ESBD_384442_1735660020728_G.5 Proposal Cost Breakdown.pdf
PDF 900 KB Posted
- Attached to
- Stephenville Roof Replacement
- Solicitation number
- TMD25-CFMO-0038145
- Issued by
- Ellis County, Texline Town, Texas
About this file
This is a proposal cost breakdown form issued by the Texas Military Department for the Stephenville RC Roof Replacement project. The base proposal section includes line items for demolition, metal flashing, TPO 60 mil roof membrane (fully-adhered), 1/2" coverboard applied with adhesive, 3" polyiso insulation, and flexible flashing. The form includes additional sections for mobilization, general conditions, overhead and profit, and bonds and insurance costs.
The proposal options section outlines six additional components: PO#1 for masonry control joint caulk replacement, PO#2 for gutter and downspout replacement, PO#3 for downspout rework at the northeast building corner, PO#4 for new fixed roof ladders, PO#5 for upgrading wood blocking components to kiln-dried pressure treated lumber, and PO#6 for masonry seal coating. Each proposal option includes separate line items for direct costs, general conditions, and bonds and insurance, with spaces to calculate subtotals and final totals. The form is structured to allow for detailed cost itemization but contains no pre-filled pricing information.
View the file
Other files
Show all 27
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CSI # Item Units Unit Cost Total
Base:
2B Demolition
5A Metal - Flashing
7A Roofing - TPO 60 mil Roof Membrane Fully-Adhered
7B Roofing - 1/2" Coverboard Applied with Adhesive
7C Roofing - 3" Polyiso Insulation
7D Flexible Flashing
OH & P
BONDS & INSURANCE:
Proposal Cost Breakdown
Stephenville RC Roof Replacement
GENERAL CONDITIONS:
MOBILIZATION::
DIRECT COST OF WORK SUBTOTAL:
BASE PROPOSAL
Texas Military Department
COST OF WORK SUBTOTAL:
Base Proposal Total:
Page: 1 of 2
Attachment G.5 Proposal Cost Breakdown
Proposal Cost Breakdown
Stephenville RC Roof Replacement
BASE PROPOSAL
Texas Military Department
CSI # Item Units Unit Cost Total
PO #1:
CSI #4 Massonry - Replace caulk at masonry control joints and exterior wall openings
PO #2:
CSI #5C Metal - Replace gutters downspouts and associated components.
PO #3:
CSI #5D Metal - Re-work downspout at northeast corner of building
PO #4:
CSI #5E Metal - New fixed roof ladders
PO #5:
CSI #6 Carpentry - Upgrade wood blocking components to kiln-dried pressure treated lumber
PO #6:
CSI #7E Seal coat masonry
Proposal Option 6 TOTAL:
DIRECT COST OF WORK SUBTOTAL:
PROPOSAL OPTIONS TOTAL:
Proposal Option 5 TOTAL:
COST OF WORK SUBTOTAL:
BONDS & INSURANCE:
GENERAL CONDITIONS:
Proposal Option 5 TOTAL:
COST OF WORK SUBTOTAL:
Proposal Option 2 TOTAL:
BONDS & INSURANCE:
Proposal Option 1 TOTAL:
DIRECT COST OF WORK SUBTOTAL:
GENERAL CONDITIONS:
COST OF WORK SUBTOTAL:
BONDS & INSURANCE:
PROPOSAL OPTIONS
GENERAL CONDITIONS:
DIRECT COST OF WORK SUBTOTAL:
Proposal Option #1:
COST OF WORK SUBTOTAL:
BONDS & INSURANCE:
GENERAL CONDITIONS:
DIRECT COST OF WORK SUBTOTAL:
GENERAL CONDITIONS:
COST OF WORK SUBTOTAL:
BONDS & INSURANCE:
Proposal Option 3 TOTAL:
DIRECT COST OF WORK SUBTOTAL:
DIRECT COST OF WORK SUBTOTAL:
GENERAL CONDITIONS:
COST OF WORK SUBTOTAL:
BONDS & INSURANCE:
Page: 2 of 2
Attachment G.5 Proposal Cost Breakdown
File details come from the government source that posted it. Updated .