This is an asbestos notification letter dated June 5, 2023, detailing the presence of asbestos containing materials (ACM) and presumed asbestos containing materials (PACM) in the Paul D. Wellstone Federal Building (MN0036ZZ) for prospective contractors bidding on elevator maintenance services. The letter provides a detailed inventory of ACM/PACM locations and quantities, including pipe insulation fittings, HVAC sealant, floor tiles with mastic, vinyl sheet flooring, window caulk/putty, transite panels, sink undercoating, duct insulation tape, window glazing, vibration dampers, glue pads, mastic, and roofing materials throughout various floors of the building.
The letter is related to solicitation 47PF0025R0003 for elevator maintenance services at four Minnesota federal buildings, including the Wellstone Federal Building. The contract will be a firm-fixed-price award starting around June 1, 2025, with four one-year options and an additional 6-month option. The procurement is unrestricted under NAICS code 238290 ($22M size standard) and will use a Best Value evaluation considering past performance and total price. The General Services Administration (GSA) Public Buildings Service Region 5 is the contracting agency, with Donald McFall serving as the Contract Specialist.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Solicitation Amendment 47PF0025R0003_0002.pdf | ||
| Solicitation Amendment 47PF0025R0003_0001.pdf | ||
| Exhibit 7 Elevator Inspection.pdf | ||
| Exhibit 12 Model SubkPlan.docx | DOCX document | |
| Exhibit 14 Burger Asbestos Letter.docx | DOCX document | |
| 05 IUEC - Wage Rate - Local 9.pdf | ||
| Exhibit 13 Hydraulic Elevator Checklist.pdf | ||
| Exhibit 11 CCP Murphy.xls | XLS spreadsheet | |
| Exhibit 11 CCP Devitt.xls | XLS spreadsheet | |
| Exhibit 11 CCP Wellstone.xls | XLS spreadsheet | |
| Exhibit 13 Electric Traction Checklist.pdf | ||
| Exhibit 14 Devitt Asbestos Letter.docx | DOCX document | |
| Exhibit 11 CCP Burger.xls | XLS spreadsheet | |
| Exhibit 13 Escalator Checklist.pdf |
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Date: 06/05/2023 Prospective Contractors (bidders), Pursuant to the Code of Federal Regulations all building owners are required to provide notification of the presence, location, and quantity of asbestos containing materials (ACM) and presumed asbestos containing materials (PACM) in their facilities. This notification is provided as a safeguard, to ensure prospective contractors (bidders) are aware of this information.
Asbestos containing material is present in the Federal Building (MN0036ZZ) in the following forms, locations, and quantities:
| Type |
| Location |
| Quantity |
| Fittings associated with paper wrap insulation1 |
| 3rd Floor |
| 200 lf |
| Mud joints on 3” and 6’ pipe insulation1 |
| Above Ceiling |
| 1000 lf |
| HVAC Sealant |
| Throughout Building |
| 1450 sf |
| Floor Tile and Associated Mastic |
| Throughout Basement, 1st Floor, 2nd Floor and 3rd Floor |
| 111600 sf |
| Vinyl sheet flooring |
| 1st Floor |
| 4960 sf |
| Interior/Exterior Window Caulk/ Putty |
| Throughout Building |
| 2500 lf |
Transite Panels Cooling Towers[footnoteRef:1] [1: ]
| Cooling Towers on Roof |
| 1000 lf |
| Sink Undercoating1 |
| 2nd Floor |
| 3 sinks |
| Black Tape on Duct Insulation |
| 3rd Floor |
| 1450 sf |
| Interior/Exterior Window Glazing |
| 1st Floor Exterior |
| 125 windows |
| Vibration Damper1 |
| 3rd floor |
| 4 dampers |
| Brown glue pad on wall |
| Basement (Room B28) |
| 2000 sf |
| Brown mastic on columns |
| Basement Corridor (Near Room 33A) |
| 100 sf |
| Roofing Materials1 |
| Roof |
| 60000 sf |
Denotes material was not tested at the time of the most recent survey. Testing is not feasible in some cases as it would result in damage to the material or its structural components. In other cases, the material or area may not have been accessible. As such, the material must be presumed to be ACM based on its characteristics, age or other technical factors. Material is presumed to be ACM to ensure appropriate precautions and methods are employed when contemplating or executing activity that may disturb the material.
If you have any questions, please contact: