ESBD_384442_1735659977712_G.4 Pricing Schedule.pdf
PDF 284 KB Posted
- Attached to
- Stephenville Roof Replacement
- Solicitation number
- TMD25-CFMO-0038145
- Issued by
- Ellis County, Texline Town, Texas
About this file
This is a pricing schedule (Attachment G.4) for a Texas Military Department (TMD) construction project involving roofing, gutters, and downspouts maintenance and repair services. The scope includes a base requirement for full replacement of roof damage, flashing damage, window and door openings/frames, and unforeseen damages resulting from hail/windstorm damage. There are six additional proposal options: replacing caulk at masonry control joints, replacing gutters and downspouts, reworking downspouts at the northeast corner, installing new fixed roof ladders, upgrading wood blocking components, and seal coating masonry. Each item is listed as one job unit.
The pricing terms require bidders to complete a cost breakdown proposal and transfer total amounts to the schedule. Award will be based on the most responsive, responsible bidder with the lowest price considering both base bid and all options, in accordance with Texas Government Code § 2155.074. TMD reserves the right to award all, none, or any sequence of bid alternates based on funding availability. Bidders must specify project completion timeline in days from purchase order receipt and list any pricing assumptions in the provided table.
View the file
Other files
Show all 27
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment G.4
Class and Item: 910-66 Roofing, Gutters, and Downspouts Maintenance and Repair Services, 909-22 Building Construction, Non-Residential, Office Bldg., etc., 925-44 General Construction: Management, Scheduling, Cost Estimation Engineering
Description QTY Unit of Measure
Price
Base Full replacement of all roof damage, flashing damage, any window and door openings and frames, unforeseen damages as a direct result of the hail/windstorm
1 JOB $
Proposal Option #1 Masonry – Replace caulk at masonry control joints and exterior wall openings
1 JOB $
Proposal Option #2 Metal – Replace gutters downspouts and associated components
1 JOB $
Proposal Option #3 Metal – Re-work downspouts at northeast corner of building
1 JOB $
Proposal Option #4 Metal – New Fixed roof ladders
1 JOB $
Proposal Option #5 Carpentry – Upgrade wood blocking components to kiln-dried pressure treated lumber
1 JOB $
Proposal Option #6 Seal Coat masonry
1 JOB $
Contractor estimates that the project will be completed within ______ days from the receipt of purchase order.
*Contractor must complete the cost breakdown proposal and transfer the total amount to this sheet.
* Award will be based on the most responsive, responsible Bidder and lowest price based on base bid and all options. TMD will award based on best value for the state as directed by Texas Government Code § 2155.074 when awarding a Contract. Award is contingent upon the availability of State and/or Federal funding. TMD reserves the right to award all, none or any sequence of bid alternates contingent upon the availability of funds.
Table 2: Pricing Assumptions PRICING ASSUMPTIONS: Bidder shall provide any pricing amount assumptions for each Deliverable in reference to amounts and/or pricing conditions by outlining them (if any) in Table 2: Pricing Assumptions. Bidder may add additional rows as needed.
# Assumption
File details come from the government source that posted it. Updated .