About this file
This is a site plan drawing for Phase 2 of the Eagle Landing project at Texas A&M University-Texarkana, showing the layout and infrastructure details for new student housing units. The drawing illustrates the placement of multiple residential buildings with associated sidewalks, parking areas, and utility connections. Phase 2 construction areas are highlighted in red on the plan, including concrete sidewalks, accessible loading zone parking, and new parking areas. The plan shows detailed utility connections and infrastructure layouts, with specific markings for Phase 2 sewer main locations and domestic/fire hydrant connections.
The technical drawing includes specific notes regarding contractor responsibilities for utility connections and infrastructure development. A scale and north arrow are provided for reference, and the plan includes a legend identifying different construction elements and phases. The drawing appears to be part of a larger set of construction documents, as indicated by the professional engineering title block and drawing number in the lower right corner. The layout demonstrates careful consideration of accessibility requirements and integration with existing campus infrastructure.
View the file
Other files
Show all 25
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PHASE 2 CONCRETE SIDEWALK
PHASE 2 CONCRETE ACCESSIBLE/LOADING
ZONE PARKING
PHASE 2 RESIDENTIAL UNIT AREAS
CONTRACTOR TO PROVIDE "PHASE 2
LOOPED 8" WATER MAIN". DOMESTIC AND
FIRE SERVICES, ALONG WITH ANY
HYDRANTS NEED TO COME OFF OF NEW 8"
LINE. ASSUME METERING UNITS
ASSUME SEWER SERVICES TO COME OFF OF
PHASE 1 8" SEWER MAIN. SERVICE
BRANCHES CAN BE SIZED FOR MULTIPLE
SERVICES. CLEANOUTS SHOULD BE
LOCATED EVERY 75'.