Exhibit 18-NBOC 2 - PastPerfQuestionaire LBH-TS Inspected.pdf

PDF 35 KB Posted

Attached to
NASA Balloon Operations Contract (NBOC) II Federal contract opportunity
Solicitation number
80GSFC20R0031
Issued by
National Aeronautics and Space Administration Goddard Space Center

About this file

This document contains a past performance questionnaire for the NASA Balloon Operations Contract (NBOC) II solicitation. The solicitation seeks proposals for balloon flight operations support, engineering services, aircraft operations, facilities maintenance, configuration management, risk management, training, IT, property management, and task order management. Offerors must submit completed past performance questionnaires from references as part of their proposal. The questionnaires require references to assess offerors' experience and performance on relevant contract work elements, and to rate offerors' performance in quality, schedule, cost, and business management. References also provide award fee ratings if applicable. Overall contract ratings and comments are requested to aid NASA's evaluation of offerors' past performance.

View the file

Other files for this federal contract opportunity

Other files attached to NASA Balloon Operations Contract (NBOC) II, newest first.
File Type Posted
SF30 amend 4 1-6-21 LBH Signed.pdf PDF
SF30 amend 3 1-5-21 Signed.pdf PDF
Questions and Responses January 6 2021 LBH.pdf PDF
RFP NBOC II Contract Clauses - Sections B-M Final 1-5-21 LBH.pdf PDF
Exh Cost Plus AF or FF Hybrid CORE-IDIQ RTOs Onsite and Offsite by GFY -RFP Final Revision 12-14-2020 719pm LBH - AMW.pdf PDF
Attachment F - Direct Indirect Labor Rates 12-2-20 LBH - AMW.pdf PDF
Enclosure 3 NBOC II - Phase-In SOW 12.17.2020 LBH - AMW.pdf PDF
SF33-14a 12-17-20 Revised -AMW.pdf PDF
RFP NBOC II Contract Clauses - Sections B-M Final 12-17-20 with changes accepted LBH-AMW.pdf PDF
RFP questions-12-17-20 500pm-TS - LBH redacted - AMW.pdf PDF
SF30 amend 2 12-17-20 page 1 and 2 - AMW Signed.pdf PDF
Wage Determination 2015-5454- Rev 14 LBH - AMW.pdf PDF
Attach A SOW 12-17-20 Redacted LBH - AMW.pdf PDF
Exhibit 18-NBOC 2 - PastPerfQuestionaire 12-2-20 redacted LBH - AMW.pdf PDF
FRFP Cover Letter 12-17-20-Revised Final - AMW.pdf PDF
SF30 amend 1 Signed 12-10-20.pdf PDF
FRFP Cover Letter 11-13-20-Inspected TS.pdf PDF
RFP NBOC II Contract Clauses - Sections B-M Final sanitized-TS Inspected.pdf PDF
SF33-14a 11-13-20.pdf PDF
Attachment B - Complete inventory 01-2020 Sanitized TS.pdf PDF
Enclosure 2 - NBOC Surveillance Plan September 2019.pdf PDF
Enclosure 3 - Balloon Phase-In SOW 1.10.2020 LBH-TS Inspected - Copy.pdf PDF
Attachment J - Reliability and Quality Assurance Plan Cover TS-Inspected TS.pdf PDF
Attachment M- Contract Historical Data TS-TS Inspected.pdf PDF
Attachment P - IT Security Applicable Documents List 11-13-2020 LBH-TS Inspected.pdf PDF
Attachment R - CSBF FY20 Real Property Manual 05-15-20 TS-TS Inspected.pdf PDF
Exh Cost Plus AF or FF Hybrid CORE-IDIQ RTOs Onsite and Offsite by GFY -RFP Final Revision 11-13-2020-TS Inspected.pdf PDF
Attachment B - Balloon Inventory 1.14.20 Sanitized TS.pdf PDF
Attachment A - NBOC II SOW LBH-Inspected TS.pdf PDF
Attachment B CSBF FHW Inventory 8-28-2020 LBH-Inspected TS.pdf PDF
Attachment B - CSBF Real Property List Sanitized TS.pdf PDF
Attachment D - Safety and Health Plan Cover TS-Inspected TS.pdf PDF
Attachment E - Financial management instructions 533 Attach Core and IDIQ--Both Onsite and Offsite LBH-TS Inspected.pdf PDF
Attachment H - IT Security Management Plan Cover TS-Inspected TS.pdf PDF
Attachment K - WBS - SOW Dictionary August 26 2020 LBH-Inspected TS.pdf PDF
Enclosure 1 NBOC II Scenarios 2-10-20 LBH-TS Inspected.pdf PDF
Enclosure 5 Historical Data - NBOC II LBH-TS Inspected.pdf PDF
Attachment C WD 15-5812 Rev 13 TX-TS Inspected.pdf PDF
Attachment F - Direct Indirect Labor Rates TS-TS Inspected.pdf PDF
Attachment G - Organizational Conflicts of Interest Avoidance Plan Cover TS-TS Inspected.pdf PDF
Attachment L - New Technology Reporting Plan (cover) TS-Inspected TS.pdf PDF
Attachment N - Personal Identiy Verification Issuance Procedures LBH-TS Inspected.pdf PDF
Attachment O -NBOC II- Applicable Standards and Policy Documents 9-29-2020 LBH-TS Inspected.pdf PDF
Attachment Q Contractor Proposed Enhancements Attachment LBH-TS Inspected.pdf PDF
Enclosure 4 - Information Technology Security Management Plan Template Sanitized-TS Inspected - Copy.pdf PDF
Attachment C WD 15-5445 Rev 10 NM-TS Inspected.pdf PDF
Attachment I - Small Business Subcontracting Plan Cover TS-TS Inspected.pdf PDF
Show all 47

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PAST PERFORMANCE QUESTIONNAIRE INSTRUCTIONS

(Updated May 2018)

Exhibit 18

RFP 80GSFC20R0031

Sections 1-3 provide for contract-related descriptive information and identification of the evaluator.

Section 4 lists the major work elements within our Statement of Work (SOW). Please provide your assessment of the “relevant experience” and “performance” associated with our SOW evidenced within the contract for which you are a reference. “Experience” means a contractor who has performed work in the specific SOW Element. “Did not Perform” means that the specific SOW element was not performed under the contract.

Section 5 evaluates the contractor’s technical, schedule, and cost performance and management. (Additional pages may be used for comments if desired). If you cannot answer any questions, please circle “N/R” for Not Rated.

The following definitions are offered for your use in assigning a performance rating for each of the factors in Sections 5 and 6:

Very High

(VH)

The Offeror’s relevant past performance is of exceptional merit;

indicating exemplary performance in a timely, efficient, and economical manner; very minor (if any) problems with no adverse effect on overall performance.

High

(H)

The Offeror’s relevant past performance demonstrates very effective performance that would be fully responsive to contract requirements with contract requirements accomplished in a timely, efficient, and economical manner for the most part with only minor problems with little identifiable effect on overall performance.

Moderate

(M)

The Offeror’s relevant past performance demonstrates effective performance; fully responsive to contract requirements; reportable problems, but with little identifiable effect on overall performance.

Low

(L)

The Offeror’s relevant past performance meets or slightly exceeds minimum acceptable standards; adequate results; reportable problems with identifiable, but not substantial, effects on overall performance.

Very Low

(VL)

The Offeror’s relevant past performance does not meet minimum acceptable standards in one or more areas; remedial action required in one or more areas; problems in one or more areas which, adversely affect overall performance.

N/R Not Rated

Section 6 provides for evaluation of the contractor’s management of cost and award/incentive fee history.

RETURN THIS QUESTIONNAIRE TO NASA Goddard Space Flight Center/Wallops Flight Facility BY TBD. Attn: Lisa B. Hall, Code 210.I Wallops Island, VA 23337 Phone: 757-824-1420 E-mail: Lisa.B.Hall@nasa.gov

PAST PERFORMANCE QUESTIONNAIRE

1. Contract Information

A. Name of Company/Division Being Evaluated:_____________________

B. Address:_____________________________________________

C. Contractor Cage Code and/or DUNS number

D. Contract Number:_______________________________________

E. Contract Type:_________________________________________

F. Period of Performance (including options): From:______ To:_______

G. Total Contract Value:_____________________________________

H. Award Information: Competitive: Yes___ No___ Basis of Selection: Technical___ Cost/Price___ Other (specify)_________________________

2. Description of Contract

Briefly describe the services provided under this contract:

During the contract performance being evaluated, this firm was the:

Prime Contractor____ Significant Subcontractor ____ Team Member ____ Other (describe)____________________________________________

Does a corporate or business relationship exist between the firm being evaluated and your organization?

Yes ___ No ___. If yes, please describe: ___________________________

3. Evaluator Information

Name: _____________________________________________________ Title: _______________________________________________________ Agency/Company: ____________________________________________ E-mail Address: _______________________________________________ Phone: ______________ Date Questionnaire Completed: _____________ Role in Program/Contract: ______________________________________ Length of Involvement in this Program/ Contract: _____________________

This form contains Source Selection Information when completed. See FAR 3.104. 3

4. SOW Survey Relevance Ratings: Please check the appropriate blocks for Relevance (Performed or Did Not Perform)

SOW ELEMENT

PERFORMED

DID NOT

PERFORM

Reliability and Quality Management of Manufacturing to include vendors/sub-contractors

Reliability and Quality Management of Flight Systems and Flight Support Ground Systems

Balloon Flight Operations Support Engineering Services Aircraft Operations and Management Facilities – Operations and Maintenance Configuration Management Risk Management Training and Certification Information Technology Property Management Task Order Management

This form contains Source Selection Information when completed. See FAR 3.104. 4

5. General Performance Survey

NO PERFORMANCE QUESTIONS PERFORMANCE RATING

(Please Circle)

QUALITY

1. Quality of services and support provided VH H M L VL N/R

2. Timely identification and mitigation of risks VH H M L VL N/R

3. Ability to identify and correct performance deficiencies in a timely manner VH H M L VL N/R

4. Demonstrated understanding and compliance with mission safety requirements VH H M L VL N/R

Comment:

SCHEDULE

5. Timeliness, quality, and accuracy of schedule estimates and financial reporting VH H M L VL N/R

6. Ability to meet/exceed schedule milestones VH H M L VL N/R

COST

7. Ability to establish realistic cost estimates and adhere to estimated costs VH H M L VL N/R

8. Ability to anticipate, identify and control cost growth. VH H M L VL N/R

BUSINESS/MANAGEMENT

9. Overall performance in planning and controlling the program VH H M L VL N/R

10. Compliance with technical requirements and performance standards VH H M L VL N/R

11. Communicating/interfacing with Government and overall responsiveness to Government requests VH H M L VL N/R

12. Ability to effectively manage the contract including subcontractor performance, if applicable VH H M L VL N/R

13.

Ability to recruit and retain highly skilled personnel, including ability to fill key vacancies in a timely manner.

VH H M L VL N/R

14. Adequacy of Contractor’s system(s) for processing task orders and/or changes. VH H M L VL N/R

15. Ability to meet Small Business Subcontracting Plan Goals VH H M L VL N/R

16. Ability to build effective working relationships with associate contractors, subcontractors and the VH H M L VL N/R

This form contains Source Selection Information when completed. See FAR 3.104. 5

Government in a team environment

17. Ability to handle fluctuating workloads VH H M L VL N/R

18.

Ability to design and/or deliver a product that meets or exceeds performance requirements within costs and schedule

VH H M L VL N/R

19. Adherence to safety and health procedures VH H M L VL N/R

20. Overall safety and health injury/illness record VH H M L VL N/R

Section 6:

What is the Contract Value:

Initial Value Current Value Estimated Cost: $___________ $____________

Fee: $___________ $____________

Total Value: $___________ $_____________

What are the total contract expenditures to date (cost/fees to date based on invoices, reports, etc)?

What is the Annual Contract Value to Date (The current contract expenditures to date divided by the number of years of performance to date)?

For example (note, these example numbers may not relate to this specific procurement):

Assume your contract is a current five year contract, is still ongoing, and the latest cost report reflects a cost/fee of $43,500,000 through the first 2 years and 4 months (to date). In this example, current/total Contract Expenditures incurred to Date are $43,500,000 and associated period of performance for those expenditures, expressed in years, is 2.33 years.

Therefore, the Average Annual Cost/Fee Incurred to Date: $18,669,528 ($43,500,000/2.33 years)

Was there a cost overrun? ( ) Yes ( ) No If yes, please explain:

If this was an award fee contract, what are the individual and/or average ratings of performance by your organization? Please attach any available award fee letters or database entries.

This form contains Source Selection Information when completed. See FAR 3.104. 6

Please comment on particularly strong/weak points of Contractor’s performance (technical, schedule, and/or cost). If the Overall Contract Performance Rating below is less than Very High, please provide some explanation in this section on why a higher rating was not provided.

Overall Contract Performance Rating (circle one)

Very High High Moderate Low Very Low

If less than Very High Performance Rating, please explain:

Please add any other comments you may feel are pertinent.

Rater’s Signature Date

File details come from the government source that posted it. Updated .