About this file

This DD Form 1423-1 is a Contract Data Requirements List (CDRL) for a HVAC REOS system contract (Contract/PR No. FA8051-25-R-4001). The document specifies a "Report of Visit" data item (A002) to be delivered once per TO, with the first submission date referencing Block 16 of the contract. The requiring office is AFCEC/COMH, and the distribution is limited to authorized U.S. Government agencies and their contractors.

Key delivery requirements include: electronic deliverables in standard Microsoft Office format, with reports to be submitted via email, CD, DVD, or DoD SAFE website. The contractor must deliver the In-Brief, Out-Brief, and Report of Visit to the Contracting Officer Representative (COR) within 20 calendar days following completion of work, following specific formatting and content guidelines from AFCEC/COMH. All deliverables will be evaluated for acceptance or rejection, with a five-day correction period allowed for rejected submissions.

View the file

Other files

File Type Posted
Questions and Answers - HVAC REOS rv1_2 Feb 26.pdf PDF
Combined Synopsis FA805125R4001 - HVAC REOS final rv1_2 Feb 26.pdf PDF
RFP Attachment 1 - Provisions and Clauses rv1_2 Feb 26.pdf PDF
Questions and Answers - HVAC REOS.pdf PDF
RFP Attachment 3 - Price Sheet.xlsx XLSX spreadsheet
Task Order Attachment 2 - Price Sheet.xlsx XLSX spreadsheet
RFP Attachment 3 - Price Sheet.xlsx XLSX spreadsheet
Task Order Attachment 2 - Price Sheet.xlsx XLSX spreadsheet
PWS Attachment 3 - Request to Purchase Materials.xlsx XLSX spreadsheet
RFP Attachment 3 - Price Sheet.xlsx XLSX spreadsheet
RFP Attachment 4 - Task Order PWS final.pdf PDF
RFP Attachment 1 - Provisions and Clauses.pdf PDF
RFP Attachment 2 - Basic PWS_HVAC REOS final.pdf PDF
Task Order Attachment 1 - Wage Determination.pdf PDF
Task Order Attachment 2 - Price Sheet.xlsx XLSX spreadsheet
Exhibit A_CDRL A001 - Work Progress Schedule.pdf PDF
Combined Synopsis FA805125R4001 - HVAC REOS final.pdf PDF
PWS Attachment 2 - Acceptable Repairable Replaceable HVAC Items.pdf PDF
PWS Attachment 5 - TAB Data Spreadsheet Template.xls XLS spreadsheet
PWS Attachment 1 - Qualifications and Experience.pdf PDF
PWS Attachment 4 - Request for Task Order Proposal.pdf PDF
Exhibit A_CDRL A003 - Monthly Status Report.pdf PDF
Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DD FORM 1423-1, FEB 2001

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

PREVIOUS EDITION MAY BE USED.

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

15. TOTAL

16. REMARKS

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

Page of Pages

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

16. REMARKS (Continued)

DD FORM 1423-1, FEB 2001 Page of Pages

INSTRUCTIONS FOR COMPLETING DD FORM 1423

(See DoD 5010.12-M for detailed instructions.)

FOR GOVERNMENT PERSONNEL

Item A. Self-explanatory.

Item B. Self-explanatory.

Item C. Mark (X) appropriate category: TDP - Technical Data Package;

TM - Technical Manual; Other - other category of data, such as "Provisioning,""Configuration Management," etc.

Item D. Enter name of system/item being acquired that data will support.

Item E. Self-explanatory (to be filled in after contract award).

Item F. Self-explanatory (to be filled in after contract award).

Item G. Signature of preparer of CDRL.

Item H. Date CDRL was prepared.

Item I. Signature of CDRL approval authority.

Item J. Date CDRL was approved.

Item 1. See DoD FAR Supplement Subpart 4.71 for proper numbering.

Item 2. Enter title as it appears on data acquisition document cited in Item 4.

Item 3. Enter subtitle of data item for further definition of data item (optional entry).

Item 4. Enter Data Item Description (DID) number, military specification number, or military standard number listed in DoD 5010.12-L (AMSDL), or one-time DID number, that defines data content and format requirements.

Item 5. Enter reference to tasking in contract that generates requirement for the data item (e.g., Statement of Work paragraph number).

Item 6. Enter technical office responsible for ensuring adequacy of the data item.

Item 7. Specify requirement for inspection/acceptance of the data item by the Government.

Item 8. Specify requirement for approval of a draft before preparation of the final data item.

Item 9. For technical data, specify requirement for contractor to mark the appropriate distribution statement on the data (ref. DoDD 5230.24).

Item 10. Specify number of times data items are to be delivered.

Item 11. Specify as-of date of data item, when applicable.

Item 12. Specify when first submittal is required.

Item 13. Specify when subsequent submittals are required, when applicable.

Item 14. Enter addressees and number of draft/final copies to be delivered to each addressee. Explain reproducible copies in Item 16.

Item 15. Enter total number of draft/final copies to be delivered.

Item 16. Use for additional/clarifying information for Items 1 through 15.

Examples are: Tailoring of documents cited in Item 4; Clarification of submittal dates in Items 12 and 13; Explanation of reproducible copies in Item 14.; Desired medium for delivery of the data item.

FOR THE CONTRACTOR

Item 17. Specify appropriate price group from one of the following groups of effort in developing estimated prices for each data item listed on the DD Form 1423.

a. Group I. Definition - Data which is not otherwise essential to the contractor's performance of the primary contracted effort (production, development, testing, and administration) but which is required by DD Form 1423.

Estimated Price - Costs to be included under Group I are those applicable to preparing and assembling the data item in conformance with Government requirements, and the administration and other expenses related to reproducing and delivering such data items to the Government.

b. Group II. Definition - Data which is essential to the performance of the primary contracted effort but the contractor is required to perform additional work to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, or quality of the data item.

Estimated Price - Costs to be included under Group II are those incurred over and above the cost of the essential data item without conforming to Government requirements, and the administrative and other expenses related to reproducing and delivering such data item to the Government.

c. Group III. Definition - Data which the contractor must develop for his internal use in performance of the primary contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, and quality of the data item.

Estimated Price - Costs to be included under Group III are the administrative and other expenses related to reproducing and delivering such data item to the Government.

d. Group IV. Definition - Data which is developed by the contractor as part of his normal operating procedures and his effort in supplying these data to the Government is minimal.

Estimated Price - Group IV items should normally be shown on the DD Form 1423 at no cost.

Item 18. For each data item, enter an amount equal to that portion of the total price which is estimated to be attributable to the production or development for the Government of that item of data.

These estimated data prices shall be developed only from those costs which will be incurred as a direct result of the requirement to supply the data, over and above those costs which would otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any amount for rights in data. The Government's right to use the data shall be governed by the pertinent provisions of the contract.

DD FORM 1423-1 (BACK), FEB 2001

data_item: A002
title: Report of Visit
sub:
auth: DI-MISC-81943
ref: PWS
req_ofc: AFCEC/COMH
dd250: LT
appcode: N/A
dist: C
freq: Once per TO
asof: As of Award
firstsub: See Blk 16
subsub: See Blk 16
addressee1: AFCEC/COMH
draft1: 1
reg1: 1
repro1: 0
addressee2:
draft2:
reg2:
repro2:
addressee3:
draft3:
reg3:
repro3:
addressee4:
draft4:
reg4:
repro4:
addressee5:
draft5:
reg5:
repro5:
addressee6:
draft6:
reg6:
repro6:
addressee7:
draft7:
reg7:
repro7:
addressee8:
draft8:
reg8:
repro8:
addressee9:
draft9:
reg9:
repro9:
addressee10:
draft10:
reg10:
repro10:
addressee11:
draft11:
reg11:
repro11:
addressee12:
draft12:
reg12:
repro12:
addressee13:
draft13:
reg13:
repro13:
addressee14:
draft14:
reg14:
repro14:
addressee15:
draft15:
reg15:
repro15:
addressee16:
draft16:
reg16:
repro16:
addressee17:
draft17:
reg17:
repro17:
addressee18:
draft18:
reg18:
repro18:
addressee19:
draft19:
reg19:
repro19:
addressee20:
draft20:
reg20:
repro20:
addressee21:
draft21:
reg21:
repro21:
addressee22:
draft22:
reg22:
repro22:
addressee23:
draft23:
reg23:
repro23:
addressee24:
draft24:
reg24:
repro24:
addressee25:
draft25:
reg25:
repro25:
addressee26:
draft26:
reg26:
repro26:
addressee27:
draft27:
reg27:
repro27:
addressee28:
draft28:
reg28:
repro28:
addressee29:
draft29:
reg29:
repro29:
addressee30:
draft30:
reg30:
repro30:
addressee31:
draft31:
reg31:
repro31:
addressee32:
draft32:
reg32:
repro32:
addressee33:
draft33:
reg33:
repro33:
addressee34:
draft34:
reg34:
repro34:
addressee35:
draft35:
reg35:
repro35:
addressee36:
draft36:
reg36:
repro36:
addressee37:
draft37:
reg37:
repro37:
addressee38:
draft38:
reg38x:
repro38:
total_draft: 1
total_reg: 1
total_repro: 0
remarks: DISTRIBUTION STATEMENT C: Authorized to U.S. Government agencies and their contractors; administrative or operational use. Refer other requests for this document to AFCEC/COM, 1001 Mississippi Road, Tyndall AFB, FL 32403-5323.

Blocks 12 & 13: The contractor shall deliver the In-Brief, Out-Brief, and Report of Visit to the COR in accordance with PWS Table 4, Table 5 as well as paragraph 6.2, within 20 calendar days following completion of work at a specified installation. The Report of Visit will be reviewed by the COR and will be sent back for corrections if necessary. Sample reports will be provided to the contractor to ensure Report of Visit formatting and content is consistent with current AFCEC/COMH reports.

Block 14: Deliverable Electronic Formats: Electronic deliverables shall generally be in standard Microsoft Office format. Electronic deliverables that should be in another format, shall be in a format proposed by the contractor and agreed to by the COR.

Deliverable Acceptance: All deliverables will be made to the COR and evaluated for acceptance or rejection. In the event of rejection of any deliverable, the contractor shall be notified in writing of the specific reasons why the deliverable was rejected. The contractor shall have five (5) days to correct the rejected deliverable and resubmit. Electronic deliverables shall normally be sent via email. If attachment file size precludes email, they may be delivered via CD, DVD, or the DoD SAFE website (preferred). Electronic deliverable acceptance or non-acceptance will be communicated by email. Reports are to be submitted on time and with no more than two resubmissions required.

group:
total_price:
prep_name:
line_item: 0007
exhibit: A
xtdp: Off
xtm: Off
othercat: MISC
system: HVAC REOS
ctr_no: FA8051-25-R-4001
contr: TBD
remarksb:
Page2:
Reset:
prep_date:
app_by:
app_date:
Page:
of_pages:
app: Adobe Professional 8.0

File details come from the government source that posted it. Updated .