Excavation and Gravel Work Map PDF.pdf

PDF 953 KB Posted

Attached to
WVARNG VBSA EXCAVATING AND GRAVEL WORK
Solicitation number
W912L8-26-B-A001
Issued by

About this file

This document contains site maps and detailed pad specifications for Base Camp Victory, located at approximately 37°53'25.1"N 81°06'40.2"W. The facility comprises seven designated pads (PAD 1 through PAD 7) requiring various ground preparation and site development work.

The pads range in size from approximately 0.4 acres to 2 acres and have the following specific requirements: PAD 1 (~2 acres) requires grading of all gravel in the inner area; PAD 2 (~1.5 acres) requires spreading and compaction of all gravel; PAD 3 (~0.4 acres) requires compaction of all gravel; PAD 4 (~0.4 acres) requires movement of rip-rap and grading plus compaction of all gravel; PAD 5 (~0.6 acres) requires compaction of all gravel; PAD 6 (~0.4 acres) requires grading and compaction of all gravel; and PAD 7 acreage is not specified but is shown on the site map. Additionally, a pedestrian walkway (marked in yellow) connecting PADs 2, 3, and 4 requires development. The document provides aerial imagery with color-coded overlays identifying the specific areas within each pad requiring work, enabling contractors to assess scope and develop accurate cost estimates for site preparation activities.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Locations of Interest:

• Base Camp Victory

Base Camp Victory

Base Camp Victory

Approximate Location:

37°53'25.1"N 81°06'40.2"W

PAD 1

PAD 2

PAD 3

PAD 4

PAD 5

PAD 6

PAD 7

PAD 1

~2 acres

PAD 1

Requires grading of all gravel in (Yellow) inner area

PAD 2

~1.5 acres

PAD 3

PAD 4

~0.4 acres

~0.4 acres

PAD 5

~0.6 acres PAD 2

PAD 3

PAD 5

PAD 4

Pedestrian Walkway (yellow) connecting pads 2, 3, and 4

Requires spreading and compaction of all gravel in

(Red) inner area

Requires compaction of all gravel in (Green) inner area

Requires movement of rip-rap and grading + compaction of all gravel in (Purple) inner area

PAD 7

PAD 6

~0.4 acres

PAD 6

Requires grading + compaction of all gravel in

(Gold) inner area