ESBD_384442_1735660020728_G.5 Proposal Cost Breakdown.pdf
PDF 900 KB Posted
- Attached to
- Stephenville Roof Replacement
- Solicitation number
- TMD25-CFMO-0038145
- Issued by
- Ellis County, Texline Town, Texas
About this file
This is a proposal cost breakdown form for a roof replacement project at Stephenville RC for the Texas Military Department. The base proposal scope includes demolition, metal flashing, TPO 60 mil fully-adhered roof membrane, 1/2" coverboard applied with adhesive, 3" polyiso insulation, and flexible flashing. The form also includes six proposal options: PO #1 for masonry caulk replacement at control joints and exterior wall openings, PO #2 for gutter and downspout replacement, PO #3 for downspout rework at the building's northeast corner, PO #4 for new fixed roof ladders, PO #5 for upgrading wood blocking components to kiln-dried pressure treated lumber, and PO #6 for masonry seal coating.
The form is structured to capture unit costs and totals for each line item, with subtotals for direct costs of work, general conditions, mobilization, overhead and profit, and bonds and insurance for both the base proposal and each proposal option. The document appears to be a blank form template ready for contractor completion, with no actual costs filled in. Each section includes space for calculating direct cost subtotals, general conditions, cost of work subtotals, and bonds and insurance before arriving at total costs for both the base proposal and each optional component.
View the file
Other files
Show all 27
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CSI # Item Units Unit Cost Total
Base:
2B Demolition
5A Metal - Flashing
7A Roofing - TPO 60 mil Roof Membrane Fully-Adhered
7B Roofing - 1/2" Coverboard Applied with Adhesive
7C Roofing - 3" Polyiso Insulation
7D Flexible Flashing
OH & P
BONDS & INSURANCE:
Proposal Cost Breakdown
Stephenville RC Roof Replacement
GENERAL CONDITIONS:
MOBILIZATION::
DIRECT COST OF WORK SUBTOTAL:
BASE PROPOSAL
Texas Military Department
COST OF WORK SUBTOTAL:
Base Proposal Total:
Page: 1 of 2
Attachment G.5 Proposal Cost Breakdown
Proposal Cost Breakdown
Stephenville RC Roof Replacement
BASE PROPOSAL
Texas Military Department
CSI # Item Units Unit Cost Total
PO #1:
CSI #4 Massonry - Replace caulk at masonry control joints and exterior wall openings
PO #2:
CSI #5C Metal - Replace gutters downspouts and associated components.
PO #3:
CSI #5D Metal - Re-work downspout at northeast corner of building
PO #4:
CSI #5E Metal - New fixed roof ladders
PO #5:
CSI #6 Carpentry - Upgrade wood blocking components to kiln-dried pressure treated lumber
PO #6:
CSI #7E Seal coat masonry
Proposal Option 6 TOTAL:
DIRECT COST OF WORK SUBTOTAL:
PROPOSAL OPTIONS TOTAL:
Proposal Option 5 TOTAL:
COST OF WORK SUBTOTAL:
BONDS & INSURANCE:
GENERAL CONDITIONS:
Proposal Option 5 TOTAL:
COST OF WORK SUBTOTAL:
Proposal Option 2 TOTAL:
BONDS & INSURANCE:
Proposal Option 1 TOTAL:
DIRECT COST OF WORK SUBTOTAL:
GENERAL CONDITIONS:
COST OF WORK SUBTOTAL:
BONDS & INSURANCE:
PROPOSAL OPTIONS
GENERAL CONDITIONS:
DIRECT COST OF WORK SUBTOTAL:
Proposal Option #1:
COST OF WORK SUBTOTAL:
BONDS & INSURANCE:
GENERAL CONDITIONS:
DIRECT COST OF WORK SUBTOTAL:
GENERAL CONDITIONS:
COST OF WORK SUBTOTAL:
BONDS & INSURANCE:
Proposal Option 3 TOTAL:
DIRECT COST OF WORK SUBTOTAL:
DIRECT COST OF WORK SUBTOTAL:
GENERAL CONDITIONS:
COST OF WORK SUBTOTAL:
BONDS & INSURANCE:
Page: 2 of 2
Attachment G.5 Proposal Cost Breakdown