Exhibit A - CDRLs.docx

DOCX document 575 KB Posted

Attached to
RFP for Integration & Production (I&P) Follow-On
Solicitation number
N0042124R0038
Issued by

About this file

This document is a Contract Data Requirements List (CDRL) that specifies 27 contractual data deliverables required for the Integration & Production (I&P) Follow-On contract with the Department of the Navy Naval Air Systems Command (NAVAIR). The CDRLs cover a range of products and services including technical documentation, management reports, quality certifications, inspection data, training materials, and logistics data. Key details include submission timelines, distribution requirements, approval processes, and tailoring of data item descriptions. The contract opportunity is for follow-on integration and production support services for the Combat Integration & Identification Systems (CI&IDS) program, with a contracting officer specified as the requiring office. No specific pricing terms, set asides, incumbents, or award dates are provided in this CDRL document.

View the file

Other files

File Type Posted
N0042124R0038-0003 CC.docx DOCX document
N0042124R0038-0003.docx DOCX document
Questions and Answers to Amendment 0001.pdf PDF
N0042124R0038-0002 CC.docx DOCX document
N0042124R0038-0002.docx DOCX document
Attachment 4 - OCI List.docx DOCX document
Attachment P1 - Cost Summary Spreadsheet.xlsx XLSX spreadsheet
N0042124R0038-0001.docx DOCX document
N0042124R0038-0001 CC.docx DOCX document
Questions and Answers to RFP N0042124R0038.pdf PDF
Attachment 3 - Locator Form.doc DOC document
Attachment 6 - WD 2015-4279-Rev 25.pdf PDF
N0042124R0038.pdf PDF
Attachment 2 - IP_CSP V6_CUI.docx DOCX document
Attachment 4 - IP_OCI List.docx DOCX document
Attachment P2 - Annual Fully Burdened Rates.xlsx XLSX spreadsheet
Attachment P3 - SBPCD.docx DOCX document
Attachment 1 -DD FORM 254 JUNE 2025.pdf PDF
Attachment P1 - Cost Summary Spreadsheet.xlsx XLSX spreadsheet
Attachment 5 - Data Transmittal Form.docx DOCX document
Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACT DATA REQUIREMENTS LIST (CDRL)

(1 Data Item) Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.
B. EXHIBIT
C. CATEGORY:

0001, 0008

TDP_______
TM_______
OTHER_____MGMT__________________
D. SYSTEM/ITEM
E. CONTRACT/PR NO.
F. CONTRACTOR

CI&IDS Integration & Production Support Services

TBD
TBD
1. DATA ITEM NO.
2. TITLE OF DATA ITEM
3. SUBTITLE
A001
Contracting Officer’s Representative (COR) Management Report for Technical Direction Letters (TDLs)
Segregation of Cost and Invoice Requirements Reporting for TDLs
4. AUTHORITY (Data Acquisition Document No.)
5. CONTRACT REFERENCE
6. REQUIRING OFFICE
DI-MGMT-81864 NOT 1 (See BLK 16)
3.1.3.1, 3.1.9
NAWCAD WOLF CI&IDS
7. DD 250 REQ
9. DIST STATEMENTREQUIRED
10. FREQUENCY
12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION

LT (See BLK 16)

(See BLK 16)
(See BLK 16)
a. ADDRESSEE
b. COPIES
8. APP CODE
D
11. AS OF DATE
13. DATE OF SUBSEQUENTSUBMISSION
Draft
Final

N/A (See BLK 16)

(See BLK 16)
(See BLK 16)
Reg
Repro
16. REMARKS
COR (See BLK 16)
0
1
0

BLK 4: The Contractor shall use the format listed in attachment x Excel template “COR only” and attachment X Excel template “COR customer_TPOC” of section J of the Contract. The Contractor shall segregate costs incurred on the Task Order (TO) at the lowest level of performance by TDL or the lowest level subtask stated in the TDL and shall also submit invoices reflecting costs incurred at that level. In addition, the Contractor shall also include summaries of work charged during the period covered; percentage of funds invoiced, expended, and budgeted; and an Estimate at Completion (EAC) at the level identified within each TDL to represent the estimated cost of tasking for the Period of Performance (PoP) of the TDL. For this CDRL the Contractor shall not submit data or invoices on a Contract Line Item Number (CLIN) or total contract basis.

BLK 7: Submit in an editable software format (Microsoft Office) to ensure compatibility with the Navy Marine Corps Intranet (NMCI) information technology computer infrastructure system and in accordance with Combat Integration & Identification Systems (CI&IDS) Work Instruction Naval Systems Engineering Resource Center (NSERC) Contract Deliverables Workflow (WI-4K20-B-EMC-024).

BLK 8: This CDRL format will not require Government approval. However, if the Contracting Officer’s Representative (COR) communicates errors found in either the data deliverable or the format, the COR will determine if immediate correction is warranted or can be corrected in the next deliverable submission.

BLKS 10, 11, 12, and 13: The first data submission is due 10 business days after the first full month of TO performance and shall include data from TO award through the end of the first month of performance; this data shall also be submitted with the first invoice. Subsequent monthly data deliverables shall be submitted within 10 business days of the preceding month and with each monthly invoice. The data deliverable shall reflect the exact dollar amount and PoP as shown on the invoice. All data submittals shall be distributed to those identified in block 14.

BLK 14: Submit to the COR and Project Lead/Technical Point of Contact (TPOC).

Monthly Data Deliverables:

“COR only” deliverable: COR and Naval Air Warfare Center Aircraft Division (NAWCAD) Procurement Group Procuring Contracting Officer (PCO) “COR customer_TPOC”: COR, NAWCAD Procurement Group PCO, and Project Lead/TPOC "Engineering and Technical Services Accomplishment Report": COR and Project Lead/TPOC

15.TOTAL▬▬▬▬►
0
1
0
G. PREPARED BY
H. DATE
I. APPROVED BY
J. DATE
Kelsey Trifone
10/3/2023

DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page _1_ of _30_Pages18. ESTIMATED TOTAL PRICE

17. PRICE GROUP

INSTRUCTIONS FOR COMPLETING DD FORM 1423

(See DoD 5010.12-M for detailed instructions.)

FOR GOVERNMENT PERSONNEL
FOR CONTRACTOR PERSONNEL

Item A. Self-explanatory.

Item B. Self-explanatory.

Item C. Mark (X) appropriate category: TDP - Technical Data Package; TM - Technical Manual; Other - other category of data, such as “Provisioning”, “Configuration Management”, etc.

Item D. Enter name of system/item being acquired that data will support.

Item E. Self-explanatory (to be filled in after contract award).

Item F. Self-explanatory (to be filled in after contract award).

Item G. Signature of preparer of CDRL.

Item H. Date CDRL was prepared.

Item I. Signature of CDRL approval authority.

Item J. Data CDRL was approved.

Item 1. See DoD FAR Supplement Subpart 4.71 for proper numbering.

Item 2. Enter title as it appears on data acquisition document cited in item 4.

Item 3. Enter subtitle of data item for further definition of data item (optional entry).

Item 4. Enter Data Item Description (DID) number, military specification number, or military standard number listed on the ASSIST website), or onetime DID number, that defines data content and format requirements.

Item 5. Enter reference to tasking in contract that generates requirement for the data item (e.g., Statement of Work paragraph number).

Item 6. Enter technical office responsible for ensuring adequacy of the data item.

Item 7. Specify requirement for inspection/acceptance of the data item by the Government.

Item 8. Specify requirement for approval of a draft before preparation of the final data item.

Item 9. For technical data, specify requirement for Contractor to mark the appropriate distribution statement on the data (ref. DoD 5230.24).

Item 10. Specify number of time data items are to be delivered.

Item 11. Specify as-of date of data item, when applicable.

Item 12. Specify when first submittal is required.

Item 13. Specify when subsequent submittals are required, when applicable.

Item 14. Enter addresses and number of draft/final copies to be delivered to each addressee. Explain reproducible copies in item 16.

Item 15. Enter total number of draft/final copies to be delivered.

Item 16. Use for additional/clarifying information for Items 1 through 12. Examples are: Tailoring of documents cited in item 4; Clarification of submittal dates in items 12 and 13; Explanation of reproducible copies in item 14.; Desired medium for delivery of the data item.

Item 17. Specify appropriate price group from one of the following groups of effort in developing estimated prices for each data item on the DD Form 1423.

a. Group I. Definition - Data which is not otherwise essential to the Contractor’s performance of the primary contracted effort (production, development, testing, and administration) but which is required by DD Form 1423.

Estimated Price - Costs to be included under Group I are those applicable to preparing and assembling the data item in conformance with Government requirements, and the administration and other expenses related to reproducing and delivering such data items to the Government.

b. Group II. Definition - Data which is essential to the performance of the primary contracted effort but the Contractor is required to perform additional work to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, or the data item.

Estimated Price - Cost to be included under Group II are those incurred over and above the cost of the essential data item without conforming to Government requirements, and the administrative and other expenses related to reproducing and delivering such data item to the Government.

c. Group III. Definition - Data which the Contractor must develop for his internal use in performance of the primary contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of content, format, frequency or submittal, preparation, control, and quality of the data item.

Estimated Price - Cost to be included under Group III are the administrative and other expenses related to reproducing and delivering such data item to the Government.

d. Group IV. Definition - Data which is developed by the Contractor as part of his normal operating procedures and his effort in supplying these data to the Government is minimal.

Estimated Price - Group IV Item should normally be shown on the DD Form 1423 at no cost.

Item 18. For each data item, enter an amount equal to that portion of the total price which is estimated to be attributable to the production or development for the Government of that item of data. These estimated data prices shall be developed only from those costs which will be incurred as a direct result of the requirement to supply the data, over and above those costs which would otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any amount for rights in data. The Governments’ right to use the data shall be governed by the pertinent provisions of the contract.

CONTRACT DATA REQUIREMENTS LIST (CDRL)

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.
B. EXHIBIT
C. CATEGORY:

0001, 0008

TDP_______
TM_______
OTHER_____MGMT__________________
D. SYSTEM/ITEM
E. CONTRACT/PR NO.
F. CONTRACTOR

CI&IDS Integration & Production Support Services

TBD
TBD
1. DATA ITEM NO.
2. TITLE OF DATA ITEM
3. SUBTITLE
A002
Management Plan
Organizational Chart & Labor Mix ReportComment by McLendon, Ashley L CIV (USA): Please ensure that this title matches the SOW reference to this report.
4. AUTHORITY (Data Acquisition Document No.)
5. CONTRACT REFERENCE
6. REQUIRING OFFICE
DI-MGMT-80004A (See BLK 16)
3.1.3.2
NAWCAD WOLF CI&IDS
7. DD 250 REQ
9. DIST STATEMENTREQUIRED
10. FREQUENCY
12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION

LT (See BLK 16)

MNTHLY
10DARP (See BLK 16)
a. ADDRESSEE
b. COPIES
8. APP CODE
D
11. AS OF DATE
13. DATE OF SUBSEQUENTSUBMISSION
Draft
Final

N/A

O
10DARP (See BLK 16)
Reg
Repro
16. REMARKS
COR
0
1
0

BLK 4: The Data Item Description (DID) requirements may be tailored to be limited to providing an organizational chart and labor mix breakout depicting assignment of functions, duties, responsibilities, and clearance requirements/status on a per person basis.

BLK 7: Submit in an editable software format (Microsoft Office) to ensure compatibility with the Navy Marine Corps Intranet (NMCI) information technology computer infrastructure system and in accordance with Combat Integration & Identification Systems (CI&IDS) Work Instruction Naval Systems Engineering Resource Center (NSERC) Contract Deliverables Workflow (WI-4K20-B-EMC-024).

BLKS 12 and 13: The reporting period is defined as the last day of each month.

15.TOTAL▬▬▬▬►
0
1
0
G. PREPARED BY
H. DATE
I. APPROVED BY
J. DATE
Kelsey Trifone
10/3/2023

DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page _2_ of _30_Pages18. ESTIMATED TOTAL PRICE

CONTRACT DATA REQUIREMENTS LIST (CDRL)

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.
B. EXHIBIT
C. CATEGORY:

0001, 0008

TDP_______
TM_______
OTHER_____SESS____________
D. SYSTEM/ITEM
E. CONTRACT/PR NO.
F. CONTRACTOR

CI&IDS Integration & Production Support Services

TBD
TBD
1. DATA ITEM NO.
2. TITLE OF DATA ITEM
3. SUBTITLE
A003
Certificate of Quality Audit Compliance
International Organization for Standards (ISO) International Standard 9001:2015, Quality Management Systems, September 2015
4. AUTHORITY (Data Acquisition Document No.)
5. CONTRACT REFERENCE
6. REQUIRING OFFICE
DI-SESS-81922 NOT 1Comment by McLendon, Ashley L CIV (USA): Added
3.1.3.3
NAWCAD WOLF CI&IDS
7. DD 250 REQ
9. DIST STATEMENTREQUIRED
10. FREQUENCY
12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION

LT (See BLK 16)

ANNLY
30 DAC
a. ADDRESSEE
b. COPIES
8. APP CODE
D
11. AS OF DATE
13. DATE OF SUBSEQUENTSUBMISSION
Draft
Final

N/A

N/A
ANNLY (See BLK 16)
Reg
Repro
16. REMARKS
COR
0
1
0

BLK 7: Submission will be required to be compatible with the Navy Marine Corps Intranet (NMCI) information technology computer infrastructure system and in accordance with Combat Integration & Identification Systems (CI&IDS) Work Instruction Naval Systems Engineering Resource Center (NSERC) Contract Deliverables Workflow (WI-4K20-B-EMC-024).

BLK 13: The Contractor shall provide a copy of the ISO 9001:2015 Certificate of Compliance each year upon completion of Contractor's annual audit.

15.TOTAL▬▬▬▬►
0
1
0
G. PREPARED BY
H. DATE
I. APPROVED BY
J. DATE
Kelsey Trifone
10/3/2023

DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page _3_ of _30_Pages18. ESTIMATED TOTAL PRICE

CONTRACT DATA REQUIREMENTS LIST (CDRL)

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.
B. EXHIBIT
C. CATEGORY:

0001, 0008

TDP_______
TM_______
OTHER_____MISC__________________
D. SYSTEM/ITEM
E. CONTRACT/PR NO.
F. CONTRACTOR

CI&IDS Integration & Production Support Services

TBD
TBD
1. DATA ITEM NO.
2. TITLE OF DATA ITEM
3. SUBTITLE
A004
Trip/Travel Report
4. AUTHORITY (Data Acquisition Document No.)
5. CONTRACT REFERENCE
6. REQUIRING OFFICE
DI-MISC-81943 NOT 2 (See BLK 16)
3.1.5.1.3
NAWCAD WOLF CI&IDS
7. DD 250 REQ
9. DIST STATEMENTREQUIRED
10. FREQUENCY
12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION

LT (See BLK 16)

ASREQ (See BLK 16)
ASREQ (See BLK 16)
a. ADDRESSEE
b. COPIES
8. APP CODE
D
11. AS OF DATE
13. DATE OF SUBSEQUENTSUBMISSION
Draft
Final

N/A (See BLK 16)

N/A
ASREQ (See BLK 16)
Reg
Repro
16. REMARKS
COR
0
1
0

BLK 4: In addition to the information required by the Data Item Description (DID), the Trip/Travel report shall also contain Points of Contact (POCs), accomplishments, action items, and problems encountered.

BLK 7: Submit in an editable software format (Microsoft Office) to ensure compatibility with the Navy Marine Corps Intranet (NMCI) information technology computer infrastructure system and in accordance with Combat Integration & Identification Systems (CI&IDS) Work Instruction Naval Systems Engineering Resource Center (NSERC) Contract Deliverables Workflow (WI-4K20-B-EMC-024).

BLK 8: This CDRL will not require Government approval. However, if the Contracting Officer’s Representative (COR) communicates errors found in either the data deliverable or the format, the COR will determine if immediate correction is warranted or provide a time period for the correction to be completed.

BLKS 10, 12, and 13: The Contractor shall submit a trip report for each trip within 10 business days of returning from travel.

15.TOTAL▬▬▬▬►
0
1
0
G. PREPARED BY
H. DATE
I. APPROVED BY
J. DATE
Kelsey Trifone
10/3/2023

DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page _4_ of _30_Pages18. ESTIMATED TOTAL PRICE

CONTRACT DATA REQUIREMENTS LIST (CDRL)

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.
B. EXHIBIT
C. CATEGORY:

0001, 0008

TDP_______
TM_______
OTHER_____MGMT__________________
D. SYSTEM/ITEM
E. CONTRACT/PR NO.
F. CONTRACTOR

CI&IDS Integration & Production Support Services

TBD
TBD
1. DATA ITEM NO.
2. TITLE OF DATA ITEM
3. SUBTITLE
A005
Contractor Performance Assessment Report
Technical Assistance Performance Evaluation (TAPE) Report
4. AUTHORITY (Data Acquisition Document No.)
5. CONTRACT REFERENCE
6. REQUIRING OFFICE
DI-MGMT-82216 NOT 1 (See BLK 16)
3.1.5.1.4
NAWCAD WOLF CI&IDS
7. DD 250 REQ
9. DIST STATEMENTREQUIRED
10. FREQUENCY
12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION

LT (See BLK 16)

ASREQ (See BLK 16)
ASREQ (See BLK 16)
a. ADDRESSEE
b. COPIES
8. APP CODE
D
11. AS OF DATE
13. DATE OF SUBSEQUENTSUBMISSION
Draft
Final

N/A

N/A
ASREQ (See BLK 16)
Reg
Repro
16. REMARKS
COR
0
1
0

BLK 4: Tailor Data Item Description (DID) to meet format of attachment X, TAPE Form.

BLK 7: Submission will be required to be compatible with the Navy Marine Corps Intranet (NMCI) information technology computer infrastructure system and in accordance with Combat Integration & Identification Systems (CI&IDS) Work Instruction Naval Systems Engineering Resource Center (NSERC) Contract Deliverables Workflow (WI-4K20-B-EMC-024).

BLKS 10, 12, and 13: The Contractor shall provide feedback forms and updated quality metrics within five business days of receipt of each TAPE Form.

15.TOTAL▬▬▬▬►
0
1
0
G. PREPARED BY
H. DATE
I. APPROVED BY
J. DATE
Kelsey Trifone
10/3/2023

DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page _5_ of _30_Pages18. ESTIMATED TOTAL PRICE

CONTRACT DATA REQUIREMENTS LIST (CDRL)

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.
B. EXHIBIT
C. CATEGORY:

0001, 0008

TDP_______
TM_______
OTHER_____MGMT__________________
D. SYSTEM/ITEM
E. CONTRACT/PR NO.
F. CONTRACTOR

CI&IDS Integration & Production Support Services

TBD
TBD
1. DATA ITEM NO.
2. TITLE OF DATA ITEM
3. SUBTITLE
A006
Government Property (GP) Inventory Report
Contractor Acquired Property (CAP)
4. AUTHORITY (Data Acquisition Document No.)
5. CONTRACT REFERENCE
6. REQUIRING OFFICE
DI-MGMT-80441D (See BLK 16)
3.1.5.2
NAWCAD WOLF CI&IDS
7. DD 250 REQ
9. DIST STATEMENTREQUIRED
10. FREQUENCY
12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION

XX (See BLK 16)

ONE/R
90 DPT EOC
a. ADDRESSEE
b. COPIES
8. APP CODE
D
11. AS OF DATE
13. DATE OF SUBSEQUENTSUBMISSION
Draft
Final

A (See BLK 16)

N/A
N/A
Reg
Repro
16. REMARKS
COR
0
1
0

BLK 4: In addition to the information required by the Data Item Description (DID), the Government Property (GP) Inventory Report will include quantity of items, order status for any undelivered items, and receipt dates.

BLK 7: Submit in an editable software format (Microsoft Office) to ensure compatibility with the Navy Marine Corps Intranet (NMCI) information technology computer infrastructure system and in accordance with Combat Integration & Identification Systems (CI&IDS) Work Instruction Naval Systems Engineering Resource Center (NSERC) Contract Deliverables Workflow (WI-4K20-B-EMC-024).

BLK 8: The Government will have 10 business days to review and provide any comments. If required, the Contractor shall submit the final deliverable within five business days of Government comments. If the Government does not provide comments within 10 business days of submission the CDRL is considered accepted.

15.TOTAL▬▬▬▬►
0
1
0
G. PREPARED BY
H. DATE
I. APPROVED BY
J. DATE
Kelsey Trifone
10/3/2023

DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page _6_ of _30_Pages18. ESTIMATED TOTAL PRICE

CONTRACT DATA REQUIREMENTS LIST (CDRL)

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.
B. EXHIBIT
C. CATEGORY:

0001, 0008

TDP_______
TM_______
OTHER_____MGMT__________________
D. SYSTEM/ITEM
E. CONTRACT/PR NO.
F. CONTRACTOR

CI&IDS Integration & Production Support Services

TBD
TBD
1. DATA ITEM NO.
2. TITLE OF DATA ITEM
3. SUBTITLE
A007
Phase-Out Transition Plan
Transition-Out Plan
4. AUTHORITY (Data Acquisition Document No.)
5. CONTRACT REFERENCE
6. REQUIRING OFFICE
DI-MGMT-81945A
3.1.8
NAWCAD WOLF CI&IDS
7. DD 250 REQ
9. DIST STATEMENTREQUIRED
10. FREQUENCY
12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION

XX (See BLK 16)

ONE/R
60 DPT EOC
a. ADDRESSEE
b. COPIES
8. APP CODE
D
11. AS OF DATE
13. DATE OF SUBSEQUENTSUBMISSION
Draft
Final

A (See BLK 16)

N/A
N/A
Reg
Repro
16. REMARKS
COR
0
1
0

BLK 7: Submit in an editable software format (Microsoft Office) to ensure compatibility with the Navy Marine Corps Intranet (NMCI) information technology computer infrastructure system and in accordance with Combat Integration & Identification Systems (CI&IDS) Work Instruction Naval Systems Engineering Resource Center (NSERC) Contract Deliverables Workflow (WI-4K20-B-EMC-024).

BLK 8: The Government will have 10 business days to review and provide comments. If Government comments are not received within 10 business days, the CDRL is to be considered accepted. If required, the Contractor shall submit the final deliverables within five business days of Government comments.

15.TOTAL▬▬▬▬►
0
1
0
G. PREPARED BY
H. DATE
I. APPROVED BY
J. DATE
Kelsey Trifone
10/3/2023

DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page _7_ of _30_Pages18. ESTIMATED TOTAL PRICE

CONTRACT DATA REQUIREMENTS LIST (CDRL)

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.
B. EXHIBIT
C. CATEGORY:

0001, 0008

TDP_______
TM_______
OTHER_____MISC_________________
D. SYSTEM/ITEM
E. CONTRACT/PR NO.
F. CONTRACTOR

CI&IDS Integration & Production Support Services

TBD
TBD
1. DATA ITEM NO.
2. TITLE OF DATA ITEM
3. SUBTITLE
A008
Certification Data Report
Organizational Conflict of Interest (OCI) Mitigation Plan & Non-Disclosure Agreement (NDA) Status Certification
4. AUTHORITY (Data Acquisition Document No.)
5. CONTRACT REFERENCE
6. REQUIRING OFFICE
DI-MISC-82386 (See BLK 16)
3.1.10
NAWCAD WOLF CI&IDS
7. DD 250 REQ
9. DIST STATEMENTREQUIRED
10. FREQUENCY
12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION

LT (See BLK 16)

ASREQ (See BLK 16)
See BLK 16
a. ADDRESSEE
b. COPIES
8. APP CODE
D
11. AS OF DATE
13. DATE OF SUBSEQUENTSUBMISSION
Draft
Final

N/A (See BLK 16)

ASREQ (See BLK 16)
ASREQ (See BLK 16)
Reg
Repro
16. REMARKS
COR
0
1
0

BLK 4: Contractor format is acceptable but shall include all required information as documented in Clause 5252.209-9510.

BLK 7 & 8: Submission, when applicable, will be required to be compatible with the Navy Marine Corps Intranet (NMCI) information technology computer infrastructure system and in accordance with Combat Integration & Identification Systems (CI&IDS) Work Instruction Naval Systems Engineering Resource Center (NSERC) Contract Deliverables Workflow (WI-4K20-B-EMC-024). Government review and approval of the initial OCI Mitigation Plan will occur as part of the evaluation process and will not be required for initial submission of this CDRL. Updates required to the OCI Mitigation Plan as a result of OCI arising during performance will be executed in accordance with the guidance provided for BLK 13.

BLK 12: The Contractor shall submit certification of compliance with the OCI Mitigation Plan to include a company-to-company NDA execution status within 20 business days of Task Order (TO) award.

BLKS 10, 11, and 13: The Contractor shall resubmit within five business days of any changes in either compliance with the OCI Mitigation Plan or to company-to-company NDA status. If an OCI was not identified during the solicitation phase and one arises during performance, revision, and resubmission of the OCI Mitigation Plan is required within 10 business days of the OCI arising. The Government will review and respond within 10 business days. Government provided feedback shall be adjudicated within five business days.

15.TOTAL▬▬▬▬►
0
1
0
G. PREPARED BY
H. DATE
I. APPROVED BY
J. DATE
Kelsey Trifone
10/3/2023

DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page _8_ of _30_Pages18. ESTIMATED TOTAL PRICE

CONTRACT DATA REQUIREMENTS LIST (CDRL)

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.
B. EXHIBIT
C. CATEGORY:

0001, 0008

TDP_______
TM_______
OTHER_____MGMT__________________
D. SYSTEM/ITEM
E. CONTRACT/PR NO.
F. CONTRACTOR

CI&IDS Integration & Production Support Services

TBD
TBD
1. DATA ITEM NO.
2. TITLE OF DATA ITEM
3. SUBTITLE
A009
NAVAIR Operations Security (OPSEC) Plan
4. AUTHORITY (Data Acquisition Document No.)
5. CONTRACT REFERENCE
6. REQUIRING OFFICE
DI-MGMT-81999A
3.2.5
NAWCAD WOLF CI&IDS
7. DD 250 REQ
9. DIST STATEMENTREQUIRED
10. FREQUENCY
12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION

XX (See BLK 16)

ONE/R
90 DAC
a. ADDRESSEE
b. COPIES
8. APP CODE
D
11. AS OF DATE
13. DATE OF SUBSEQUENTSUBMISSION
Draft
Final

A (See BLK 16)

N/A
N/A
Reg
Repro
16. REMARKS
COR
0
1
0

BLK 7: Submit in an editable software format (Microsoft Office) to ensure compatibility with the Navy Marine Corps Intranet (NMCI) information technology computer infrastructure system and in accordance with Combat Integration & Identification Systems (CI&IDS) Work Instruction Naval Systems Engineering Resource Center (NSERC) Contract Deliverables Workflow

(WI-4K20-B-EMC-024).

BLK 8: Review comments will be provided by the Government within 30 calendar days, if applicable. Resubmission by the Contractor shall be within 10 calendar days of receipt of any comments.

15.TOTAL▬▬▬▬►
0
1
0
G. PREPARED BY
H. DATE
I. APPROVED BY
J. DATE
Kelsey Trifone
10/3/2023

DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page _9_ of _30_Pages18. ESTIMATED TOTAL PRICE

CONTRACT DATA REQUIREMENTS LIST (CDRL)

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.
B. EXHIBIT
C. CATEGORY:

0001, 0008

TDP_______
TM_______
OTHER_____SESS_________________
D. SYSTEM/ITEM
E. CONTRACT/PR NO.
F. CONTRACTOR

CI&IDS Integration & Production Support Services

TBD
TBD
1. DATA ITEM NO.
2. TITLE OF DATA ITEM
3. SUBTITLE
A010
Schematic Block Diagrams
Engineering Drawings
4. AUTHORITY (Data Acquisition Document No.)
5. CONTRACT REFERENCE
6. REQUIRING OFFICE
DI-SESS-81223A
3.3.1.1, 3.3.2.1, 3.3.3.1.3
NAWCAD WOLF CI&IDS
7. DD 250 REQ
9. DIST STATEMENTREQUIRED
10. FREQUENCY
12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION

XX (See BLK 16)

ASREQ (See BLK 16)
ASREQ (See BLK 16)
a. ADDRESSEE
b. COPIES
8. APP CODE
D
11. AS OF DATE
13. DATE OF SUBSEQUENTSUBMISSION
Draft
Final

A (See BLK 16)

N/A
ASREQ (See BLK 16)
Reg
Repro
16. REMARKS
COR
0
1
0

BLK 7: Submit in an editable software format (Microsoft Office) to ensure compatibility with the Navy Marine Corps Intranet (NMCI) information technology computer infrastructure system and in accordance with Combat Integration & Identification Systems (CI&IDS) Work Instruction Naval Systems Engineering Resource Center (NSERC) Contract Deliverables Workflow

(WI-4K20-B-EMC-024).

BLKS 8, 10, 12, and 13: The Contractor shall prepare preliminary drawings and submit 90 calendar days after assignment of design task. The Government will review and provide approval or review comments within 15 calendar days. The Contractor shall resubmit the drawings within 10 calendar days.

15.TOTAL▬▬▬▬►
0
1
0
G. PREPARED BY
H. DATE
I. APPROVED BY
J. DATE
Kelsey Trifone
10/3/2023

DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page _10_ of _30_Pages18. ESTIMATED TOTAL PRICE

CONTRACT DATA REQUIREMENTS LIST (CDRL)

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.
B. EXHIBIT
C. CATEGORY:

0001, 0008

TDP___X____
TM_______
OTHER____________________
D. SYSTEM/ITEM
E. CONTRACT/PR NO.
F. CONTRACTOR

CI&IDS Integration & Production Support Services

TBD
TBD
1. DATA ITEM NO.
2. TITLE OF DATA ITEM
3. SUBTITLE
A011
Techncial Data Packages
Wiring and Cabling Drawings
4. AUTHORITY (Data Acquisition Document No.)
5. CONTRACT REFERENCE
6. REQUIRING OFFICE
MIL-STD-31000B NOT 1
3.3.1.1, 3.3.1.2, 3.3.1.4, 3.3.2.1
NAWCAD WOLF CI&IDS
7. DD 250 REQ
9. DIST STATEMENTREQUIRED
10. FREQUENCY
12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION

XX (See BLK 16)

ASREQ (See BLK 16)
ASREQ (See BLK 16)
a. ADDRESSEE
b. COPIES
8. APP CODE
D
11. AS OF DATE
13. DATE OF SUBSEQUENTSUBMISSION
Draft
Final

A (See BLK 16)

N/A
ASREQ (See BLK 16)
Reg
Repro
16. REMARKS
COR
0
1
0

BLK 7: Submit in an editable software format (Microsoft Office) to ensure compatibility with the Navy Marine Corps Intranet (NMCI) information technology computer infrastructure system and in accordance with Combat Integration & Identification Systems (CI&IDS) Work Instruction Naval Systems Engineering Resource Center (NSERC) Contract Deliverables Workflow

(WI-4K20-B-EMC-024).

BLKS 8, 10, 12, and 13: The Contractor shall prepare preliminary drawings and submit 90 calendar days after assignment of design task. The Government will review and provide approval or review comments within 15 calendar days. The Contractor shall resubmit the report within 10 calendar days.

15.TOTAL▬▬▬▬►
0
1
0
G. PREPARED BY
H. DATE
I. APPROVED BY
J. DATE
Kelsey Trifone
10/3/2023

DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page _11_ of _30_Pages18. ESTIMATED TOTAL PRICE

CONTRACT DATA REQUIREMENTS LIST (CDRL)

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.
B. EXHIBIT
C. CATEGORY:

0001, 0008

TDP_______
TM_______
OTHER________SESS_______________
D. SYSTEM/ITEM
E. CONTRACT/PR NO.
F. CONTRACTOR

CI&IDS Integration & Production Support Services

TBD
TBD
1. DATA ITEM NO.
2. TITLE OF DATA ITEM
3. SUBTITLE
A012
Interface Control Document (ICD)
4. AUTHORITY (Data Acquisition Document No.)
5. CONTRACT REFERENCE
6. REQUIRING OFFICE
DI-SESS-81248B
3.3.1.1
NAWCAD WOLF CI&IDS
7. DD 250 REQ
9. DIST STATEMENTREQUIRED
10. FREQUENCY
12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION

XX (See BLK 16)

ASREQ (See BLK 16)
ASREQ (See BLK 16)
a. ADDRESSEE
b. COPIES
8. APP CODE
D
11. AS OF DATE
13. DATE OF SUBSEQUENTSUBMISSION
Draft
Final

A (See BLK 16)

N/A
ASREQ (See BLK 16)
Reg
Repro
16. REMARKS
COR
0
1
0

BLK 7: Submit in an editable software format (Microsoft Office) to ensure compatibility with the Navy Marine Corps Intranet (NMCI) information technology computer infrastructure system and in accordance with Combat Integration & Identification Systems (CI&IDS) Work Instruction Naval Systems Engineering Resource Center (NSERC) Contract Deliverables Workflow

(WI-4K20-B-EMC-024).

BLKS 8, 10, 12, and 13: The Contractor shall prepare preliminary drawings and submit 90 calendar days after assignment of design task. The Government will review and provide approval or review comments within 15 calendar days. The Contractor shall resubmit the drawings within 10 calendar days.

15.TOTAL▬▬▬▬►
0
1
0
G. PREPARED BY
H. DATE
I. APPROVED BY
J. DATE
Kelsey Trifone
10/3/2023

DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page _12_ of _30_Pages18. ESTIMATED TOTAL PRICE

CONTRACT DATA REQUIREMENTS LIST (CDRL)

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.
B. EXHIBIT
C. CATEGORY:

0001, 0008

TDP_______
TM_______
OTHER_____DRPR__________________
D. SYSTEM/ITEM
E. CONTRACT/PR NO.
F. CONTRACTOR

CI&IDS Integration & Production Support Services

TBD
TBD
1. DATA ITEM NO.
2. TITLE OF DATA ITEM
3. SUBTITLE
A013
Installation Control Drawings
4. AUTHORITY (Data Acquisition Document No.)
5. CONTRACT REFERENCE
6. REQUIRING OFFICE
DI-DRPR-81242 NOT 1
3.3.1.1, 3.3.3.1.4, 3.3.3.1.5
NAWCAD WOLF CI&IDS
7. DD 250 REQ
9. DIST STATEMENTREQUIRED
10. FREQUENCY
12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION

XX (See BLK 16)

ASREQ (See BLK 16)
ASREQ (See BLK 16)
a. ADDRESSEE
b. COPIES
8. APP CODE
D
11. AS OF DATE
13. DATE OF SUBSEQUENTSUBMISSION
Draft
Final

A (See BLK 16)

N/A
ASREQ (See BLK 16)
Reg
Repro
16. REMARKS
COR
0
1
0

BLK 7: Submission will be required to be compatible with the Navy Marine Corps Intranet (NMCI) information technology computer infrastructure system and in accordance with Combat Integration & Identification Systems (CI&IDS) Work Instruction Naval Systems Engineering Resource Center (NSERC) Contract Deliverables Workflow (WI-4K20-B-EMC-024).

BLK 8: The Government will have 15 calendar days to review and provide comments. If Government comments are not received within 15 calendar days, the CDRL is to be considered accepted. If required, the Contractor shall submit the final deliverables within 10 calendar days of Government comments.

BLKS 10, 12, and 13: The Contractor shall prepare or revise and deliver requested drawings within 60 calendar days of assignment of each drawing task.

15.TOTAL▬▬▬▬►
0
1
0
G. PREPARED BY
H. DATE
I. APPROVED BY
J. DATE
Kelsey Trifone
10/3/2023
DD FORM 1423-1, FEB 2001PREVIOUS EDITION MAY BE USED.Page _13_ of _30 Pages
CONTRACT DATA REQUIREMENTS LIST (CDRL)

(1 Data Item) Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.
B. EXHIBIT
C. CATEGORY:

0001, 0008

TDP_______
TM_______
OTHER_____STD__________________
D. SYSTEM/ITEM
E. CONTRACT/PR NO.
F. CONTRACTOR

CI&IDS Integration & Production Support Services

TBD
TBD
1. DATA ITEM NO.
2. TITLE OF DATA ITEM
3. SUBTITLE
A014
General Style and Format Requirements for Technical Manuals
Technical Manual, Maintenance Manual, Operator Manual, Installation Manual
4. AUTHORITY (Data Acquisition Document No.)
5. CONTRACT REFERENCE
6. REQUIRING OFFICE
MIL-STD-38784B
3.3.1.5
NAWCAD WOLF CI&IDS
7. DD 250 REQ
9. DIST STATEMENTREQUIRED
10. FREQUENCY
12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION

XX (See BLK 16)

ASREQ (See BLK 16)
ASREQ (See BLK 16)
a. ADDRESSEE
b. COPIES
8. APP CODE
D
11. AS OF DATE
13. DATE OF SUBSEQUENTSUBMISSION
Draft
Final

A (See BLK 16)

N/A
ASREQ (See BLK 16)
Reg
Repro
16. REMARKS
COR
0
1
0

BLK 7: Submit in an editable software format (Microsoft Office) to ensure compatibility with the Navy Marine Corps Intranet (NMCI) information technology computer infrastructure system and in accordance with Combat Integration & Identification Systems (CI&IDS) Work Instruction Naval Systems Engineering Resource Center (NSERC) Contract Deliverables Workflow

(WI-4K20-B-EMC-024).

BLKS 8, 10, 12, and 13: The Contractor shall prepare preliminary manuals and submit 90 calendar days after assignment of design task. The Government will review and provide approval or review comments within 15 calendar days. The Contractor shall resubmit the deliverable within 10 calendar days.

15.TOTAL▬▬▬▬►
0
1
0
G. PREPARED BY
H. DATE
I. APPROVED BY
J. DATE
Kelsey Trifone
10/3/2023

DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page _14_ of _30_Pages18. ESTIMATED TOTAL PRICE

18. ESTIMATED TOTAL PRICE

CONTRACT DATA REQUIREMENTS LIST (CDRL)

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.
B. EXHIBIT
C. CATEGORY:

0001, 0008

TDP_______
TM_______
OTHER_____DTL_________________
D. SYSTEM/ITEM
E. CONTRACT/PR NO.
F. CONTRACTOR

CI&IDS Integration & Production Support Services

TBD
TBD
1. DATA ITEM NO.
2. TITLE OF DATA ITEM
3. SUBTITLE
A015
Manuals, Technical, Equipment Operation and/or Maintenance Instructions, Technical Content Requirements (Work Package Concept)
4. AUTHORITY (Data Acquisition Document No.)
5. CONTRACT REFERENCE
6. REQUIRING OFFICE
MIL-DTL-81919C NOT 2
3.3.1.5, 3.3.3.1.2, 3.3.3.1.5, 3.3.5.1.3
NAWCAD WOLF CI&IDS
7. DD 250 REQ
9. DIST STATEMENTREQUIRED
10. FREQUENCY
12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION

XX (See BLK 16)

ASREQ (See BLK 16)
ASREQ (See BLK 16)
a. ADDRESSEE
b. COPIES
8. APP CODE
D
11. AS OF DATE
13. DATE OF SUBSEQUENTSUBMISSION
Draft
Final

A (See BLK 16)

N/A
ASREQ (See BLK 16)
Reg
Repro
16. REMARKS
COR
0
1
0

BLK 7: Submit in an editable software format (Microsoft Office) to ensure compatibility with the Navy Marine Corps Intranet (NMCI) information technology computer infrastructure system and in accordance with Combat Integration & Identification Systems (CI&IDS) Work Instruction Naval Systems Engineering Resource Center (NSERC) Contract Deliverables Workflow (WI-4K20-B-EMC-024).

BLK 8: This CDRL requires Contracting Officer’s Representative (COR) approval prior to further dissemination or distribution. Review comments will be provided by the Government within 10 business days, if applicable. Resubmission by the Contractor shall be within 10 business days of receipt of any comments. If Government comments are not received within 10 business days, the CDRL is considered to be accepted.

BLKS 10, 12, and 13: The Contractor shall submit Manuals, Technical, Equipment Operation and/or Maintenance Instructions, Technical Content Requirements (Work Package Concept) in accordance with approved project/task schedules.

15.TOTAL▬▬▬▬►
0
1
0
G. PREPARED BY
H. DATE
I. APPROVED BY
J. DATE
Kelsey Trifone
10/3/2023

DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page _15_ of _30_Pages18. ESTIMATED TOTAL PRICE

CONTRACT DATA REQUIREMENTS LIST (CDRL)

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.
B. EXHIBIT
C. CATEGORY:

0001, 0008

TDP_______
TM_______
OTHER_____MISC__________________
D. SYSTEM/ITEM
E. CONTRACT/PR NO.
F. CONTRACTOR

CI&IDS Integration & Production Support Services

TBD
TBD
1. DATA ITEM NO.
2. TITLE OF DATA ITEM
3. SUBTITLE
A016
Technical Report - Study/Services
Engineering Analysis
4. AUTHORITY (Data Acquisition Document No.)
5. CONTRACT REFERENCE
6. REQUIRING OFFICE
DI-MISC-80508B
3.3.1.6, 3.3.3.1.6, 3.3.3.2.2, 3.3.3.2.3, 3.3.3.3.2, 3.3.3.3.3, 3.3.3.5.1, 3.3.3.5.3, 3.3.3.5.4, 3.3.5.3.2, 3.3.5.3.3
NAWCAD WOLF CI&IDS
7. DD 250 REQ
9. DIST STATEMENTREQUIRED
10. FREQUENCY
12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION

XX (See BLK 16)

ASREQ (See BLK 16)
ASREQ (See BLK 16)
a. ADDRESSEE
b. COPIES
8. APP CODE
D
11. AS OF DATE
13. DATE OF SUBSEQUENTSUBMISSION
Draft
Final

A (See BLK 16)

N/A
ASREQ (See BLK 16)
Reg
Repro
16. REMARKS
COR
0
1
0

BLK 7: Submit in an editable software format (Microsoft Office) to ensure compatibility with the Navy Marine Corps Intranet (NMCI) information technology computer infrastructure system and in accordance with Combat Integration & Identification Systems (CI&IDS) Work Instruction Naval Systems Engineering Resource Center (NSERC) Contract Deliverables Workflow (WI-4K20-B-EMC-024).

BLK 8: This CDRL requires Contracting Officer’s Representative (COR) approval prior to further dissemination or distribution.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .