ESBD_384085_1736958968188_TAMUT RFP 0898_122024 Eagle Landing Phase II Student Housing Construction or Modular Units RESPONSE TO QUESTIONS (2ND ROUND).pdf

PDF 49 KB Posted

Attached to
Texas A&M- Texarkana Eagle Landing Phase II: Student Housing Construction or Modular Units
Solicitation number
TAMUT-RFP-0898_122024
Issued by
Blanco County, Waco City, Texas

About this file

This document contains responses to questions for Texas A&M University-Texarkana's (TAMUT) RFP 0898_12204 regarding the Eagle Landing Phase II Student Housing Construction or Modular Units project. The Q&A addresses three key aspects of the construction project: electrical metering, site preparation, and construction footprint requirements. Specifically, TAMUT clarifies that while individual building metering is not required, they prefer individual building shutoffs for maintenance purposes. The university will handle above-ground clearing of trees, shrubs, and bushes, but the winning contractor will be responsible for all below-ground work and dirt work. Additionally, the document indicates flexibility in the site plan, noting that sidewalk plans and utility routes can be modified as long as the contractor's design meets the communicated requirements.

The document is primarily technical in nature and focuses on clarifying construction specifications rather than discussing pricing or funding details. It establishes division of responsibilities between TAMUT and the contractor for site preparation work, which could impact project costs, though specific financial terms are not addressed. The Q&A format suggests this is part of the pre-bid clarification process to ensure contractors can accurately scope and price their proposals.

View the file

Other files

File Type Posted
ESBD_384085_1733509952130_TAMUT RFP 0898_122024 Eagle Landing Phase II Student Housing Construction or Modular Units.pdf PDF
ESBD_384085_1736287734579_TAMUT RFP 0898_122024 Eagle Landing Phase II Student Housing Construction or Modular Units AMENDMENT 2 PRE-BID VIRTUAL MEETING SCHEDULED .pdf PDF
ESBD_384085_1734964033235_KL235009 - TAMUT GEOTECH.pdf PDF
ESBD_384085_1736958968188_TAMUT RFP 0898_122024 Eagle Landing Phase II Student Housing Construction or Modular Units RESPONSE TO QUESTIONS (2ND ROUND).pdf PDF
ESBD_384085_1734736083894_TAMU-T Housing Construction Plans.pdf PDF
ESBD_384085_1736783015748_Eagle Landing Phase I - Fire Drawings.pdf PDF
ESBD_384085_1736550961568_TAMUT RFP 0898_122024 Eagle Landing Phase II Student Housing Construction or Modular Units AMENDMENT 3.pdf PDF
ESBD_384085_1734964033795_TAMUT RFP 0898_122024 Eagle Landing Phase II Student Housing Construction or Modular Units AMENDMENT TO SUBMISSION DATE & SCHEDULE.pdf PDF
ESBD_384085_1736550962161_Eagle Landing Phase 2 1-8-25.pdf PDF
ESBD_384085_1734736083304_TAMUT RFP 0898_122024 Eagle Landing Phase II Student Housing Construction or Modular Units RESPONSE TO QUESTIONS.pdf PDF
ESBD_384085_1736783015748_Eagle Landing Phase I - Fire Drawings.pdf PDF
ESBD_384085_1736287734579_TAMUT RFP 0898_122024 Eagle Landing Phase II Student Housing Construction or Modular Units AMENDMENT 2 PRE-BID VIRTUAL MEETING SCHEDULED .pdf PDF
ESBD_384085_1736550961568_TAMUT RFP 0898_122024 Eagle Landing Phase II Student Housing Construction or Modular Units AMENDMENT 3.pdf PDF
ESBD_384085_1736550962161_Eagle Landing Phase 2 1-8-25.pdf PDF
ESBD_384085_1734736083894_TAMU-T Housing Construction Plans.pdf PDF
ESBD_384085_1734736083304_TAMUT RFP 0898_122024 Eagle Landing Phase II Student Housing Construction or Modular Units RESPONSE TO QUESTIONS.pdf PDF
ESBD_384085_1734964033795_TAMUT RFP 0898_122024 Eagle Landing Phase II Student Housing Construction or Modular Units AMENDMENT TO SUBMISSION DATE & SCHEDULE.pdf PDF
ESBD_384085_1733509952130_TAMUT RFP 0898_122024 Eagle Landing Phase II Student Housing Construction or Modular Units.pdf PDF
ESBD_384085_1734964033235_KL235009 - TAMUT GEOTECH.pdf PDF
ESBD_384085_1734736083894_TAMU-T Housing Construction Plans.pdf PDF
ESBD_384085_1734964033235_KL235009 - TAMUT GEOTECH.pdf PDF
ESBD_384085_1734964033795_TAMUT RFP 0898_122024 Eagle Landing Phase II Student Housing Construction or Modular Units AMENDMENT TO SUBMISSION DATE & SCHEDULE.pdf PDF
ESBD_384085_1734736083304_TAMUT RFP 0898_122024 Eagle Landing Phase II Student Housing Construction or Modular Units RESPONSE TO QUESTIONS.pdf PDF
ESBD_384085_1733509952130_TAMUT RFP 0898_122024 Eagle Landing Phase II Student Housing Construction or Modular Units.pdf PDF
ESBD_384085_1733509952130_TAMUT RFP 0898_122024 Eagle Landing Phase II Student Housing Construction or Modular Units.pdf PDF
Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RESPONSES TO QUESTIONS

TAMUT RFP 0898_12204

EAGLE LANDING PHASE II:

STUDENT HOUSING CONSTRUCTION OR MODULAR UNITS

1. Will this complex be metered by building (individually) or with a central meter and shutoffs for each building? Should we assume that this will be powered by a bank of electrical meters centrally located?

a. The new buildings do not need to be metered individually, but we would prefer shutoffs for each building, so we don’t take the complex down for repairs in one unit.

2. Phase II Site Plan General Notes #5 says the contractor is responsible for clearing and grubbing. Can you verify that this is incorrect and TAMUT will be responsible for clearing, grubbing, root raking, etc.?

a. TAMUT will have any trees, shrubs, bushes removed. TAMUT will not be removing roots or anything below the surface. The bid-winning contractor will be responsible for dirt work, which includes removing anything below the surface that must be removed.

3. The Phase II Site Plan is likely bigger than necessary for the proposed 10 units. Should we plan on installing all sidewalks and utilities shown even if this footprint is not required for our proposal?

a. The bid-winning contractor will not be held to the current proposal exactly. If the contractor design satisfies the communicated requirements, sidewalk plans and utility routes are flexible.