ESBD_433095_1751482966644_SOL_EXH_F.15_405-25R0014809_Resilience Base and Accessories.pdf

PDF 391 KB Posted

Attached to
Sierra Blanca New office space remodel
Solicitation number
405-25R0014809
Issued by
Hidalgo County, Texas

About this file

This document is a technical specification section (Section 09 65 13) for Resilient Base and Accessories prepared by the Texas Department of Public Safety (TXDPS) Facilities Bureau, dated June 01, 2016. The specification provides detailed requirements for installing thermoset-rubber base in TXDPS facilities, including performance standards, material specifications, and installation guidelines. The document outlines precise technical requirements for a 4-inch high, 0.125-inch thick resilient base in Roppe Brown color, to be installed on walls, columns, pilasters, casework, and other permanent fixtures.

The specification emphasizes low-emitting materials compliance with California Department of Public Health standards and requires water-resistant adhesives with VOC content of 50 g/L or less. Installation instructions include specific temperature and substrate preparation requirements, such as maintaining ambient temperatures between 70-95 degrees F during installation and ensuring substrates are clean, level, and free of imperfections. The document provides comprehensive guidance on corner formations, adhesion techniques, and post-installation protection, indicating a meticulous approach to ensuring quality and durability of the resilient base installation.

View the file

Other files

File Type Posted
ESBD_433095_1751482954684_SOL_EXH_F.4_405-25R0014809_Direct Deposit Authorization.pdf PDF
ESBD_433095_1751482945934_SOL_EXH_F.13_405-25R0014809_Non Structural Metal Framing.pdf PDF
ESBD_433095_1751482957635_SOL_EXH_F.6_405-25R0014809_Statement of Work.pdf PDF
ESBD_433095_1751482950313_SOL_EXH_F.10_405-25R0014809_Hollow Metal Doors.pdf PDF
ESBD_433095_1751482948877_SOL_EXH_F.21_405-25R0014809_Summary and Scope of Work.pdf PDF
ESBD_433095_1751482968097_SOL_EXH_F.19_405-25R0014809_Exterior Painting.pdf PDF
ESBD_433095_1751482962313_SOL_EXH_F.17_405-25R0014809_Resilient Athletic resurfacing.pdf PDF
ESBD_433095_1751482973840_SOL_EXH_F.7_405-25R0014809_Wage Determination.pdf PDF
ESBD_433095_1751482956132_SOL_EXH_F.11_405-25R0014809_Flush Wood Doors.pdf PDF
ESBD_433095_1751482947379_SOL_EXH_F.16_405-25R0014809_Resilient luxury vinyl tile flooring.pdf PDF
ESBD_433095_1751482951761_SOL_EXH_F.8_405-25R0014809_Cleaning and Waste management.pdf PDF
ESBD_433095_1751482959126_SOL_PST_IFB INVITATION TO BID.pdf PDF
ESBD_433095_1751482970978_SOL_EXH_F.9_405-25R0014809_Selective Demolition.pdf PDF
ESBD_433095_1751482942923_SOL_EXH_F.2_405-25R0014809_Information and Certifications Form.pdf PDF
ESBD_433095_1751482944469_SOL_EXH_F.14_405-25R0014809_Gypsum Board.pdf PDF
ESBD_433095_1751482960572_SOL_EXH_F.12_405-25R0014809_Door Hardware.pdf PDF
ESBD_433095_1751482965204_SOL_EXH_F.5_405-25R0014809_Request for Taxpayer Identification Number and Certification.pdf PDF
ESBD_433095_1751482972423_SOL_EXH_F.20_405-25R0014809_Aluminum Mini Blind System.pdf PDF
ESBD_433095_1751482963730_SOL_EXH_F.18_405-25R0014809_Interior Painting.pdf PDF
ESBD_433095_1751482969533_SOL_EXH_F.1_405-25R0014809_DPS Standard Terms and Conditions.pdf PDF
ESBD_433095_1751482953281_SOL_EXH_F.3_405-25R0014809_Application for Texas Identification Number.pdf PDF
Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

JUNE 01, 2016 TXDPS Facilities Bureau

Spec Rev. 06-2016

1 00 00 00 Page

SECTION 09 65 13 - Resilient Base and Accessories

PART 1 – GENERAL

1.01 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions apply to this Section.

1.02 SUMMARY

A. Section Includes:

1. Resilient base.

2. Resilient molding accessories.

1.03 SUBMITTALS

A. Product Data: For each type of product.

B. Samples: For each exposed product and for each color and texture specified, not less than 12 inches long.

1.04 MAINTENANCE MATERIAL SUBMITTALS

A. Furnish extra materials that match products installed and that are packaged with protective covering for storage and identified with labels describing contents.

1. Furnish not less than 10 linear feet for every 500 linear feet or fraction thereof, of each type, color, pattern, and size of resilient product installed.

1.05 DELIVERY, STORAGE, AND HANDLING

A. Store resilient products and installation materials in dry spaces protected from the weather, with ambient temperatures maintained within range recommended by manufacturer, but not less than 50 degrees F or more than 90 degrees F.

1.06 FIELD CONDITIONS

A. Maintain ambient temperatures within range recommended by manufacturer, but not less than 70 degrees F or more than 95 degrees F, in spaces to receive resilient products during the following time periods:

1. 48 hours before installation.

2. During installation.

3. 48 hours after installation.

B. After installation and until Substantial Completion, maintain ambient temperatures within range recommended by manufacturer, but not less than 55 degrees F or more than 95 degrees F.

C. Install resilient products after other finishing operations, including painting, have been completed.

PART 2 – PRODUCTS

2.01 PERFORMANCE REQUIREMENTS

2 00 00 00 Page

A. Low-Emitting Materials: Flooring system shall comply with the testing and product requirements of the California Department of Public Health's "Standard Method for the Testing and Evaluation of Volatile Organic Chemical Emissions from Indoor Sources Using Environmental Chambers."

2.02 THERMOSET-RUBBER BASE RB-1

A. Product Standard: ASTM F 1861, Type TS (rubber, vulcanized thermoset), Group I (solid, homogeneous).

1. Style and Location:

a. Style B, Cove.

b. Thickness: 0.125 inch.

c. Height: 4” High unless otherwise noted.

d. Lengths: Coils in manufacturer's standard length.

e. Outside Corners: Job formed

f. Inside Corners: Job formed

g. Color: Roppe Brown, #110

2.03 INSTALLATION MATERIALS

A. Trowelable Leveling and Patching Compounds: Latex-modified, Portland cement based or blended hydraulic-cement-based formulation provided or approved by resilient-product manufacturer for applications indicated.

B. Adhesives: Water-resistant type recommended by resilient-product manufacturer for resilient products and substrate conditions indicated.

1. Adhesives shall have a VOC content of 50 g/L or less.

PART 3 – EXECUTION

3.01 EXAMINATION

A. Examine substrates, with Installer resent, for compliance with requirements for maximum moisture content and other conditions affecting performance of the Work.

1. Verify that finishes of substrates comply with tolerances and other requirements specified in other Sections and that substrates are free of cracks, ridges, depressions, scale, and foreign deposits that might interfere with adhesion of resilient products.

B. Proceed with installation only after unsatisfactory conditions have been corrected.

1. Installation of resilient products indicates acceptance of surfaces and conditions.

3.02 PREPARATION

A. Prepare substrates according to manufacturer's written instructions to ensure adhesion of resilient products.

C. Fill cracks, holes, and depressions in substrates with trowel-able leveling and patching compound;

remove bumps and ridges to produce a uniform and smooth substrate.

D. Do not install resilient products until they are the same temperature as the space where they are to be installed.

1. At least 48 hours in advance of installation, move resilient products and installation materials into spaces where they will be installed.

3 00 00 00 Page

E. Immediately before installation, sweep and vacuum clean substrates to be covered by resilient products.

3.03 RESILIENT BASE INSTALLATION

A. Comply with manufacturer's written instructions for installing resilient base.

B. Apply resilient base to walls, columns, pilasters, casework and cabinets in toe spaces, and other permanent fixtures in rooms and areas where base is required.

C. Install resilient base in lengths as long as practical without gaps at seams and with tops of adjacent pieces aligned.

D. Adhere the resilient base tightly to the substrate throughout length of each piece, with base in continuous contact with horizontal and vertical substrates.

E. Do not stretch resilient base during installation.

F. On masonry surfaces or other similar irregular substrates, fill voids along top edge of resilient base with manufacturer's recommended adhesive filler material.

G. Preformed Corners: Install preformed corners before installing straight pieces.

H. Job-Formed Corners:

1. Outside Corners: Use straight pieces of maximum lengths possible and form with returns not less than 24 inches in length.

a. Form without producing discoloration (whitening) at bends.

2. Inside Corners: Use straight pieces of maximum lengths possible and form with returns not less than 24 inches in length.

a. Miter corners to minimize open joints.

3.04 CLEANING AND PROTECTION

A. Comply with manufacturer's written instructions for cleaning and protecting resilient products.

B. Perform the following operations immediately after completing resilient-product installation:

1. Remove adhesive and other blemishes from exposed surfaces.

C. Protect resilient products from mars, marks, indentations, and other damage from construction operations and placement of equipment and fixtures during remainder of construction period.

D. Cover resilient products subject to wear and foot traffic until Substantial Completion.

END OF SECTION

4 00 00 00 Page

File details come from the government source that posted it. Updated .