ESBD_489527_1775594100125_Addendum No. 3 Pricing Sheet.pdf
PDF 174 KB Posted
- Attached to
- Emergency Standby Generators Installation Project (Riverside Pump Station & Ops Building)
- Solicitation number
- RFB2026-009
- Issued by
- Loving County, Wichita Falls City, Texas
About this file
This is an addendum pricing sheet for a bid form related to the City of Waco's Emergency Standby Generators Installation Project at the Riverside Pump Station and Operations Building in Texas. The project encompasses the installation of emergency standby generators at two locations: the Riverside Water Treatment Plant High Service Pump Station (HSPS) and the Riverside Water Treatment Plant Operations Building. Work includes demolition of existing components, civil site work, electrical installations (including cable terminations, switches, and conduit), generator installation with associated switchgear, SCADA modifications, third-party testing of transfer systems, modifications to harmonic filters, and concrete foundation work. The bid form is organized into four main sections: General Conditions (mobilization, bonds, insurance, safety plans, and owner allowance), Riverside WTP HSPS Generator work, Riverside WTP Operations Building Generator work, and miscellaneous items including project record drawings. Specific line items include an owner allowance of $100,000.00, Oncor utility charges of $15,000.00 for the HSPS location, and $5,000.00 for the Operations Building location, with quantities ranging from single lump-sum items to 85 linear feet of reinforced concrete pipe.
The bid form requires contractors to provide unit prices and extended amounts for all line items, with explicit instructions that extended amounts should not be rounded and that the official bid total is determined by multiplying unit prices by estimated quantities. Contractors must also identify any subcontractors being utilized for the work and provide firm name, authorized signature, title, and address information. The pricing sheet does not contain specified response dates, due dates, award dates, or contract term information on this particular document, as it functions as a blank template for contractor pricing submissions rather than a complete solicitation notice.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Total Item Description Quantity Unit Unit Price Total Amount
1.01 Mobilization, bonds, and Insurance, not to exceed 10% of the Total Bid Amount, Complete and in place
1 LS $ $
1.02 Bond and Insurance not to exceed 2.5% of the Total Bid
Amount, Complete and in place 1 $
1.03 Trench Safety Plan 1 LS $ $
1.04 Storm Water Pollution Prevention Plan 1 LS $ $
1.05 Storm Water Pollution Prevention Plan Implementation
1 LS $ $
1.06 Owner Allowance (to be used at the discretion of the CIty of Waco Project manager or designee) 1 LS $ 100,000.00$ $ 100,000.00$
1.07 Trench Safety Plan Implementation 1 LS $ $
SUBTOTAL $
2.01 Riverside WTP HSPS Generator - All work in regards to
the demolition/abandonment of existing components at the project site shown on the drawings and required by the specifications
1 LS $ $
2.02 Riverside WTP HSPS Generator - All work in regards to
construction of civil site work, including but not limited to site grading, subgrade preparation, lime stabilized subgrade, cement treated base, paving, concrete curbs, concrete, concrete pilot channel, pavement striping, wheel stops, concrete sidewalk, handrail, vegetation of work area, erosion control, storm drain, and other miscellaneous features as shown on the drawings and required by the specifications complete and in place
1 LS $ $
2.03 Riverside WTP HSPS Generator - 5 kV cable, terminations, and testing complete and in place
1 LS $ $
2.04 Riverside WTP HSPS Generator - 600 volt cable complete
and in place
1 LS $ $
2.05 Riverside WTP HSPS Generator - 5kV fused switch for
generator complete and in place
1 LS $ $
2.06 Riverside WTP HSPS Generator - Installation of generator and associated switchgear and coordination with generator and switchgear manufacturer on startup, complete and in place
1 LS $ $
2.07 Riverside WTP HSPS Generator - Misc conduit and cable
complete and in place
1 LS $ $
2.08 Riverside WTP HSPS Generator - Concrete foundation
including piers for generator pad complete and in place
1 LS $ $
2.00 RIVERSIDE WTP HSPS GENERATOR
1.00 GENERAL CONDITIONS
BID FORM - BASE BID
City of Waco Emergency Standby Generators Installation Project (Riverside Pump Station & Ops Building)
ChetW Architect
ChetW Cloud+ Moved to bid item 2.17 & 2.18
2.10 Riverside WTP HSPS Generator - crane to move
generator from plant location to concrete pad
1 LS $ $
2.11 Riverside WTP HSPS Generator - Building door
modifications to allow installation of switchgear
1 LS $ $
2.12 Riverside WTP HSPS Generator -SCADA PLC hardware
modifications
1 LS $ $
2.13 Riverside WTP HSPS Generator - 3rd Party Testing of 100
msec transfer system
1 LS $ $
2.14 Riverside WTP HSPS Generator - Oncor Charges for
system/protective relay modifications due to closed transition 100msec transfer switchgear
1 LS $ 15,000.00$ $ 15,000.00$
2.16 Riverside WTP HSPS Generator - Modifications to Four (4) existing harmonic filters, complete and in place
1 LS $ $
2.17 10' City of Waco curb inlet w/18" removable plug, complete and in place 1 LS $ $
2.18 18" Dia Reinforced Concrete Pipe (RCP), ASTM C76, Class III, w/18" cap, complete and in place 85 LF $ $
SUBTOTAL $
3.01 Riverside WTP Operations Building Generator - All work
in regards to the demolition/abandonment of existing components at the project site shown on the drawings and required by the specifications
1 LS $ $
3.02 Riverside WTP Operations Building - All work in regards
to construction of civil site work, including but not limited to site grading, subgrade preparation, lime stabilized subgrade, cement treated base, paving, concrete curbs, concrete, pavement striping, wheel stops, concrete sidewalk, handrail, vegetation of work area, erosion control, and other miscellaneous features as shown on the drawings and required by the specifications complete and in place
1 LS $ $
3.03 Riverside WTP Operations Building Generator - 600 volt
cable complete and in place 1 LS $ $
3.04 Riverside WTP Operations Building Generator - Misc
conduit and cable complete and in place 1 LS $ $
3.05 Riverside WTP Operations Building Generator -
Installation of generator and associated ATS (automatic transfer switch) and coordination with generator and ATS manufacturer on startup, complete and in place
1 LS $ $
3.06 Riverside WTP Operations Building Generator - Concrete
foundation including piers for generator pad complete and in place
1 LS $ $
3.07 Riverside WTP Operations Building Generator -
Concrete/structural modifications to inside of Auxiliary Building for new switchgear complete and in place
1 LS $ $
3.08 Riverside WTP Operations Bldg. Generator - crane to
move generator from stored plant location to concrete pad
1 LS $ $
3.09 Riverside WTP Operations Bldg. Generator - Oncor
Charges for service modifications
1 LS $ 5,000.00$ $ 5,000.00$
3.10 Riverside WTP Operations Building Generator -
Temporary generator to power main service for change over 1 LS $ $ $
SUBTOTAL $
3.00 RIVERSIDE WTP OPERATIONS BUILDING GENERATOR
4.01 Project Record Drawings (As Builts) complete 1 LS $ $
SUBTOTAL $
TOTAL BASE BID $
TOTAL AMOUNT OF MATERIALS $
TOTAL AMOUNT OF LABOR & EQUIPMENT $
TOTAL AMOUNT OF BASE BID $
FIRM NAME:
BY (SIGNED):
TITLE:
ADDRESS:
Contractor acknowledges and agrees that the official TOTAL AMOUNT OF BID is determined by multiplying the unit bid prices by the respective estimated quantities shown in this bid form and then totaling all of the extended amounts. Extended amounts SHOULD NOT be rounded up or down. All dollar amounts should be either written legibly or typed. Any mistakes should be rewritten and initialed by the Contractor.
4.00 MISCELLANEOUS ITEMS
I WILL USE THE FOLLOWING SUBCONTRACTORS FOR THIS WORK:
SUBCONTRACTOR TYPE OF WORK
Bid Form (To McCreary)
File details come from the government source that posted it. Updated .