Attachment K - WBS - SOW Dictionary August 26 2020 LBH-Inspected TS.pdf

PDF 12 KB Posted

Attached to
NASA Balloon Operations Contract (NBOC) II Federal contract opportunity
Solicitation number
80GSFC20R0031
Issued by
National Aeronautics and Space Administration Goddard Space Center

About this file

This document provides a Work Breakdown Structure (WBS) and Statement of Work (SOW) dictionary for the National Aeronautics and Space Administration (NASA) Balloon Operations Contract (NBOC) II solicitation. The WBS outlines technical and business management support, flight operations and engineering support, and indefinite delivery indefinite quantity task orders. Key areas under technical and business management include quality assurance, risk management, safety and health management, training and certification, contract management, facilities support, and investigations. Flight operations and engineering support covers annual flight candidate programs, flight hardware certification, flight system certification, flight operations engineering, and campaign-specific areas. The WBS also defines IDIQ task order support.

View the file

Other files for this federal contract opportunity

Other files attached to NASA Balloon Operations Contract (NBOC) II, newest first.
File Type Posted
SF30 amend 4 1-6-21 LBH Signed.pdf PDF
Questions and Responses January 6 2021 LBH.pdf PDF
SF30 amend 3 1-5-21 Signed.pdf PDF
RFP NBOC II Contract Clauses - Sections B-M Final 1-5-21 LBH.pdf PDF
Attachment F - Direct Indirect Labor Rates 12-2-20 LBH - AMW.pdf PDF
Enclosure 3 NBOC II - Phase-In SOW 12.17.2020 LBH - AMW.pdf PDF
SF30 amend 2 12-17-20 page 1 and 2 - AMW Signed.pdf PDF
Wage Determination 2015-5454- Rev 14 LBH - AMW.pdf PDF
Attach A SOW 12-17-20 Redacted LBH - AMW.pdf PDF
Exhibit 18-NBOC 2 - PastPerfQuestionaire 12-2-20 redacted LBH - AMW.pdf PDF
FRFP Cover Letter 12-17-20-Revised Final - AMW.pdf PDF
Exh Cost Plus AF or FF Hybrid CORE-IDIQ RTOs Onsite and Offsite by GFY -RFP Final Revision 12-14-2020 719pm LBH - AMW.pdf PDF
SF33-14a 12-17-20 Revised -AMW.pdf PDF
RFP NBOC II Contract Clauses - Sections B-M Final 12-17-20 with changes accepted LBH-AMW.pdf PDF
RFP questions-12-17-20 500pm-TS - LBH redacted - AMW.pdf PDF
SF30 amend 1 Signed 12-10-20.pdf PDF
Attachment J - Reliability and Quality Assurance Plan Cover TS-Inspected TS.pdf PDF
Attachment M- Contract Historical Data TS-TS Inspected.pdf PDF
Attachment P - IT Security Applicable Documents List 11-13-2020 LBH-TS Inspected.pdf PDF
Attachment R - CSBF FY20 Real Property Manual 05-15-20 TS-TS Inspected.pdf PDF
Exh Cost Plus AF or FF Hybrid CORE-IDIQ RTOs Onsite and Offsite by GFY -RFP Final Revision 11-13-2020-TS Inspected.pdf PDF
Attachment B - Balloon Inventory 1.14.20 Sanitized TS.pdf PDF
Attachment C WD 15-5812 Rev 13 TX-TS Inspected.pdf PDF
Attachment F - Direct Indirect Labor Rates TS-TS Inspected.pdf PDF
Attachment G - Organizational Conflicts of Interest Avoidance Plan Cover TS-TS Inspected.pdf PDF
Attachment L - New Technology Reporting Plan (cover) TS-Inspected TS.pdf PDF
Attachment N - Personal Identiy Verification Issuance Procedures LBH-TS Inspected.pdf PDF
Attachment O -NBOC II- Applicable Standards and Policy Documents 9-29-2020 LBH-TS Inspected.pdf PDF
Attachment Q Contractor Proposed Enhancements Attachment LBH-TS Inspected.pdf PDF
Enclosure 4 - Information Technology Security Management Plan Template Sanitized-TS Inspected - Copy.pdf PDF
Attachment C WD 15-5445 Rev 10 NM-TS Inspected.pdf PDF
Attachment I - Small Business Subcontracting Plan Cover TS-TS Inspected.pdf PDF
FRFP Cover Letter 11-13-20-Inspected TS.pdf PDF
RFP NBOC II Contract Clauses - Sections B-M Final sanitized-TS Inspected.pdf PDF
SF33-14a 11-13-20.pdf PDF
Attachment B - Complete inventory 01-2020 Sanitized TS.pdf PDF
Enclosure 2 - NBOC Surveillance Plan September 2019.pdf PDF
Enclosure 3 - Balloon Phase-In SOW 1.10.2020 LBH-TS Inspected - Copy.pdf PDF
Exhibit 18-NBOC 2 - PastPerfQuestionaire LBH-TS Inspected.pdf PDF
Attachment A - NBOC II SOW LBH-Inspected TS.pdf PDF
Attachment B CSBF FHW Inventory 8-28-2020 LBH-Inspected TS.pdf PDF
Attachment B - CSBF Real Property List Sanitized TS.pdf PDF
Attachment D - Safety and Health Plan Cover TS-Inspected TS.pdf PDF
Attachment E - Financial management instructions 533 Attach Core and IDIQ--Both Onsite and Offsite LBH-TS Inspected.pdf PDF
Attachment H - IT Security Management Plan Cover TS-Inspected TS.pdf PDF
Enclosure 1 NBOC II Scenarios 2-10-20 LBH-TS Inspected.pdf PDF
Enclosure 5 Historical Data - NBOC II LBH-TS Inspected.pdf PDF
Show all 47

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NASA Balloon Operations Contract (NBOC) II

Work Breakdown Structure (WBS) Relation to Statement of Work (SOW)

August 26, 2020

WBS Level 3 – Technical & Business Management & Facilities Support

3.1 Technical and Business Management and Facilities Support

3.1.1 Contract Transition Phase Out Plan

3.1.2 Quality Assurance

3.1.3 Reliability and Quality Management

3.1.4 Configuration Management

3.1.5 Risk Management

3.1.6 Safety and Health Management

3.1.7 Training and Certification

3.1.8 Information Technology

3.1.9 Contract Management

3.1.10 Reviews

3.1.11 Facilities

3.1.12 Construction of Facilities

3.1.13 Task Orders

3.1.14 Agreements

3.1.15 Investigations

3.1.16 Historical Data

3.1.17 Government Property

3.1.18 Applicable Standards and Policies Documents

WBS Level 3 – Flight Operations & Engineering Support

3.2 NASA Flight Program Operations

3.3 Engineering Services

WBS Level 4 – Flight Operations & Engineering NOT Directly Related to an Individual Campaign

3.2.1 Annual Flight Candidate Program

3.2.2 Flight Support Equipment

3.2.5 Ground Support Equipment

3.3.2 Software Engineering

3.3.3 Equipment and Enhancement Projects

3.3.4 Reliability and Quality Assurance Engineering Support

WBS Level 4 – Campaigns

3.2.2 Flight Support Equipment

3.2.3 Flight Hardware Mechanical Certification

3.2.4 Flight System Certification

3.2.5 Ground Support Equipment

3.2.6 Handling of Radioactive Sources

3.2.7 Flight Operations Support

3.2.8 Aviation/ Aircraft Support

3.2.9 Operational Safety

3.2.10 Flight Assessment

3.2.11 Balloon Flight Summary Document

3.3.1 Flight Operations Engineering Support

WBS Level 3 - Indefinite Delivery Indefinite Quantity (IDIQ) Task Orders

4.1 Routine IDIQ Summary

4.2 Special IDIQ

File details come from the government source that posted it. Updated .