About this file

This is a request for proposal for the NASA Balloon Operations Contract II follow-on contract. Products and services required include complete balloon operations services, engineering support, payload integration, testing and evaluation for the long-duration ballooning program. The response date is not provided. The incumbent contractor is Northrop Grumman Innovation Systems. The award date and period of performance are not specified. The contract will be administered by NASA's Balloon Program Office located at Wallops Flight Facility.

View the file

Other files for this federal contract opportunity

Other files attached to NASA Balloon Operations Contract (NBOC) II, newest first.
File Type Posted
SF30 amend 4 1-6-21 LBH Signed.pdf PDF
Questions and Responses January 6 2021 LBH.pdf PDF
SF30 amend 3 1-5-21 Signed.pdf PDF
RFP NBOC II Contract Clauses - Sections B-M Final 1-5-21 LBH.pdf PDF
Attachment F - Direct Indirect Labor Rates 12-2-20 LBH - AMW.pdf PDF
Enclosure 3 NBOC II - Phase-In SOW 12.17.2020 LBH - AMW.pdf PDF
Exh Cost Plus AF or FF Hybrid CORE-IDIQ RTOs Onsite and Offsite by GFY -RFP Final Revision 12-14-2020 719pm LBH - AMW.pdf PDF
SF33-14a 12-17-20 Revised -AMW.pdf PDF
RFP NBOC II Contract Clauses - Sections B-M Final 12-17-20 with changes accepted LBH-AMW.pdf PDF
RFP questions-12-17-20 500pm-TS - LBH redacted - AMW.pdf PDF
SF30 amend 2 12-17-20 page 1 and 2 - AMW Signed.pdf PDF
Wage Determination 2015-5454- Rev 14 LBH - AMW.pdf PDF
Attach A SOW 12-17-20 Redacted LBH - AMW.pdf PDF
Exhibit 18-NBOC 2 - PastPerfQuestionaire 12-2-20 redacted LBH - AMW.pdf PDF
FRFP Cover Letter 12-17-20-Revised Final - AMW.pdf PDF
SF30 amend 1 Signed 12-10-20.pdf PDF
Attachment J - Reliability and Quality Assurance Plan Cover TS-Inspected TS.pdf PDF
Attachment M- Contract Historical Data TS-TS Inspected.pdf PDF
Attachment P - IT Security Applicable Documents List 11-13-2020 LBH-TS Inspected.pdf PDF
Exh Cost Plus AF or FF Hybrid CORE-IDIQ RTOs Onsite and Offsite by GFY -RFP Final Revision 11-13-2020-TS Inspected.pdf PDF
Attachment B - Balloon Inventory 1.14.20 Sanitized TS.pdf PDF
FRFP Cover Letter 11-13-20-Inspected TS.pdf PDF
RFP NBOC II Contract Clauses - Sections B-M Final sanitized-TS Inspected.pdf PDF
SF33-14a 11-13-20.pdf PDF
Attachment B - Complete inventory 01-2020 Sanitized TS.pdf PDF
Enclosure 2 - NBOC Surveillance Plan September 2019.pdf PDF
Enclosure 3 - Balloon Phase-In SOW 1.10.2020 LBH-TS Inspected - Copy.pdf PDF
Exhibit 18-NBOC 2 - PastPerfQuestionaire LBH-TS Inspected.pdf PDF
Attachment A - NBOC II SOW LBH-Inspected TS.pdf PDF
Attachment B CSBF FHW Inventory 8-28-2020 LBH-Inspected TS.pdf PDF
Attachment B - CSBF Real Property List Sanitized TS.pdf PDF
Attachment D - Safety and Health Plan Cover TS-Inspected TS.pdf PDF
Attachment E - Financial management instructions 533 Attach Core and IDIQ--Both Onsite and Offsite LBH-TS Inspected.pdf PDF
Attachment H - IT Security Management Plan Cover TS-Inspected TS.pdf PDF
Attachment K - WBS - SOW Dictionary August 26 2020 LBH-Inspected TS.pdf PDF
Enclosure 1 NBOC II Scenarios 2-10-20 LBH-TS Inspected.pdf PDF
Enclosure 5 Historical Data - NBOC II LBH-TS Inspected.pdf PDF
Attachment C WD 15-5812 Rev 13 TX-TS Inspected.pdf PDF
Attachment F - Direct Indirect Labor Rates TS-TS Inspected.pdf PDF
Attachment G - Organizational Conflicts of Interest Avoidance Plan Cover TS-TS Inspected.pdf PDF
Attachment L - New Technology Reporting Plan (cover) TS-Inspected TS.pdf PDF
Attachment N - Personal Identiy Verification Issuance Procedures LBH-TS Inspected.pdf PDF
Attachment O -NBOC II- Applicable Standards and Policy Documents 9-29-2020 LBH-TS Inspected.pdf PDF
Attachment Q Contractor Proposed Enhancements Attachment LBH-TS Inspected.pdf PDF
Enclosure 4 - Information Technology Security Management Plan Template Sanitized-TS Inspected - Copy.pdf PDF
Attachment C WD 15-5445 Rev 10 NM-TS Inspected.pdf PDF
Attachment I - Small Business Subcontracting Plan Cover TS-TS Inspected.pdf PDF
Show all 47

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

This page intentionally left blank.

PREFACE BACKGROUND

CSBF Real Property Manual July 17, 2019 Page i

PREFACE

BACKGROUND

The Columbia Scientific Balloon Facility (CSBF) in Palestine, Texas was established in the early 1960s under the sponsorship of the National Science Foundation (NSF). The purpose of the CSBF is to provide a permanent complex for scientific balloon flight operations. Since its inception in the early 1960s, the CSBF has been a Government-owned, contractor-operated institution. Originally named the Scientific Balloon Facility, it was renamed the National Scientific Balloon Facility (NSBF) on July 1, 1972.

In October 1982, sponsorship of the NSBF was transferred from the National Science Foundation to the National Aeronautics and Space Administration (NASA), and the NSBF became a separate entity under the University Corporation for Atmospheric Research (UCAR). At that time, the NSF issued NASA an indefinite user permit for all land and other real property at NSBF in Palestine, Texas. In October 1987, the NASA contract to operate the NSBF was awarded to the Physical Science Laboratory under the auspices of New Mexico State University in Las Cruces, New Mexico. On February 1, 2015 the contract was awarded to Orbital Sciences Corporation Technical Services Division. A few months later, Orbital Sciences merged with the Aerospace and Defense groups of Alliant Techsystems Inc. (ATK), creating Orbital ATK. Then in 2015, Orbital ATK was acquired by Northrop Grumman and renamed Northrop Grumman Innovation Systems. The contract is administered by the NASA Balloon Program Office located at Goddard Space Flight Center's (GSFC) Wallops Flight Facility in Wallops Island, Virginia.

On August 23, 2005, NASA signed off on a plan by U.S. Congressman Jeb Hensarling (R-Texas) to rename the NSBF to the Columbia Scientific Balloon Facility (CSBF) in honor of the seven astronauts who perished during the loss of the Space Shuttle Columbia.

SERVICES

The CSBF has the following threefold mission:

To plan and develop facilities and provide operations services to meet the approved ballooning requirements of the scientific community

To perform the necessary research and development to meet future scientific ballooning requirements

To provide consulting services in the field of scientific ballooning

The CSBF provides complete balloon operations services and engineering support to the United States and foreign scientific communities. The operational services include:

Balloon inflation

Launching

Tracking and recovering the balloon payload

Telecommanding and data retrieval with reliable electronics systems

Engineering support services include:

Balloon systems design

Balloon material research

Electronics design

Gondola design

Thermal analysis

PALESTINE, TEXAS FACILITY PREFACE

Page ii July 17, 2019 CSBF Real Property Manual

PALESTINE, TEXAS FACILITY

The CSBF is five miles northwest of the City of Palestine in Anderson County, Texas. The facility is west of the Palestine Municipal Airport, accessible from U.S. Highway 287 via Farm-to-Market Road 3224. Two sides of the property are defined by the north-south and east-west runways of the airport (see Figure 1). There are 19 buildings in the complex. The buildings and two paved launch areas are situated on 473.85 acres of land, of which

165.97 acres are leased from the City of Palestine and the remaining 307.88 acres are listed as NASA real property. On February 16, 2016 10 of the NSF owned buildings and 307.88 acres of NSF owned land were transferred to NASA, the entire facility is now NASA owned. The facility is used exclusively for scientific balloon flight operations and engineering. All properties are being fully used in support of the CSBF mission and are essential to program requirements.

Figure 1 - CSBF Base and Palestine Airport

FORT SUMNER, NEW MEXICO FACILITY

Remote site operations include a launch facility in Fort Sumner, New Mexico (see Figure 2). NASA purchased

8.15 acres of land from the City of Fort Sumner, New Mexico for use as a remote launch site at the Fort Sumner, New Mexico Municipal Airport. In 1991, an 80 x 80-ft building was erected on this acreage to serve as the staging facility for balloon missions launched from Fort Sumner. There is currently no permanent staff at the Fort Sumner location.

Two leases are in place in connection with the Fort Sumner facility. A hangar is leased from the Village of Fort Sumner, and a parcel of land used as a down-range facility at the Winslow-Lindbergh Regional Airport is leased from the City of Winslow, AZ. Starting in 2019 NASA is handling all procurement functions on all leases.

CONTENTS

CSBF Real Property Manual July 17, 2019 Page v

CONTENTS

Preface ...................................................................................................................... i

Background .......................................................................................................................................... i Services ............................................................................................................................................... i Palestine, Texas Facility ........................................................................................................................ ii Fort Sumner, New Mexico Facility ........................................................................................................... ii Additional Information .......................................................................................................................... iv

Current Out-Grants .................................................................................................................... iv Floodplains or Wetlands .............................................................................................................. iv Historic or Cultural Significance ................................................................................................... iv Mineral Activity ......................................................................................................................... iv Utilities..................................................................................................................................... iv

Contents ................................................................................................................... v

List of Tables ........................................................................................................... vii

List of Figures .......................................................................................................... vii

1 Introduction

1.1 Origin of Real Property Data

1.2 Chronological Listing of NSF Real Property

1.3 Chronological Listing of NASA Real Property

1.4 Summary of Real Property

2 Land: Owned and Leased

2.1 Palestine, TX

2.1.1 Summary

2.1.2 Chronological Listing

2.2 Ft. Sumner, NM and Winslow, AZ

2.2.1 Summary

2.2.2 Chronological Listing

3 Buildings and Structures

3.1 Administration – Building 1

3.2 Facilities/Battery Storage – Building 2

3.3 Facility Services/Equipment Maintenance –Building 3

3.4 Flight Operations – Building 4

3.5 Stratoport I – Building 5

3.6 Administration Storage – Building 6

3.7 Vehicle Storage I (Old Tim Shed) – Building 7

3.8 Monuments – Structure 8

3.9 Facilities Storage - Building 9

3.10 Visitor Center – Building 10

3.11 Staging – Building 11

3.12 Operations Control Center (OCC) – Building 12

3.13 Vehicle Storage II (New Tim Shed) – Building 13

3.14 Balloon Storage – Building 14

CONTENTS

Page vi July 17, 2019 CSBF Real Property Manual

3.15 Warehouse I – Building 15

3.16 Verizon Cellular Site – Structure 16

3.17 Tractor Shed – Building 17

3.18 Warehouse II – Building 18

3.19 Nonmagnetic A-Frame – Structure 19

3.20 NOAA Wind Profiling Site – Structure 20

3.21 Base Sign – Structure 22

3.22 Engineering Support – Building 23

3.23 Water Tower – Structure 24

3.24 Test and Evaluation (T&E) – Building 25

3.25 Loading Dock – Structure 26

3.26 Econo Vault Fuel Storage – Structure 27

3.27 Balloon Support – Building 28

3.28 East Pavilion – Structure 29

3.29 West Pavilion – Structure 30

3.30 NOAA Climate Reference Network– Structure 31

3.31 Engineering Support Storage – Building 32

4 OTHER INFRASTRUCTURE

4.1 East Launch Pad

4.2 West Launch Pad

4.3 Roads, Walks, and Parking Lots

4.4 Fire Protection Sprinkler System

5 Fort Sumner Flight Facility

5.1 Staging – Remote Building R1

5.2 Lithium Battery Storage – Remote Building R3

5.3 Kitchen – Remote Building R4

6 Alice Springs, Australia

6.1 Demountable Building – Remote Building R2

7 McMurdo Station, Antarctica

7.1 Payload Building 1

7.2 Payload Building 2

7.3 Rigging Shop

7.4 Electronics Shop (Telemetry)

7.5 Mechanical Building

Appendix A – CSBF Organization

Appendix B – CSBF Facility Map

Appendix C –Palestine, TX Vicinity Map

Appendix D – Map of Fort Sumner, NM

Appendix E – Fort Sumner, NM Vicinity Map

Appendix F – CSBF Site Diagram

LIST OF TABLES

CSBF Real Property Manual July 17, 2019 Page vii

LIST OF TABLES

Table 1 - Utility Providers ............................................................................................................................ iv Table 2 - NCAR Financial Statement of NSF Real Property Transferred on September 27, 1985 Table 3 - Chronological Listing of NSF Real Property Transferred to NASA 2016 Table 4 - Chronological Listing of NASA Real Property Table 5 - Total NSF and NASA Real Property Table 6 - NASA Owned and Leased Land Table 7 - CSBF Acreage and Land Values Table 8 - GSA Real Property Survey Results Table 9 - NASA Owned and Leased Land

LIST OF FIGURES

Figure 1 - CSBF Base and Palestine Airport .................................................................................................... ii Figure 2 - Fort Sumner Launch Facility at the Fort Sumner Municipal Airport ...................................................... iii

Figure 3 - Leased hangar at Fort Sumner Airport ............................................................................................ iii Figure 4 - Leased parcel of land at Winslow Airport......................................................................................... iii Figure 5 - Administration (Building 1)

Figure 6 - Administration (Building 1) Floor Plan Figure 7 - Facilities/Battery Storage (Building 2) Figure 8 - Facilities/Battery Storage (Building 2) Floor Plan Figure 9 - Facility Services/Equipment Maintenance (Building 3) Figure 10 - Facility Services/Equipment Maintenance (Building 3) Floor Plan Figure 11 - Flight Operations (Building 4)

Figure 12 - Flight Operations (Building 4) Floor Plan Figure 13 - Stratoport I (Building 5) Figure 14 - Stratoport I (Building 5) Floor Plan

Figure 15 - Facilities Storage (Building 6) Figure 16 - Facilities Storage (Building 6) Floor Plan

Figure 17 - Vehicle Storage I (Building 7) Figure 18 - Vehicle Storage I (Building 7) Floor Plan Figure 19 - Monument (Structure 8)

Figure 20 - Facilities Storage (Building 9) Figure 21 - Facilities Storage (Building 9) Floor Plan Figure 22 - Visitor Center (Building 10) Figure 23 - Visitor Center (Building 10) Floor Plan Figure 24 - Staging (Building 11) Figure 25 - Staging (Building 11) Floor Plan

Figure 26 - Operations Control Center (Building 12) Figure 27 - Operations Control Center (Building 12) Floor Plan Figure 28 - Vehicle Storage II (Building 13) Figure 29 - Vehicle Storage II (Building 13) Floor Plan

Page viii July 17, 2019 CSBF Real Property Manual

Figure 30 - Balloon Storage (Building 14) Figure 31 - Balloon Storage (Building 14) Floor Plan Figure 32 - Warehouse I (Building 15) Figure 33 - Warehouse I (Building 15) Floor Plan Figure 34 - Verizon Antenna (Structure 16) Figure 35 - Verizon Cellular Site (Structure 16) Figure 36 - Tractor Shed (Building 17) Figure 37 - Tractor Shed (Building 17) Floor Plan Figure 38 - Warehouse II (Building 18) Figure 39 - Warehouse II (Building 18) Floor Plan

Figure 40 - Nonmagnetic A-Frame (Structure 19) Figure 41 - Former location of NOAA Wind Profiler (Structure 20) Figure 42 - Base Sign (Structure 22)

Figure 43 - Engineering Support (Building 23) Figure 44 - Engineering Support (Building 23) Floor Plan Figure 45 - Water Tower (Structure 24) Figure 46 - Water Tower (Structure 24) Drawing Figure 47 - Test and Evaluation (Building 25) Figure 48 - Test and Evaluation (Building 25) Floor Plan Figure 49 - Loading Dock (Structure 26) Figure 50 - Econo Vault Fuel Storage (Structure 27) Figure 51 - Balloon Support (Building 28)

Figure 52 - Balloon Support (Building 28) Floor Plan Figure 53 - East Pavilion (Building 29) Figure 54 - West Pavilion (Building 30) Figure 55 - NOAA Climate Network (Structure 31) Figure 56 - Engineering Support Storage (Building 32)

Figure 57 - East Launch Pad Figure 58 - West Launch Pad Figure 59 – Resurfaced Parking Area in Front of Building 11

Figure 60 - Fort Sumner Staging (Building R1) Figure 61 - Fort Sumner Staging (Building R1) Floor Plan Figure 62 - Fort Sumner Lithium Battery Storage (Building R3) Figure 63 - Fort Sumner Lithium Battery Storage (Building R3) Floor Plan Figure 64 – Ft. Sumner Kitchen (Building R4) Figure 65 - Alice Springs Demountable Building (Building R2) Floor Plan

Figure 66 - Antarctica Payload Building 1 floor plan Figure 67 - Antarctica Payload Building 1 photograph

Figure 68 - Antarctica Payload Building 2 floor plan Figure 69 - Antarctica Payload Building 2 photograph Figure 70 - Antarctica Rigging Shop floor plan Figure 71 - Antarctica Rigging Building photo Figure 72 - Antarctica Electronics Shop (Telemetry) floor/roof plans Figure 73 - Antarctica Telemetry Building photo Figure 74 - Antarctica Mechanical Building floor and roof plan Figure 75 - Antarctica Mechanical Building photo Figure 76 - CSBF Organization Chart

CSBF Real Property Manual July 17, 2019 Page ix

Figure 77 - CSBF Facility Map Figure 78 - Palestine, Texas Vicinity Map Figure 79 - Map of Fort Sumner, NM Figure 80 - Fort Sumner, NM Vicinity Map Figure 81 - CSBF Site Diagram

Page x July 17, 2019 CSBF Real Property Manual

BUILDINGS AND STRUCTURES ADMINISTRATION – BUILDING 1

CSBF Real Property Manual July 17, 2019 Page 9 drain field and the construction of a new retaining wall. Also included in the rehab was the installation of a new circuit panel, breakers, circuits, duplex receptacles, wire molds, uninterruptible power system, and accessories.

This work was accomplished by contractor Jacobe Brothers Construction of Tyler, Texas under NASA contract NAS5-31125.

This resulted in the building being deleted from the NSF Real Property Records and added to NASA Real Property Records.

1999 Awnings Striped aluminum awnings were added above five doorways. The work was done by Glenwood Blind and Awning of Tyler, Texas under NASA contract

NAS5-98005.

2017 Roof The roof of the building was replaced in July 2017. The work was performed by Sawyer Building Systems of Tyler, Texas, under NASA contract

NNG15WA53C.

Figure 5 - Administration (Building 1)

ADMINISTRATION – BUILDING 1 BUILDINGS AND STRUCTURES

Page 10 July 17, 2019 CSBF Real Property Manual

Figure 6 - Administration (Building 1) Floor Plan

WC

WC

BUILDINGS AND STRUCTURES FACILITIES/BATTERY STORAGE – BUILDING 2

CSBF Real Property Manual July 17, 2019 Page 11

3.2 FACILITIES/BATTERY STORAGE – BUILDING 2

CONSTRUCTED: 1963

SQUARE FEET: 5,600

VALUE: $37,413.44

OWNERSHIP: NASA

PROPERTY ID: N/A

1963 Original Construction This single-story 140 x 40–ft building was originally constructed for balloon storage and later converted to the Electronics Shop (building 2), Facility Services (building 2A), and the Machine Shop (building 2B). As advised by NCAR on September 27, 1985, their records revealed the $37,413.44 as part of the total value given for six buildings. A value of $6.68/ft2 ($37,413.44 divided by 5,600-ft2) appears to be a fair value.

1989 Mezzanines and Office Space

A mezzanine was built in the Machine Shop (building 2B) by CSBF personnel. Two offices and a storage room with mezzanine above were also built in Facility Services (building 2A). This work was performed under NASA contract NAS5-29800.

1991 Electronics Shop Expansion

The Electronics Shop was expanded to include building 2A after Facility Services moved to building 3.

1993 HVAC An HVAC unit including ductwork was installed in building 2A by Palestine Air and Refrigeration of Palestine, Texas.

1994 HVAC An HVAC unit was installed in building 2 and a thermostat to control heat strips was installed in building 2B by Palestine Air and Refrigeration of Palestine, Texas.

1998 Electronics and Machine Shop relocated

The Electronics section and Machine Shop were moved to the newly constructed Engineering Support (building 28). The building is now being used as the Facility shop/storage and for climate-controlled battery storage.

2000 AC Unit A 3-ton AC unit was installed in the bay area where the lithium batteries are stored.

2012 Building Enclosed and

AC

The building was enclosed and a 4-ton AC unit was installed at a cost of $3,800.

Figure 7 - Facilities/Battery Storage (Building 2)

FACILITIES/BATTERY STORAGE – BUILDING 2 BUILDINGS AND STRUCTURES

Page 12 July 17, 2019 CSBF Real Property Manual

Figure 8 - Facilities/Battery Storage (Building 2) Floor Plan

AC

BUILDINGS AND STRUCTURES FACILITY SERVICES/EQUIPMENT MAINTENANCE –BUILDING 3

CSBF Real Property Manual July 17, 2019 Page 13

3.3 FACILITY SERVICES/EQUIPMENT MAINTENANCE –

BUILDING 3

CONSTRUCTED: 1966

SQUARE FEET: 3,600

VALUE: $31,405.00

OWNERSHIP: NASA

PROPERTY ID: N/A

1966 Original construction An open 60 x 60-ft shelter was added to the shop buildings referred to in Section 3.2 on page 11. A 40 x 20-ft area of this space was enclosed in 1968 to be used as the welding shop. The remaining space was used as a helium shed. The cost of the original shop buildings (2, 2A, and 2B) in 1963 was $6.68/ft2. Therefore, it is reasonable to use $7.00/ft2 for the 3,600-ft2 addition constructed in 1966 and 1968.

1984 Enclosure The 20 x 20-ft area behind the helium shed area was enclosed and converted to equipment maintenance under NASA contract NAS5-28218.

1990 Dirt Floor Covered with Concrete Slab

A 40 x 20-ft concrete slab was poured to cover the dirt floor of the equipment maintenance area. The work was performed under NASA contract NAS5-29800.

1991 New Facility Services Work Area

A 19 x 60-ft area was enclosed by CSBF personnel for a new facility services work area. A work area, three small offices, a mezzanine, and a storage area were added. One of CSBF's heating and air conditioning units and ductwork were installed and the system connected by Palestine Air and Refrigeration of Palestine, Texas. A new overhead door was installed by Athens Steel Building Corporation of Athens, Texas. The work was performed under NASA contract NAS5-29800.

1994 Equipment Maintenance Bay Enclosure/HVAC/ Insulation

The bay was enclosed, an overhead door was added, and the ceiling was insulated. Tiles and grid work were installed in the shop area. CSBF furnished the tiles and insulation and CSBF personnel furnished labor, tools, and grid work. Cost of the work was $4,140.00. This construction was done under NASA contract NAS5-31125. An HVAC unit including ductwork was installed in the middle bay by Palestine Air and Refrigeration of Palestine, Texas. The middle bay was insulated with 6-in vinyl-faced R19 insulation and an overhead door was installed by RPR Construction of Tyler, Texas.

2003 Air Conditioning The air conditioning (AC) unit was replaced in the welding shop on 7 July 2003 by Palestine Air and Refrigeration of Palestine, Texas at a cost of $7,130.00.

FACILITY SERVICES/EQUIPMENT MAINTENANCE –BUILDING 3 BUILDINGS AND STRUCTURES

Page 14 July 17, 2019 CSBF Real Property Manual

Figure 9 - Facility Services/Equipment Maintenance (Building 3)

Figure 10 - Facility Services/Equipment Maintenance (Building 3) Floor Plan

BUILDINGS AND STRUCTURES FLIGHT OPERATIONS – BUILDING 4

CSBF Real Property Manual July 17, 2019 Page 15

3.4 FLIGHT OPERATIONS – BUILDING 4

CONSTRUCTED: 1963

SQUARE FEET: 5,584.5

VALUE: $149,534.54

OWNERSHIP: NASA

PROPERTY ID: N/A

1963 Original Construction

This single-story 70 x 35-ft building was donated to the CSBF by Princeton University. The $10/ft2 cost of construction was estimated by considering fair market value and labor costs at the time of construction:

70 x 35-ft = 2,450-ft2 x $10 = $24,500

The dimensions of 70 x 35-ft were taken from the Floor Plan Rigging Building, page 69 of the Master Plan NCAR Scientific Balloon Facility, Palestine, Texas, dated July 1972.

1978 Parachute Pull Tunnel

A 74 x 15-ft covered concrete pad was added to the back of the building by CSBF personnel to facilitate stretching and rigging of parachutes. The material cost was estimated at $5,000. Labor costs were estimated for approximately 400 hours at $12.50/hr or $5,000.00. Therefore, the value of $10,203.00 appears reasonable and is one of the six values provided by NCAR on 27 September 1985.

1989 Parachute Pull Tunnel Removal

An addition to the mechanical rigging shop required the removal of the existing parachute pull tunnel and its foundation. The metal from this building was removed, stacked, and saved with plans to reconstruct the 74 x 15-ft building as an extension to this new addition.

1989 Addition to Flight

Operations

A firm fixed-price subcontract for $114,832.00 was awarded to Athens Steel

Building Corporation of Athens, Texas on 25 July 1988 for construction of a 40 x 80-ft building addition under NASA contract NAS5-29800. The new dimensions of the building are 153 x 36.5-ft (5,584.5-ft2). The building has a monorail hoist and is air conditioned and heated. The new addition is connected to the existing building by an overhead door and a walk door. NASA improvements to the building owned by NSF were an improvement to NSF Real Property. The increase in value of this building was reported to NSF on their Annual Report GSA Form 1166.

1994 Roof A new roof of urethane foam with white reflective coating was installed on the front portion of the building and existing roof box vents were removed by Pal-Tex Urethane of Palestine, Texas. A Lennox 7.5-ton heat pump was installed by Palestine Air and Refrigeration of Palestine, Texas.

Overhead Door

Bathroom Update

42’ x 42’ slab

Cubical

The south overhead door was replaced with an insulated door by Overhead Door Company of Tyler, Texas.

The small restroom was removed and replaced with a modern style Bathroom with a shower stall, a urinal and two toilets. The work was handled by David Harden Construction. The cost was $34,907.00.

One 42’ x 42’ slab was added to the back of this building to extend the area that was usable to ready parachutes for flight. Morris Construction was used for the project at a cost of $8,138.

Cubical space was built by CSBF Facilities to allow separate computer work space estimated cost $400.

2012 Break/Training Room

Break/training room was added. Construction was done by CSBF Facilities.

FLIGHT OPERATIONS – BUILDING 4 BUILDINGS AND STRUCTURES

Page 16 July 17, 2019 CSBF Real Property Manual

Figure 11 - Flight Operations (Building 4)

Figure 12 - Flight Operations (Building 4) Floor Plan

BUILDINGS AND STRUCTURES STRATOPORT I – BUILDING 5

CSBF Real Property Manual July 17, 2019 Page 17

3.5 STRATOPORT I – BUILDING 5

CONSTRUCTED: 1963

SQUARE FEET: 1,540

VALUE: $52,779.90

OWNERSHIP: NASA

PROPERTY ID: N/A

1963 Original Construction The main section of this building is hexagonal in shape, having an area of 1,020-ft2. Two storage areas, each 13 x 20-ft, were connected adding 520-ft2. Stratoport I was constructed by Princeton University and later donated to CSBF.

NCAR identified all real property except for the cost of Stratoport I and the Coronaport. The two buildings are very similar in design and composition and were built relatively close to the same time (1963 and 1965);

therefore, the cost allocation was based on square footage.

1989 Asbestos Removal Stratoport I was completely stripped of all asbestos cement sandwich panels which included all walls and the roof. A new girt system was connected onto the existing structural members. New sandwich panels consisting of urethane core insulation and a light-gage metal liner were connected to the new girt system. The building also received a new roof system. The work was performed by Red Eagle Construction Company of Manvel, Texas under NASA contract NAS5-29800.

1990 AC Installation A Sears 25,000-BTU window AC unit was installed by Palestine Air and Refrigeration of Palestine, Texas.

2013 Asbestos Testing/ Removal

Testing and assessment for the presence of asbestos was completed. Floor tiles were removed from the west and north rooms.

STRATOPORT I – BUILDING 5 BUILDINGS AND STRUCTURES

Page 18 July 17, 2019 CSBF Real Property Manual

Figure 13 - Stratoport I (Building 5)

Figure 14 - Stratoport I (Building 5) Floor Plan

BUILDINGS AND STRUCTURES ADMINISTRATION STORAGE – BUILDING 6

CSBF Real Property Manual July 17, 2019 Page 19

3.6 ADMINISTRATION STORAGE – BUILDING 6

CONSTRUCTED: 1963

SQUARE FEET: 1,500

VALUE: $4,564.14

OWNERSHIP: NASA

PROPERTY ID: N/A

1963 Original Construction The 30 x 50-ft building was constructed by Princeton University and later donated to the CSBF. Originally used as storage space, the building was converted to a test laboratory in 1979.

1985 Valve A valve valued at $4,564.14 was provided to CSBF by NCAR on 27 September 1985.

1988 Safety Exit Door A safety exit door was installed in the building and a 10 x 10-ft office area was enclosed for the Quality Assurance (QA)/Lab Supervisor. The work was performed by CSBF personnel under NASA contract NAS5-29800.

1995 Roof A 1-in urethane foam roof with white coating application was installed by Pal-Tex Urethane of Palestine, Texas.

1998 QA Lab Relocated The QA Laboratory was relocated to Balloon Support (building 28) upon its completion. This building is now being used for administration and purchasing storage.

Roof

HVAC

New roof installed by Reliable Roofing in Palestine, Tx for $15,500.00.

Leagueville Air replaced a 3-ton HVAC unit $4950.00

2018 New Doors CSBF Facilities installed one walk-up door and one roll up door as well as refurbished half of the inside in preparation for a Flight Operations Inventory stockroom.

ADMINISTRATION STORAGE – BUILDING 6 BUILDINGS AND STRUCTURES

Page 20 July 17, 2019 CSBF Real Property Manual

Figure 15 - Facilities Storage (Building 6)

Figure 16 - Facilities Storage (Building 6) Floor Plan

BUILDINGS AND STRUCTURES VEHICLE STORAGE I (OLD TIM SHED) – BUILDING 7

CSBF Real Property Manual July 17, 2019 Page 21

3.7 VEHICLE STORAGE I (OLD TIM SHED) – BUILDING 7

CONSTRUCTED: 1968

SQUARE FEET: 4,200

VALUE: $25,000

OWNERSHIP: NASA

PROPERTY ID: N/A

1968 Original Construction This 60 x 70-ft building is an open storage shelter for launch vehicles. The value of this building has been estimated to be $25,000.00. This is based upon a cost of $5.95/ft2. Since both the Electronic Shop and Vehicle Storage buildings were constructed at approximately the same time (1968), the cost for the 4,200-ft2 open shed appears reasonable.

1990 Floor Paving The dirt floor of the shed was paved with asphalt by L & L Asphalt of Tyler, Texas under NASA contract NAS5-29800.

Figure 17 - Vehicle Storage I (Building 7)

VEHICLE STORAGE I (OLD TIM SHED) – BUILDING 7 BUILDINGS AND STRUCTURES

Page 22 July 17, 2019 CSBF Real Property Manual

Figure 18 - Vehicle Storage I (Building 7) Floor Plan

BUILDINGS AND STRUCTURES MONUMENTS – STRUCTURE 8

CSBF Real Property Manual July 17, 2019 Page 23

3.8 MONUMENTS – STRUCTURE 8

CONSTRUCTED: 2004

SQUARE FEET: N/A

VALUE: N/A

OWNERSHIP: NASA

PROPERTY ID: N/A

1995 Three monuments (boundary/position markers) were placed on the facility during a mapping survey. The first is between building 1 and the fuel storage tank (structure 27). The second is between the old Coronaport site and the fence. The third is between the tractor shed (building 17) and the A-frame (structure 19).

Figure 19 - Monument (Structure 8)

FACILITIES STORAGE - BUILDING 9 BUILDINGS AND STRUCTURES

Page 24 July 17, 2019 CSBF Real Property Manual

3.9 FACILITIES STORAGE - BUILDING 9

CONSTRUCTED: 1982

SQUARE FEET: 144

VALUE: $1,200.00

OWNERSHIP: NASA

PROPERTY ID: N/A

1982 Original Construction This 12 x 12-ft building was built by CSBF personnel. The cost, estimated by the head of the Facility Services Department, is approximately $8.33/ft2. The building is currently used for lawn equipment storage.

Figure 20 - Facilities Storage (Building 9)

BUILDINGS AND STRUCTURES FACILITIES STORAGE - BUILDING 9

CSBF Real Property Manual July 17, 2019 Page 25

Figure 21 - Facilities Storage (Building 9) Floor Plan

VISITOR CENTER – BUILDING 10 BUILDINGS AND STRUCTURES

Page 26 July 17, 2019 CSBF Real Property Manual

3.10 VISITOR CENTER – BUILDING 10

CONSTRUCTED: 2009

SQUARE FEET: 1,200

VALUE: $63,580

OWNERSHIP: NASA

NASA CONTRACT: NAS5-03003

PROPERTY ID: 3065

1991 Original Construction The new modular Visitor Center replaced the old prefabricated Guard House at the CSBF entrance. This 14 x 20-ft standard modular office unit was purchased from Atlantic Trailer of Baltimore, Maryland and delivered to the CSBF in May 1991. CSBF personnel provided the electrical and water services. Palestine Air and Refrigeration of Palestine, Texas installed a heater, one of CSBF’s air conditioning units (NASA Tag 2758), provided the ductwork, and connected the system. In order to comply with government regulations, a new septic system was installed for the building by Septic King Co. of Palestine, Texas.

1995 Carpet Carpet was replaced by Sherwin Williams of Palestine, Texas.

2003 AC Replacement The heating and AC unit were replaced by Palestine Air and Refrigeration of Palestine, Texas.

Canopy

Building Replaced

An aluminum canopy was installed over the entrance by Glenwood Blind and Awning of Tyler, Texas.

This building was replaced again by a 30 x 40 Metal structure. This larger building was required to accommodate conference facilities conduct lager meeting and facility tours. The building was purchased from Athens Steal Buildings with all interior work being accomplished by CSBF personnel. The cost of the building was $63,580. The old 14 x 20 building was then moved to Winslow AZ in 2010 for CSBF and Science use as a downrange facility.

Figure 22 - Visitor Center (Building 10)

BUILDINGS AND STRUCTURES STAGING – BUILDING 11

CSBF Real Property Manual July 17, 2019 Page 29

Maintenance Replaced Overhead cranes to handle larger payloads work performed by OMI cranes $103,149.00 Leagueville Air Installed 10 Ton HVAC unit for the fourth floor $11,200.00 Leagueville Air Installed 10 Ton HVAC unit for the third floor $11,200.00 Leagueville Air Installed 2 20 ton HVAC units for the high bays $38,380.00

2017 Elevator Thyssenkrupp Elevator Upgraded the elevator $50,586.00

2019 Elevator Thyssenkrupp elevator installed a battery backup system $861.00

Figure 24 - Staging (Building 11)

BUILDINGS AND STRUCTURES OPERATIONS CONTROL CENTER (OCC) – BUILDING 12

CSBF Real Property Manual July 17, 2019 Page 31

Figure 26 - Operations Control Center (Building 12)

BUILDINGS AND STRUCTURES VEHICLE STORAGE II (NEW TIM SHED) – BUILDING 13

CSBF Real Property Manual July 17, 2019 Page 33

3.13 VEHICLE STORAGE II (NEW TIM SHED) – BUILDING 13

CONSTRUCTED: 2004

SQUARE FEET: 4,800

VALUE: $334,025.00

OWNERSHIP: NASA

NASA CONTRACT: NAS5-03003

PROPERTY ID: 4387

2004 Original Construction This building replaced an NSF building that was deleted from NSF Real Property Records due to its size restraints and age. The replacement was due to a need for more storage for the large equipment used at CSBF. The value of this equipment precluded storing these items exposed to weather.

The new Tim Shed was constructed by Hughes Building Services of Dallas, Texas.

The new building’s close proximity to Science personnel and Electronics staff provides additional advantages.

Figure 28 - Vehicle Storage II (Building 13)

VEHICLE STORAGE II (NEW TIM SHED) – BUILDING 13 BUILDINGS AND STRUCTURES

Page 34 July 17, 2019 CSBF Real Property Manual

Figure 29 - Vehicle Storage II (Building 13) Floor Plan

BUILDINGS AND STRUCTURES BALLOON STORAGE – BUILDING 14

CSBF Real Property Manual July 17, 2019 Page 35

3.14 BALLOON STORAGE – BUILDING 14

CONSTRUCTED: 1979

SQUARE FEET: 4,000

VALUE: $42,070.00

OWNERSHIP: NASA

PROPERTY ID: N/A

1979 Original Construction This single-story 100 x 40-ft building was constructed at an approximate cost of $9.64/ft2. This is an air conditioned storage building.

The asphalt paving, approximately 1,400-ft2 around the building, was completed in 1979.

1990 Asphalt resurfacing The asphalt paving was resurfaced by L & L Asphalt of Tyler, Texas.

1991 Overhead Door Replacement

The overhead door was replaced with a larger door by Overhead Door Company of Tyler, Texas under NASA contract NAS5-29800.

Figure 30 - Balloon Storage (Building 14)

BALLOON STORAGE – BUILDING 14 BUILDINGS AND STRUCTURES

Page 36 July 17, 2019 CSBF Real Property Manual

Figure 31 - Balloon Storage (Building 14) Floor Plan

BUILDINGS AND STRUCTURES WAREHOUSE I – BUILDING 15

CSBF Real Property Manual July 17, 2019 Page 37

3.15 WAREHOUSE I – BUILDING 15

CONSTRUCTED: 1982

SQUARE FEET: 3,200

VALUE: $25,385.00

OWNERSHIP: NASA

PROPERTY ID: N/A

1982 Original Construction This single-story 40 x 80-ft building was constructed at an approximate cost of $6.67/ft2. Located behind Balloon Storage (building 14), this is an unloaded building used for storage.

The warehouse was built on an existing concrete slab previously furnished by NASA at a cost of $4,046.00.

2003 Air Conditioning An AC unit was added to the building by Palestine Air and Refrigeration of Palestine, Texas.

Figure 32 - Warehouse I (Building 15)

WAREHOUSE I – BUILDING 15 BUILDINGS AND STRUCTURES

Page 38 July 17, 2019 CSBF Real Property Manual

Figure 33 - Warehouse I (Building 15) Floor Plan

BUILDINGS AND STRUCTURES VERIZON CELLULAR SITE – STRUCTURE 16

CSBF Real Property Manual July 17, 2019 Page 39

3.16 VERIZON CELLULAR SITE – STRUCTURE 16

CONSTRUCTED: 2004

SQUARE FEET: N/A

VALUE: N/A

OWNERSHIP: VERIZON

PROPERTY ID: N/A

Original Construction In an effort to improve the quality of CSBF cellular services, Alltel agreed to place an antenna on the NASA water tower. In conjunction with the antenna, Alltel was given permission to place a small building enclosed by fence at the base of the water tower to house the transmitter and receiver.

January 9, 2009 Verizon wireless purchased Alltel and took possession of these sites.

Figure 34 - Verizon Antenna (Structure 16)

VERIZON CELLULAR SITE – STRUCTURE 16 BUILDINGS AND STRUCTURES

Page 40 July 17, 2019 CSBF Real Property Manual

Figure 35 - Verizon Cellular Site (Structure 16)

BUILDINGS AND STRUCTURES TRACTOR SHED – BUILDING 17

CSBF Real Property Manual July 17, 2019 Page 41

3.17 TRACTOR SHED – BUILDING 17

CONSTRUCTED: 1979

SQUARE FEET: 1,200

VALUE: $7,257.00

OWNERSHIP: NASA

PROPERTY ID: N/A

1979 Original Construction This building is a 20 x 60-ft open shed with a storage room on one end.

Used lithium batteries are placed in the storage room prior to being shipped for disposal. The shed was built by CSBF personnel in approximately 48 hours.

Figure 36 - Tractor Shed (Building 17)

Figure 37 - Tractor Shed (Building 17) Floor Plan

WAREHOUSE II – BUILDING 18 BUILDINGS AND STRUCTURES

Page 42 July 17, 2019 CSBF Real Property Manual

3.18 WAREHOUSE II – BUILDING 18

CONSTRUCTED: 1985

SQUARE FEET: 6,000

VALUE: $151,363.17

OWNERSHIP: NASA

NASA CONTRACT: Original: NAS5-28218 Added: NAS5-31125

PROPERTY ID: 2579

1985 Original Construction This single-story 150 x 40-ft air conditioned building was originally constructed at a cost of $129,840.60. Additional finishing work was completed by CSBF personnel. As of 30 September 1985 the CSBF Project Status Report listed $14,032.60 in finishing costs. Additional costs of construction in 1985 increased the value of the building to $144,860.61.

1994 Mezzanine Addition A 392-ft2 mezzanine with a 4-ft wide stairway was added to the building by CSBF personnel. Capacity is 125 lbs. per square foot.

Figure 38 - Warehouse II (Building 18)

Figure 39 - Warehouse II (Building 18) Floor Plan

BUILDINGS AND STRUCTURES NONMAGNETIC A-FRAME – STRUCTURE 19

CSBF Real Property Manual July 17, 2019 Page 43

3.19 NONMAGNETIC A-FRAME – STRUCTURE 19

CONSTRUCTED: 1991

SQUARE FEET: N/A

VALUE: UNKNOWN

OWNERSHIP: N/A

PROPERTY ID: N/A

1991 Original Construction The A-Frame was erected to enable scientific groups to suspend their gondolas in a nonmagnetic environment. The concrete slab was poured without steel reinforcement, the poles are wood, and the I-beam is aluminum. The structure is behind Staging (building 11).

2017 Out of service The aluminum I-beam was removed due to no longer being able to pass inspection by Sierra Lobo (NASA Contractor)

Figure 40 - Nonmagnetic A-Frame (Structure 19)

NOAA WIND PROFILING SITE – STRUCTURE 20 BUILDINGS AND STRUCTURES

Page 44 July 17, 2019 CSBF Real Property Manual

3.20 NOAA WIND PROFILING SITE – STRUCTURE 20

CONSTRUCTED: 1989-1991

SQUARE FEET: N/A

VALUE: N/A

OWNERSHIP: NOAA

PROPERTY ID: N/A

1989 to

Original Construction Through an agreement between NOAA and NASA, NOAA installed a 404- MHz wind profiler behind Warehouse I. Wind profilers are specifically designed to measure vertical profiles of horizontal wind speed and direction from near the surface to above the tropopause. The NOAA Profiler Network (NPN), consisting of 35 unmanned Doppler Radar sites located in 18 central US states and Alaska, provides hourly vertical wind profile data. The data produced by this network are distributed to the National Weather Service (NWS), environmental research groups, and Universities.

The equipment shelter houses the radar's transmitter, receiver, data processing, and antenna beam control electronics. The antenna subsystem is formed from two coaxial colinear arrays arranged orthogonal to each other to form a Vertical, a North, and an East beam. The North and Vertical beams share the same physical antenna array. The two arrays occupy an area 40 x 40-ft. Each array is formed from 20 rows of coaxial colinear array subassemblies fed by series of radio frequency (RF) power dividers.

2015 Removal The profiler station was completely removed from CSBF property.

Figure 41 - Former location of NOAA Wind Profiler (Structure 20)

BUILDINGS AND STRUCTURES BASE SIGN – STRUCTURE 22

CSBF Real Property Manual July 17, 2019 Page 45

3.21 BASE SIGN – STRUCTURE 22

CONSTRUCTED: 2003

SQUARE FEET: N/A

VALUE: $3,900.00

OWNERSHIP: NASA

NASA CONTRACT: NAS5-03003

PROPERTY ID: N/A

Original Construction This concrete and metal sign was erected at the entrance to the CSBF.

Signage design and landscaping were done by CSBF employees. The concrete was placed by Doug Manis Construction of Palestine, Texas.

Sign Update The CSBF and NASA logos were repositioned so that the NASA logo was placed above the CSBF logo in accordance with NASA’s logo use policy.

Figure 42 - Base Sign (Structure 22)

ENGINEERING SUPPORT – BUILDING 23 BUILDINGS AND STRUCTURES

Page 46 July 17, 2019 CSBF Real Property Manual

3.22 ENGINEERING SUPPORT – BUILDING 23

CONSTRUCTED: 1990

SQUARE FEET: 4,000

VALUE: $259,463.00

OWNERSHIP: NASA

NASA CONTRACT: NAS5-29800

PROPERTY ID: 2974

1990 Original Construction This single-story 40 x 100-ft pre-engineered metal building has a 12-ft eave height. The building currently houses the Site Manager's office, the managers of the Engineering and Operations departments, and other engineering and support personnel. The building has a 28 x 20-ft conference room capable of comfortably seating 30 people. The building was constructed by Athens Steel Building Corporation of Athens, Texas.

2005 HVAC Replacements The south-end heat pump and air handler and the north-end compressor were replaced by Palestine Air and Refrigeration of Palestine, Texas.

2007 Enlarge Offices Two small offices were enlarged by adding a 15’ extension.

2010 Addition A 15’ x 20’ room was added to be used as a kitchen area. Construction was done by LEC Homes Inc. at a cost of $19,977.00.

2016 HVAC Warren AC and Heating replaced two 10-ton HVAC units $21,036

2019 Sidewalk/Stair repair The stairs on the NE side were reworked to meet OSHA requirements.

Sunken portions of the sidewalks around the building were lifted. $4,900

Figure 43 - Engineering Support (Building 23)

BUILDINGS AND STRUCTURES ENGINEERING SUPPORT – BUILDING 23

CSBF Real Property Manual July 17, 2019 Page 47

Figure 44 - Engineering Support (Building 23) Floor Plan

WATER TOWER – STRUCTURE 24 BUILDINGS AND STRUCTURES

Page 48 July 17, 2019 CSBF Real Property Manual

3.23 WATER TOWER – STRUCTURE 24

CONSTRUCTED: 1992

SQUARE FEET: N/A

GALLONS: 75,000

HEIGHT: 135.5 FT

VALUE: $432,995.00

OWNERSHIP: NASA

NASA CONTRACT: NAS5-29800

PROPERTY ID: 3051

1992 Original Construction This structure is a 75,000-gal spheroidal single-pedestal elevated tank including foundation and control system. The project included modification of the water distribution system at the CSBF which involved installing ~5,388-lin ft of 6-, 8-, and 12-in water mains including valves, fire hydrants, service connections, boring and jacking, pavement repairs, and a water supply control pit.

Contracted to A. E. Shull and Company of Tyler, Texas, the original contract amount was $425,000.00; change order 1 added $6,995.00 for additional water lines; change order 4 added $1,000.00 to install 2-in PVC pipe for a total of $432,995.00.

1996 Inspection, Washout, and Disinfection

A tank inspection was conducted and included field evaluation, coating evaluation, and washout and disinfection. The inspection was performed by Tank Industry Consultants of Indianapolis, Indiana.

2002 Rehabilitation A rehabilitation was performed on the water tower including sandblasting and repainting, welding of anchor bolts, ladder upgrade, and posting of confined space and fall protection signs. The work was performed by TMI Coatings, Inc. of St. Paul, Minnesota at a cost of $72,300.00.

2016 Repair Utility Service Group performed repairs of the ladder, fixed a leak, and cleaned the water tower $13,812.00.

2018 Maintenance An annual inspection was performed, the inside was cleaned, and a new 12” valve was installed.

BUILDINGS AND STRUCTURES WATER TOWER – STRUCTURE 24

CSBF Real Property Manual July 17, 2019 Page 49

Figure 45 - Water Tower (Structure 24)

WATER TOWER – STRUCTURE 24 BUILDINGS AND STRUCTURES

Page 50 July 17, 2019 CSBF Real Property Manual

Figure 46 - Water Tower (Structure 24) Drawing

BUILDINGS AND STRUCTURES TEST AND EVALUATION (T&E) – BUILDING 25

CSBF Real Property Manual July 17, 2019 Page 51

3.24 TEST AND EVALUATION (T&E) – BUILDING 25

CONSTRUCTED: 1993

SQUARE FEET: 4,200

VALUE: $459,061.00

OWNERSHIP: NASA

NASA CONTRACT: Initiated: NAS5-2980 Awarded: NAS5-31125

PROPERTY ID: 3319

1993 Original Construction This two-story 50 x 60 x 32-ft pre-engineered building contains a staging bay, testing laboratory, control center, offices, antenna deck, and enclosed exterior stairway. It houses payload integration, test, and evaluation services for the long-duration ballooning (LDB) program. At least two large scientific gondolas can undergo simultaneous integration and testing in this building.

The contractor for construction was Watkins Development Corporation of Corsicana, Texas.

1996 Bemco Chamber Added

The Bemco environmental chamber was relocated to Test and Evaluation (building 25).

2004 HVAC The second-floor heat pump and first-floor AC unit were replaced by Palestine Air and Refrigeration of Palestine, Texas.

2009 Cubical Second floor was remodeled to add five work areas to allow space for computer work and personal storage. Estimated cost was $1,000. Work was completed by CSBF Facilities.

2016 HVAC Leagueville Air replaced a 5-ton HVAC unit for the second floor for $5,100.00.

2018 ESD Flooring ESD Flooring was installed in the electronic work area.

TEST AND EVALUATION (T&E) – BUILDING 25 BUILDINGS AND STRUCTURES

Page 52 July 17, 2019 CSBF Real Property Manual

Figure 47 - Test and Evaluation (Building 25)

BUILDINGS AND STRUCTURES TEST AND EVALUATION (T&E) – BUILDING 25

CSBF Real Property Manual July 17, 2019 Page 53

Figure 48 - Test and Evaluation (Building 25) Floor Plan

LOADING DOCK – STRUCTURE 26 BUILDINGS AND STRUCTURES

Page 54 July 17, 2019 CSBF Real Property Manual

3.25 LOADING DOCK – STRUCTURE 26

CONSTRUCTED: 1995

SQUARE FEET: 900

VALUE: $20,200.00

OWNERSHIP: NASA

NASA CONTRACT: NAS5-31125

PROPERTY ID: 3494

1995 Original Construction A 30 x 30-ft loading dock was built to conform to NASA safety standards. A 15 x 30-ft slab was poured in front of the loading dock and the asphalt was cut out and the ground leveled to allow trucks to back up to the dock and remain level. The contractor was Benco Builders of Kennard, Texas.

Figure 49 - Loading Dock (Structure 26)

BUILDINGS AND STRUCTURES ECONO VAULT FUEL STORAGE – STRUCTURE 27

CSBF Real Property Manual July 17, 2019 Page 55

3.26 ECONO VAULT FUEL STORAGE – STRUCTURE 27

CONSTRUCTED: 1992

SQUARE FEET: N/A

VALUE: $34,662.00

OWNERSHIP: NASA

NASA CONTRACT: NAS5-29800

PROPERTY ID: 3133

1992 Original Construction Two underground fuel storage tanks were excavated and removed to meet requirements of the Texas Clean Water Act. The removal was performed by Eagle Construction and Environmental Inc. of Eastland, Texas.

A concrete foundation and retaining wall were built to accommodate new concrete vaulted fuel tanks. Two 500-gal above-ground tanks encased in concrete were installed. The work was performed by Lacon Construction of Houston, Texas.

2016 Secondary containment

A secondary containment was constructed around the fuel tank to comply with EPA regulations. It was completed in November 2016 by Terry Vaughn Construction of Palestine, Texas.

Figure 50 - Econo Vault Fuel Storage (Structure 27)

BALLOON SUPPORT – BUILDING 28 BUILDINGS AND STRUCTURES

Page 56 July 17, 2019 CSBF Real Property Manual

3.27 BALLOON SUPPORT – BUILDING 28

CONSTRUCTED: 1998

SQUARE FEET: 8,640

VALUE: $698,999.00

OWNERSHIP: NASA

NASA CONTRACT: NAS5-31125

PROPERTY ID: 3649

1998 Original Construction

This building houses the Electronics, QA Laboratory, and Machine Shops. It was built by Timberline Constructors of Lufkin, Texas. After construction a lean-to was added to store metal materials.

AC Installed

A 3-ton Lennox air conditioner was installed in the Weber Chamber room by Palestine Air and Refrigeration of Palestine, Texas.

2008 Office Space Additional office space and work area was created for Electronics by taking in about half of the original space that was being use by the QA Lab. One wall and one door were added to create the work area. Estimated cost is $300.

2018 ESD Flooring ESD Flooring was installed in the electronic work area.

Figure 51 - Balloon Support (Building 28)

EAST PAVILION – STRUCTURE 29 BUILDINGS AND STRUCTURES

Page 58 July 17, 2019 CSBF Real Property Manual

3.28 EAST PAVILION – STRUCTURE 29

CONSTRUCTED: 2002

SQUARE FEET: 540

VALUE: $5,400.00

OWNERSHIP: NASA

NASA CONTRACT: NAS5-98008

PROPERTY ID: N/A

2002 Original Construction This 18 x 30-ft pavilion was erected alongside Engineering Support (building

23) by CSBF personnel.

Figure 53 - East Pavilion (Building 29)

BUILDINGS AND STRUCTURES WEST PAVILION – STRUCTURE 30

CSBF Real Property Manual July 17, 2019 Page 59

3.29 WEST PAVILION – STRUCTURE 30

CONSTRUCTED: 2002

SQUARE FEET: 540

VALUE: $5,400.00

OWNERSHIP: NASA

NASA CONTRACT: NAS5-98008

PROPERTY ID: N/A

2002 Original Construction This 18’ x 30’ pavilion was erected adjacent to the Operations Control Center (building 12) by CSBF personnel.

2011 Upgraded The Pavilion cover was upgraded to steel with hip roof and enlarged to 20’ x 30’. Upgrade was performed by CSBF Facilities at a cost of $4,000.

Figure 54 - West Pavilion (Building 30)

NOAA CLIMATE REFERENCE NETWORK– STRUCTURE 31 BUILDINGS AND STRUCTURES

Page 60 July 17, 2019 CSBF Real Property Manual

3.30 NOAA CLIMATE REFERENCE NETWORK– STRUCTURE 31

CONSTRUCTED: 2003

SQUARE FEET: N/A

VALUE: N/A

OWNERSHIP: NOAA

PROPERTY ID: N/A

2003 Original Construction A U.S. Climate Reference Network (USCRN) data collection center was installed by NOAA. Its purpose is to provide future long-term high-quality observations of surface air temperature and precipitation that can be coupled to past long-term observations for the detection and attribution of present and future climate change. USCRN measures the following:

Air temperature

Ground surface temperature

Precipitation

Relative humidity

Soil moisture and temperature

Solar radiation

Wind speed

Figure 55 - NOAA Climate Network (Structure 31)

BUILDINGS AND STRUCTURES ENGINEERING SUPPORT STORAGE – BUILDING 32

CSBF Real Property Manual July 17, 2019 Page 61

3.31 ENGINEERING SUPPORT STORAGE – BUILDING 32

CONSTRUCTED: 2003

SQUARE FEET: 288

VALUE: $5,217.51

OWNERSHIP: NASA

NASA CONTRACT: NAS5-03003

PROPERTY ID: 4298

2003 Original Construction A 12 x 20-ft storage building was purchased and placed at the south end of the parking lot between Engineering Support (building 23) and Administration (building 1) to expand available storage space for Engineering Support. The structure was built off-site and delivered to CSBF by Apollo Building Systems of Bullard, Texas. A wall heating and air conditioning unit was placed in the building.

Figure 56 - Engineering Support Storage (Building 32)

EAST LAUNCH PAD OTHER INFRASTRUCTURE

Page 62 July 17, 2019 CSBF Real Property Manual

4 OTHER INFRASTRUCTURE

4.1 EAST LAUNCH PAD

CONSTRUCTED: 1963

SURFACE: 500,000 FT2

SIX RADIALS 96,000 FT2

VALUE: N/A

OWNERSHIP: LEASED

PROPERTY ID: N/A

1963 Original Construction The original east launch pad is part of the 165.97 acres leased from the City of Palestine. This launch pad was used for all flight operations until 1974. It is currently used for special flight operations requiring minimal launch area.

OTHER INFRASTRUCTURE EAST LAUNCH PAD

CSBF Real Property Manual July 17, 2019 Page 63

Figure 57 - East Launch Pad

WEST LAUNCH PAD OTHER INFRASTRUCTURE

Page 64 July 17, 2019 CSBF Real Property Manual

4.2 WEST LAUNCH PAD

CONSTRUCTED: 1974

SURFACE: 785,000 FT2

TWELVE RADIALS: 48,000 FT2

PERIMETER ROAD: 125,000 FT2

DIAMETER: 1,000 FT

RADIUS: 500 FT

VALUE: $1,103,252.73

OWNERSHIP: NASA

PROPERTY ID: N/A

1974 Original Construction The 19-acre, 1,000-ft diameter launch pad is surrounded by a 500-ft grass apron and encircled by a paved 20-ft wide perimeter road.