft Office Suite of products (or a Microsoft Office-compatible format).

17. PRICEGROUP

18. ESTIMATED

TOTAL PRICE

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved OMB No.0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C.CATEGORY:

TDP TM OTHER

D. SYSTEM/ITEM E. CONTRACT/PRNO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6.REQUIRINGOFFICE

7. DD 250 REQ 9. DIST STATEMENT

REQUIRED

10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE 11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION Draft

Final

Reg Repro

16. REMARKS

15. TOTAL

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

0001-0003 & 1001-4003 A MGMT

INTEGRATED LIFECYCLE SUSTAINMENT AND DEPOT-LEVEL REPAIR SERVICES CDRL-PHD-N03-2025-0001 TBD

A006

INTEGRATED PROGRAM MANAGEMENT DATA ANALYSIS REPORT (IPMDAR)

DI-MGMT-81861C SOW 5.1.17 PHD-N03-NSWCPHD

LT

SEE BLOCK 16

MTHLY SEE BLOCK 16

N/A SEE BLOCK 16 SEE BLOCK 16

PCO, CODE 0232

PHD-N03-NSWCPHD

1 1

DE JESUS, MATTHEW D. 02/13/2025

NSP

1 1

Only the following paragraphs apply: 1.1-1.4.1; 1.7; 2.2.1-2.2.4; 2.3.1.5-2.3.1.8.3; 2.3.1.11-2.3.1.12;

2.3.1.14-2.3.1.18; 2.3.2.1.1; 2.3.2.1.5-2.3.2.1.6; 2.3.2.4.1-2.3.2.4.5; 2.3.2.5.2-2.3.2.5.4; 2.4.1.4;

2.4.2.2-2.4.2.4; 2.4.2.9; 2.5.2-2.5.2.2.1.

Contractor format is acceptable.

Block 9: Mark Controlled Unclassified Information (CUI) according to the DoDI 5200.48, March 6, 2020, and Distribution Statements on Technical Documents according to DoDI 5230.24, August 23, 2012. If a data submission requires a distribution statement, the contractor shall ensure that the deliverable contains the appropriate classification markings and distribution statement.

Block 11: The contractor shall submit and or re-work deliverable in accordance with the Statement of Work.

Block 12: The contractor shall submit and or re-work deliverable in accordance with the Statement of Work.

Block 13: The contractor shall submit and or re-work deliverable in accordance with the Statement of Work.

Block 14: The deliverable shall be sent via electronic mail to the Contracting Officer's Representative (COR) and Procuring Contracting Officer (PCO) specified in Section G of the contract, using the most recent NMCI-compatible Microsoft Office Suite of products (or a Microsoft Office-compatible format).

17. PRICEGROUP

18. ESTIMATED

TOTAL PRICE

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved OMB No.0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C.CATEGORY:

TDP TM OTHER

D. SYSTEM/ITEM E. CONTRACT/PRNO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6.REQUIRINGOFFICE

7. DD 250 REQ 9. DIST STATEMENT

REQUIRED

10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE 11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION Draft

Final

Reg Repro

16. REMARKS

15. TOTAL

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

0001-0003 & 1001-4003 A MISC

INTEGRATED LIFECYCLE SUSTAINMENT AND DEPOT-LEVEL REPAIR SERVICES CDRL-PHD-N03-2025-0001 TBD

A007

TRIP/TRAVEL REPORT

DI-MISC-81943 SOW 5.1.18, 5.10.4, AND 6.6.3 PHD-N03-NSWCPHD

LT

SEE BLOCK 16

(See Block 16) SEE BLOCK 16

N/A SEE BLOCK 16 SEE BLOCK 16

PCO, CODE 0232

PHD-N03-NSWCPHD

1 1

DE JESUS, MATTHEW D. 04/08/2025

NSP

1 1

Contractor format is acceptable.

Block 9: Mark Controlled Unclassified Information (CUI) according to the DoDI 5200.48, March 6, 2020, and Distribution Statements on Technical Documents according to DoDI 5230.24, August 23, 2012. If a data submission requires a distribution statement, the contractor shall ensure that the deliverable contains the appropriate classification markings and distribution statement.

Block 10: The contractor shall submit and or re-work deliverable in accordance with the Statement of Work.

Block 11: The contractor shall submit and or re-work deliverable in accordance with the Statement of Work.

Block 12: The contractor shall submit and or re-work deliverable in accordance with the Statement of Work.

Block 13: The contractor shall submit and or re-work deliverable in accordance with the Statement of Work.

Block 14: The deliverable shall be sent via electronic mail to the Contracting Officer's Representative (COR) and Procuring Contracting Officer (PCO) specified in Section G of the contract, using the most recent NMCI-compatible Microsoft Office Suite of products (or a Microsoft Office-compatible format.

17. PRICEGROUP

18. ESTIMATED

TOTAL PRICE

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved OMB No.0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C.CATEGORY:

TDP TM OTHER

D. SYSTEM/ITEM E. CONTRACT/PRNO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6.REQUIRINGOFFICE

7. DD 250 REQ 9. DIST STATEMENT

REQUIRED

10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE 11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION Draft

Final

Reg Repro

16. REMARKS

15. TOTAL

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

0001-0003 & 1001-4003 A ADMN

INTEGRATED LIFECYCLE SUSTAINMENT AND DEPOT-LEVEL REPAIR SERVICES CDRL-PHD-N03-2025-0001 TBD

A008

REVISIONS TO EXISTING GOVERNMENT DOCUMENTS GFI

DI-ADMN-80925A SOW 5.4.1 PHD-N03-NSWCPHD

LT

SEE BLOCK 16

(See Block 16) SEE BLOCK 16

N/A SEE BLOCK 16 SEE BLOCK 16

PCO, CODE 0232

PHD-N03-NSWCPHD

1 1

DE JESUS, MATTHEW D. 04/08/2025

NSP

1 1

Contractor format is acceptable.

Block 9: Mark Controlled Unclassified Information (CUI) according to the DoDI 5200.48, March 6, 2020, and Distribution Statements on Technical Documents according to DoDI 5230.24, August 23, 2012. If a data submission requires a distribution statement, the contractor shall ensure that the deliverable contains the appropriate classification markings and distribution statement.

Block 10: The contractor shall submit and or re-work deliverable in accordance with the Statement of Work.

Block 11: The contractor shall submit and or re-work deliverable in accordance with the Statement of Work.

Block 12: The contractor shall submit and or re-work deliverable in accordance with the Statement of Work.

Block 13: The contractor shall submit and or re-work deliverable in accordance with the Statement of Work.

Block 14: The deliverable shall be sent via electronic mail to the Contracting Officer's Representative (COR) and Procuring Contracting Officer (PCO) specified in Section G of the contract, using the most recent NMCI-compatible Microsoft Office Suite of products (or a Microsoft Office-compatible format.

17. PRICEGROUP

18. ESTIMATED

TOTAL PRICE

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved OMB No.0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C.CATEGORY:

TDP TM OTHER

D. SYSTEM/ITEM E. CONTRACT/PRNO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6.REQUIRINGOFFICE

7. DD 250 REQ 9. DIST STATEMENT

REQUIRED

10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE 11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION Draft

Final

Reg Repro

16. REMARKS

15. TOTAL

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

0001-0003 & 1001-4003 A MGMT

INTEGRATED LIFECYCLE SUSTAINMENT AND DEPOT-LEVEL REPAIR SERVICES CDRL-PHD-N03-2025-0001 TBD

A009

GOVERNMENT PROPERTY (GP) INVENTORY REPORT

DI-MGMT-80441D SOW 5.5.1 PHD-N03-NSWCPHD

LT

SEE BLOCK 16

(See Block 16) SEE BLOCK 16

N/A SEE BLOCK 16 SEE BLOCK 16

PCO, CODE 0232

PHD-N03-NSWCPHD

1 1

DE JESUS, MATTHEW D. 04/08/2025

NSP

1 1

Contractor format is acceptable.

Block 9: Mark Controlled Unclassified Information (CUI) according to the DoDI 5200.48, March 6, 2020, and Distribution Statements on Technical Documents according to DoDI 5230.24, August 23, 2012. If a data submission requires a distribution statement, the contractor shall ensure that the deliverable contains the appropriate classification markings and distribution statement.

Block 10: The contractor shall submit and or re-work deliverable in accordance with the Statement of Work.

Block 11: The contractor shall submit and or re-work deliverable in accordance with the Statement of Work.

Block 12: The contractor shall submit and or re-work deliverable in accordance with the Statement of Work.

Block 13: The contractor shall submit and or re-work deliverable in accordance with the Statement of Work.

Block 14: The deliverable shall be sent via electronic mail to the Contracting Officer's Representative (COR) and Procuring Contracting Officer (PCO) specified in Section G of the contract, using the most recent NMCI-compatible Microsoft Office Suite of products (or a Microsoft Office-compatible format.

17. PRICEGROUP

18. ESTIMATED

TOTAL PRICE

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved OMB No.0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C.CATEGORY:

TDP TM OTHER

D. SYSTEM/ITEM E. CONTRACT/PRNO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6.REQUIRINGOFFICE

7. DD 250 REQ 9. DIST STATEMENT

REQUIRED

10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE 11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION Draft

Final

Reg Repro

16. REMARKS

15. TOTAL

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

0001-0003 & 1001-4003 A MGMT

INTEGRATED LIFECYCLE SUSTAINMENT AND DEPOT-LEVEL REPAIR SERVICES CDRL-PHD-N03-2025-0001 TBD

A00A

PRICED BILL OF MATERIAL (PBOM)

DI-MGMT-81994B SOW 5.6.1, 5.6.2, 5.6.3 PHD-N03-NSWCPHD

LT

SEE BLOCK 16

ASREQ (See Block 16) SEE BLOCK 16

N/A SEE BLOCK 16 SEE BLOCK 16

PCO, CODE 0232

PHD-N03-NSWCPHD

1 1

DE JESUS, MATTHEW D. 04/08/2025

NSP

1 1

Contractor format is acceptable.

Block 9: Mark Controlled Unclassified Information (CUI) according to the DoDI 5200.48, March 6, 2020, and Distribution Statements on Technical Documents according to DoDI 5230.24, August 23, 2012. If a data submission requires a distribution statement, the contractor shall ensure that the deliverable contains the appropriate classification markings and distribution statement.

Block 10: The contractor shall submit and or re-work deliverable in accordance with the Statement of Work.

Block 11: The contractor shall submit and or re-work deliverable in accordance with the Statement of Work.

Block 12: The contractor shall submit and or re-work deliverable in accordance with the Statement of Work.

Block 13: The contractor shall submit and or re-work deliverable in accordance with the Statement of Work.

Block 14: The deliverable shall be sent via electronic mail to the Contracting Officer's Representative (COR) and Procuring Contracting Officer (PCO) specified in Section G of the contract, using the most recent NMCI-compatible Microsoft Office Suite of products (or a Microsoft Office-compatible format.

17. PRICEGROUP

18. ESTIMATED

TOTAL PRICE

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved OMB No.0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C.CATEGORY:

TDP TM OTHER

D. SYSTEM/ITEM E. CONTRACT/PRNO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6.REQUIRINGOFFICE

7. DD 250 REQ 9. DIST STATEMENT

REQUIRED

10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE 11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION Draft

Final

Reg Repro

16. REMARKS

15. TOTAL

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

0001-0003 & 1001-4003 A N/A

INTEGRATED LIFECYCLE SUSTAINMENT AND DEPOT-LEVEL REPAIR SERVICES CDRL-PHD-N03-2025-0001 TBD

A00B

COUNTERFEIT PREVENTATION PLAN

DFARS 252.246-7007 SOW 5.7.1 PHD-N03-NSWCPHD

LT

SEE BLOCK 16

(See Block 16) 45DAC

N/A N/A N/A

PCO, CODE 0232

PHD-N03-NSWCPHD

1 1

DE JESUS, MATTHEW D. 04/08/2025

NSP

1 1

Contractor format is acceptable.

Block 9: Mark Controlled Unclassified Information (CUI) according to the DoDI 5200.48, March 6, 2020, and Distribution Statements on Technical Documents according to DoDI 5230.24, August 23, 2012. If a data submission requires a distribution statement, the contractor shall ensure that the deliverable contains the appropriate classification markings and distribution statement.

Block 10: OTIME

Block 11: The contractor shall submit and or re-work deliverable in accordance with the Statement of Work.

Block 12: The contractor shall submit and or re-work deliverable in accordance with the Statement of Work.

Block 13: The contractor shall submit and or re-work deliverable in accordance with the Statement of Work.

Block 14: The deliverable shall be sent via electronic mail to the Contracting Officer's Representative (COR) and Procuring Contracting Officer (PCO) specified in Section G of the contract, using the most recent NMCI-compatible Microsoft Office Suite of products (or a Microsoft Office-compatible format.

17. PRICEGROUP

18. ESTIMATED

TOTAL PRICE

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved OMB No.0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C.CATEGORY:

TDP TM OTHER

D. SYSTEM/ITEM E. CONTRACT/PRNO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6.REQUIRINGOFFICE

7. DD 250 REQ 9. DIST STATEMENT

REQUIRED

10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE 11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION Draft

Final

Reg Repro

16. REMARKS

15. TOTAL

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

0001-0003 & 1001-4003 A N/A

INTEGRATED LIFECYCLE SUSTAINMENT AND DEPOT-LEVEL REPAIR SERVICES CDRL-PHD-N03-2025-0001 TBD

A00C

TECHNICAL REPORT - STUDY/SERVICES, UNAUTHORIZED SUPPLIER PURCHASE REPORT

DFARS 252.246-7007 SOW 5.7.2 PHD-N03-NSWCPHD

LT

SEE BLOCK 16

ASREQ (See Block 16) SEE BLOCK 16

N/A SEE BLOCK 16 SEE BLOCK 16

PCO, CODE 0232

PHD-N03-NSWCPHD

1 1

DE JESUS, MATTHEW D. 04/08/2025

NSP

1 1

Contractor format is acceptable.

Block 9: Mark Controlled Unclassified Information (CUI) according to the DoDI 5200.48, March 6, 2020, and Distribution Statements on Technical Documents according to DoDI 5230.24, August 23, 2012. If a data submission requires a distribution statement, the contractor shall ensure that the deliverable contains the appropriate classification markings and distribution statement.

Block 10: The contractor shall submit and or re-work deliverable in accordance with the Statement of Work.

Block 11: The contractor shall submit and or re-work deliverable in accordance with the Statement of Work.

Block 12: The contractor shall submit and or re-work deliverable in accordance with the Statement of Work.

Block 13: The contractor shall submit and or re-work deliverable in accordance with the Statement of Work.

Block 14: The deliverable shall be sent via electronic mail to the Contracting Officer's Representative (COR) and Procuring Contracting Officer (PCO) specified in Section G of the contract, using the most recent NMCI-compatible Microsoft Office Suite of products (or a Microsoft Office-compatible format).

17. PRICEGROUP

18. ESTIMATED

TOTAL PRICE

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved OMB No.0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C.CATEGORY:

TDP TM OTHER

D. SYSTEM/ITEM E. CONTRACT/PRNO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6.REQUIRINGOFFICE

7. DD 250 REQ 9. DIST STATEMENT

REQUIRED

10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE 11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION Draft

Final

Reg Repro

16. REMARKS

15. TOTAL

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

0001-0003 & 1001-4003 A N/A

INTEGRATED LIFECYCLE SUSTAINMENT AND DEPOT-LEVEL REPAIR SERVICES CDRL-PHD-N03-2025-0001 TBD

A00D

UNAUTHORIZED SUPPLIER PURCHASE REPORT

SAE AS5553 SOW 5.7.4 AND 5.7.5 PHD-N03-NSWCPHD

LT

SEE BLOCK 16

(See Block 16) SEE BLOCK 16

N/A SEE BLOCK 16 SEE BLOCK 16

PCO, CODE 0232

PHD-N03-NSWCPHD

1 1

DE JESUS, MATTHEW D. 04/08/2025

NSP

1 1

Contractor format is acceptable.

Block 9: Mark Controlled Unclassified Information (CUI) according to the DoDI 5200.48, March 6, 2020, and Distribution Statements on Technical Documents according to DoDI 5230.24, August 23, 2012. If a data submission requires a distribution statement, the contractor shall ensure that the deliverable contains the appropriate classification markings and distribution statement.

Block 10: The contractor shall submit and or re-work deliverable in accordance with the Statement of Work.

Block 11: The contractor shall submit and or re-work deliverable in accordance with the Statement of Work.

Block 12: The contractor shall submit and or re-work deliverable in accordance with the Statement of Work.

Block 13: The contractor shall submit and or re-work deliverable in accordance with the Statement of Work.

Block 14: The deliverable shall be sent via electronic mail to the Contracting Officer's Representative (COR) and Procuring Contracting Officer (PCO) specified in Section G of the contract, using the most recent NMCI-compatible Microsoft Office Suite of products (or a Microsoft Office-compatible format.

17. PRICEGROUP

18. ESTIMATED

TOTAL PRICE

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved OMB No.0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C.CATEGORY:

TDP TM OTHER

D. SYSTEM/ITEM E. CONTRACT/PRNO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6.REQUIRINGOFFICE

7. DD 250 REQ 9. DIST STATEMENT

REQUIRED

10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE 11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION Draft

Final

Reg Repro

16. REMARKS

15. TOTAL

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

0001-0003 & 1001-4003 A MGMT

INTEGRATED LIFECYCLE SUSTAINMENT AND DEPOT-LEVEL REPAIR SERVICES CDRL-PHD-N03-2025-0001 TBD

A00E

HAZARDOUS MATERIAL MANAGEMENT PROGRAM (HMMP) PLAN

DI-MGMT-81398D SOW 5.8 PHD-N03-NSWCPHD

LT

SEE BLOCK 16

(See Block 16) SEE BLOCK 16

N/A SEE BLOCK 16 SEE BLOCK 16

PCO, CODE 0232

PHD-N03-NSWCPHD

1 1

DE JESUS, MATTHEW D. 04/08/2025

NSP

1 1

Contractor format is acceptable.

Block 9: Mark Controlled Unclassified Information (CUI) according to the DoDI 5200.48, March 6, 2020, and Distribution Statements on Technical Documents according to DoDI 5230.24, August 23, 2012. If a data submission requires a distribution statement, the contractor shall ensure that the deliverable contains the appropriate classification markings and distribution statement.

Block 10: The contractor shall submit and or re-work deliverable in accordance with the Statement of Work.

Block 11: The contractor shall submit and or re-work deliverable in accordance with the Statement of Work.

Block 12: The contractor shall submit and or re-work deliverable in accordance with the Statement of Work.

Block 13: The contractor shall submit and or re-work deliverable in accordance with the Statement of Work.

Block 14: The deliverable shall be sent via electronic mail to the Contracting Officer's Representative (COR) and Procuring Contracting Officer (PCO) specified in Section G of the contract, using the most recent NMCI-compatible Microsoft Office Suite of products (or a Microsoft Office-compatible format.

17. PRICEGROUP

18. ESTIMATED

TOTAL PRICE

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved OMB No.0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C.CATEGORY:

TDP TM OTHER

D. SYSTEM/ITEM E. CONTRACT/PRNO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6.REQUIRINGOFFICE

7. DD 250 REQ 9. DIST STATEMENT

REQUIRED

10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE 11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION Draft

Final

Reg Repro

16. REMARKS

15. TOTAL

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

0001-0003 & 1001-4003 A MGMT

INTEGRATED LIFECYCLE SUSTAINMENT AND DEPOT-LEVEL REPAIR SERVICES CDRL-PHD-N03-2025-0001 TBD

A00F

PROJECT PLANNING CHART SCHEDULE PLAN

DI-MGMT-80507C SOW 6.3.1 PHD-N03-NSWCPHD

LT

SEE BLOCK 16

(See Block 16) SEE BLOCK 16

N/A SEE BLOCK 16 SEE BLOCK 16

PCO, CODE 0232

PHD-N03-NSWCPHD

1 1

DE JESUS, MATTHEW D. 04/08/2025

NSP

1 1

Contractor format is acceptable.

Block 9: Mark Controlled Unclassified Information (CUI) according to the DoDI 5200.48, March 6, 2020, and Distribution Statements on Technical Documents according to DoDI 5230.24, August 23, 2012. If a data submission requires a distribution statement, the contractor shall ensure that the deliverable contains the appropriate classification markings and distribution statement.

Block 10: The contractor shall submit and or re-work deliverable in accordance with the Statement of Work.

Block 11: The contractor shall submit and or re-work deliverable in accordance with the Statement of Work.

Block 12: The contractor shall submit and or re-work deliverable in accordance with the Statement of Work.

Block 13: The contractor shall submit and or re-work deliverable in accordance with the Statement of Work.

Block 14: The deliverable shall be sent via electronic mail to the…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .