ESBD_374441_1724690507683_ATTACHMENT G.D - Ellington AFB (EF) Field Engineering.pdf
PDF 104 KB Posted
- Attached to
- Hush House Transformer Replacement
- Solicitation number
- TMD24-ANG-WJ-24150007
- Issued by
- Harris County, Texas
About this file
This document is an attachment related to a state and local contract opportunity for field engineering services at Ellington AFB in Houston, TX. The Contractor is required to provide survey work, civil/structural/other professional engineering services, and preserve all survey stakes and marks during construction. The Contractor must retain a registered surveyor in Texas to lay out and maintain the work. The Contractor is responsible for establishing temporary benchmarks, verifying layouts, and maintaining survey records. The Contractor must submit GIS electronic maps integrating into the 147 CES Common Installation Picture using GPS Geospatial data per ANG ETL 19-12 specifications, including the final locations of all built and installed items.
The document does not provide details on pricing terms, set asides, incumbents, funding requirements, or other salient commercial information. It focuses solely on the technical requirements for the field engineering services.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT G.D - ELLINGTON AFB (EF) FIELD ENGINEERING
PART 1 – GENERAL
1. REQUIREMENTS INCLUDED
A. The Contractor shall provide and pay for field engineering services for:
a. Survey work required in execution of work.
b. Civil, structural, or other professional engineering services specified or required to execute the Contractor’s construction method.
B. The method of field staking for the construction of the work shall be at the option of the Contractor.
C. The accuracy of any method of staking shall be responsibility of the Contractor. All engineering for vertical and horizontal control shall be the responsibility of the
Contractor.
a. The Contractor shall be held responsible for the preservation of all stakes and marks. If any stakes or marks are carelessly or willfully disturbed by the
Contractor, the Contractor shall not proceed with any work until he has re-established such points, marks, lines, and elevations as may be necessary for the prosecution of the work.
b. The Contractor shall retain the services of a competent surveyor, registered in the State of Texas, to lay out the work and maintain a survey during construction. The Contractor shall be solely responsible for proper location of the work.
2. SURVEY REFERENCE POINTS
A. Locate and protect control points prior to starting site work and preserve all permanent reference points during construction.
a. Make no changes or relocations without prior written notice to the Project
Manager.
b. Report to the Project Manager when any reference point is lost or destroyed or requires relocation because of necessary changes in grades or locations.
3. PROTECT SURVEY REQUIREMENTS
A. Establish temporary benchmarks as needed, referenced to data established by survey control points. Record locations with horizontal and vertical data, on Record
Drawings.
B. Establish lines and levels, and locate and lay out, by instrumentation and similar appropriate means:
a. Site improvements, including utility slopes and invert elevations.
b. Batter boards for structures.
c. From time to time, verify layouts by same methods.
4. RECORDS
A. Maintain a complete, accurate log of al control and survey work as it progresses.
B. At Contract closeout, submit a survey of installation of roadways, drainage, site grading, buried utilities, and manholes at the same scale as the Construction
Documents indicating elevations and stationing at 100-foot increments.
ELLINGTON FIELD, HOUSTON, TX 21 May 2024
5. SUBMITTALS
A. On request of the Project Manager, submit documentation to verify accuracy of field engineering work.
B. Submit Drawings showing locations of all pipes and structures constructed. This
Drawing shall be included with the Record Drawings.
6. GEOSPATIAL DATA STANDARD
A. Prepare and furnish geographical Information System (GIS) electronic map of the site and site utilities that integrates into the 147 CES Common Installation Picture (CIP) using Geographical Positioning System (GPS) Geospatial Electronic data per ANG
ETL 19-12, Geographic Information System (GIS) Data Format Specifications Dated
18 November 2019.
B. At the end of the project all data points will need to be provided by the contractor.
Provide all final locations of the corners (outline) of building, valves, manholes, handholes, light poles, fire hydrants, outline of parking lots and other items to provide a complete picture of what has been built and installed. Provide enough data to enable the government to have the location of everything on the project.
File details come from the government source that posted it. Updated .