This is Addendum No. 2 to Request for Bid (RFB) No. 2025-075 issued by the City of Waco, Texas Purchasing Services for the Old McGregor Ground Storage Tank Improvements project. The project encompasses the construction of a new 5.0 million gallon prestressed concrete ground storage tank, installation of yard piping ranging from 12 inches to 48 inches in diameter, placement of various valves and gate valves, site improvements including concrete and asphalt pavement replacement, demolition and removal work, electrical and instrumentation installation, and selective rehabilitation of an existing 5.0 million gallon ground storage tank. The bid form has been consolidated from 100 line items to 22 summary bid items, with a detailed bid form provided for reference. The revised bid closing date is January 7, 2026, at 2:00 P.M. CST, with bid opening at 2:01 P.M. CST via Zoom video and dial-in. The project requires substantial completion within 365 calendar days and total completion within 425 calendar days. The addendum provides revised Sheet C12 (tank details), revised Sheet C32 (construction details), updated technical specifications for precast prestressed concrete tanks (Section 33 16 33), responses to 30 contractor questions, and a revised summary bid form clarifying bid item sequencing and quantities.
The engineering estimate for the base bid is $12.5 million with potential alternates bringing the total to $13.5 million. A $100,000 owner's allowance is included for use only as authorized by the City of Waco. The specifications require the tank to be constructed by one of two pre-approved manufacturers (DN Tanks or Preload), though other qualified tank contractors may submit prequalification packages. All general contractors must submit complete prequalification documentation by the specified deadline, with major sub-contractors also requiring qualification approval. Key clarifications in the addendum include confirmation that AWWA C303 pipe is required (AWWA C200 steel pipe is not permitted), the chain link fence shall be 8 feet tall and galvanized, the overflow design capacity has been reduced to 26.62 MGD, and domestic material requirements (AIS, BABAA) are not applicable. Liquidation fees of $3,000 per day apply for delays before substantial completion, reducing to $1,000 daily thereafter. No separate payment is provided for work associated with tank installation, which is considered incidental to various bid items.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Purchasing Services Post Office Box 2570
Waco, Texas 76702-2570 Phone: 254-750-8098
Fax: 254-750-8063 melaniew@wacotx.gov
CITY OF WACO www.waco-texas.com
Date: 12/17/2025
RFB No: 2025-075 Commodity: Old McGregor Ground Storage Tank Improvements Purchasing Agent: Melanie Wade
Closing Time: 2:00 P.M. CST, Wednesday, January 7, 2026 Opening Time: 2:01 P.M. CST, Wednesday, January 7, 2026
RFB Opening Location: Via Zoom Video and Dial In
Addendum No: 2
• Bid closing date moved to January 7, 2026, 2:00 p.m. (CT)
• Revised Summary Bid Form
• Provided Detailed Bid Form for Reference
• Revised Sheet C12
• Revised Sheet C32
• Responded to Questions from Contractors
• Revised Technical Specification 33 16 33 - Precast, Prestressed Concrete Tank with Steel Diaphragm
The above-mentioned RFB has been changed. Sign and return addendum to the Purchasing Office by the closing time and date with your RFB response.
Returning this page signed by your authorized agent will serve to acknowledge this change. All other requirements of the invitation remain unchanged. If you have any questions, please call or stop by the Purchasing Office at the above address.
Firm:____________________________________________________________________________________
Address___________________________________________________________________________________
Signature of Person Authorized to Sign Bid:______________________________________________________________________
Signor's Name and Title (print or type):_____________________________________________________________________________
E-mail Address:____________________________________________________________________________
Date:____________________Telephone:___________________________Fax:_________________________ mailto:melaniew@wacotx.gov file://NETAPP/HOMES/JodyC/0%20Purchasing/Utilities/2014/RFB%202014-012%20Generator%20Rebuild/www.waco-texas.com
Item No. Item Description Quantity Unit Unit Price Item Cost Base Bid
1 Mobilization, Permits and Project Incidentals (10% Maximum of Total Bid) 1 LS
2 Bonding & Insurance (2.5% Maximum of Total Bid) 1 LS
3 Owner's Allowance (Allowance to be used only as authorized by the City of Waco) 1 LS $100,000.00 $100,000.00
Building Waco Sign, including all signage, anchorage, installation, removal, and all material, labor, equipment, and incidentals, complete and in place
1 EA
5 Stormwater Pollution & Prevention Plan 1 LS
Stormwater Pollution & Prevention Plan Implementation, including all necessary material, labor, equipment, incidentals, and removal complete and in place
1 LS
7 Trench Safety Plan 1 LS
8 Trench Safety Implementation, including all material, labor, equipment, training, and incidentals, complete and in place 1,574 LF
9 Confined Space Plan 1 LS
10 Confined Space Implementation, including all material, labor, equipment, training, and incidentals, complete and in place 1 LS
Utility Potholes, including all necessary traffic control, traffic control plans, non-destructive potholing of the identified utility, coordination with utility provider, surveying of pothole, repair to surface, and all material, labor, equipment, and incidentals, complete and in place
1 LS
Coordination with Private Utility Companies, including coordination and permitting, temporary measures to protect private utilities, payment to private utility company sub-contractor to shield overhead electric lines, and all material, labor, equipment, and incidentals, complete and in place
1 LS
Testing of Improvements, including all testing required for acceptance of the water improvements, and all material, labor, equipment and incidentals, complete and in place
1 LS
14 Demolition and Removal (Detailed Bid Form: Bid Items 14-20) 1 LS 15 Site Improvements (Detailed Bid Form: Bid Items 21-30) 1 LS 16 Ground Storage Tank (Detailed Bid Form: Bid Item 31) 1 LS 17 Yard Piping (Detailed Bid Form: Bid Items 32 - 63) 1 LS
18 Existing 5.0 MG Ground Storage Tank Selective Rehabilitation (Detailed Bid Form: Bid Item 64) 1 LS
19 Electrical, Instrumentation, and Controls (Detailed Bid Form: Bid Item 65) 1 LS
20 Alternate 1 Bid (Detailed Bid Form: Bid Items 66 - 77) 1 LS 21 Alternate 2 Bid (Detailed Bid Form: Bid Items 78 - 89) 1 LS 22 Alternate 3 Bid (Detailed Bid Form: Bid Items 90 - 100) 1 LS
Total Base Bid
Summary Bid Form
Base Bid
1 Mobilization, Permits and Project Incidentals (10% Maximum of Total Bid) 1 LS
2 Bonding & Insurance (2.5% Maximum of Total Bid) 1 LS
3 Owner's Allowance (Allowance to be used only as authorized by the City of Waco) 1 LS $100,000.00 $100,000.00
Building Waco Sign, including all signage, anchorage, installation, removal, and all material, labor, equipment, and incidentals, complete and in place
1 EA
5 Stormwater Pollution & Prevention Plan 1 LS
Stormwater Pollution & Prevention Plan Implementation, including all necessary material, labor, equipment, incidentals, and removal complete and in place
1 LS
7 Trench Safety Plan 1 LS
8 Trench Safety Implementation, including all material, labor, equipment, training, and incidentals, complete and in place 1,574 LF
9 Confined Space Plan 1 LS
10 Confined Space Implementation, including all material, labor, equipment, training, and incidentals, complete and in place 1 LS
Utility Potholes, including all necessary traffic control, traffic control plans, non-destructive potholing of the identified utility, coordination with utility provider, surveying of pothole, repair to surface, and all material, labor, equipment, and incidentals, complete and in place
1 LS
Coordination with Private Utility Companies, including coordination and permitting, temporary measures to protect private utilities, payment to private utility company sub-contractor to shield overhead electric lines, and all material, labor, equipment, and incidentals, complete and in place
1 LS
Testing of Improvements, including all testing required for acceptance of the water improvements, and all material, labor, equipment and incidentals, complete and in place
1 LS
Demolition and Removal
Site Clearing, Grubbing, and Tree Removal, including haul-off and disposal of materials at permitted disposal facility, and all material, labor, equipment, incidentals, complete and in place
1 LS
Fence, Posts, and Concrete Footer Removal, including haul-off and disposal of materials at permitted disposal facility, and all material, labor, equipment, and incidentals, complete and in place
327 LF
Existing 24" Water Line (All Types) to be Removed, including necessary excavation, pipe cutting, dewatering, installation of backfill, haul-off and disposal of materials at permitted disposal facility, and all material, labor, equipment, and incidentals complete and in place
30 LF
Existing 30" Water Line (All Types) to be Removed, including necessary excavation, pipe cutting, dewatering, installation of backfill, haul-off and disposal of materials at permitted disposal facility, and all material, labor, equipment, and incidentals complete and in place
17 LF
Existing 30" Gate Valve to be Removed and Delivered to the City of Waco, including necessary excavation, pipe cutting, dewatering, transportation and delivery to City Facilities, installation of backfill, and all material, labor, equipment, and incidentals complete and in place
4 EA
Asphalt Pavement Removal, including sawcutting of existing pavement, removal, haul-off and disposal of materials at permitted disposal facility, and all material, labor, equipment, incidentals complete and in place
110 SY
General Conditions
Detailed Bid Form
Concrete Pavement Removal, including sawcutting of existing pavement, removal, haul-off and disposal of materials at permitted disposal facility, and all material, labor, equipment, incidentals complete and in place
310 SY
Site Improvements
21 Temporary Fencing, including all material, labor, equipment, training, incidentals, and removal, complete and in place 1 LS
Class 'B' Asphalt Surface Replacement, including all necessary preparation, subgrade compaction, installation of concrete base, bonding course, placement of HMAC (Type D), cleanup and all material, labor, equipment and incidentals complete and in place
110 SY
Concrete Surface Replacement, including all necessary preparation, subgrade compaction, base course, reinforcement, forming, installation of concrete, connection to existing concrete pavement, cleanup and all material, labor, equipment and incidentals complete and in place
310 SY
Ground Storage Tank Concrete Mowstrip, including all necessary preparation, subgrade compaction, base course, reinforcement, forming, installation of concrete, joint sealing, cleanup and all material, labor, equipment and incidentals complete and in place
160 SY
8' Chain Link Fence, including fence, posts, concrete footing, miscellaneous materials, and all material, labor, equipment, incidentals complete and in place
990 LF
Site Grading, including import of fill, removal of spoils, rock trenching, placement, compaction, and all material, labor, equipment, incidentals complete and in place
1 LS
Water Quality Pond, including import of fill, removal of spoils, rock trenching, placement, compaction, and all material, labor, equipment, incidentals complete and in place
1 LS
Protection Stone Riprap, 12-Inch Thick, including all necessary preparation, subgrade compaction, installation, cleanup, and all material, labor, equipment and incidentals complete and in place
2 CY
Erosion Control Blanket, including all necessary preparation, subgrade compaction, installation, maintenance until acceptance, cleanup, and all material, labor, equipment and incidentals complete and in place
430 SY
Hydromulch and Watering, including all necessary preparation, installation, maintenance and watering until acceptance, cleanup, and all material, labor, equipment and incidentals complete and in place
15,980 SY
Ground Storage Tank
5.0 MG Ground Storage Tank, Subgrade, Piping, and
Appurtenances, including all necessary preparation, excavation, spoils haul-off, subgrade compaction, base course, reinforcement, forming, installation of concrete, cleanup, payment to Geotechnical Engineer for required inspections, and all material, labor, equipment and incidentals complete and in place
1 LS
Yard Piping
48" AWWA C303 Pipe and Fittings, including necessary excavation, rock trenching, embedment, geotechnical fabric, tracer wire, marking tape, installation of utility, trench backfill, concrete thrust blocking, joint restraint, electrical joint bonding, and all material, labor, equipment, and incidentals complete and in place
186 LF
36" AWWA C303 Pipe and Fittings, including necessary excavation, rock trenching, embedment, geotechnical fabric, tracer wire, marking tape, installation of utility, trench backfill, concrete thrust blocking, joint restraint, electrical joint bonding, and all material, labor, equipment, and incidentals complete and in place
1,130 LF
30" AWWA C303 Pipe and Fittings, including necessary excavation, rock trenching, embedment, geotechnical fabric, tracer wire, marking tape, installation of utility, trench backfill, concrete thrust blocking, joint restraint, electrical joint bonding, and all material, labor, equipment, and incidentals complete and in place
41 LF
12" AWWA C-900 DR-18 Water Quality Pond Drain Line, including necessary excavation, rock trenching, embedment, geotechnical fabric, tracer wire, marking tape, installation of utility, trench backfill, concrete thrust blocking, joint restraint, and all material, labor, equipment, and incidentals complete and in place
15 LF
Connect to 24" AWWA C151 Ductile Iron Water Line, including special fittings, spool pieces, necessary excavation, rock trenching, embedment, geotechnical fabric, tracer wire, marking tape, installation of utility, trench backfill, concrete thrust blocking, joint restraint, coordination with City for accomodation of acceptable connection time frames, and all material, labor, equipment, and incidentals complete and in place
1 EA
Connect to 30" AWWA C303 Water Line or Valve, including special fittings, spool pieces, necessary excavation, rock trenching, embedment, geotechnical fabric, tracer wire, marking tape, installation of utility, trench backfill, concrete thrust blocking, joint restraint, coordination with City for accomodation of acceptable connection time frames, and all material, labor, equipment, and incidentals complete and in place
4 EA
48" x 30" AWWA C303 Reducer (48" Balance Line, Sta. 0+25), including necessary excavation, spool pieces, thrust blocking, trench backfill, and all material, labor, equipment, and incidentals complete and in place
1 EA
Cathodic Protection and Monitoring for 48" Common Header AWWA C303 Pipe, including all necessary preparation, installation, cleanup, and all material, labor, equipment and incidentals complete and in place
1 LS
Cathodic Protection and Monitoring for 36" Supply Line and Bypass AWWA C303 Pipe, including all necessary preparation, installation, cleanup, and all material, labor, equipment and incidentals complete and in place
1 LS
Cathodic Protection and Monitoring for 30" Supply Line AWWA C303 Pipe, including all necessary preparation, installation, cleanup, and all material, labor, equipment and incidentals complete and in place
1 LS
24" Temporary Bypass Line, Fittings, and Appurtenances - Phase 1, including special fittings and appurtenances, spool pieces, bypass line, temporary trench, temporary steel road plates, trench backfill and compaction, and all material, labor, equipment, and incidentals complete and in place
1 LS
24" Temporary Bypass Line, Fittings, and Appurtenances - Phase 2, including special fittings and appurtenances, spool pieces, bypass line, temporary trench, temporary steel road plates, trench backfill and compaction, and all material, labor, equipment, and incidentals complete and in place
1 LS
48" Resilient Seat Gate Valve, including necessary excavation, embedment and backfill, connection to water line, tracer wire, concrete thrust blocking, concrete valve cradle and base, valve box and lid, and all material, labor, equipment, and incidentals complete and in place
4 EA
36" Resilient Seat Gate Valve, including necessary excavation, embedment and backfill, connection to water line, tracer wire, concrete thrust blocking, concrete valve cradle and base, valve box and lid, and all material, labor, equipment, and incidentals complete and in place
5 EA
30" Resilient Seat Gate Valve, including necessary excavation, embedment and backfill, connection to water line, tracer wire, concrete thrust blocking, concrete valve cradle and base, valve box and lid, and all material, labor, equipment, and incidentals complete and in place
4 EA
24" Resilient Seat Gate Valve, including necessary excavation, embedment and backfill, connection to water line, tracer wire, concrete thrust blocking, concrete valve cradle and base, valve box and lid, and all material, labor, equipment, and incidentals complete and in place
1 EA
12" Resilient Seat Gate Valve, including necessary excavation, embedment and backfill, connection to water line, tracer wire, concrete thrust blocking, valve box and lid, and all material, labor, equipment, and incidentals complete and in place
3 EA
30" Motor Operated Butterfly Valve, Manhole, Piping, and Appurtenances, including actuator, manhole, AWWA C200 piping, embedment and backfill, necessary excavation, connection to water line, and all material, labor, equipment, and incidentals complete and in place
1 EA
36" Resilient Seat Gate Valve, including actuator, necessary excavation, embedment and backfill, connection to water line, tracer wire, concrete thrust blocking, concrete valve cradle and base, valve box and lid, and all material, labor, equipment, and incidentals complete and in place
1 EA
36" Motor Operated Butterfly Valve (Above Ground), including actuator, piping, appurtenances, and material, labor, equipment and incidentals complete and in place
1 EA
30" Supply Vault Piping Modifications, including piping, appurtenances, and material, labor, equipment and incidentals complete and in place
1 EA
24" Supply Vault Piping Modifications and Flow Meter, including piping, appurtenances, and material, labor, equipment and incidentals complete and in place
1 EA
Fire Hydrant Assembly, including necessary excavation, connection to water line, and all material, labor, equipment, and incidentals complete and in place
1 EA
Air Release Valve, Manhole, Piping, and Appurtenances, including manhole, necessary excavation, embedment and backfill, connection to water line, and all material, labor, equipment, and incidentals complete and in place
1 EA
Access Manhole, Piping, and Appurtenances, including manhole, necessary excavation, embedment and backfill, connection to water line, and all material, labor, equipment, and incidentals complete and in place
1 EA
2" Air Bleeder Valve, including meter box, necessary excavation, embedment and backfill, connection to water line, and all material, labor, equipment, and incidentals complete and in place
2 EA
24" Water Line Concrete Cap including all necessary excavation, rock trenching, embedment, marking tape, trench backfill, reinforcement, forming, installation of concrete, cleanup and all material, labor, equipment and incidentals complete and in place
20 LF
24" Class III Storm Drain Line and Fittings, including necessary excavation, rock trenching, embedment, geotechnical fabric, marking tape, installation of utility, trench backfill, and all material, labor, equipment, and incidentals complete and in place
82 LF
6' x 6' Standard Storm Drain Junction Box (Open Top), Piping, and Appurtenances, including, necessary excavation, embedment and backfill, connection to storm drain lines, and all material, labor, equipment, and incidentals complete and in place
1 EA
Storm Drain Headwall (Type CH-FW-0), including all necessary preparation, subgrade compaction, base course, reinforcement, forming, installation of concrete, joint sealing, connection to storm drain, fine grading, cleanup and all material, labor, equipment and incidentals complete and in place
2 EA
Existing Chemical Injection Quill Remove and Replace within existing manhole, including necessary preparation, and all material, labor, equipment, and incidentals complete and in place
1 LS
2" SCH 80 PVC Pipe and Fittings, including necessary excavation, rock trenching, embedment, geotechnical fabric, tracer wire, marking tape, installation of utility, trench backfill, concrete thrust blocking, joint restraint, electrical joint bonding, and all material, labor, equipment, and incidentals complete and in place
70 LF
Existing 5.0 MG Ground Storage Tank Selective Rehabilitation
Existing 5.0 MG Ground Storage Tank Selective Rehabilitation, including necessary preparation, dewatering, disinfection, and all material, labor, equipment, and incidentals complete and in place
1 LS
Electrical, Intrumentation, and Controls
65 Electrical, Intrumentation, and Controls, including all material, labor, equipment, and incidentals complete and in place 1 LS
Alternate 1 Bid
Existing 24" Water Line (All Types) to be Removed, including necessary excavation, dewatering, installation of backfill, haul-off and disposal of materials at permitted disposal facility, and all material, labor, equipment, and incidentals complete and in place
64 LF
Existing 24" Water Line (All Types) to be Abandoned In Place, including installation of plugs in pipe, grout installation, and all material, labor, equipment and incidentals, complete and in place
32 LF
30" Discharge Piping AWWA C303 Pipe and Fittings, including necessary excavation, rock trenching, embedment, geotechnical fabric, tracer wire, marking tape, installation of utility, trench backfill, concrete thrust blocking, joint restraint, electrical joint bonding, and all material, labor, equipment, and incidentals complete and in place
193 LF
Cathodic Protection and Monitoring for 30" AWWA C303 Pipe, including all necessary preparation, installation, cleanup, and all material, labor, equipment and incidentals complete and in place
1 LS
24" Discharge Piping AWWA C303 Pipe and Fittings, including necessary excavation, rock trenching, embedment, geotechnical fabric, tracer wire, marking tape, installation of utility, trench backfill, concrete thrust blocking, joint restraint, electrical joint bonding, and all material, labor, equipment, and incidentals complete and in place
28 LF
Cathodic Protection and Monitoring for 24" AWWA C303 Pipe, including all necessary preparation, installation, cleanup, and all material, labor, equipment and incidentals complete and in place
1 LS
72 Trench Safety Implementation, including all material, labor, equipment, training, and incidentals, complete and in place 221 LF
Connect to 24" AWWA C151 Ductile Iron Water Line, including special fittings, spool pieces, necessary excavation, rock trenching, embedment, geotechnical fabric, tracer wire, marking tape, installation of utility, trench backfill, concrete thrust blocking, joint restraint, coordination with City for accomodation of acceptable connection time frames, and all material, labor, equipment, and incidentals complete and in place
2 EA
Connect to 24" AWWA C303 Water Line, including special fittings, spool pieces, necessary excavation, rock trenching, embedment, geotechnical fabric, tracer wire, marking tape, installation of utility, trench backfill, concrete thrust blocking, joint restraint, coordination with City for accomodation of acceptable connection time frames, and all material, labor, equipment, and incidentals complete and in place
2 EA
30" Resilient Seat Gate Valve, including necessary excavation, embedment and backfill, connection to water line, tracer wire, concrete thrust blocking, concrete valve cradle and base, valve box and lid, and all material, labor, equipment, and incidentals complete and in place
3 EA
30" Flow Meter, Vault Structure, including vault, AWWA C200 piping, electrical, sump pump, appurtenances, necessary excavation, embedment and backfill, connection to water line, and all material, labor, equipment, and incidentals complete and in place
1 EA
Fire Hydrant Assembly, including necessary excavation, connection to water line, and all material, labor, equipment, and incidentals complete and in place
Alternate 2 Bid
Connect to 30" AWWA C303 Water Line or Valve, including special fittings, spool pieces, necessary excavation, rock trenching, embedment, geotechnical fabric, tracer wire, marking tape, installation of utility, trench backfill, concrete thrust blocking, joint restraint, coordination with City for accomodation of acceptable connection time frames, and all material, labor, equipment, and incidentals complete and in place
-1 EA
48" x 30" AWWA C303 Reducer (48" Balance Line, Sta. 0+17), including necessary excavation, spool pieces, thrust blocking, trench backfill, and all material, labor, equipment, and incidentals complete and in place
-1 EA
Existing Chemical Injection Quill Remove and Replace within existing manhole, including necessary preparation, and all material, labor, equipment, and incidentals complete and in place
-1 LS
Existing 30" Gate Valve to be Removed and Delivered to the City of Waco, including necessary excavation, dewatering, transportation and delivery to City Facilities, installation of backfill, and all material, labor, equipment, and incidentals complete and in place
1 EA
48" AWWA C303 Pipe and Fittings, including necessary excavation, rock trenching, embedment, geotechnical fabric, tracer wire, marking tape, installation of utility, trench backfill, concrete thrust blocking, joint restraint, electrical joint bonding, and all material, labor, equipment, and incidentals complete and in place
27 LF
42" AWWA C303 Pipe and Fittings, including necessary excavation, rock trenching, embedment, geotechnical fabric, tracer wire, marking tape, installation of utility, trench backfill, concrete thrust blocking, joint restraint, electrical joint bonding, and all material, labor, equipment, and incidentals complete and in place
22 LF
Chemical Dosing Manhole, Piping, and Appurtenances, including manhole, necessary excavation, embedment and backfill, connection to water line, and all material, labor, equipment, and incidentals complete and in place
1 EA
85 Trench Safety Implementation, including all material, labor, equipment, training, and incidentals, complete and in place 49 LF
Connect to 30" Schedule 20 Steel Water Line, including special fittings, spool pieces, necessary excavation, rock trenching, embedment, geotechnical fabric, tracer wire, marking tape, installation of utility, trench backfill, concrete thrust blocking, joint restraint, coordination with City for accomodation of acceptable connection time frames, and all material, labor, equipment, and incidentals complete and in place
1 EA
Connect to 42" AWWA C303 Water Line, including special fittings, spool pieces, necessary excavation, rock trenching, embedment, geotechnical fabric, tracer wire, marking tape, installation of utility, trench backfill, concrete thrust blocking, joint restraint, coordination with City for accomodation of acceptable connection time frames, and all material, labor, equipment, and incidentals complete and in place
1 EA
48" Resilient Seat Gate Valve, including necessary excavation, embedment and backfill, connection to water line, tracer wire, concrete thrust blocking, concrete valve cradle and base, valve box and lid, and all material, labor, equipment, and incidentals complete and in place
1 EA
42" Resilient Seat Gate Valve, including necessary excavation, embedment and backfill, connection to water line, tracer wire, concrete thrust blocking, concrete valve cradle and base, valve box and lid, and all material, labor, equipment, and incidentals complete and in place
Alternate 3 Bid
36" AWWA C303 Pipe and Fittings, including necessary excavation, rock trenching, embedment, geotechnical fabric, tracer wire, marking tape, installation of utility, trench backfill, concrete thrust blocking, joint restraint, electrical joint bonding, and all material, labor, equipment, and incidentals complete and in place
-1,130 LF
30" AWWA C303 Pipe and Fittings, including necessary excavation, rock trenching, embedment, geotechnical fabric, tracer wire, marking tape, installation of utility, trench backfill, concrete thrust blocking, joint restraint, electrical joint bonding, and all material, labor, equipment, and incidentals complete and in place
-41 LF
Cathodic Protection and Monitoring for 36" Supply Line AWWA C303 Pipe, including all necessary preparation, installation, cleanup, and all material, labor, equipment and incidentals complete and in place
-1 LS
Cathodic Protection and Monitoring for 30" Supply Line AWWA C303 Pipe, including all necessary preparation, installation, cleanup, and all material, labor, equipment and incidentals complete and in place
-1 LS
36" AWWA C-900 DR-18 PVC Restrained Joint Pipe, including necessary excavation, rock trenching, embedment, geotechnical fabric, tracer wire, marking tape, installation of utility, trench backfill, concrete thrust blocking, joint restraint, and all material, labor, equipment, and incidentals complete and in place
1,130 LF
30" AWWA C-900 DR-18 PVC Restrained Joint Pipe, including necessary excavation, rock trenching, embedment, geotechnical fabric, tracer wire, marking tape, installation of utility, trench backfill, concrete thrust blocking, joint restraint, and all material, labor, equipment, and incidentals complete and in place
41 LF
36" X 24" DIP Eccentric Reducer, including necessary excavation, thrust blocking, trench backfill and all material, labor, equipment, and incidentals complete and in place
1 EA
36" X 30" DIP Tee, including necessary excavation, thrust blocking, trench backfill and all material, labor, equipment, and incidentals complete and in place
1 EA
36" X 36" DIP Tee, including necessary excavation, thrust blocking, trench backfill and all material, labor, equipment, and incidentals complete and in place
3 EA
36" - 45° DIP Bend, including necessary excavation, connection to water line, spool pieces, thrust blocking, trench backfill and all material, labor, equipment, and incidentals complete and in place
8 EA
30" - 45° DIP Bend, including necessary excavation, connection to water line, spool pieces, thrust blocking, trench backfill and all material, labor, equipment, and incidentals complete and in place
F.F. ELEV. = 656.0'
45°
C/L
1. PROVIDE REMOVABLE 316 STAINLESS STEEL BAFFLE DEVICE WITH STAINLESS STEEL 316 HARDWARE AS RECOMMENDED BY THE TANK MANUFACTURER. MANUFACTURER SHALL BE RESPONSIBLE FOR PROVIDING THE CONNECTION DETAIL TO RESTRAIN THE BAFFLE DEVICE. USE A MAX. FLOW RATE OF 58 MGD AS THE DESIGN CRITERIA. MAXIMUM VELOCITY THROUGH VORTEX OF
STRUCTURE SHALL BE 5 FT/SEC. BAFFLE DEVICE MINIMUM DIAMETER SHALL BE 60".
2. CONTRACTOR SHALL PRESSURIZE THE 30"/48" OUTLET PIPE IN THE ENCASEMENT AREA AT 225 PSI FOR 2 HOURS WITH ZERO
LEAKAGE PRIOR TO ENCASEMENT.
3. BURIED FLANGES, COUPLINGS, AND HARNESSES SHALL BE COVERED WITH PETROLEUM TAPE SYSTEM PER SECTION 33 14 10
AND SECTION 33 14 05.
4. OUTLET PIPE TO HAVE FLANGE WITH THREADED HOLES INSTALLED FLUSH WITH FINISHED FLOOR SO BLIND FLANGE CAN BE
ATTACHED FOR PRESSURE TESTING.
C/L
3'-0"
F.F. ELEV. = 656.0'
1'-0"
MIN.
5' -0
1'-0"
30"/48" OUTLET
48" T/P ELEV. = 651.00'
PROVIDE FLANGED ISOLATION
KIT BETWEEN DISSIMILAR PIPE
MATERIALS
12" MIN.
12" MIN.
316 S.S. C303
1'-0"
30" T/P ELEV. = 645.00'
STEEL COUPLING JOINT
HARNESS WITH THRUST
RESTRAINT
BAFFLE DEVICE
4000 PSI STRENGTH CLASS S
CONCRETE ENCASEMENT
30/48" 90° BEND
4000 PSI
CONCRETE
ENCASEMENT
DIMENSIONS OF BLOCKING
SHALL BE IN ACCORDANCE
WITH TANK MANUFACTURER'S
RECOMMENDATIONS
CONCRETE TANK WALL
BOLTED ACCESS PLATE
REMOVABLE BAFFLE DEVICE
BAFFLE DEVICE
BAFFLE VANE (TYP.)
8 REQUIRED
54" DIA. 6" DEEP SUMP FOR 30" OUTLET
72" DIA. 6" DEEP SUMP FOR 48" OUTLET
ED
G
E O
F D
O M
E
6"W x 4"H
CONCRETE CURB
HANDRAIL AROUND
ENTIRE PERIMETER
RE: 2/C12
CENTER
OF TANK
EXTERIOR LADDER WITH SAFETY
CLIMB AND LADDER GATE RE:
DETAIL 3,6/C13
1. THE KICK PLATE SHALL BE ELEVATED SLIGHTLY OFF THE TANK TO ALLOW FOR RUNOFF DRAINAGE.
2. CONTRACTOR SHALL SUBMIT SHOP DRAWINGS FOR PROPOSED LADDER AND LADDER GATE.
3. HANDRAIL SHALL BE ALUMINUM.
4. ALL ALUMINUM TO BE ISOLATED FROM CONCRETE USING NEOPRENE GASKETS.
5. ALL HATCH OPENINGS WHALL HAVE A RAISED 4" CURB WITH A LOCKABLE COVER THAT OVERLAPS THE RAISED COVER BY AT
LEAST 2" IN A DOWNWARD DIRECTION. WHERE NECESSARY, A GASKET SHALL BE USED TO MAKE A POSITIVE SEAL WHEN THE HATCH IS CLOSED. ALL HATCHES SHALL REMAIN LOCKED EXCEPT DURING INSPECTIONS AND MAINTENANCE.
.0
NOTES:
4 - 4" FLANGED OPENINGS
FOR ELECTRICAL CONDUITS
4" X 1/4" KICK PLATE
7' - 0"
TYP
CHAIN GATE
3' - 3"
TYP
3'
0"
TY
P
48" x 48" LOACKABLE
ROOF HATCH
15.0'
CHAIN GATE
HOLLAENDER
JOINT (TYP)
HOLLAENDER
JOINT (TYP)
FRONT CIRCUM.
HANDRAIL (TYP)
SEE NOTE 3
BASE PLATE WITH
5/8" HOLES
SEE NOTE 1
6061-T6 SCH. 40
ALUMINUM PIPE (TYP.)
6061-T6 SCH. 40
ALUMINUM PIPE (TYP.)
BASE PLATE WITH 5/8"
HOLES
4" TOE BOARD (AT
FRONT ONLY)
REAR CIRCUM.
HANDRAIL TYP.
1. S.S. WEDGE ANCHORS TO BE USED AT EACH
HANDRAIL/TANK CONNECTION.
2. ALL ALUMINUM TO BE ISOLATED FROM CONCRETE
USING NEOPRENE GASKETS.
3. FOUR-INCH TOE BOARD TO BE PROVIDED ON FRONT
CIRCUMFERENTIAL HANDRAIL. TOE BOARD SHALL BE
ELEVATED SLIGHTLY OFF THE TANK TO ALLOW FOR
RUNOFF DRAINAGE.
4" KICK PLATE
NOTES:
SIDE RAIL
F.F. ELEV. = 656.00'
T/P ELEV = 652.00'
1.0' 6" 316 STAINLESS
STEEL BLIND FLANGE
6" 316 STAINLESS
STEEL 90° BEND1.0'
5'
6" 316 STAINLESS
STEEL BLIND FLANGE
K:
\F
TW
_U til iti es \0
-W ac o O ld M cG re go r P um p
St at io n
Im pr ov em en ts
\C
AD
D \S
H
EE
TS
\P
R O
PO
SE
D G
ST
D
ET
AI
LS
.d w g
P
LO
T
D
AT
E:
/8 /2
3:
M by
O N
TI
VE
R O
S, M
AT
TH
EW
2023-213
SHEET NO.
CHECKED:
DESIGN:
DRAWN:
CJM
MCF
AWS
PROJECT NO:
ISSUE DATE:
AUGUST 2025 S
H E
E T
S
IZ
E : 2
2X
NO. REVISION DATE
CONSULTANT:
WATER UTILITY SERVICES
OLD MCGREGOR GROUND STORAGE TANK IMPROVEMENTS
GENERAL NOTES
LEGEND
KEY NOTES
TBPE No. 928 F: 817-335-5070 801 Cherry St., Suite 1300 Ft. Worth, TX 76102 P: 817-335-6511
DETAIL3
SCALE: NOT TO SCALE
ROOF HATCH
C12
SECTION1
SCALE: NOT TO SCALE
PROPOSED 30/48-INCH OUTLET PIPE
C12
SCALE: NOT TO SCALE
HAND RAIL
C12
SECTION
C12
5.0 MG GROUND STORAGE
TANK DETAILS II
CIVIL
SECTION4
SCALE: NOT TO SCALE
RECIRCULATION PIPING STUBOUT
C12
1 ADDENDUM 3 12/08/25
andrew.simonsen Text Box
2"
3'-0"
AWAY FROM TANK
SLOPE AT 1.00%
4"
EXPANSION JOINT
1/ 2"
EXPANSION JOINT
1" SAND CUSHION
SCARIFY SUBGRADE A MINIMUM OF 6
INCHES AND UNIFORMLY COMPACT TO A
MINIMUM OF 95% OF STANDARD PROCTOR
DENSITY (ASTM D698), TO MINUS 2 TO
PLUS 4 PERCENTAGE POINTS OF OPTIMUM
MOISTURE CONTENT.
OUTSIDE EDGE OF
TANK WALL
2" REDWOOD
OR PREMOLD
SIKAFLEX-1C SL
JOINT SEALING
COMPOUND, OR
APPROVED EQUAL
#3 BARS ON
36" CENTERS
3 - #3 BARS EQUALLY SPACED
5'
TOOLED
JOINT
ALL JOINTS SHALL BE CUT 1" DEEP, FOLLOWED BY GROOVING TOOL.
1/2" PREMOLDED EXPANSION JOINT MATERIAL SHALL BE PLACED WHERE
NEW WORK ABUTS OLD OR NEW WORK IS ADJACENT TO OTHER CONCRETE
WORK, WALL, FOUNDATIONS, CURBS, ETC. MAXIMUM SPACING OF TRANSVERSE
GENERAL NOTES
EXPANSION JOINTS SHALL BE 40'-0"
3"
1. CONCRETE SHALL BE 3,000 PSI CLASS A.
2. EXPANSION JOINTS SHLL BE 1/2" THICK REDWOOD FOR FULL DEPTH MINUS 1/2" OF SIDEWALK
AND SHALL INCLUDE GREASED 24" SMOOTH 1/2" DIA. DOWEL STEEL BARS WITH CAPS.
WIDTH PER SITE PLAN.
ENSURE CONTINUOUS REBAR
REINFORCEMENT ACROSS
ENTIRE WIDTH OF MOW STRIP.
END POSTLINE POST
NOTES:
1. MOWSTRIP (18" BY 4") SHALL BE INSTALLED BENEATH ALL FENCE IN
UNPAVED AREAS.
2. REFER TO 32 31 00 FOR CHAIN LINK SPECIFICATIONS.
3. MOWSTRIP SHALL BE 2" ABOVE GROUND LEVEL AND INCLUDE TWO (2)
ROWS OF #3 REBAR EVENLY SPACED ALONG THE FULL LENGTH OF
THE MOWSTRIP AND A #3 REBAR CROSS-TIED EVERY FOUR (4) FEET.
EXPANSION JOINTS SHALL BE INSTALLED EVERY TWENTY (20) FEET.
(OR CORNER POST)2.375"Ø SCH. 40 PIPE
8' -0
3' -0
M
IN
10'-0" MAXIMUM SPACING
3 STRANDS BARBED WIRE
1.625"Ø CONTINUOUS
TENSION ROD
TURNBUCKLE
TENSION WIRE #7
TIE CHAIN LINK TO POSTS @ 14"
BARBED WIRE MOUNTED
ON 45-DEGREE SINGLE
EXTENSION ARM.
1.625"Ø BRACE, TYP.
2.875"Ø SCH. 40 PIPE
ASTM A824, TYP.
M
IN
3' -0
12"9" 2"
4" C-C, TYP.
4"
12" MOWSTRIP
NOTE:
1. d = THICKNESS OF PAVEMENT
2. CLEAN JOINT OPENING PRIOR
TO SEALING.
PER 32 13 73 JOINT SEALANT
BACKER ROD MATERIAL
(DIA. = W + 18 INCH)
W TO 1.5 W
d/3
W SURFACE
PAVEMENT
VOID SPACE
6" FLEX BASE PER TXDOT ITEM
247, TYPE A, GRADES 1 OR 2
PROPOSED 8" DRIVEWAY WITH #4
BARS @ 18" O.C.B.W.
12"
SCARIFY SUBGRADE A MINIMUM OF 6 INCHES AND
UNIFORMLY COMPACT TO A MINIMUM OF 95% STANDARD
PROCTOR DENSITY (ASTM D698).
12"
4,500 PSI P2 CONCRETE
PER SECTION 03 00 00.
NOTE:
1. MATCH PROPOSED CONSTRUCTION JOINTS TO
EXISTING CONSTRUCTION JOINTS. PROVIDE JOINT
SEALANT PER DETAIL 3/C40.
2. DOWEL AND EPOXY INTO EXISTING PAVEMENT WITH
MINIMUM #4 BARS 18" IN LENGTH AT 18" ON CENTER.
K:
\F
TW
_U til iti es \0
-W ac o O ld M cG re go r P um p
St at io n
Im pr ov em en ts
\C
AD
D \S
H
EE
TS
\M
IS
C
EL
LA
N
EO
U S
D
ET
AI
LS
.d w g
LO
T D
AT
E:
/2
0/
:5
PM
by O
N
TI
VE
R
O S, M
AT
TH
EW
2023-213
SHEET NO.
CHECKED:
DESIGN:
DRAWN:
CJM
MCF
AWS
PROJECT NO:
ISSUE DATE:
AUGUST 2025 S
H E
E T
S
IZ
E : 2
2X
NO. REVISION DATE
CONSULTANT:
WATER UTILITY SERVICES
OLD MCGREGOR GROUND STORAGE TANK IMPROVEMENTS
GENERAL NOTES
LEGEND
KEY NOTES
TBPE No. 928 F: 817-335-5070 801 Cherry St., Suite 1300 Ft. Worth, TX 76102 P: 817-335-6511
DETAIL1
SCALE: NOT TO SCALE
TANK MOWSTRIP
C32
DETAIL4
SCALE: NOT TO SCALE
CHAIN LINK FENCE
C32
SECTION3
SCALE: NOT TO SCALE
PROPOSED CONCRETE PAVEMENT REPLACEMENT
C32DETAIL2
SCALE: NOT TO SCALE
JOINT SEALANT
C32
C32
CONSTRUCTION DETAILS VI
DETAILS
PAVEMENT / SURFACE REPLACEMENT DETAILS
1 SEE FOR CONCRETE OR FOR CONTROLLED LOW STRENGTH MATERIAL AND APPLICABLE AND/OR
FOR SAW CUT AND PAVEMENT REPLACEMENT DETAILS.
2 SEE AND APPLICABLE AND/OR FOR SAW CUT AND PAVEMENT REPLACEMENT DETAILS.
3 TYPE “A” MATERIAL PER STANDARD SPECIFICATIONS FOR CONSTRUCTION, SECTION 4.2 EXCAVATION AND BACKFILL, PART 2: PRODUCT, A. MATERIALS, 3. TRENCH BACKFILL, A. TYPE “A.” MATERIAL MECHANICALLY COMPACTED TO 95% OF
THE MAXIMUM DRY DENSITY (TEX-113-E) OR CONTROLLED LOW STRENGTH MATERIAL.
4 USE CONTROLLED LOW STRENGTH MATERIAL TO BACKFILL ALL TRENCHES 22 IN. OR NARROWER, IN THE RIGHT-OF-WAY
AND PUBLIC EASEMENTS.
5 EDGE TO BE STRAIGHT, SQUARE AND PARALLEL TO SIDES OF TRENCH.
6 6 IN. MIN. TOPSOIL AND SEED OR SOD - SUBSIDIARY.
7 TXDOT ITEM 247 FLEXIBLE BASE TYPE A GRADE 1-2 MINIMUM PLASTICITY INDEX 5.
8 SEE FOR BACKFILL MATERIAL REQUIREMENTS AND FOR INSTALLATION.
3 4 8
VA
R
IE
S
IN
IN
CLASS F
SEED OR SOD
CLASS C
HMAC
LOCAL STREETS
CLASS D
CONCRETE
CLASS E
FOR EXISTING NON-BONDED
AGGREGATE SURFACES ONLY
4 7
12 IN. 12 IN.
CLASS B
HMAC
RESIDENTIAL COLLECTOR &
COMMERCIAL COLLECTOR STREETS
G-9
CLASS A
HMAC
INDUSTRIAL COLLECTOR &
ARTERIAL STREETS
G-10
ST-30 ST-33 ST-34
ST-37 ST-35 ST-36
DISCLAIMER: THE USE OF THIS STANDARD IS GOVERNED BY THE "TEXAS
ENGINEERING PRACTICE ACT". NO WARRANTY OF ANY KIND IS MADE BY
THE CITY OF WACO FOR ANY PURPOSE WHATSOEVER. THE CITY OF WACO
ASSUMES NO RESPONSIBILITY FOR THE CONVERSION OF THIS STANDARD
TO OTHER FORMATS OR FOR INCORRECT RESULTS OR DAMAGES
RESULTING FROM ITS USE.
NO.
REVISIONS
COMMENTS BY DATE
## DESCRIPTION FL MM/DD/YYYY
DATE
01/01/2024
ST-31
1 MODIFY NOTE 1 MZ 04/19/2024
2 NOTE 4: CHANGE WIDTH OF TRENCH FROM 18" MZ 11/15/2024
DETAIL5
SCALE: NOT TO SCALE
PAVEMENT SURFACE REPLACEMENT
C32
(NO SCALE)
WIDTH VARIES
CLASS A, B & C (ASPHALTIC) PAVEMENT REPLACEMENT,
TRENCH BACKFILL, & EMBEDMENT
12 IN.
12 IN. OR GREATER
NOTES:
1 SEE , , , AND FOR MATERIAL REQUIREMENTS AND INSTALLATION.
2 CONCRETE - MINIMUM 2,000 PSI.
CLASS A INDUSTRIAL COLLECTOR & ARTERIAL = 12 IN.
CLASS B RESIDENTIAL COLLECTOR & COMMERCIAL COLLECTOR = 10 IN.
CLASS C LOCAL STREET = 8 IN.
3 SAW CUT EDGE OF EXISTING PAVEMENT ON ALL SIDES OF TRENCH TO PRODUCE A SMOOTH AND EVEN EDGE FOR SURFACE REPLACEMENT. EXISTING PAVEMENT SHOULD BE REMOVED TO CLEAN, STRAIGHT LINES PARALLEL AND PERPENDICULAR TO THE FLOW OF TRAFFIC. DO NOT CONSTRUCT PATCHES WITH
ANGLED SIDES AND IRREGULAR SHAPES.
4 SEE AND/OR FOR LIMITS OF THIS SAW CUTTING.
5 BONDING COURSE OF AE-P OR PRE-APPROVED EQUAL SHALL BE APPLIED TO SWEPT SURFACE AND
ALLOWED TO BREAK.
6 CLASS A INDUSTRIAL COLLECTOR & ARTERIAL: HMAC (TYPE D) - MATCH EXISTING SURFACE THICKNESS
WITH 3 IN. MINIMUM (GREATER THAN 3 IN. REQUIRES MORE THAN 1 LIFT).
CLASS B RESIDENTIAL COLLECTOR & COMMERCIAL COLLECTOR: HMAC (TYPE D) - MATCH EXISTING
SURFACE THICKNESS WITH 2 IN. MINIMUM.
CLASS C LOCAL STREET: HMAC (TYPE D) - MATCH EXISTING SURFACE THICKNESS WITH 2 IN. MINIMUM.
7 IF BASE REPLACEMENT IS WITHIN 3 FT. OF PAVEMENT EDGE OR APPURTENANCE (CURB AND GUTTER, VALLEY GUTTER, ETC.), LIMITS OF CONCRETE AND SURFACE SHALL EXTEND TO PAVEMENT EDGE OR
APPURTENANCE.
5 6
SAW CUT 3 4
LIMITS OF PAYMENT
FOUNDATION COURSE
(SEE CITY OF WACO DETAIL )
ST-30
SAW CUT 3
G-7 G-8 G-9 G-10
ST-33 ST-34
G-8
DISCLAIMER: THE USE OF THIS STANDARD IS GOVERNED BY THE "TEXAS
ENGINEERING PRACTICE ACT". NO WARRANTY OF ANY KIND IS MADE BY
THE CITY OF WACO FOR ANY PURPOSE WHATSOEVER. THE CITY OF WACO
ASSUMES NO RESPONSIBILITY FOR THE CONVERSION OF THIS STANDARD
TO OTHER FORMATS OR FOR INCORRECT RESULTS OR DAMAGES
RESULTING FROM ITS USE.
NO.
REVISIONS
COMMENTS BY DATE
## DESCRIPTION FL MM/DD/YYYY
DATE
01/01/2024
(NO SCALE)
ST-34
UTILITY STREET CUT
2 FT.
2 FT.
6 IN.
ASPHALT STREET CUT REPAIR REQUIREMENTS
FOR STREETS NOT IMPROVED FOR THE PRIOR FIVE YEARS
6 IN.
6 IN.
< 14 FT.
< 2 FT.
≥12 FT.
≥12 FT
NOTES:
1. FOR STREETS NOT IMPROVED FOR THE PRIOR FIVE YEARS TYPICAL
RESTORATION LIMITS FOR ASPHALT PAVEMENT TO REPAIR CUTS ARE
SHOWN.
2. WORK SHALL BE DONE IN ACCORDANCE WITH STANDARD SPECIFICATIONS
FOR CONSTRUCTION SECTION 4.3: STREET CUT EXCAVATION AND REPAIR
STANDARDS.
3. OFFSET OF PAVEMENT REPAIR SHALL BE A MINIMUM OF 2 FT. FROM EDGE
OF UTILITY STREET CUT AND
·6 IN. FROM LONGITUDINAL PAVEMENT MARKINGS AND TO LIP OF
GUTTER/EDGE OF ASPHALTIC PAVEMENT IF IN OUTSIDE LANE
INCLUDING BIKE LANES AND SHOULDERS.
OR
·ON STREETS WITHOUT PAVEMENT MARKINGS TO NEAREST NOMINAL
LANE LINE/JOINT AND TO LIP OF GUTTER/EDGE OF ASPHALTIC
PAVEMENT IF IN OUTSIDE LANE INCLUDING BIKE LANES AND
SHOULDERS.
4. IF LONGITUDINAL DISTANCE BETWEEN REQUIRED REPAIRS IS LESS THAN
12 FT. THEN REPAIRS SHALL BE COMBINED.
CITY STANDARD RESTORATION REQUIREMENTS FOR
ASPHALT PAVEMENT. SEE STANDARD DETAILS , , ,
, , AND
G-7 G-8 G-9
G-10 ST-1 ST-30 ST-31
DISCLAIMER: THE USE OF THIS STANDARD IS GOVERNED BY THE "TEXAS
ENGINEERING PRACTICE ACT". NO WARRANTY OF ANY KIND IS MADE BY
THE CITY OF WACO FOR ANY PURPOSE WHATSOEVER. THE CITY OF WACO
ASSUMES NO RESPONSIBILITY FOR THE CONVERSION OF THIS STANDARD
TO OTHER FORMATS OR FOR INCORRECT RESULTS OR DAMAGES
RESULTING FROM ITS USE.
NO.
REVISIONS
COMMENTS BY DATE
## DESCRIPTION FL MM/DD/YYYY
DATE
01/01/2024
DETAIL6
SCALE: NOT TO SCALE
CLASS A, B, & C PAVEMENT REPAIR
C32
DETAIL7
SCALE: NOT TO SCALE
ASPHALT STREET CUT REPAIR
C32
1 ADDENDUM 2 11/20/25
Questions RFB 2025-075 Old McGregor GST Improvements
1. Can the new proposed tank be Steel? No
2. Can the proposed Concrete 5,000,000G Tank have an alternate bid for Steel 5,000,000G Tank? No
3. Will the GC bidding be Tank Contractors? Any company can be the bidding General Contractor if their company and sub-contractor team meet the requirements of the pre-qualification application.
4. Both Preload and DN are named in the specifications for the prestressed concrete ground storage tank. I thought it was mentioned that since we are named in the specs we don’t have to submit the prequalification package to provide a price in December. Is this true or do the tank builders still need to submit qualifications for the November due date? All general contractors must submit the pre-qualification package in full. If DN Tanks and Preload want to submit as a general contractor, all project experience and project manager/superintendent information requested must still be provided. If a general contractor wants to use pre-approved DN Tanks or Preload as a "major" sub-contractor for the concrete ground storage tank installation work, then they need to specify they are using one of these companies and then will not need to provide the tank experience or project manager/superintendent resumes for that company only. All other large piping experience requirements and requirements for the other "major" sub-contractors will still need to be provided in full.
5. PLEASE, CORRECT BID ITEM NUMBERING. (SEQUENCE IS OFF AT ITEMS 21-
22 AND SO ON. Bid Item sequencing has been updated.
6. Please furnish details for the new proposed Concrete Surface Replacement. Also, please verify if the concrete can be hand poured since it is such a small quantity. Details for Concrete Surface Replacement can be found on C32 details 2 and 3. The concrete may be hand poured, but will still be subject to submittal approval and material testing in the field.
The above answered questions were released with Addendum No. 1 on 10/24/25.
7. Bid Quantity's differ between the original bid quantity sheet of 990 LF, and the addendum quantity of 327 LF. When I measure off of the plans it seems like the first one of 990 LF is correct, but I just want to make sure. Can you please clarify?
Bid Item #16 is for 327 LF of removal of existing fence.
Bid Item #25 is for 990 LF of installation of new fence.
8. The Bid Quantity also states 8' chain link , but the detail shows 6' chain link. Please clarify what is to be used.
The chain link fence should be 8’. A revised detail is provided on Sheet C32.
9. The bis sheet states the chain link fence as 8' tall, as well as the fencing plan. The detail sheet shows the chain link fence at 6' tall. Do you know which is correct? Also, it is unclear as to if the chain link fence is galvanized or vinyl coated. Please confirm which.
The chain link fence should be 8’. A revised detail is provided on Sheet C32. Provide galvanized chain link fence.
10. To maintain a competitive bid environment, we are hereby requesting AWWA C200 Steel Pipe be allowed for Bid Items 29,30,31,32,35,36,67,69,73,77,78,81,82,86,89, & 90 vs the C303 Pipe. All connecting to existing and capping off of existing can still be accomplished very easily. Owners currently using C200 Steel Pipe are numerous but to mention a few NTMWD-TRA-UTRA-UTRWD-City of Dallas/Fort Worth. Pipe size ranges from 16" thru 108" in dia. Project listing can be provided upon request.
In addition to the request above, please add Mid America Pipe & Fabrications to you list of Manufactures. Mid America has been furnishing C200 Steel Pipe in Texas since 1965.
https://midamericapipe.com/spiral-pipe/
THANK YOU AGAIN, YOUR CONSIDERATIONS ARE GREATLY APPRECIATED
AWWA C200 Steel Pipe, for the bid items specified in the question, is not allowed.
11. Can we please request that the bid form be shortened to a lump sum or just a few lump sum bid items? Pump station Projects such as this are extremely difficult to bid with 100 bid items. This bid form is more suited to cross country pipeline projects where quantity's are much higher and costs are consistent. All of the items requested in this current bid form would be provided by the awarded contractor's schedule of values as well.
The bid form has been shortened to twenty-two (22) bid items. A summary bid form has been provided for the bidders’ use with the twenty-two (22) bid items.
The summary bid form bid items refer to a detailed bid form. The detailed bid form provides greater detail on the scope items to include in the summary bid form individual bid items. A revised detailed bid form has been provided for the bidders’ reference.
The bidder is only required to complete the summary bid form. The detailed bid form should be the basis for the schedule of values, to be provided at a later date.
12. Please confirm that there are no domestic material requirements associated with this project (AIS, BABAA, etc.).
Domestic materials are not required.
13. Section 33 16 33, Page 7, Article 2.2.C.2.c.1.a: Please clarify if the tank floor is to have an eccentric slope from the 656.00 elevation down toward the drain pipe (northeast).
Yes, the tank floor is to have an eccentric slope towards the drain pipe.
14. Section 33 16 13, Page 7, Article 2.2.C.1.e.4: This overflow design capacity will require a 36-inch diameter overflow pipe while the drawings show a 24-inch diameter overflow pipe. Please confirm the overflow sizing shall be per tank mfg. based on overflow rate listed in specifications.
The maximum fill rate has been decreased to 26.62 MGD.
The overflow design capacity has been decreased to 26.62 MGD.
See revised Specification 33 16 33.
Please refer to Specification 33 16 33 and Detail 2/C11 for overflow design.
15. Section 33 16 33, Page 10, Article 2.2.D.7.e: Please confirm that a decorative coating system is required for the tank wall exterior consisting of two (2) coats of non-cementious, high build 100% acrylic resin polymer such as “Tammscoat Smooth Coating Smooth” or approved equal.
Yes, this is required.
16. Section 33 16 33, Page 10, Article 2.2.E.1.b.3.a: Please clarify the number of roof hatches required for the tank as only one is shown on Detail 1 of Drawing Sheet C10.
Only one roof hatch is required. See revised Specification 33 16 33.
17. Sheet C1: Please provide the voltage of the existing overhead power lines bordering the site.
Oncor has indicated that the overhead primary conductor is 12.5 KV.
18. Sheet C12: Please provide the floor sump dimensions for the 48-inch diameter outlet pipe.
For the 30-inch outlet pipe provide 54-inch diameter, 6-inch deep sump.
For the 48-inch outlet pipe provide 72-inch diameter, 6-inch deep sump.
See revised sheet C12.
19. Sheet C12: The tank manufacturer cannot design the anti-vortex plate to ensure anti-vortex flows are achieved. Please confirm the anti-vortex plate may be designed and sized in accordance with NFPA 22 guidelines or provide details for each anti-vortex plate at the outlet pipe locations.
Yes, the anti-vortex plate may be designed in accordance with NFPA 22 guidelines.
20. Is an opinion of probable cost or estimated budget available for this project?
Base bid $12.5M. Base bid plus alternates $13.5M.
21. The Geotechnical Engineering Study conducted by CMJ Engineering (Report No. 103-
23-470-1) includes foundation recommendations written largely in the context of steel ground storage tanks. Does the geotechnical report’s tank foundation section (Section 4.4) apply specifically to the proposed prestressed concrete tank (PCT)? Prestressed concrete tanks use a membrane floor system that behaves differently from a steel tank bottom. If the report was written using steel GST design assumptions, please provide clarification on the following:
The correct subgrade preparation requirements for a PCT membrane floor Whether the crushed rock/flexible base recommendations are still required or should be modified for a PCT Whether the stated bearing capacity (8 ksf on tan limestone or 6 ksf on flexible base) remains valid for a PCT Any additional considerations for differential movement, edge support, or interior slab behavior specific to PCTs
The crushed rock/flexible base recommendation is required. A sand cushion is okay.
The stated bearing capacity (8 ksf on tan limestone or 6 ksf on flexible base) is valid.
22. Section 331613 2.2E.1.a.1 states "All interior piping and supports shall be 316 Stainless
Steel. Piping shall not be integrally cast into the wall panel". Our standard utilizes a concrete encasement around the overflow piping and weir. Can this requirement be waived?
This requirement will not be waived.
23. Please confirm a logo is NOT required on the tank exterior (to match the logo on the existing tank). There does not appear to be any reference to a logo in the bid documents.
A logo is not required.
24. Are there any AIS, BABA, or Buy American provisions on this project?
No.
25. Please confirm the tank manufacturer may adjust the lower wall manway elevation and the overflow wall penetration elevations to obtain the most cost effective and efficient design. Please note that varying wall penetration elevations create multiple unbanded areas and we try to localize these penetration elevations if possible.
This can’t be confirmed without additional information. For bidding purposes assume that the penetration elevations cannot be changed.
26. Please confirm the 30” Outlet/Balance Line requires a baffle device (same as the 48” Outlet).
The 30” Outlet/Balance Line also requires a baffle device.
27. Please provide the voltage of the powerlines on the East side of the tank site.
Oncor has indicated that the overhead primary conductor is 12.5 KV.