ESBD_472151_1763763088555_Attachment C - Respondent Cost Propsal.xlsx
XLSX spreadsheet 11 KB Posted
- Attached to
- Texas Governor's Mansion Exterior Preservation
- Solicitation number
- 809-26-0006
- Issued by
- Travis County, Austin City, Texas
About this file
This is a Respondent Cost Proposal attachment for RFP 809-26-0006 issued by the State of Texas for the Texas Governor's Mansion Exterior Preservation project. The scope of work encompasses eleven line items addressing the complete exterior restoration of the mansion, including scaffolding and access systems, wood repair utilizing component replacement and consolidation techniques, temporary window inserts, wood window and shutter repairs with reglazing, masonry repointing at a unit rate per linear foot (with 8 linear feet specified), sealant and caulk application for windows and structural joints, glass security film removal and replacement, painting of wood, metal, and repointed masonry areas, general cleaning, and contingency allocations for general conditions, overhead, and profit.
Bidders are required to submit unit prices and total bid amounts for each scope item in the cost proposal format provided. The contract base bid total will incorporate both a 5% Contractor's contingency and a 5% Owner's contingency calculated on the submitted base bid amount; respondents are explicitly instructed not to include contingency amounts within their proposals. The pricing structure requires line-item cost development for lump-sum items and unit-price quotations where applicable, with all costs ultimately consolidated into a single Grand Total Bid amount that must be stated both numerically and in written form.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Respondent Cost Proposal
| Attachment C - Respondent Cost Proposal | |||||
| RFP 809-26-0006 | |||||
| Texas Governor's Mansion Exterior Preservation | |||||
| Scope Item | Description | Sub Description | Unit Price | Base Bid Quantity | Total Bid |
| 1 | Scaffolding and Access | LS | $ |
2 Wood Repair Component Replacement, Dutchman, Epoxy, Consolidant) LS $
3 Temporary Window Inserts Fabricate, install, removal LS $
4 Wood Window, Shutter, and Screen Repair and Screen Material Replacement Removal, wood repair, reglazing, install LS $
5 Masonry Repointing _____$/LF @ 8LF = $
6 Sealant & Caulk Window frame, roof, construction joints, wood trim LS $
7 Glass Security Film Removal and Replacement LS $
8 Painting Wood, metal, and brick repointed areas LS $
| 9 | Cleaning | LS | $ |
| 10 | Other | LS | $ |
| 11 | General Conditions/Overhead/Profit | LS | $ |
| Base Bid Grand Total - Including all scope items | $ | ||
| Base Bid Grand Total (in words) | |||
| Dollars | |||
| (Note: contract will incorporate 5% Contractor's and 5% Owner's contingencies based on this amount. Do not include contingency amount in this proposal) |
File details come from the government source that posted it. Updated .