Attachment P2 - Annual Fully Burdened Rates.xlsx
XLSX spreadsheet 30 KB Posted
- Attached to
- RFP for Integration & Production (I&P) Follow-On
- Solicitation number
- N0042124R0038
About this file
This document is an attachment to a Request for Proposal (RFP) for the Integration and Production (I&P) Follow-On contract with the Department of the Navy Naval Air Systems Command. It provides instructions for prime contractors to complete the Attachment P2 Annual Fully Burdened Labor Rates template, which requires proposing annual fully burdened labor rates and hours for various labor categories such as Administrative Assistant, Budget Analysts, Electrical Engineers, Engineering Technicians, and others. The template specifies that the proposed annual fully burdened labor rates should include fringe, overhead, G&A, and fee, but exclude other direct costs such as materials, travel, and cost of money. The RFP solicitation number is N0042124R0038, and the key due dates and award information are not provided in this attachment.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| N0042124R0038-0003 CC.docx | DOCX document | |
| N0042124R0038-0003.docx | DOCX document | |
| Questions and Answers to Amendment 0001.pdf | ||
| N0042124R0038-0002 CC.docx | DOCX document | |
| N0042124R0038-0002.docx | DOCX document | |
| Attachment 4 - OCI List.docx | DOCX document | |
| Attachment P1 - Cost Summary Spreadsheet.xlsx | XLSX spreadsheet | |
| N0042124R0038-0001.docx | DOCX document | |
| N0042124R0038-0001 CC.docx | DOCX document | |
| Questions and Answers to RFP N0042124R0038.pdf | ||
| Attachment 3 - Locator Form.doc | DOC document | |
| Attachment 6 - WD 2015-4279-Rev 25.pdf | ||
| N0042124R0038.pdf | ||
| Attachment 2 - IP_CSP V6_CUI.docx | DOCX document | |
| Attachment 4 - IP_OCI List.docx | DOCX document | |
| Exhibit A - CDRLs.docx | DOCX document | |
| Attachment P3 - SBPCD.docx | DOCX document | |
| Attachment 1 -DD FORM 254 JUNE 2025.pdf | ||
| Attachment P1 - Cost Summary Spreadsheet.xlsx | XLSX spreadsheet | |
| Attachment 5 - Data Transmittal Form.docx | DOCX document |
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Instructions Instructions to Prime Contractors for completing Attachment P2 Annual Fully Burdened Labor
RFP # N0042124R0038
| COLUMN/AREA | COLUMN HEADING | DESCRIPTION OF DATA UNDER THIS COLUMN HEADING |
| B | Offeror Name | Enter the Offeror (Prime's name or Subcontractor's name) in this field to distinguish between the companies |
| C | Proposed Labor Category (Furnished by Government) | Enter the Proposed Labor Category that correlates to each of the Government solication Labor Categories in the Attachment P1 Cost Summary. Spell and format entry the same every time it is used on the template (for example, when it relates to the Prime Offeror's rates on one row and to a Subcontractor's rates on another row). If the Offeror determines that no personnel will be proposed to perform work defined by one of the Government Estimate Labor Categories listed, enter "NA". |
| D | Individual Designator* | For each individual Contractor employee proposed, the contractor shall enter the corresponding Position Number or Employee name as found on Attachment P1. |
| E-I | Proposed Annual Fully-Burdened Labor (Rate) per Labor Catergory, per Labor Individual Designator | Enter the Annual Fully-Burdened Labor Rate proposed for the applicable performance period (e.g. Base or Year_#) for personnel associated with the Proposed Labor Category and Individual Designator. Enter numbers only, in U.S. Dollar format $###.## rounded to the nearest cent. Annual Fully-Burdened Labor Rates shall include fringe, overhead, G&A, and fee on total cost, but should not include Fully-Burdened Other Direct Costs (ODCs) such as Materials, Travel, and Cost of Money costs. |
| J | Total Hours Proposed | Enter the Total Hours Proposed per year for the proposed labor category to be consistent with what is proposed on the Attachment P1. If the Hours differ per year, please add additional columns to separate the hours by year. |
| K-O | Proposed Annual Fully-Burdened Labor Amount (Yearly) per Labor Catergory, per Labor Individual Designator | Calculate the Total Proposed Annual Fully Burdened Amount per Year by multiplying the Annual Fully-Burdened Labor Rates times the amount of hours proposed for the applicable performance period. Per Section L of the RFP, any individual whose proposed Annual Fully Burdened Labor Amount (Yearly) shall be less than $300K or a tripwire justification shall be included in the proposal. |
Prime Burdened Labor Rates
| Offeror Name | ATTACHMENT P2 Annual Fully Burdened Rates | Individual Designator* | Proposed Annual Fully-Burdened Labor (Rate) | Total Hours Proposed | Proposed Annual Fully Burdened Labor (Yearly) | ||||||||||||
| Proposed Labor Category | Year 1 | Year 2 | Year 3 | Year 4 | Year 5 | Year 1 | Year 2 | Year 3 | Year 4 | Year 5 | Year 1 | Year 2 | Year 3 | Year 4 | Year 5 | ||
| Administrative Assistant | |||||||||||||||||
| Budget Analysts, Junior | |||||||||||||||||
| Budget Analysts, Journeyman | |||||||||||||||||
| Budget Analysts, Senior | |||||||||||||||||
| Drafter/CAD Operator III | |||||||||||||||||
| Drafter/CAD Operator IV | |||||||||||||||||
| Computer and Information Research Scientists, Journeyman | |||||||||||||||||
| Electrical Engineers, Junior | |||||||||||||||||
| Electrical Engineers, Journeyman | |||||||||||||||||
| Electrical Engineers, Senior | |||||||||||||||||
| Electrical Engineers, Senior * | |||||||||||||||||
| Electrical Engineers, Senior * | |||||||||||||||||
| Electrical Engineers, Senior * | |||||||||||||||||
| Electronics Technician Maintenance I | |||||||||||||||||
| Electronics Technician Maintenance II | |||||||||||||||||
| Electronics Technician Maintenance III | |||||||||||||||||
| Engineering Technician I | |||||||||||||||||
| Engineering Technician II | |||||||||||||||||
| Engineering Technician III | |||||||||||||||||
| Engineering Technician IV | |||||||||||||||||
| Engineering Technician V | |||||||||||||||||
| Engineering Technician V Overtime | |||||||||||||||||
| General and Operations Managers, Journeyman | |||||||||||||||||
| General and Operations Managers, Senior * | |||||||||||||||||
| General Clerk I | |||||||||||||||||
| Logisticians, Junior | |||||||||||||||||
| Logisticians, Journeyman* | |||||||||||||||||
| Logisticians, Journeyman* | |||||||||||||||||
| Management Analysts, Junior | |||||||||||||||||
| Management Analysts, Journeyman | |||||||||||||||||
| Management Analysts , Journeyman | |||||||||||||||||
| Supply Technician | |||||||||||||||||
| Technical Instructor/Course Developer | |||||||||||||||||
| Technical Writer III |
N00421-23-R-0070