ESBD_374441_1724692037243_ATTACHMENT G.N - Ellington Field (EF) Manufacturers’ Services.pdf
PDF 132 KB Posted
- Attached to
- Hush House Transformer Replacement
- Solicitation number
- TMD24-ANG-WJ-24150007
- Issued by
- Harris County, Texas
About this file
This document is an attachment to a state and local government contract opportunity for Manufacturer's Services at Ellington Field in Houston, Texas. The contract requires the successful vendor to provide a variety of services including installation assistance, equipment inspection and adjustment, technical support, training of facility personnel, and completion of required documentation. The contract duration is unspecified, but training services must be scheduled and coordinated with the project manager at least 21 days prior to the start of equipment installation. The attachment outlines detailed submittal requirements for training schedules, plans, materials, and manufacturer qualifications. It also specifies the minimum required onsite services to be provided by the manufacturer's representatives and the responsibilities of the contractor in coordinating and delivering the training to Ellington Field personnel.
View the file
Other files
Show 40 more
Latest 50 of 76 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT G.N - ELLINGTON AFB (EF) MANUFACTURERS’
SERVICES
PART 1 – GENERAL
1. DEFINITIONS
Person-Day: One person for eight (8) hours within regular Contractor working hours.
2. SUBMITTALS
A. Training Schedule: Submit not less than twenty-one (21) days prior to start of equipment installation and revise as necessary for acceptance.
B. Preliminary Training Plan: Submit within sixty (60) days after Notice to Proceed for approval by the Project Manager.
C. Final Training Plan: Submit after training coordination meeting.
D. Training Materials:
a. Submit written outlines of proposed training sessions not less than twenty-one
(21) days prior to scheduled training to be approved by the Project Manager.
b. Furnish complete training materials, to include operation and maintenance data as required in this section to be retained by each trainee.
E. Quality Control Submittals: When specified in the individual Specifications, submit:
a. Qualifications of Manufacturer’s Representative performing specified services.
b. Manufacturer’s Certificate of Proper Installation: On form appended to this section.
3. QUALIFICATION OF MANUFACTURER’S REPRESENTATIVE
A. Authorized representative of the manufacturer shall be factory trained and experienced in the technical applications, installation, operation, and maintenance of respective equipment, subsystem, or system. Additional qualifications may be specified elsewhere.
B. Manufacturer’s Representative subject to acceptance by the Project Manager. No substitute representatives will be allowed unless prior written approval by the Project
Manager has been given.
4. FULFILLMENT OF SPECIFIED MINIMUM SERVICES
A. Where manufacturers’ services are specified, furnish manufacturer’s qualified representative. Where time is necessary in excess of that stated in the Specifications for manufacturers’ services, additional time required to perform the specified services shall be considered incidental work.
B. Schedule manufacturer’s services to avoid conflicting with other onsite testing or other manufacturer’s onsite services.
a. Determine that all conditions necessary to allow successful testing have been met before scheduling services.
C. Only those days of service approved by the Project Manager will be credited to fulfill the specified minimum services.
D. If specified, manufacturer’s onsite services shall include as a minimum:
a. Assistance during product (system, subsystem, or component) installation to
ELLINGTON FIELD, HOUSTON, TX 21 May 2024 include observation, guidance, instruction of Contractor’s assembly, erection, installation or application procedures.
b. Inspection, checking, and adjustment as required for product (system, subsystem, or component) to function as warranted by manufacturer and necessary to furnish written approval of installation.
c. Revisiting the site as required to correct problems and until installation and operation are acceptable to the Project Manager.
d. Resolution of assembly or installation problems attributable to, or associated with, respective manufacturer’s products and systems.
e. Assistance during functional and performance testing and startup demonstration, and until product acceptance by the Project Manager.
f. Training of EF personnel in the operation and maintenance of respective product as required.
g. Completion of Manufacturer’s Certificate of Proper Installation (form enclosed at end of this section) with applicable certificates for proper installation and initial, interim, and final test or service.
h. Additional requirements as may be specified elsewhere.
5. TRAINING SCHEDULE
A. List specified equipment and systems with respective manufacturers that require training services of manufacturers’ representatives and show:
a. Estimated dates for installation completion.
b. Estimated training dates to allow for multiple sessions when several shifts are involved.
B. Adjust training schedule to ensure training of appropriate personnel as deemed necessary by the Project Manager, and to allow full participation by manufacturers’ representatives. Adjust schedule for interruptions in operability of equipment.
6. TRAINING PLAN
A. Preliminary Training Plan: If specified, and within sixty (60) days after Notice to
Proceed, submit for each proposed course to be approved by the Project Manager:
a. Title and objectives.
b. Training schedule.
c. Prerequisite training and experience of attendees.
d. Recommended types of attendees (e.g., managers, engineers, operators, maintenance).
e. Course description and outline of course content.
f. Duration.
g. Location (e.g., training center or site).
h. Format (e.g., lecture, self-study, demonstration, hands-on).
i. Instruction materials and equipment requirements.
j. Final Training Plan: Submit the following after training coordination meeting, if specified.
k. Updated versions of course descriptions from preliminary training plan.
l. Personnel who will attend each course.
ELLINGTON FIELD, HOUSTON, TX 21 May 2024
m. Schedule of training courses including dates, durations, and locations of each class.
n. Detailed course schedule for each day showing time allocated to each topic.
o. Resumes of instructors providing the training.
7. TRAINING BASE PERSONNEL
A. Furnish trained, articulate personnel to coordinate and expedite training, to be present during training coordination meetings with EF Personnel, and familiar with operation and maintenance manual information specified in Division 1 Section, “Operation and
Maintenance Data”.
B. Furnish manufacturers’ representatives for detailed classroom and hands-on training to EF personnel on operation and maintenance of specified product (system, subsystem, component) and as may be required in applicable Specifications.
a. Manufacturer’s Representative: Familiar with facility operation and maintenance requirements as well as with specified equipment.
C. Prestart up Training:
a. Coordinate training sessions with EF operating personnel and manufacturers’ representatives, and with submission of operation and maintenance manuals in accordance with Division 1 Section “Operation and Maintenance Data”.
b. Complete at least fourteen (14) days prior to actual startup.
D. Post-Startup Training: If required in Specifications, furnish and coordinate training of
EF operating personnel by respective manufacturer’s representatives.
8. SUPPLEMENTS
A. The supplements listed below, following “END OF SECTION,” are part of this
Specification.
a. Forms: Manufacturer’s Certificate of Proper Installation.
File details come from the government source that posted it. Updated .