The NAVSEA 4340/2 form is a Government Furnished Information (GFI) template used to track and document information that the government will provide to a contractor during a contract. The form contains specific instructions for completing each column, including:
Column (1): Sequential numbering of GFI items
Column (2): Document title
Column (3): Document number (if assigned)
Column (4): Document publication date
Column (5): Date the item is due to the contractor
The instructions provide flexibility in specifying due dates, allowing for various methods such as days/months after contract award, months before delivery, or months before equipment testing. The form is designed to be completed by the contracting officer, with specific guidance on how to fill out each field, ensuring clear communication of government-provided information to the contractor.
View the file
Other files
Show all 24
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NAVSEA 4340/2 (Rev. Mar 2018) Page 1 of 2
GOVERNMENT FURNISHED INFORMATION
ATTACHMENT # PR#
PROGRAM TITLE: CONTRACT NUMBER: DATE:
CODE:
(1) NUMBER (5) GFI DUE DATE(4) DOCUMENT DATE(3) DOCUMENT NUMBER(2) DOCUMENT TITLE
NAVSEA 4340/2 (Rev. Mar 2018) Page 2 of 2
NAVSEA Form 4340/2 - Government Furnished Information Instructions
ATTACHMENT #: Leave blank, contracting officer will complete when preparing solicitation or contract.
PR #: Enter Purchase Request (PR) number.
PROGRAM TITLE: Enter the title of the program.
CONTRACT NO.: Leave blank if this requirement will result in a new contract. Insert contract number if the PR will result in the modification to an existing contract.
DATE: Enter the calendar date that this form was prepared.
CODE: Enter the Program Office / Requiring Activity's office code.
NUMBER, Column (1): Enter a sequential number for each item of GFI to be supplied.
DOCUMENT TITLE, Column (2): Enter Document Title for each item.
DOCUMENT NUMBER, Column (3): Enter Document Number assigned to identify a specific document. If no number has been assigned, leave blank.
DOC DATE, Column (4): Enter publication date of the document. If the item has no date assigned, leave blank. This format (MM/DD/YR) for the date is preferred (e.g., 06/25/16).
GFI DUE DATE, Column (5): Insert the date the item is due at the contractor's plant or is to be first available to the contractor for use. A calendar date format (MM/DD/YR) is preferred (e.g., 02/28/19), but following non-calendar methods are acceptable:
DAC - Days after contract award date MAC - Months after contract award date MACM - Months after contract modification date MAOE - Months after option exercise MBD - Months before delivery MBT - Months before the start of ship builder's trials or equipment test
PAGE __ OF __: Assign page numbers sequentially.
NAVSEA 4340/2 (Rev. Mar 2018) Page of NAVSEA 4340/2 (Rev. Mar 2018) Page of
GOVERNMENT FURNISHED INFORMATION
(1) NUMBER
(5) GFI DUE DATE
(4) DOCUMENT DATE
(3) DOCUMENT NUMBER
(2) DOCUMENT TITLE
NAVSEA Form 4340/2 - Government Furnished Information Instructions
ATTACHMENT #: Leave blank, contracting officer will complete when preparing solicitation or contract.
PR #: Enter Purchase Request (PR) number.
PROGRAM TITLE: Enter the title of the program.
CONTRACT NO.: Leave blank if this requirement will result in a new contract. Insert contract number if the PR will result in the modification to an existing contract.
DATE: Enter the calendar date that this form was prepared.
CODE: Enter the Program Office / Requiring Activity's office code.
NUMBER, Column (1): Enter a sequential number for each item of GFI to be supplied.
DOCUMENT TITLE, Column (2): Enter Document Title for each item.
DOCUMENT NUMBER, Column (3): Enter Document Number assigned to identify a specific document. If no number has been assigned, leave blank.
DOC DATE, Column (4): Enter publication date of the document. If the item has no date assigned, leave blank. This format (MM/DD/YR) for the date is preferred (e.g., 06/25/16).
GFI DUE DATE, Column (5): Insert the date the item is due at the contractor's plant or is to be first available to the contractor for use. A calendar date format (MM/DD/YR) is preferred (e.g., 02/28/19), but following non-calendar methods are acceptable:
DAC - Days after contract award date MAC - Months after contract award date MACM - Months after contract modification date MAOE - Months after option exercise MBD - Months before delivery MBT - Months before the start of ship builder's trials or equipment test
PAGE __ OF __: Assign page numbers sequentially.
11.0.1.20130826.2.901444.899636
| CurrentPage: |
| PageCount: |
| TextField1: |
| TextField2: |
| TextField7: |
| TextField8: |
| DateField1: |
| TextField3: |
| DateField3: |
| DateField2: |
| TextField6: |
| TextField5: |
| TextField4: |
File details come from the government source that posted it. Updated .