ESBD_383359_1732634922373_Exhibit D Contractor's Qualification Stmt.pdf
PDF 195 KB Posted
- Solicitation number
- 808-25-250510
- Issued by
- El Paso County, El Paso City, Texas
About this file
This is a Contractor's Qualifications Statement form (Exhibit D) for the Magoffin Home State Historic Site Visitor Center Structural Repairs project (HSD-2024-038) issued by the Texas Historical Commission. The document requires contractors to provide detailed information about their qualifications to perform structural repairs at the visitor center, including firm history, construction capabilities, financial capabilities, and experience records. Contractors must demonstrate their ability to self-perform various construction tasks including demolition, electrical, plumbing, mechanical, painting, roofing, finish carpentry, masonry construction/preservation, and waterproofing work.
The form requires comprehensive documentation of the contractor's bonding references, banking references, and detailed information about 3-6 similar projects completed within the last five years that are at least 80% complete. Contractors must provide their average annual construction volume for the past three fiscal years, current financial statements, and information about any past contract defaults or litigation. The form must be certified as true and correct, with authorization for the Texas Historical Commission to contact references and verification that the firm is not debarred from performing work for the U.S.A. or State of Texas.
View the file
Other files
Show all 37
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Magoffin Home State Historic Site HSD-2024-038 Visitor Center Structural Repairs RFP# 808-25-250510
EXHIBIT D
CONTRACTOR’S QUALIFICATIONS STATEMENT
COMPLETE AND SUBMIT WITH PROPOSAL
PROJECT NO.
HSD-2024-038 LOCATION:
Magoffin Home State Historic Site, El Paso
County, Texas
PROPOSAL
DATE:
FIRM
ADDRESS
CITY STATE ZIP
PHONE FAX
Individual Partnership Corporation
If incorporated, under the laws of the State of with principal place of business in
PRINCIPALS IN FIRM AND YEARS EXPERIENCE IN CONSTRUCTION:
NAME TITLE PHONE NO. OF
YEARS
FIRM HISTORY: List firm history below including any other business names used.
From to Firm Name
From to Firm Name
Has firm, under its current or former name(s) ever failed to complete a project, defaulted on a contract, or been engaged in litigation over a contract? Yes No. If so, state particulars of most recent occurrence on separate sheet(s) and attach to this form.
CONSTRUCTION CAPABILITIES:
FIRM’S AVERAGE ANNUAL CONSTRUCTION VOLUME FOR THE PAST THREE FISCAL YEARS $
Indicate below the work categories that your firm typically self-perform, and the percentage of your projects on which you do so (e.g. you self-perform the finish carpentry on 50% of your projects):
Demolition % Mechanical % Roofing % ____________ %
Electrical % Painting % Finish carpentry % ____________ %
Plumbing %
Masonry construction
/preservation % Waterproofing %
FINANCIAL CAPABILITIES:
FINANCIAL INFORMATION SUMMARIZED BELOW WAS PREPARED BY:
ACCOUNTING FIRM Address
City State Zip
Prepared by (name): Phone
FINANCIAL STATEMENT SUMMARY:
Current Assets Current Liabilities
Fixed Assets Net Worth
Total Assets Total Liab. & Net Worth
BONDING REFERENCES: Indicate agency/surety through which bonding will be obtained.
AGENCY Address
City State Zip
Phone Fax
Agent’s Name
Agent’s
Phone
Name of Power of Attorney from Bond Company
Expiration
Date
BONDING COMPANY
Address
Phone Fax
Name of Representative Phone
BANKING REFERENCES:
BANK Address
Bank Contact Name Phone
Checking Acct. Numbers
Loan Acct. Numbers
CD/MM Acct. Numbers
EXPERIENCE RECORD:
List minimum of three (3) projects and a maximum of six (6) that are at least 80% completed or have been completed within the last five (5) years by your organization. Projects similar to the one being bid are preferred. Describe how your experience on these past projects is relevant to your ability to execute this project.
• List the projects in order of relevance, with the projects that best demonstrate your ability to complete this project listed first.
• For each project, provide all information requested on the form. If a particular piece of information is not applicable for a particular project (e.g. a project that did not have an architect or engineer) note “N/A” in that box.
1.
Project Name and location
Project Type (e.g. new bldg., addition, restoration, etc.):
Bldg. orig.
construction date:
Primary building use (e.g. office, school, residence, etc.)
Bldg. square footage,# of stories:
Primary exterior materials (e.g.
wood siding, brick, stone)
Name of site superintendent:
Roof type/material (e.g. comp.
shingle, wood shake, membrane) Contract Amount Beginning $ Ending: $
Describe the project and your scope of work, and how it relates to your ability to execute this project:
Project Owner (company) Address
Project Owner’s Rep (familiar with project) Phone Fax
Project percent complete If completed, date
Project A/E Name (firm and individual) A/E Phone
2.
Project Name and location
Project Type (e.g. new bldg., addition, restoration, etc.):
Bldg. orig.
construction date:
Primary building use (e.g. office, school, residence, etc.)
Bldg. square footage,# of stories:
Primary exterior materials (e.g.
wood siding, brick, stone)
Name of site superintendent:
Roof type/material (e.g. comp.
shingle, wood shake, membrane) Contract Amount Beginning $ Ending: $
Describe the project and your
EXPERIENCE RECORD: (CONTINUED)
3.
Project Name and location
Project Type (e.g. new bldg., addition, restoration, etc.):
Bldg. orig.
construction date:
Primary building use (e.g. office, school, residence, etc.)
Bldg. square footage,# of stories:
Primary exterior materials (e.g.
wood siding, brick, stone)
Name of site superintendent:
Roof type/material (e.g. comp.
shingle, wood shake, membrane) Contract Amount Beginning $ Ending: $
Describe the project and your
4.
Project Name and location
Project Type (e.g. new bldg., addition, restoration, etc.):
Bldg. orig.
construction date:
Primary building use (e.g. office, school, residence, etc.)
Bldg. square footage,# of stories:
Primary exterior materials (e.g.
wood siding, brick, stone)
Name of site superintendent:
EXPERIENCE RECORD: (CONTINUED)
5.
Project Name and location
Project Type (e.g. new bldg., addition, restoration, etc.):
Bldg. orig.
construction date:
Primary building use (e.g. office, school, residence, etc.)
Bldg. square footage,# of stories:
Primary exterior materials (e.g.
wood siding, brick, stone)
Name of site superintendent:
6.
Project Name and location
Project Type (e.g. new bldg., addition, restoration, etc.):
Bldg. orig.
construction date:
Primary building use (e.g. office, school, residence, etc.)
Bldg. square footage,# of stories:
Primary exterior materials (e.g.
wood siding, brick, stone)
Name of site superintendent:
I hereby certify that all information provided above and attached is true and correct. Furthermore, I hereby authorize you to contact the references listed above and authorize release of information from such references to Texas Historical Commission. I hereby certify that my firm is not debarred or suspended from performing work for the U.S.A. or the State of Texas.
Name of Firm Signature of Owner or Officer
Date Date
REMAINDER OF THIS PAGE INTENTIONALLY LEFT BLANK
File details come from the government source that posted it. Updated .