This is a bid form addendum (Addendum No. 3 Pricing Sheet) for the City of Waco Emergency Standby Generators Installation Project, a capital improvement initiative involving the Riverside Pump Station and Operations Building. The project encompasses two primary generator installations with associated electrical, civil, and structural work. Line items are organized into four sections: General Conditions (including mobilization, bonds, insurance, and a $100,000 owner allowance), Riverside WTP HSPS Generator installation, Riverside WTP Operations Building Generator installation, and miscellaneous items such as project record drawings. Specific work scopes include demolition of existing components, civil site work (grading, paving, concrete work), electrical infrastructure (5kV and 600-volt cabling, switchgear installation), SCADA modifications, third-party system testing, utility coordination with Oncor for protective relay modifications, concrete foundations, crane services, and building modifications. The bid form requires contractors to complete unit pricing for each line item and calculate extended amounts without rounding, with instructions to identify all proposed subcontractors and their designated work types.
The pricing sheet establishes a lump-sum bidding structure wherein contractors submit unit prices for each specified task with quantities already determined by the City of Waco. Two predetermined allowances are identified: a $100,000 owner allowance for discretionary use by the City's project manager and $15,000 for Oncor charges related to the HSPS generator's closed-transition transfer switchgear modifications, plus $5,000 for Oncor service modifications for the Operations Building Generator. The form requires contractors to segregate total bid amounts into materials, labor and equipment components and to submit signed documentation identifying the firm name, authorized signatory, title, and address. Any bid modifications or corrections must be initialed by the contractor to ensure accuracy in the official total amount calculation.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Bid Form (To McCreary)
BID FORM - BASE BID
| City of Waco |
| Emergency Standby Generators Installation Project (Riverside Pump Station & Ops Building) |
| Total | |||||
| Item | Description | Quantity | Unit | Unit Price | Total Amount |
| 1.00 GENERAL CONDITIONS | |||||||
| 1.01 | Mobilization, bonds, and Insurance, not to exceed 10% of the Total Bid Amount, Complete and in place | 1 | LS | $ | $ | ||
| 1.02 | Bond and Insurance not to exceed 2.5% of the Total Bid Amount, Complete and in place | 1 | $ | ||||
| 1.03 | Trench Safety Plan | 1 | LS | $ | $ | ||
| 1.04 | Storm Water Pollution Prevention Plan | 1 | LS | $ | $ | ||
| 1.05 | Storm Water Pollution Prevention Plan Implementation | 1 | LS | $ | $ | ||
| 1.06 | Owner Allowance (to be used at the discretion of the CIty of Waco Project manager or designee) | 1 | LS | $ | $ 100,000.00 | $ | $ 100,000.00 |
| 1.07 | Trench Safety Plan Implementation | 1 | LS | $ | $ | ||
| SUBTOTAL | $ |
| 2.00 RIVERSIDE WTP HSPS GENERATOR | |||||||
| 2.01 | Riverside WTP HSPS Generator - All work in regards to the demolition/abandonment of existing components at the project site shown on the drawings and required by the specifications | 1 | LS | $ | $ | ||
| 2.02 | Riverside WTP HSPS Generator - All work in regards to construction of civil site work, including but not limited to site grading, subgrade preparation, lime stabilized subgrade, cement treated base, paving, concrete curbs, concrete, concrete pilot channel, pavement striping, wheel stops, concrete sidewalk, handrail, vegetation of work area, erosion control, storm drain, and other miscellaneous features as shown on the drawings and required by the specifications complete and in place | 1 | LS | $ | $ | ||
| 2.03 | Riverside WTP HSPS Generator - 5 kV cable, terminations, and testing complete and in place | 1 | LS | $ | $ | ||
| 2.04 | Riverside WTP HSPS Generator - 600 volt cable complete and in place | 1 | LS | $ | $ | ||
| 2.05 | Riverside WTP HSPS Generator - 5kV fused switch for generator complete and in place | 1 | LS | $ | $ | ||
| 2.06 | Riverside WTP HSPS Generator - Installation of generator and associated switchgear and coordination with generator and switchgear manufacturer on startup, complete and in place | 1 | LS | $ | $ | ||
| 2.07 | Riverside WTP HSPS Generator - Misc conduit and cable complete and in place | 1 | LS | $ | $ | ||
| 2.08 | Riverside WTP HSPS Generator - Concrete foundation including piers for generator pad complete and in place | 1 | LS | $ | $ | ||
| 2.10 | Riverside WTP HSPS Generator - crane to move generator from plant location to concrete pad | 1 | LS | $ | $ | ||
| 2.11 | Riverside WTP HSPS Generator - Building door modifications to allow installation of switchgear | 1 | LS | $ | $ | ||
| 2.12 | Riverside WTP HSPS Generator -SCADA PLC hardware modifications | 1 | LS | $ | $ | ||
| 2.13 | Riverside WTP HSPS Generator - 3rd Party Testing of 100 msec transfer system | 1 | LS | $ | $ | ||
| 2.14 | Riverside WTP HSPS Generator - Oncor Charges for system/protective relay modifications due to closed transition 100msec transfer switchgear | 1 | LS | $ | $ 15,000.00 | $ | $ 15,000.00 |
| 2.16 | Riverside WTP HSPS Generator - Modifications to Four (4) existing harmonic filters, complete and in place | 1 | LS | $ | $ | ||
| 2.17 | 10' City of Waco curb inlet w/18" removable plug, complete and in place | 1 | LS | $ | $ | ||
| 2.18 | 18" Dia Reinforced Concrete Pipe (RCP), ASTM C76, Class III, w/18" cap, complete and in place | 85 | LF | $ | $ |
SUBTOTAL $
| 3.00 RIVERSIDE WTP OPERATIONS BUILDING GENERATOR | ||||||||
| 3.01 | Riverside WTP Operations Building Generator - All work in regards to the demolition/abandonment of existing components at the project site shown on the drawings and required by the specifications | 1 | LS | $ | $ | |||
| 3.02 | Riverside WTP Operations Building - All work in regards to construction of civil site work, including but not limited to site grading, subgrade preparation, lime stabilized subgrade, cement treated base, paving, concrete curbs, concrete, pavement striping, wheel stops, concrete sidewalk, handrail, vegetation of work area, erosion control, and other miscellaneous features as shown on the drawings and required by the specifications complete and in place | 1 | LS | $ | $ | |||
| 3.03 | Riverside WTP Operations Building Generator - 600 volt cable complete and in place | 1 | LS | $ | $ | |||
| 3.04 | Riverside WTP Operations Building Generator - Misc conduit and cable complete and in place | 1 | LS | $ | $ | |||
| 3.05 | Riverside WTP Operations Building Generator - | |||||||
| Installation of generator and associated ATS (automatic transfer switch) and coordination with generator and ATS manufacturer on startup, complete and in place | 1 | LS | $ | $ | ||||
| 3.06 | Riverside WTP Operations Building Generator - Concrete foundation including piers for generator pad complete and in place | 1 | LS | $ | $ | |||
| 3.07 | Riverside WTP Operations Building Generator - Concrete/structural modifications to inside of Auxiliary Building for new switchgear complete and in place | 1 | LS | $ | $ | |||
| 3.08 | Riverside WTP Operations Bldg. Generator - crane to move generator from stored plant location to concrete pad | 1 | LS | $ | $ | |||
| 3.09 | Riverside WTP Operations Bldg. Generator - Oncor Charges for service modifications | 1 | LS | $ | $ 5,000.00 | $ | $ 5,000.00 | |
| 3.10 | Riverside WTP Operations Building Generator - Temporary generator to power main service for change over | 1 | LS | $ | $ | $ |
SUBTOTAL $
| 4.00 MISCELLANEOUS ITEMS | |||||
| 4.01 | Project Record Drawings (As Builts) complete | 1 | LS | $ | $ |
SUBTOTAL $
TOTAL BASE BID $
| TOTAL AMOUNT OF MATERIALS | $ |
| TOTAL AMOUNT OF LABOR & EQUIPMENT | $ |
| TOTAL AMOUNT OF BASE BID | $ |
FIRM NAME:
BY (SIGNED):
TITLE:
ADDRESS:
| Contractor acknowledges and agrees that the official TOTAL AMOUNT OF BID is determined by multiplying |
| the unit bid prices by the respective estimated quantities shown in this bid form and then totaling all of the |
| extended amounts. Extended amounts SHOULD NOT be rounded up or down. All dollar amounts should |
| be either written legibly or typed. Any mistakes should be rewritten and initialed by the Contractor. |
&"Avenir LT Pro 55 Roman,Regular"&8Page &P of &N
I WILL USE THE FOLLOWING SUBCONTRACTORS FOR THIS WORK:
SUBCONTRACTOR TYPE OF WORK
image1.png image2.png image3.png
File details come from the government source that posted it. Updated .