Exhibit 7 Elevator Inspection.pdf

PDF 43 KB Posted

Attached to
Elevator Maintenance Service at Four Minnesota Locations
Solicitation number
47PF0025R0003
Issued by

About this file

This is a GSA Great Lakes Region COR Elevator Inspection Checklist template used for evaluating elevator systems and maintenance. The checklist covers four main inspection areas: Lobby and Hallways, Elevator Car Interior, Machine Room, and Documentation. Key inspection points include functionality of position indicators, call buttons, door operations, ride quality, safety features, and maintenance documentation. The checklist requires verification of proper machine room conditions, including ventilation, security, cleanliness, and safety equipment such as fire extinguishers.

The checklist corresponds to solicitation 47PF0025R0003, which seeks elevator maintenance services at four Minnesota federal buildings: Diana E. Murphy U.S. Courthouse (Minneapolis), Warren E. Burger Federal Building (St. Paul), Paul D. Wellstone Federal Building (Minneapolis), and Edward J. Devitt U.S. Courthouse (Fergus Falls). The contract will be a firm-fixed price award starting around June 1, 2025, with four one-year option periods plus a possible 6-month extension. The procurement uses NAICS code 238290 ($22M size standard) and will be awarded on a best-value basis considering past performance and price. While open to all businesses, woman-owned, veteran-owned, service-disabled veteran-owned, HUBZone, and small disadvantaged businesses are encouraged to participate.

View the file

Other files

File Type Posted
Solicitation Amendment 47PF0025R0003_0002.pdf PDF
Solicitation Amendment 47PF0025R0003_0001.pdf PDF
Exhibit 12 Model SubkPlan.docx DOCX document
Exhibit 14 Burger Asbestos Letter.docx DOCX document
05 IUEC - Wage Rate - Local 9.pdf PDF
Exhibit 13 Hydraulic Elevator Checklist.pdf PDF
Exhibit 11 CCP Murphy.xls XLS spreadsheet
Exhibit 11 CCP Devitt.xls XLS spreadsheet
Exhibit 11 CCP Wellstone.xls XLS spreadsheet
Exhibit 14 Wellstone Asbestos Letter.docx DOCX document
Exhibit 13 Electric Traction Checklist.pdf PDF
Exhibit 14 Devitt Asbestos Letter.docx DOCX document
Exhibit 11 CCP Burger.xls XLS spreadsheet
Exhibit 13 Escalator Checklist.pdf PDF
Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

GSA Great Lakes Region COR Elevator Inspection Checklist

Building Name and Location:

Inspection Date and Time:

Inspected By:

Signature:

Contractors Receipt

Signature: Date:

INSTRUCTIONS: If problems are found please note in the comments section.

Lobby and Hallways

Inspection Item Yes No Comments

Hall position indicators work properly

Direction indicators work properly

Hall stations and buttons are secured and undamaged

Hall call buttons light up when pressed

When car arrives, chime is clear and audible

Elevators respond to calls in reasonable amount of time

Entrances are unobstructed and clearly accessible

No trip hazards of flooring problems in lobby

Elevator Car Interior

Door reopening device causes doors to stop and reopen

Doors open and close smoothly and quickly

Door sills and tracks are free of dirt and debris

Wall panels, ceiling fixtures, and hand rails are securely in place

All car operating panels are secured with no missing screws

Car position indicator works properly at all landings, and directional arrows work properly.

All call buttons work properly and light up when pressed

Elevator Car Interior (continued)

Inspection Item Yes No Comments

All car lighting is working properly

All access panels are locked and secure

Floor covering is secure and does not present trip hazard

Elevator inspection certificate is up to date and displayed in frame inside of the car

Ride Quality

Smooth starts, stops, and floor to floor travel

No unusual noise or vibration

Car levels properly at each landing

Machine Room (Note: Machine rooms are restricted spaces. Always have qualified elevator personnel with you)

Access to machine room is clear and unobstructed

Machine room is properly ventilated and temperature within required guidelines

Machine room doors are self-closing and self-locking

Machine room and machine room access is well lighted

All controller cabinets are secured. All enclosure covers are in place.

Room is clean and free of debris, and floor is free of grease and oil

All outlets have GFCI protection

Approved storage cabinets for parts and supplies are provided. Fire cans for oily rags are provided

No non-elevator related materials are stored in machine room

ABC type fire extinguisher is mounted near door and regularly inspected.

Documentation

Contractor provides monthly reports in compliance with contract requirements

Copy of MCP is located in the machine room, and signage indicating location is provided

Preventive maintenance logs and service call logs are provided in machine room for each elevator, and is up to date.

Fireman’s Emergency Operation and Emergency Phone testing logs are provided in machine room and are up to date.

Region 5 COR Elevator Inspection Checklist 8/22/2017

File details come from the government source that posted it. Updated .