ESBD_522306_1781623033178_26CSP006-CS-3-Pre-Proposal Slides_20260612.pptx
PPTX presentation 1 MB Posted
- Attached to
- CS3 CP2000534 26CSP006 Structural and Electrical Repairs State and local contract opportunity
- Solicitation number
- 26CSP006
- Issued by
- Travis County, Austin City, Austin City, Austin City, Austin City, Texas
About this file
This is a pre-proposal meeting presentation file for the University of Texas at Austin's structural and electrical repairs project at Central Chilling Station No. 3 (CS3), Contract 26CSP006. The project scope encompasses the demolition and installation of structural elements including equipment foundations, piles, flatwork, canopy and miscellaneous metals; civil surface and underground elements; and electrical raceway, cabling, grounding, equipment disconnection, protection, storage, testing, and reconnection. The mandatory pre-proposal conference was held on June 12, 2026, with a second site visit scheduled for June 17, 2026 at 10:00 a.m. Proposals are due July 16, 2026. The work must be performed while the University facility remains fully operational and occupied, requiring coordination with UT staff, engineering teams (Burns Engineering and Garza EMC), student and faculty personnel, emergency responders, and adjacent contractors. The key personnel identified include Logan Golla as Project Manager from the University's Physical Facilities Division, along with engineering specialists from Burns Engineering and Garza EMC representing electrical, structural, and civil disciplines.
The evaluation criteria allocate maximum 65 points for contractor qualifications, assessing construction team qualifications, technical and management competence, past experience with the University of Texas System, OSHA safety records, project execution planning, quality control and commissioning programs, project close-out capability, and warranty service support. Both the project superintendent and project manager must maintain current 30-hour OSHA certification. Contractors must demonstrate experience on similarly complex facilities maintaining continuous operations during construction, such as universities, hospitals, laboratories, or semiconductor facilities. A mandatory VetHUB subcontracting plan demonstrating good-faith effort to recruit Texas-certified service-disabled veteran businesses is required, with contractors obligated to divide work into reasonable lots and notify a minimum of two certified VetHUBs for each opportunity. Prime contractors must submit progress assessment reports with each payment application documenting all subcontractor payments across three tiers. Hazardous materials handling, including lead-based paint removal and special sampling requirements for concrete and soil, must be coordinated with UT Environmental Health and Safety. Testing and inspections for certain divisions will be contracted by the owner through third parties.
View the file
Other files for this state and local contract opportunity
| File | Type | Posted |
|---|---|---|
| ESBD_522306_1780500483432_Link to RFP CS3 CP2000534 26CSP006.pdf | ||
| ESBD_522306_1781526236029_26CSP006 Preproposal Sign-in--.pdf | ||
| ESBD_522306_1782823872379_Addendum 1 26CSP006.pdf | ||
| ESBD_522306_1780500658401_Section 8.docx | DOCX document | |
| ESBD_522306_1781787389238_26CSP006 2nd Site Visit--.pdf | ||
| ESBD_522306_1780500599833_Link to Drawings CS3 CP2000534 26CSP006.pdf | ||
| ESBD_522306_1780500766495_Exhibit H with SP and PAR (0526).pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CS3 Structural and Electrical Repairs
26CSP006-CP2000534
Pre Proposal Meeting June 12, 2026
PRE-PROPOSAL MEETING AGENDA
Key Personnel Administrative Procedures Testing/Inspections Hazardous Materials Scope Of Work
KEY PERSONNEL
The University of Texas at Austin Logan Golla – Project Manager, PDC Moses Kai, P.E. – Director, Power Systems, Controls, & Ops Technology Eric Salazar – Asst. Director, Power Systems Burns Engineering Darrell Widner, P.E. – Project Manager Edwin John, P.E. – Lead Electrical Engineer Derrick Whitaker, P.E. – Lead Structural Engineer Garza EMC Justin Rusthoven – Lead Civil Engineer
ADMINISTRATIVE PROCEDURES
Site access and coordination per Section 01 10 00:
University will be fully operational and occupied at all times Contractor shall cooperate and/or coordinate with various entities:
UT staff/personnel/contractors Engineering Team – BURNS & Garza EMC Student/faculty/public pedestrian & vehicular traffic Adjacent contractors Emergency responders
Utility interruptions per 01 10 00:
Must schedule in advance Notification in writing with owner’s written approval required
ADMINISTRATIVE PROCEDURES (ctd.)
Construction Schedule Ref. RFP Section 1 and 01 10 00 Multi phase approach to construction to maintain plant operability Phasing plan/schedule submitted for review Factor important campus dates (commencement, finals, special events)
Parking Ref. RFP Section 2, 01 10 00, and Additional General Conditions Parking is at contractor cost Parking to be secured by contractor for all personnel and subs Designated parking spaces are not provided Parking on campus must comply with UT Parking and Transportation Services regulations
Pedestrian and Vehicular Traffic Control Ref. 01 10 00, 01 35 23, 01 50 00 Contractor is responsible for providing any and all traffic control devices and signage necessary Egress paths maintained at all times Emergency vehicle access clear at all times
Project Safety and Security Ref. Construction Safety sections within RFP (incl. UGC and AGC) Ultimate Goal = injury and incident free project Contractor is responsible for safety and security of site Contractor to provide safety personnel as applicable Educate/train workers Foster a safe workplace and culture Restrict access to authorized persons
TESTING/INSPECTIONS
Testing and inspections covered under UGC, 01 45 00 and subsequent sections of technical specifications Owner will contract third party for Divisions 03, 05, 31, 32 Contractor to provide timely notice to Owner and Engineer, and schedule tests/inspections with third party
HAZARDOUS MATERIALS
Ref. Lead Based/Lead Containing Paint Removal Workplan (Appendix B) Section 01014 – Lead Disposal Coordination If lead-based or lead-containing materials will be removed or demolished, the Contractor shall contact UT EHS to coordinate TCLP sampling for proper waste characterization Relocating equipment does not necessarily constitute disturbance Section 02067 – Special Sampling Requirements Concrete and soil sampling required by EHS during demolition of containment associated with acid tank
SCOPE OF WORK
Furnishing labor, tools, equipment, materials,& supplies for the demolition and installation of:
Structural elements – equipment foundations, piles, flatwork, canopy and misc. metals Civil surface and underground elements Electrical raceway and cabling, and grounding Electrical EQPM-disconnect, protection, storage, testing and reconnection Provisions to support owner activities Provisions to handle, support, and install GFCI and existing materials.
Questions?