ESBD_384085_1736550962161_Eagle Landing Phase 2 1-8-25.pdf
PDF 428 KB Posted
- Attached to
- Texas A&M- Texarkana Eagle Landing Phase II: Student Housing Construction or Modular Units
- Solicitation number
- TAMUT-RFP-0898_122024
- Issued by
- Blanco County, Waco City, Texas
About this file
This is a site plan drawing for Phase 2 of the Texas A&M-Texarkana Eagle Landing Student Housing project, showing the layout and technical specifications for proposed residential units on campus. The drawing details the placement of multiple residential structures, concrete sidewalks, accessible loading zones, and parking areas, with specific utility connections and infrastructure elements marked in different colors. A north arrow and scale are included for reference, and the plan shows the integration with existing campus features.
The technical drawing indicates Phase 2 concrete sidewalks and accessible loading zone parking highlighted in red, with utility connections marked in blue and green. The plan includes specific notations regarding contractor requirements for Phase 2 domestic and fire service water main installations. The drawing features multiple residential unit structures arranged in a curved configuration, with detailed measurements and utility connection points clearly marked. General site notes at the bottom of the drawing provide additional contractor requirements and specifications for utility coordination, though specific pricing and funding details are not included in this technical document.
View the file
Other files
Show all 25
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PHASE 2 CONCRETE SIDEWALK
PHASE 2 CONCRETE ACCESSIBLE/LOADING
ZONE PARKING
PHASE 2 RESIDENTIAL UNIT AREAS
CONTRACTOR TO PROVIDE "PHASE 2
LOOPED 8" WATER MAIN". DOMESTIC AND
FIRE SERVICES, ALONG WITH ANY
HYDRANTS NEED TO COME OFF OF NEW 8"
LINE. ASSUME METERING UNITS
ASSUME SEWER SERVICES TO COME OFF OF
PHASE 1 8" SEWER MAIN. SERVICE
BRANCHES CAN BE SIZED FOR MULTIPLE
SERVICES. CLEANOUTS SHOULD BE
LOCATED EVERY 75'.