This document outlines a federal solicitation for design-build services to renovate a courtroom at a federal courthouse. The General Services Administration intends to issue a Request for Proposal for design-build services to renovate the 5th floor District Courtroom Suite 521 at the Charles L. Brieant Jr. Courthouse in White Plains, New York. The design-build contractor will be responsible for developing construction documents, specifications and plans, performing selective demolition work, and renovating the space to match recently completed renovations on the 6th floor courtrooms. Renovations are intended to modernize the courtroom infrastructure and finishes for IT, AV, and security equipment. The contract is a firm-fixed-price contract with a period of performance of 448 calendar days from notice to award. The project magnitude is estimated between $1-5 million. The solicitation will be a 100% total small business set-aside, using a best value tradeoff source selection process evaluating experience, past performance, staffing plan, and price.

View the file

Other files

File Type Posted
47PC0222R0015 Generated PDF with TOC.pdf PDF
Ex 13 WPCH - Courtroom 521 - Option 1 AV SOW.pdf PDF
Solicitation Amendment 47PC0222R0015_0001.pdf PDF
Amendment No. 0001-details.pdf PDF
Revised Attachment C Key Personnel Qualification Resume Form.xlsx XLSX spreadsheet
Ex 11 FINAL - price breakdown 2022 04.xlsx XLSX spreadsheet
Ex 11 2022 02 24 WPCH - Courtroom 521 - Contractor Bid Sheet.pdf PDF
47PC0222R0015 Solicitation_Solicitation.pdf PDF
47PC0222R0015 Solicitation_Form GSA527-21.pdf PDF
47PC0222R0015 Solicitation_SF 1442 Form.pdf PDF
Ex 1 2022 02 24 WPCH - Courtroom 521 - Division One.pdf PDF
Ex 7 2022 02 24 WPCH - Courtroom 521 - Courthouse Entry Protocol.pdf PDF
Ex 3 2022 02 24 WPCH - Courtroom 521 - POR.pdf PDF
47PC0222R0015 Solicitation_Wage Determination.pdf PDF
47PC0222R0015 Solicitation_Agreement.pdf PDF
Attachment A - Experience on Similar Projects Offeror Form - Project Fact Sheet.xlsx XLSX spreadsheet
Attachment C - Key Personnel Qualification Resume Form.xlsx XLSX spreadsheet
Ex 6 2022 02 24 WPCH - Courtroom 521 - Renovations and Alterations Appendix I.pdf PDF
47PC0222R0015 Solicitation_BID BOND-SF24-16d.pdf PDF
47PC0222R0015 Solicitation_GC Reps and Certs.pdf PDF
Attachment B - PBS PAST PERFORMANCE QUESTIONNAIRE.docx DOCX document
2022 03 03 WPCH - Courtroom 521 SOW.pdf PDF
Ex 10 2022 02 24 WPCH - Courtroom 521 - Loading Dock Access Request.pdf PDF
Ex 5 2022 02 24 WPCH - Courtroom 521 - US Court Design Guide.pdf PDF
Ex 4 2022 02 24 WPCH - Courtroom 521 - 6th Fl Construction Documents.pdf PDF
Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

S3-56A

S4-57

S4-50

S5-68

S4-49

S4-67A

S4-59

D1-49

(INCLUDES EXIT SIGNS)

ADDITIONAL DEMO PLAN KEY NOTE:

Trench floor as required to accommodate new power/IT/AV wiring as noted elsewhere in these documents, the scope of work and scope of work exhibits.

(alternate 1)

02/24/22 UPDATED BID DOCUMENTS

VirginiaKSimpson Textbox Solicitation no. 47PC0222R0015

*For hardware sets, see Exhibit 9, "6th floor shop drawings and submittals" ** Existing card reader to be removed by owner for re-installation or replacmeent. Contractor to protect existing wiring for final connection to card reader. Re-connection of card reader shall be by owner.

02/24/22 UPDATED BID DOCUMENTS

VirginiaKSimpson

02/24/22 UPDATED BID DOCUMENTS

5. PROTECT ALL EXISTING FIRE ALARM DEVICES AND TEST

AT CONTRACT COMPLETION TO ASSURE THE DEVICES

WERE NOT DAMAGED BY CONSTRUCTION.

6. PROTECT EXISTING SPRINKLER HEADS DURING

CONSTRUCTION.

VirginiaKSimpson

VirginiaKSimpson

RADIATOR COVERS SHALL BE WOOD

TO MATCH ADJACENT MILLWORK.

ATTORNEY ATTORNEY

02/24/22 UPDATED BID DOCUMENTS

VirginiaKSimpson

ATTORNEY

ATTORNEY

VirginiaKSimpson

(OWNER FURNISHED)

VirginiaKSimpson

(FUTURE)

(FUTURE)

(FUTURE)

(FUTURE)

**See POR for specifications for tables and lectern to be provided by DB contractor.

02/24/22 UPDATED BID DOCUMENTS

VirginiaKSimpson

ALL UNUSED WIRING SHALL BE REMOVED. IF IT IS DETERMINED THAT AN UNUSED RACEWAY SHALL BE LEFT IN PLACE FOR FUTURE USE, ALL EXISTING CABLING SHALL BE REMOVED AND THE RACEWAY SHALL BE LEFT

WITH A PULL STRING.

IN AREA "D1". IDENTIFY CIRCUITS MADE SPARE DURING DEMOLITION PHASE AND RE-USE CIRCUITS TO PROVIDE

POWER TO DEVICESAS SHOWN ON NEW POWER PLAN.

AREA "D2" SHALL REMAIN AS IS UNLESS OTHERWISE NOTED.

AREA "D1" - DEMOLITION ZONE.

DEMOLISH OR RE-USE CIRCUITS

AS NECESSARY TO ACHIEVE

FINAL DESIGN

AREA "D2" - MAINTAIN ALL POWER

AND IT IN THIS AREA.

* Card reader to be removed by USMS for re-installation or replacmeent. Contractor to protect existing wiring for final connection to card reader. Re-connection of card reader shall be by owner.

02/24/22 UPDATED BID DOCUMENTS

VirginiaKSimpson

TOTAL NUMBER OF JURY MONITORS IS 10. SEE DWG.

A-501 FOR LOCATIONS OF MONITORS.

TOTAL NUMBER OF JURY

MONITORS IS 10. SEE DWG.

A-501 FOR LOCATIONS OF

MONITORS.

Provide power and data outlets to accommodate A/V rack.