About this file
The document is a Base Civil Engineering Work Clearance Request form used by the Texas Military Department (TMD), Texas Air National Guard (ANG) 147th Attack Wing to coordinate contract work that may disrupt aircraft or vehicular traffic flow, base utility services, fire and intrusion alarm systems, or routine installation activities at Ellington Air Force Base in Houston, Texas. The request covers work such as excavation, utility disturbance, and other activities that require coordination and approvals from various base entities. The clearance request must be processed prior to the start of work.
The related state and local contract opportunity is for the replacement of an existing transformer with a new Alamo 150kVA three-phase padmount transformer at Ellington Field, Building B1395 in Houston, Texas. The contractor must provide and install all necessary material, equipment, and wiring for the transformer installation. This is a competitive bid opportunity for the Texas Military Department (TMD), Texas Air National Guard (ANG) 147th Attack Wing.
View the file
Other files
Show 40 more
Latest 50 of 76 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
The document you are trying to load requires Adobe Reader 8 or higher. You may not have the Adobe Reader installed or your viewing environment may not be properly configured to use Adobe Reader.
For information on how to install Adobe Reader and configure your viewing environment please see http://www.adobe.com/go/pdf_forms_configure.
DATE PREPARED
BASE CIVIL ENGINEERING WORK CLEARANCE REQUEST
(See Instructions on Reverse)
1. Clearance is requested to proceed with work at on Work Order No.
, Contract No.
, involving excavation or utility disturbance per attached sketch. This area has has not been staked or clearly marked.
2. TYPE OF FACILITY/WORK INVOLVED
G. AIRCRAFT OR VEHICULAR TRAFFIC FLOW
A. PAVEMENTS
D. FIRE DETECTION & PROTECTION SYSTEMS
H. SECURITY
B. DRAINAGE SYSTEMS
E. UTILITY
OVERHEAD
UNDERGROUND
I. OTHER
C. RAILROAD TRACKS
F. COMM
OVERHEAD
UNDERGROUND
4. DATE OF CLEARANCE
3. DATE CLEARANCE REQUIRED
5. SIGNATURE OF REQUESTING OFFICIAL
6. TELEPHONE NO.
7. ORGANIZATION
REMARKS
(Use Reverse for additional comments)
REVIEWER'S NAME AND INITIALS
ORGANIZATION
8.
A. ELECTRICAL DISTRIBUTION
B A S
B. STEAM DISTRIBUTION
E
C. WATER DISTRIBUTION
C I
D. POL DISTRIBUTION
V I L
E. SEWER DISTRIBUTION
E N
F. ENVIRONMENTAL
G I
G. PAVEMENTS/ GROUNDS
N E E
H. FIRE PROTECTION
R I
I. ZONE
N G J. OTHER (Specify)
9. SECURITY POLICE
10. SAFETY
11. COMMUNICATIONS
12. BASE OPERATIONS
13. CABLE TV
14. COMMERCIAL UTILITY COMPANY
TELEPHONE
GAS
ELECTRIC
15. OTHER (Specify)
APPROVED
DISAPPROVED
16. REQUESTED CLEARANCE
17. TYPED NAME AND SIGNATURE OF APPROVING OFFICER (Chief of Operations Flight or Chief of Engineering Flight) 17a. DATE SIGNED
PREVIOUS EDITIONS ARE OBSOLETE.
AF IMT 103, 19940801, V3
Click to sign Click to sign Click to sign Click to sign Click to sign Click to sign Click to sign Click to sign Click to sign Click to sign Click to sign Click to sign Click to sign Click to sign Click to sign Click to sign Click to sign Click to sign
INSTRUCTIONS
The BCE work clearance request is used for any work (contract or in-house) that may disrupt aircraft or vehicular traffic flow, base utility services, protection provided by fire and intrusion alarm system, or routine activities of the installation. This form is used to coordinate the required work with key base activities and keep customer inconvenience to a minimum. It is also used to identify potentially hazardous work conditions in an attempt to prevent accidents. The work clearance request is processed just prior to the start of work. If delays are encountered and the conditions at the job site change (or may have changed) this work clearance request must be reprocessed.
18. REMARKS. (This section must describe specific precautionary measure to be taken before and during work accomplishment. Specific comments concerning the approved method of excavation, hand or powered equipment, should be included.)
AF IMT 103, 19940801, V3
(REVERSE)
8.2.1.3158.1.475346.466429
| HAS: |
| HASNOT: |
| APPRVD: |
| DAPPRVD: |
| Entery date as YYYYMMDD.: |
| LOCA: |
| WONO: |
| CTRNO: |
| ABC: |
| ABC_2: |
| ABC_3: |
| D: |
| E: |
| F: |
| OVHA: |
| OVHB: |
| UNDGA: |
| UNDGB: |
| GHI: |
| GHI_2: |
| GHI_3: |
| OTH: |
| Enter date as YYYYMMDD.: |
| ReqOffclSig: |
| TELE: |
| ORGN: |
| REMKA: |
| SIGNATURE1: |
| REMKA_2: |
| SIGNATURE2: |
| REMKA_3: |
| SIGNATURE3: |
| REMKA_4: |
| SIGNATURE4: |
| REMKA_5: |
| SIGNATURE5: |
| REMKA_6: |
| SIGNATURE6: |
| REMKA_7: |
| SIGNATURE7: |
| REMKA_8: |
| SIGNATURE8: |
| ZONE: |
| REMKB: |
| SIGNATURE9: |
| OTHB: |
| REMKC: |
| SIGNATURE10: |
| REMKD: |
| SIGNATURE11: |
| REMKD_2: |
| SIGNATURE12: |
| REMKD_3: |
| SIGNATURE13: |
| REMKD_4: |
| SIGNATURE14: |
| REMKD_5: |
| OTHC: |
| REMKE: |
| COMUTIL: |
| COMUTIL_2: |
| COMUTIL_3: |
| AppOffcrSig: |
| SIGNATURE16: |
| SIGNATUREfor13: |
| EF_1: |
| EF_2: |
| REMKSF: |
| SignatureStyle1: |
| SignatureStyle2: |
File details come from the government source that posted it. Updated .