ESBD_384085_1734736083304_TAMUT RFP 0898_122024 Eagle Landing Phase II Student Housing Construction or Modular Units RESPONSE TO QUESTIONS.pdf

PDF 279 KB Posted

Attached to
Texas A&M- Texarkana Eagle Landing Phase II: Student Housing Construction or Modular Units
Solicitation number
TAMUT-RFP-0898_122024
Issued by
Blanco County, Waco City, Texas

About this file

This document is a Questions & Answers addendum for Texas A&M University-Texarkana's Request for Proposals (RFP Number TAMUT-RFP-0898_122024) for the Eagle Landing Phase II Student Housing project. The project requires the construction or provision of at least 10 residential units capable of accommodating 2-4 students per bedroom, with either 2-bedroom or 4-bedroom configurations. The university is seeking a complete turn-key solution including site engineering, pad preparation, utility design and installation, and buildings. The submission deadline has been extended to January 17, 2025, at 4:00 PM CST, with units required to be move-in ready by July 31, 2025. The contract term is for one year with four one-year renewal options.

The project is structured as an outright purchase rather than a lease arrangement, with Quality Container Builders identified as the Phase I contractor. TAMUT will handle tree clearing and provide furniture for the units, with existing parking lots available for use. While no specific budget is mentioned, contractors may submit multiple alternative proposals with varying building types (new or used) and installation methods. A HUB Subcontracting plan is required without a specific percentage requirement. The university indicates potential for expansion to Phase III, suggesting opportunity for a long-term partnership. Additional construction plans from Phase I have been provided as separate files to assist with utility locations and topographical data.

View the file

Other files

File Type Posted
ESBD_384085_1733509952130_TAMUT RFP 0898_122024 Eagle Landing Phase II Student Housing Construction or Modular Units.pdf PDF
ESBD_384085_1736287734579_TAMUT RFP 0898_122024 Eagle Landing Phase II Student Housing Construction or Modular Units AMENDMENT 2 PRE-BID VIRTUAL MEETING SCHEDULED .pdf PDF
ESBD_384085_1734964033235_KL235009 - TAMUT GEOTECH.pdf PDF
ESBD_384085_1736958968188_TAMUT RFP 0898_122024 Eagle Landing Phase II Student Housing Construction or Modular Units RESPONSE TO QUESTIONS (2ND ROUND).pdf PDF
ESBD_384085_1734736083894_TAMU-T Housing Construction Plans.pdf PDF
ESBD_384085_1736783015748_Eagle Landing Phase I - Fire Drawings.pdf PDF
ESBD_384085_1736550961568_TAMUT RFP 0898_122024 Eagle Landing Phase II Student Housing Construction or Modular Units AMENDMENT 3.pdf PDF
ESBD_384085_1734964033795_TAMUT RFP 0898_122024 Eagle Landing Phase II Student Housing Construction or Modular Units AMENDMENT TO SUBMISSION DATE & SCHEDULE.pdf PDF
ESBD_384085_1736550962161_Eagle Landing Phase 2 1-8-25.pdf PDF
ESBD_384085_1736783015748_Eagle Landing Phase I - Fire Drawings.pdf PDF
ESBD_384085_1736287734579_TAMUT RFP 0898_122024 Eagle Landing Phase II Student Housing Construction or Modular Units AMENDMENT 2 PRE-BID VIRTUAL MEETING SCHEDULED .pdf PDF
ESBD_384085_1736550961568_TAMUT RFP 0898_122024 Eagle Landing Phase II Student Housing Construction or Modular Units AMENDMENT 3.pdf PDF
ESBD_384085_1736550962161_Eagle Landing Phase 2 1-8-25.pdf PDF
ESBD_384085_1734736083894_TAMU-T Housing Construction Plans.pdf PDF
ESBD_384085_1734736083304_TAMUT RFP 0898_122024 Eagle Landing Phase II Student Housing Construction or Modular Units RESPONSE TO QUESTIONS.pdf PDF
ESBD_384085_1734964033795_TAMUT RFP 0898_122024 Eagle Landing Phase II Student Housing Construction or Modular Units AMENDMENT TO SUBMISSION DATE & SCHEDULE.pdf PDF
ESBD_384085_1733509952130_TAMUT RFP 0898_122024 Eagle Landing Phase II Student Housing Construction or Modular Units.pdf PDF
ESBD_384085_1734964033235_KL235009 - TAMUT GEOTECH.pdf PDF
ESBD_384085_1736958968188_TAMUT RFP 0898_122024 Eagle Landing Phase II Student Housing Construction or Modular Units RESPONSE TO QUESTIONS (2ND ROUND).pdf PDF
ESBD_384085_1734736083894_TAMU-T Housing Construction Plans.pdf PDF
ESBD_384085_1734964033235_KL235009 - TAMUT GEOTECH.pdf PDF
ESBD_384085_1734964033795_TAMUT RFP 0898_122024 Eagle Landing Phase II Student Housing Construction or Modular Units AMENDMENT TO SUBMISSION DATE & SCHEDULE.pdf PDF
ESBD_384085_1734736083304_TAMUT RFP 0898_122024 Eagle Landing Phase II Student Housing Construction or Modular Units RESPONSE TO QUESTIONS.pdf PDF
ESBD_384085_1733509952130_TAMUT RFP 0898_122024 Eagle Landing Phase II Student Housing Construction or Modular Units.pdf PDF
ESBD_384085_1733509952130_TAMUT RFP 0898_122024 Eagle Landing Phase II Student Housing Construction or Modular Units.pdf PDF
Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Texas A&M University-Texarkana Request For Proposals (RFP)

RFP Number

TAMUT-RFP-0898_122024

Eagle Landing Phase II:

Student Housing Construction or Modular Units

Issued Date

December 6, 2024

Response Date

January 17, 2025

4:00 PM CST

RESPONSES TO QUESTIONS

TAMUT RFP 0898_12204

EAGLE LANDING PHASE II:

STUDENT HOUSING CONSTRUCTION OR MODULAR UNITS

1. Who was awarded the Phase I project that was solicited in February 2024?

a. Quality Container Builders

2. Are you open to multiple alternative proposals, as we can provide several different options?

a. Yes

3. Is this a lease or sale?

a. Sale

4. Can we propose one single building vs multiple buildings?

a. All options will be considered.

5. Is there a preference on used vs new buildings?

a. All options will be considered.

6. Is there a preference on installation type (on grade vs blocks/decks)?

a. All options will be considered.

7. Will there be any other images of the installation location?

a. Additional images have been posted as separate files.

8. Most of the construction will be done off-site in a manufacturing facility. How will we coordinate inspection along the way with a TAMUT representative?

a. Depending on the location of the manufacturing facility, we will possibly be able to coordinate site visits for inspections.

9. Can you provide as-built drawings from previous projects which may show utility locations, topo data, etc.?

a. Construction plans for Phase I have been attached as a separate file.

10. What is the latest possible date that an award will be made by TAMUT?

a. The submission deadline has been extended to January 17, 2025 by 4:00 P.M.

central standard time.

11. Is the contractor also responsible for vehicle access/parking or will the existing parking lot be utilized?

a. Existing parking lot(s) will be utilized.

12. The contract term in the RFP states that it will be for 1 year with four renewal options. Does

A&M Texarkana anticipate other projects beyond Eagle Landing Phase II to be solicited or awarded as a part of this contract?

a. Yes, there is a possibility of this partnership extending to Phase III.

13. Please confirm the percent of participation goal for the HUB Subcontracting plan.

a. There is not a percentage. We just require the HUB Subcontracting plan be submitted.

14. The RFP states that the University requires 10 residential units capable of accommodating 2

– 4 students per bedrooms. Please confirm that the University is seeking housing for 40 students.

a. The number of students will depend on the configuration of each unit. TAMUT needs at least 10 residential units, each capable of accommodating 2-4 students per bedroom. The layout options may vary by design (2-bedroom units of 4-bedroom units) capable of accommodating 2-4 students per bedroom.

15. The site map shows that it still needs to be cleared of trees. Please confirm if this is accurate.

a. TAMUT will have trees cleared.

16. Does the University require the awardee to also furnish the units?

a. TAMUT will provide furniture for each unit.

17. It’s not entirely clear in the scope of work whether the proposer is looking for a turn-key project, including all site engineering, pad preparation, utility design and installation, and modular buildings, or if only the design, construction, and installation and hookups of the modular buildings is required. Please clarify.

a. TAMUT is looking for a turn-key solution including all site engineering, pad preparation, utility design and installation, and buildings.

b. Construction plans for Phase I have been attached as a separate file.

18. The RFP mentions attached requirements and specifications, but none are included in Exhibit A or in the broader RFP. Will these be provided, or will Offerors simply need to design and submit a proposal based entirely on our preferred specs, floorplan layouts, and construction methods?

a. Offerors will need to design and submit a proposal based entirely on their preferred specs, floorplans layouts, and construction methods.

19. Section 1.3 mentions a 1-year contract period with four optional 1-year renewals. Is this anticipated to be a lease of housing units, or an outright purchase?

a. Outright purchase