Schedules of Pricing

View the file

Other files

Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 5-O&M Services

Attachment 5
Schedule of Pricing: O&M Services
The contractor must provide all management, supervision, labor, materials, supplies and equipment (except as otherwise provided), and shall plan, schedule, coordinate and assure effective performance of all services described herein. The Contractor must provide O&M Services in accordance with the requirements of this solicitation at:
SCHEDULE OF PRICING: O&M Services
Item No:ServicesQuantityUnitPriceAmount
TRANSITION PERIOD: 30 days prior to start of contract
BASE PERIOD: (03/01/2018 - 02/28/2019)
000XO&M Services - Administrative Bldg (WA0811KA)12MO$$
000XO&M Services – Daycare Center (WA0123KA)12MO$$
000XO&M Services – Warehouse #1 (WA0824KF)12MO$$
000XO&M Services – Warehouse #2 (WA0825KF)12MO$$
000XO&M Services – Warehouse #3 (WA0822KF)12MO$$
000XO&M Services – Warehouse #4 (WA0823KF)12MO$$
000XO&M Services – Warehouse #5 (WA0821KF)12MO$$
000XO&M Services – Warehouse #6 (WA0833KF)12MO$$
000XO&M Services – Warehouse #7 (WA0831KF)12MO$$
000XO&M Services – Warehouse #8 (WA0832KF)12MO$$
000XO&M Services – Warehouse #9 (WA0817KF)12MO$$
000XO&M Services –Sprinkler / Pump House (WA0818KF)12MO$$
000XO&M Services – Fleet Management Building (WA0819KF)12MO$$
000XO&M Services – POV Facility (WA0834KF)12MO$$
000XO&M Services - Washington State Office Building (12MO$$
OPTION PERIOD 1: (03/01/2019 - 02/28/2020)
100XO&M Services - Administrative Bldg (WA0811KA)12MO$$
100XO&M Services – Daycare Center (WA0123KA)12MO$$
100XO&M Services – Warehouse #1 (WA0824KF)12MO$$
100XO&M Services – Warehouse #2 (WA0825KF)12MO$$
100XO&M Services – Warehouse #3 (WA0822KF)12MO$$
100XO&M Services – Warehouse #4 (WA0823KF)12MO$$
100XO&M Services – Warehouse #5 (WA0821KF)12MO$$
100XO&M Services – Warehouse #6 (WA0833KF)12MO$$
100XO&M Services – Warehouse #7 (WA0831KF)12MO$$
100XO&M Services – Warehouse #8 (WA0832KF)12MO$$
100XO&M Services – Warehouse #9 (WA0817KF)12MO$$
100XO&M Services –Sprinkler / Pump House (WA0818KF)12MO$$
100XO&M Services – Fleet Management Building (WA0819KF)12MO$$
100XO&M Services – POV Facility (WA0834KF)12MO$$
100XO&M Services - Washington State Office Building (12MO$$
OPTION PERIOD 2: (03/01/2020 - 02/28/2021)
200XO&M Services - Administrative Bldg (WA0811KA)12MO$$
200XO&M Services – Daycare Center (WA0123KA)12MO$$
200XO&M Services – Warehouse #1 (WA0824KF)12MO$$
200XO&M Services – Warehouse #2 (WA0825KF)12MO$$
200XO&M Services – Warehouse #3 (WA0822KF)12MO$$
200XO&M Services – Warehouse #4 (WA0823KF)12MO$$
200XO&M Services – Warehouse #5 (WA0821KF)12MO$$
200XO&M Services – Warehouse #6 (WA0833KF)12MO$$
200XO&M Services – Warehouse #7 (WA0831KF)12MO$$
200XO&M Services – Warehouse #8 (WA0832KF)12MO$$
200XO&M Services – Warehouse #9 (WA0817KF)12MO$$
200XO&M Services –Sprinkler / Pump House (WA0818KF)12MO$$
200XO&M Services – Fleet Management Building (WA0819KF)12MO$$
200XO&M Services – POV Facility (WA0834KF)12MO$$
200XO&M Services - Washington State Office Building (12MO$$
OPTION PERIOD 3: (03/01/2021 - 02/28/2022)
300XO&M Services - Administrative Bldg (WA0811KA)12MO$$
300XO&M Services – Daycare Center (WA0123KA)12MO$$
300XO&M Services – Warehouse #1 (WA0824KF)12MO$$
300XO&M Services – Warehouse #2 (WA0825KF)12MO$$
300XO&M Services – Warehouse #3 (WA0822KF)12MO$$
300XO&M Services – Warehouse #4 (WA0823KF)12MO$$
300XO&M Services – Warehouse #5 (WA0821KF)12MO$$
300XO&M Services – Warehouse #6 (WA0833KF)12MO$$
300XO&M Services – Warehouse #7 (WA0831KF)12MO$$
300XO&M Services – Warehouse #8 (WA0832KF)12MO$$
300XO&M Services – Warehouse #9 (WA0817KF)12MO$$
300XO&M Services –Sprinkler / Pump House (WA0818KF)12MO$$
300XO&M Services – Fleet Management Building (WA0819KF)12MO$$
300XO&M Services – POV Facility (WA0834KF)12MO$$
300XO&M Services - Washington State Office Building (12MO$$
OPTION PERIOD 4: (03/01/2022 - 02/28/2023)
400XO&M Services - Administrative Bldg (WA0811KA)12MO$$
400XO&M Services – Daycare Center (WA0123KA)12MO$$
400XO&M Services – Warehouse #1 (WA0824KF)12MO$$
400XO&M Services – Warehouse #2 (WA0825KF)12MO$$
400XO&M Services – Warehouse #3 (WA0822KF)12MO$$
400XO&M Services – Warehouse #4 (WA0823KF)12MO$$
400XO&M Services – Warehouse #5 (WA0821KF)12MO$$
400XO&M Services – Warehouse #6 (WA0833KF)12MO$$
400XO&M Services – Warehouse #7 (WA0831KF)12MO$$
400XO&M Services – Warehouse #8 (WA0832KF)12MO$$
400XO&M Services – Warehouse #9 (WA0817KF)12MO$$
400XO&M Services –Sprinkler / Pump House (WA0818KF)12MO$$
400XO&M Services – Fleet Management Building (WA0819KF)12MO$$
400XO&M Services – POV Facility (WA0834KF)12MO$$
400XO&M Services - Washington State Office Building (12MO$$

GSA Administrative Building (WA0811KA): 400 15th Street SW, Auburn, WA 98001 Daycare Center (WA0123KA): 520 15th Street SW, Auburn, WA 98001 Warehouse #1 (WA0824KF): 2701 C Street SW, Auburn, WA 98001 Warehouse #2 (WA0825KF): 2703 C Street SW, Auburn, WA 98001 Warehouse #3 (WA0822KF): 2507 C Street SW, Auburn, WA 98001 Warehouse #4 (WA0823KF): 2509 C Street SW, Auburn, WA 98001 Warehouse #5 (WA0821KF): 2201 C Street SW, Auburn, W 98001 Warehouse #6 (WA0833KF): 2203 C Street SW, Auburn, WA 98001 Warehouse #7 (WA0831KF): 1901 C Street SW, Auburn, WA 98001 Warehouse #8 (WA0832KF): 1903 C Street SW, Auburn, WA 98001 Warehouse #9 (WA0817KF): 1901 C Street SW, Auburn, WA 98001 Sprinkler / Pump House (WA0818KF): 2801 C Street SW, Auburn, WA 98001 Fleet Management Building (WA0819KF): 2601 C Street SW, Auburn, WA 98001 POV Facility (WA0834KF): 2501 C Street SW, Auburn, WA Washington State Office Building (WA7810ZZ): C Street SW, Auburn, WA

Attachment 6 - Profit and G&A

Attachment 6
Schedule of Pricing: Profit and G&A
The contractor must provide all management, supervision, labor, materials, supplies and equipment (except as otherwise provided), and shall plan, schedule, coordinate and assure effective performance of all services described herein. The Contractor must provide O&M Services in accordance with the requirements of this solicitation at:
SCHEDULE OF PRICING: Profit and G&A
Item No:ServicesQuantityUnit%Profit%G&A
BASE PERIOD: (03/01/2018 - 02/28/2019)
000XO&M Services - Administrative Bldg (WA0811KA)12MO%%
000XO&M Services – Daycare Center (WA0123KA)12MO%%
000XO&M Services – Warehouse #1 (WA0824KF)12MO%%
000XO&M Services – Warehouse #2 (WA0825KF)12MO%%
000XO&M Services – Warehouse #3 (WA0822KF)12MO%%
000XO&M Services – Warehouse #4 (WA0823KF)12MO%%
000XO&M Services – Warehouse #5 (WA0821KF)12MO%%
000XO&M Services – Warehouse #6 (WA0833KF)12MO%%
000XO&M Services – Warehouse #7 (WA0831KF)12MO%%
000XO&M Services – Warehouse #8 (WA0832KF)12MO%%
000XO&M Services – Warehouse #9 (WA0817KF)12MO%%
000XO&M Services –Sprinkler / Pump House (WA0818KF)12MO%%
000XO&M Services – Fleet Management Building (WA0819KF)12MO%%
000XO&M Services – POV Facility (WA0834KF)12MO%%
000XO&M Services - Washington State Office Building (12MO%%
OPTION PERIOD 1: (03/01/2019 - 02/28/2020)
100XO&M Services - Administrative Bldg (WA0811KA)12MO%%
100XO&M Services – Daycare Center (WA0123KA)12MO%%
100XO&M Services – Warehouse #1 (WA0824KF)12MO%%
100XO&M Services – Warehouse #2 (WA0825KF)12MO%%
100XO&M Services – Warehouse #3 (WA0822KF)12MO%%
100XO&M Services – Warehouse #4 (WA0823KF)12MO%%
100XO&M Services – Warehouse #5 (WA0821KF)12MO%%
100XO&M Services – Warehouse #6 (WA0833KF)12MO%%
100XO&M Services – Warehouse #7 (WA0831KF)12MO%%
100XO&M Services – Warehouse #8 (WA0832KF)12MO%%
100XO&M Services – Warehouse #9 (WA0817KF)12MO%%
100XO&M Services –Sprinkler / Pump House (WA0818KF)12MO%%
100XO&M Services – Fleet Management Building (WA0819KF)12MO%%
100XO&M Services – POV Facility (WA0834KF)12MO%%
100XO&M Services - Washington State Office Building (12MO%%
OPTION PERIOD 2: (03/01/2020 - 02/28/2021)
200XO&M Services - Administrative Bldg (WA0811KA)12MO%%
200XO&M Services – Daycare Center (WA0123KA)12MO%%
200XO&M Services – Warehouse #1 (WA0824KF)12MO%%
200XO&M Services – Warehouse #2 (WA0825KF)12MO%%
200XO&M Services – Warehouse #3 (WA0822KF)12MO%%
200XO&M Services – Warehouse #4 (WA0823KF)12MO%%
200XO&M Services – Warehouse #5 (WA0821KF)12MO%%
200XO&M Services – Warehouse #6 (WA0833KF)12MO%%
200XO&M Services – Warehouse #7 (WA0831KF)12MO%%
200XO&M Services – Warehouse #8 (WA0832KF)12MO%%
200XO&M Services – Warehouse #9 (WA0817KF)12MO%%
200XO&M Services –Sprinkler / Pump House (WA0818KF)12MO%%
200XO&M Services – Fleet Management Building (WA0819KF)12MO%%
200XO&M Services – POV Facility (WA0834KF)12MO%%
200XO&M Services - Washington State Office Building (12MO%%
OPTION PERIOD 3: (03/01/2021 - 02/28/2022)
300XO&M Services - Administrative Bldg (WA0811KA)12MO%%
300XO&M Services – Daycare Center (WA0123KA)12MO%%
300XO&M Services – Warehouse #1 (WA0824KF)12MO%%
300XO&M Services – Warehouse #2 (WA0825KF)12MO%%
300XO&M Services – Warehouse #3 (WA0822KF)12MO%%
300XO&M Services – Warehouse #4 (WA0823KF)12MO%%
300XO&M Services – Warehouse #5 (WA0821KF)12MO%%
300XO&M Services – Warehouse #6 (WA0833KF)12MO%%
300XO&M Services – Warehouse #7 (WA0831KF)12MO%%
300XO&M Services – Warehouse #8 (WA0832KF)12MO%%
300XO&M Services – Warehouse #9 (WA0817KF)12MO%%
300XO&M Services –Sprinkler / Pump House (WA0818KF)12MO%%
300XO&M Services – Fleet Management Building (WA0819KF)12MO%%
300XO&M Services – POV Facility (WA0834KF)12MO%%
300XO&M Services - Washington State Office Building (12MO%%
OPTION PERIOD 4: (03/01/2022 - 02/28/2023)
400XO&M Services - Administrative Bldg (WA0811KA)12MO%%
400XO&M Services – Daycare Center (WA0123KA)12MO%%
400XO&M Services – Warehouse #1 (WA0824KF)12MO%%
400XO&M Services – Warehouse #2 (WA0825KF)12MO%%
400XO&M Services – Warehouse #3 (WA0822KF)12MO%%
400XO&M Services – Warehouse #4 (WA0823KF)12MO%%
400XO&M Services – Warehouse #5 (WA0821KF)12MO%%
400XO&M Services – Warehouse #6 (WA0833KF)12MO%%
400XO&M Services – Warehouse #7 (WA0831KF)12MO%%
400XO&M Services – Warehouse #8 (WA0832KF)12MO%%
400XO&M Services – Warehouse #9 (WA0817KF)12MO%%
400XO&M Services –Sprinkler / Pump House (WA0818KF)12MO%%
400XO&M Services – Fleet Management Building (WA0819KF)12MO%%
400XO&M Services – POV Facility (WA0834KF)12MO%%
400XO&M Services - Washington State Office Building (12MO%%

GSA Administrative Building (WA0811KA): 400 15th Street SW, Auburn, WA 98001 Daycare Center (WA0123KA): 520 15th Street SW, Auburn, WA 98001 Warehouse #1 (WA0824KF): 2701 C Street SW, Auburn, WA 98001 Warehouse #2 (WA0825KF): 2703 C Street SW, Auburn, WA 98001 Warehouse #3 (WA0822KF): 2507 C Street SW, Auburn, WA 98001 Warehouse #4 (WA0823KF): 2509 C Street SW, Auburn, WA 98001 Warehouse #5 (WA0821KF): 2201 C Street SW, Auburn, W 98001 Warehouse #6 (WA0833KF): 2203 C Street SW, Auburn, WA 98001 Warehouse #7 (WA0831KF): 1901 C Street SW, Auburn, WA 98001 Warehouse #8 (WA0832KF): 1903 C Street SW, Auburn, WA 98001 Warehouse #9 (WA0817KF): 1901 C Street SW, Auburn, WA 98001 Sprinkler / Pump House (WA0818KF): 2801 C Street SW, Auburn, WA 98001 Fleet Management Building (WA0819KF): 2601 C Street SW, Auburn, WA 98001

Washington State Office Building

GSA Administrative Building (WA0811KA): 400 15th Street SW, Auburn, WA 98001 Daycare Center (WA0123KA): 520 15th Street SW, Auburn, WA 98001 Warehouse #1 (WA0824KF): 2701 C Street SW, Auburn, WA 98001 Warehouse #2 (WA0825KF): 2703 C Street SW, Auburn, WA 98001 Warehouse #3 (WA0822KF): 2507 C Street SW, Auburn, WA 98001 Warehouse #4 (WA0823KF): 2509 C Street SW, Auburn, WA 98001 Warehouse #5 (WA0821KF): 2201 C Street SW, Auburn, W 98001 Warehouse #6 (WA0833KF): 2203 C Street SW, Auburn, WA 98001 Warehouse #7 (WA0831KF): 1901 C Street SW, Auburn, WA 98001 Warehouse #8 (WA0832KF): 1903 C Street SW, Auburn, WA 98001 Warehouse #9 (WA0817KF): 1901 C Street SW, Auburn, WA 98001 Sprinkler / Pump House (WA0818KF): 2801 C Street SW, Auburn, WA 98001 Fleet Management Building (WA0819KF): 2601 C Street SW, Auburn, WA 98001

Attachment 7 - Switchgear

Attachment 7
Schedule of Pricing: Switchgear Testing
The contractor must provide all management, supervision, labor, materials, supplies and equipment (except as otherwise provided), and shall plan, schedule, coordinate and assure effective performance of all services described herein. The Contractor must provide O&M Services in accordance with the requirements of this solicitation at:
SCHEDULE OF PRICING: Switchgear Testing
Item No:ServicesQuantityAnnual Infrared3 Year Testing
BASE PERIOD: (03/01/2018 - 02/28/2019)
000XO&M Services - Administrative Bldg (WA0811KA)12$
000XO&M Services – Daycare Center (WA0123KA)12$
000XO&M Services – Warehouse #1 (WA0824KF)12$
000XO&M Services – Warehouse #2 (WA0825KF)12$
000XO&M Services – Warehouse #3 (WA0822KF)12$
000XO&M Services – Warehouse #4 (WA0823KF)12$
000XO&M Services – Warehouse #5 (WA0821KF)12$
000XO&M Services – Warehouse #6 (WA0833KF)12$
000XO&M Services – Warehouse #7 (WA0831KF)12$
000XO&M Services – Warehouse #8 (WA0832KF)12$
000XO&M Services – Warehouse #9 (WA0817KF)12$
000XO&M Services –Sprinkler / Pump House (WA0818KF)12$
000XO&M Services – Fleet Management Building (WA0819KF)12$
000XO&M Services – POV Facility (WA0834KF)12$
000XO&M Services - Washington State Office Building (12$
OPTION PERIOD 1: (03/01/2019 - 02/28/2020)
100XO&M Services - Administrative Bldg (WA0811KA)12$
100XO&M Services – Daycare Center (WA0123KA)12$
100XO&M Services – Warehouse #1 (WA0824KF)12$
100XO&M Services – Warehouse #2 (WA0825KF)12$
100XO&M Services – Warehouse #3 (WA0822KF)12$
100XO&M Services – Warehouse #4 (WA0823KF)12$
100XO&M Services – Warehouse #5 (WA0821KF)12$
100XO&M Services – Warehouse #6 (WA0833KF)12$
100XO&M Services – Warehouse #7 (WA0831KF)12$
100XO&M Services – Warehouse #8 (WA0832KF)12$
100XO&M Services – Warehouse #9 (WA0817KF)12$
100XO&M Services –Sprinkler / Pump House (WA0818KF)12$
100XO&M Services – Fleet Management Building (WA0819KF)12$
100XO&M Services – POV Facility (WA0834KF)12$
100XO&M Services - Washington State Office Building (12$
OPTION PERIOD 2: (03/01/2020 - 02/28/2021)**3 YEAR TESTING DUE**
200XO&M Services - Administrative Bldg (WA0811KA)12$$
200XO&M Services – Daycare Center (WA0123KA)12$$
200XO&M Services – Warehouse #1 (WA0824KF)12$$
200XO&M Services – Warehouse #2 (WA0825KF)12$$
200XO&M Services – Warehouse #3 (WA0822KF)12$$
200XO&M Services – Warehouse #4 (WA0823KF)12$$
200XO&M Services – Warehouse #5 (WA0821KF)12$$
200XO&M Services – Warehouse #6 (WA0833KF)12$$
200XO&M Services – Warehouse #7 (WA0831KF)12$$
200XO&M Services – Warehouse #8 (WA0832KF)12$$
200XO&M Services – Warehouse #9 (WA0817KF)12$$
200XO&M Services –Sprinkler / Pump House (WA0818KF)12$$
200XO&M Services – Fleet Management Building (WA0819KF)12$$
200XO&M Services – POV Facility (WA0834KF)12$$
200XO&M Services - Washington State Office Building (12$$
OPTION PERIOD 3: (03/01/2021 - 02/28/2022)
300XO&M Services - Administrative Bldg (WA0811KA)12$
300XO&M Services – Daycare Center (WA0123KA)12$
300XO&M Services – Warehouse #1 (WA0824KF)12$
300XO&M Services – Warehouse #2 (WA0825KF)12$
300XO&M Services – Warehouse #3 (WA0822KF)12$
300XO&M Services – Warehouse #4 (WA0823KF)12$
300XO&M Services – Warehouse #5 (WA0821KF)12$
300XO&M Services – Warehouse #6 (WA0833KF)12$
300XO&M Services – Warehouse #7 (WA0831KF)12$
300XO&M Services – Warehouse #8 (WA0832KF)12$
300XO&M Services – Warehouse #9 (WA0817KF)12$
300XO&M Services –Sprinkler / Pump House (WA0818KF)12$
300XO&M Services – Fleet Management Building (WA0819KF)12$
300XO&M Services – POV Facility (WA0834KF)12$
300XO&M Services - Washington State Office Building (12$
OPTION PERIOD 4: (03/01/2022 - 02/28/2023)
400XO&M Services - Administrative Bldg (WA0811KA)12$
400XO&M Services – Daycare Center (WA0123KA)12$
400XO&M Services – Warehouse #1 (WA0824KF)12$
400XO&M Services – Warehouse #2 (WA0825KF)12$
400XO&M Services – Warehouse #3 (WA0822KF)12$
400XO&M Services – Warehouse #4 (WA0823KF)12$
400XO&M Services – Warehouse #5 (WA0821KF)12$
400XO&M Services – Warehouse #6 (WA0833KF)12$
400XO&M Services – Warehouse #7 (WA0831KF)12$
400XO&M Services – Warehouse #8 (WA0832KF)12$
400XO&M Services – Warehouse #9 (WA0817KF)12$
400XO&M Services –Sprinkler / Pump House (WA0818KF)12$
400XO&M Services – Fleet Management Building (WA0819KF)12$
400XO&M Services – POV Facility (WA0834KF)12$
400XO&M Services - Washington State Office Building (12$

GSA Administrative Building (WA0811KA): 400 15th Street SW, Auburn, WA 98001 Daycare Center (WA0123KA): 520 15th Street SW, Auburn, WA 98001 Warehouse #1 (WA0824KF): 2701 C Street SW, Auburn, WA 98001 Warehouse #2 (WA0825KF): 2703 C Street SW, Auburn, WA 98001 Warehouse #3 (WA0822KF): 2507 C Street SW, Auburn, WA 98001 Warehouse #4 (WA0823KF): 2509 C Street SW, Auburn, WA 98001 Warehouse #5 (WA0821KF): 2201 C Street SW, Auburn, W 98001 Warehouse #6 (WA0833KF): 2203 C Street SW, Auburn, WA 98001 Warehouse #7 (WA0831KF): 1901 C Street SW, Auburn, WA 98001 Warehouse #8 (WA0832KF): 1903 C Street SW, Auburn, WA 98001 Warehouse #9 (WA0817KF): 1901 C Street SW, Auburn, WA 98001 Sprinkler / Pump House (WA0818KF): 2801 C Street SW, Auburn, WA 98001 Fleet Management Building (WA0819KF): 2601 C Street SW, Auburn, WA 98001

Warehouse #1 (WA0824KF): 2701 C Street SW, Auburn, WA 98001 Warehouse #2 (WA0825KF): 2703 C Street SW, Auburn, WA 98001 Warehouse #3 (WA0822KF): 2507 C Street SW, Auburn, WA 98001 Warehouse #4 (WA0823KF): 2509 C Street SW, Auburn, WA 98001 Warehouse #5 (WA0821KF): 2201 C Street SW, Auburn, W 98001 Warehouse #6 (WA0833KF): 2203 C Street SW, Auburn, WA 98001 Warehouse #7 (WA0831KF): 1901 C Street SW, Auburn, WA 98001 Warehouse #8 (WA0832KF): 1903 C Street SW, Auburn, WA 98001 Warehouse #9 (WA0817KF): 1901 C Street SW, Auburn, WA 98001 Sprinkler / Pump House (WA0818KF): 2801 C Street SW, Auburn, WA 98001 Fleet Management Building (WA0819KF): 2601 C Street SW, Auburn, WA 98001

Attachment 8 - Addt'l Services

Attachment 8
Schedule of Pricing: Additional Services
The contractor must provide all management, supervision, labor, materials, supplies and equipment (except as otherwise provided), and shall plan, schedule, coordinate and assure effective performance of all services described herein. The Contractor must provide O&M Services in accordance with the requirements of this solicitation at:
SCHEDULE OF PRICING: Additional Services
Item No:ServicesQuantityUnitPriceAmount
BASE PERIOD: (03/01/2018 - 02/28/2019)
000XAdditional Services – Regular50HR$$
000XAdditional Service - OT50HR$$
000XEmergency Call Back Service50HR$$
000XMiscellaneous Services – Regular50HR$$
000XMiscellaneous Services – OT50HR$$
OPTION PERIOD 1: (03/01/2019 - 02/28/2020)
100XAdditional Services – Regular50HR$$
100XAdditional Service - OT50HR$$
100XEmergency Call Back Service50HR$$
100XMiscellaneous Services – Regular50HR$$
100XMiscellaneous Services – OT50HR$$
OPTION PERIOD 2: (03/01/2020 - 02/28/2021)
200XAdditional Services – Regular50HR$$
200XAdditional Service - OT50HR$$
200XEmergency Call Back Service50HR$$
200XMiscellaneous Services – Regular50HR$$
200XMiscellaneous Services – OT50HR$$
OPTION PERIOD 3: (03/01/2021 - 02/28/2022)
300XAdditional Services – Regular50HR$$
300XAdditional Service - OT50HR$$
300XEmergency Call Back Service50HR$$
300XMiscellaneous Services – Regular50HR$$
300XMiscellaneous Services – OT50HR$$
OPTION PERIOD 4: (03/01/2022 - 02/28/2023)
400XAdditional Services – Regular50HR$$
400XAdditional Service - OT50HR$$
400XEmergency Call Back Service50HR$$
400XMiscellaneous Services – Regular50HR$$
400XMiscellaneous Services – OT50HR$$

GSA Administrative Building (WA0811KA): 400 15th Street SW, Auburn, WA 98001 Daycare Center (WA0123KA): 520 15th Street SW, Auburn, WA 98001 Warehouse #1 (WA0824KF): 2701 C Street SW, Auburn, WA 98001 Warehouse #2 (WA0825KF): 2703 C Street SW, Auburn, WA 98001 Warehouse #3 (WA0822KF): 2507 C Street SW, Auburn, WA 98001 Warehouse #4 (WA0823KF): 2509 C Street SW, Auburn, WA 98001 Warehouse #5 (WA0821KF): 2201 C Street SW, Auburn, W 98001 Warehouse #6 (WA0833KF): 2203 C Street SW, Auburn, WA 98001 Warehouse #7 (WA0831KF): 1901 C Street SW, Auburn, WA 98001 Warehouse #8 (WA0832KF): 1903 C Street SW, Auburn, WA 98001 Warehouse #9 (WA0817KF): 1901 C Street SW, Auburn, WA 98001 Sprinkler / Pump House (WA0818KF): 2801 C Street SW, Auburn, WA 98001 Fleet Management Building (WA0819KF): 2601 C Street SW, Auburn, WA 98001

Warehouse #1 (WA0824KF): 2701 C Street SW, Auburn, WA 98001 Warehouse #2 (WA0825KF): 2703 C Street SW, Auburn, WA 98001 Warehouse #3 (WA0822KF): 2507 C Street SW, Auburn, WA 98001 Warehouse #4 (WA0823KF): 2509 C Street SW, Auburn, WA 98001 Warehouse #5 (WA0821KF): 2201 C Street SW, Auburn, W 98001 Warehouse #6 (WA0833KF): 2203 C Street SW, Auburn, WA 98001 Warehouse #7 (WA0831KF): 1901 C Street SW, Auburn, WA 98001 Warehouse #8 (WA0832KF): 1903 C Street SW, Auburn, WA 98001 Warehouse #9 (WA0817KF): 1901 C Street SW, Auburn, WA 98001 Sprinkler / Pump House (WA0818KF): 2801 C Street SW, Auburn, WA 98001 Fleet Management Building (WA0819KF): 2601 C Street SW, Auburn, WA 98001

Attachment 8a-Pt Angeles

ATTACHMENT 8A
SCHEDULE OF PRICING: PORT ANGELES ADDITIONAL SERVICES
"NOTE TO CONTRACTOR: "Price" is considered on-sight time in labor hours, materials needed, and sub-contracted expenses for this requirement. All Additional Services work will require a Cost Proposal and Final invoice. Travel costs will be captured and reimbursed IAW FTR. G/A and Profit should be added at time of invoice."
BASE PERIOD: 03/01/2018 - 02/28/2019
CLINGuide #Equipment DiscriptionQTYUnitLocationPM StandardUnit Price
000xA-04Air Compressor - Binks - 1.5 HP1PriceBoiler RoomHVAC-AIR-02-06M
000xA-10AHeat Pump - Carrier - Model 50QJ006500-5 HP1PriceRoofHVAC-ACR-03-01Y
000xA-10AHeat pump - Carrier - Model 38CQ 020- 1.5 HP1PriceRoofHVAC-ACR-03-01Y
000xA-11AAir Handling Unit - 490 CFM - Mdl 40DQ018 300B1PriceSSA Computer RoomHVAC-AHU-01-01Y:
000xA-11AAir Handling Unit - 490 CFM - Mdl 40DQ018 300B1PriceSSA Computer RoomHVAC-FLT-01-03M
000xA-11AAir Handling Unit - 1750 CFM - Mdl 39BA050 - A691PriceAtticHVAC-AHU-01-01Y:
000xA-11AAir Handling Unit - 1750 CFM - Mdl 39BA050 - A691PriceAtticHVAC-FLT-01-03M
000xB-02ALow Press Steam Boiler, Cast Iron - Weil McLain - 1,583,900 BTU rating steam 66001PriceBoiler RoomHVAC-BLR-01-01Y
000xB-04Burner, Carlin - 1,690,000 BTU1PriceBoiler RoomHVAC-BLR-04-01Y
000xF-01Alarm Check Valves(11 EA)11PriceBldgFLSF-VLV-03-01W
000xF-02Deluge & Preaction Valves 2 1/2" (2 EA)2PriceBsmtFLSF-VLV-01-01Y
000xF-09Fire Dept. Connection1PriceFront Bldg.FLSF-HSE-02-03M
000xF-143 smoke detectors - 1 each floor Automatic Fire Detection Device - Smoke detector3PriceThroughoutFLSF-ALM-03-01Y
000xF-14AAuto Fire Detection Waterflow Alarms (4)4PriceThroughoutFLSF-ALM-04-03M
000xF-15Fire Panels - local systems1PriceBsmtFLSF-ALM-13-01Y
000xF-17Fire Alarm Box Pull Stations (10EA)10PriceThroughoutFLSF-ALM-16-01Y
000xF-22Fire Extinguisher, Pressure w/gauge(15 EA)15PriceThroughoutFLSF-FEX-06-01M
000xF-24Fire Extinguisher, Inspection(15 EA)15PriceThroughoutFLSF-FEX-02-01Y
000xF-34Fluores Fix, Ind. 2 tube, 48" (46EA)46PriceBldg.ELEC-LTG-02-05Y
000xF-34Fluores Fix, Louver, 2 tube, 48" (9EA)9PriceBldg.ELEC-LTG-02-05Y
000xF-34Fluores Fix, Louver, 3 tube, 48" (94EA)9PriceBldg.ELEC-LTG-02-05Y
000xF-34Fluores Fix, Louver, 8 tube, 48"(35EA)35PriceBldg.ELEC-LTG-02-05Y
000xI-04Fan Coil Unit, Ceiling Hung1PriceSSA Computer RoomHVAC-FAN-02-01Y
000xI-04Fan Coil Unit, Ceiling Hung1PriceSSA Computer RoomHVAC-FLT-01-03M
000xL-03Lighting, Special Fixture (62EA)62PriceStairsELEC-LTG-02-05Y
000xL-03Lighting, Special Fixture Mercury Vapor (2EA)2PriceSkylightELEC-LTG-02-05Y
000xL-04Lighting, 12' to 25' high incandescent (3EA)3PriceOutsideELEC-LTG-02-05Y
000xV-09ABackflow Preventer (0 to 1.5 In.)1PriceBoiler RoomPLMB-VLV-05-01Y
000xW-09Water Treatment for Heating System (1)1PriceBoiler RoomHVAC-WTM-01-01M
000xX-76ASME Boiler Inspection (1)1PriceBoiler Room
000xX-77ASME Unfired Pressure Vessel Inspection (1)1PriceBoiler Room
000xTravel - NTE $500.00/order ($4000/year)1per orderAuburn to Port Angeles
OPTION PERIOD I: 03/01/2019 - 02/28/2020
CLINGuide #Equipment DiscriptionQTYUnitLocationPM StandardUnit Price
100xA-04Air Compressor - Binks - 1.5 HP1PriceBoiler RoomHVAC-AIR-02-06M
100xA-10AHeat Pump - Carrier - Model 50QJ006500-5 HP1PriceRoofHVAC-ACR-03-01Y
100xA-10AHeat pump - Carrier - Model 38CQ 020- 1.5 HP1PriceRoofHVAC-ACR-03-01Y
100xA-11AAir Handling Unit - 490 CFM - Mdl 40DQ018 300B1PriceSSA Computer RoomHVAC-AHU-01-01Y:
100xA-11AAir Handling Unit - 490 CFM - Mdl 40DQ018 300B1PriceSSA Computer RoomHVAC-FLT-01-03M
100xA-11AAir Handling Unit - 1750 CFM - Mdl 39BA050 - A691PriceAtticHVAC-AHU-01-01Y:
100xA-11AAir Handling Unit - 1750 CFM - Mdl 39BA050 - A691PriceAtticHVAC-FLT-01-03M
100xB-02ALow Press Steam Boiler, Cast Iron - Weil McLain - 1,583,900 BTU rating steam 66001PriceBoiler RoomHVAC-BLR-01-01Y
100xB-04Burner, Carlin - 1,690,000 BTU1PriceBoiler RoomHVAC-BLR-04-01Y
100xF-01Alarm Check Valves(11 EA)11PriceBldgFLSF-VLV-03-01W
100xF-02Deluge & Preaction Valves 2 1/2" (2 EA)2PriceBsmtFLSF-VLV-01-01Y
100xF-09Fire Dept. Connection1PriceFront Bldg.FLSF-HSE-02-03M
100xF-143 smoke detectors - 1 each floor Automatic Fire Detection Device - Smoke detector3PriceThroughoutFLSF-ALM-03-01Y
100xF-14AAuto Fire Detection Waterflow Alarms (4)4PriceThroughoutFLSF-ALM-04-03M
100xF-15Fire Panels - local systems1PriceBsmtFLSF-ALM-13-01Y
100xF-17Fire Alarm Box Pull Stations (10EA)10PriceThroughoutFLSF-ALM-16-01Y
100xF-22Fire Extinguisher, Pressure w/gauge(15 EA)15PriceThroughoutFLSF-FEX-06-01M
100xF-24Fire Extinguisher, Inspection(15 EA)15PriceThroughoutFLSF-FEX-02-01Y
100xF-34Fluores Fix, Ind. 2 tube, 48" (46EA)46PriceBldg.ELEC-LTG-02-05Y
100xF-34Fluores Fix, Louver, 2 tube, 48" (9EA)9PriceBldg.ELEC-LTG-02-05Y
100xF-34Fluores Fix, Louver, 3 tube, 48" (94EA)9PriceBldg.ELEC-LTG-02-05Y
100xF-34Fluores Fix, Louver, 8 tube, 48"(35EA)35PriceBldg.ELEC-LTG-02-05Y
100xI-04Fan Coil Unit, Ceiling Hung1PriceSSA Computer RoomHVAC-FAN-02-01Y
100xI-04Fan Coil Unit, Ceiling Hung1PriceSSA Computer RoomHVAC-FLT-01-03M
100xL-03Lighting, Special Fixture (62EA)62PriceStairsELEC-LTG-02-05Y
100xL-03Lighting, Special Fixture Mercury Vapor (2EA)2PriceSkylightELEC-LTG-02-05Y
100xL-04Lighting, 12' to 25' high incandescent (3EA)3PriceOutsideELEC-LTG-02-05Y
100xV-09ABackflow Preventer (0 to 1.5 In.)1PriceBoiler RoomPLMB-VLV-05-01Y
100xW-09Water Treatment for Heating System (1)1PriceBoiler RoomHVAC-WTM-01-01M
100xX-76ASME Boiler Inspection (1)1PriceBoiler Room
100xX-77ASME Unfired Pressure Vessel Inspection (1)1PriceBoiler Room
100xTravel - NTE $500.00/order ($4000/year)1per orderAuburn to Port Angeles
OPTION PERIOD II: 03/01/2020 - 02/28/2021
CLINGuide #Equipment DiscriptionQTYUnitLocationPM StandardUnit Price
200xA-04Air Compressor - Binks - 1.5 HP1PriceBoiler RoomHVAC-AIR-02-06M
200xA-10AHeat Pump - Carrier - Model 50QJ006500-5 HP1PriceRoofHVAC-ACR-03-01Y
200xA-10AHeat pump - Carrier - Model 38CQ 020- 1.5 HP1PriceRoofHVAC-ACR-03-01Y
200xA-11AAir Handling Unit - 490 CFM - Mdl 40DQ018 300B1PriceSSA Computer RoomHVAC-AHU-01-01Y:
200xA-11AAir Handling Unit - 490 CFM - Mdl 40DQ018 300B1PriceSSA Computer RoomHVAC-FLT-01-03M
200xA-11AAir Handling Unit - 1750 CFM - Mdl 39BA050 - A691PriceAtticHVAC-AHU-01-01Y:
200xA-11AAir Handling Unit - 1750 CFM - Mdl 39BA050 - A691PriceAtticHVAC-FLT-01-03M
200xB-02ALow Press Steam Boiler, Cast Iron - Weil McLain - 1,583,900 BTU rating steam 66001PriceBoiler RoomHVAC-BLR-01-01Y
200xB-04Burner, Carlin - 1,690,000 BTU1PriceBoiler RoomHVAC-BLR-04-01Y
200xF-01Alarm Check Valves(11 EA)11PriceBldgFLSF-VLV-03-01W
200xF-02Deluge & Preaction Valves 2 1/2" (2 EA)2PriceBsmtFLSF-VLV-01-01Y
200xF-09Fire Dept. Connection1PriceFront Bldg.FLSF-HSE-02-03M
200xF-143 smoke detectors - 1 each floor Automatic Fire Detection Device - Smoke detector3PriceThroughoutFLSF-ALM-03-01Y
200xF-14AAuto Fire Detection Waterflow Alarms (4)4PriceThroughoutFLSF-ALM-04-03M
200xF-15Fire Panels - local systems1PriceBsmtFLSF-ALM-13-01Y
200xF-17Fire Alarm Box Pull Stations (10EA)10PriceThroughoutFLSF-ALM-16-01Y
200xF-22Fire Extinguisher, Pressure w/gauge(15 EA)15PriceThroughoutFLSF-FEX-06-01M
200xF-24Fire Extinguisher, Inspection(15 EA)15PriceThroughoutFLSF-FEX-02-01Y
200xF-34Fluores Fix, Ind. 2 tube, 48" (46EA)46PriceBldg.ELEC-LTG-02-05Y
200xF-34Fluores Fix, Louver, 2 tube, 48" (9EA)9PriceBldg.ELEC-LTG-02-05Y
200xF-34Fluores Fix, Louver, 3 tube, 48" (94EA)9PriceBldg.ELEC-LTG-02-05Y
200xF-34Fluores Fix, Louver, 8 tube, 48"(35EA)35PriceBldg.ELEC-LTG-02-05Y
200xI-04Fan Coil Unit, Ceiling Hung1PriceSSA Computer RoomHVAC-FAN-02-01Y
200xI-04Fan Coil Unit, Ceiling Hung1PriceSSA Computer RoomHVAC-FLT-01-03M
200xL-03Lighting, Special Fixture (62EA)62PriceStairsELEC-LTG-02-05Y
200xL-03Lighting, Special Fixture Mercury Vapor (2EA)2PriceSkylightELEC-LTG-02-05Y
200xL-04Lighting, 12' to 25' high incandescent (3EA)3PriceOutsideELEC-LTG-02-05Y
200xV-09ABackflow Preventer (0 to 1.5 In.)1PriceBoiler RoomPLMB-VLV-05-01Y
200xW-09Water Treatment for Heating System (1)1PriceBoiler RoomHVAC-WTM-01-01M
200xX-76ASME Boiler Inspection (1)1PriceBoiler Room
200xX-77ASME Unfired Pressure Vessel Inspection (1)1PriceBoiler Room
200xTravel - NTE $500.00/order ($4000/year)1per orderAuburn to Port Angeles
OPTION PERIOD III: 03/01/2021 - 02/28/2022
CLINGuide #Equipment DiscriptionQTYUnitLocationPM StandardUnit Price
300xA-04Air Compressor - Binks - 1.5 HP1PriceBoiler RoomHVAC-AIR-02-06M
300xA-10AHeat Pump - Carrier - Model 50QJ006500-5 HP1PriceRoofHVAC-ACR-03-01Y
300xA-10AHeat pump - Carrier - Model 38CQ 020- 1.5 HP1PriceRoofHVAC-ACR-03-01Y
300xA-11AAir Handling Unit - 490 CFM - Mdl 40DQ018 300B1PriceSSA Computer RoomHVAC-AHU-01-01Y:
300xA-11AAir Handling Unit - 490 CFM - Mdl 40DQ018 300B1PriceSSA Computer RoomHVAC-FLT-01-03M
300xA-11AAir Handling Unit - 1750 CFM - Mdl 39BA050 - A691PriceAtticHVAC-AHU-01-01Y:
300xA-11AAir Handling Unit - 1750 CFM - Mdl 39BA050 - A691PriceAtticHVAC-FLT-01-03M
300xB-02ALow Press Steam Boiler, Cast Iron - Weil McLain - 1,583,900 BTU rating steam 66001PriceBoiler RoomHVAC-BLR-01-01Y
300xB-04Burner, Carlin - 1,690,000 BTU1PriceBoiler RoomHVAC-BLR-04-01Y
300xF-01Alarm Check Valves(11 EA)11PriceBldgFLSF-VLV-03-01W
300xF-02Deluge & Preaction Valves 2 1/2" (2 EA)2PriceBsmtFLSF-VLV-01-01Y
300xF-09Fire Dept. Connection1PriceFront Bldg.FLSF-HSE-02-03M
300xF-143 smoke detectors - 1 each floor Automatic Fire Detection Device - Smoke detector3PriceThroughoutFLSF-ALM-03-01Y
300xF-14AAuto Fire Detection Waterflow Alarms (4)4PriceThroughoutFLSF-ALM-04-03M
300xF-15Fire Panels - local systems1PriceBsmtFLSF-ALM-13-01Y
300xF-17Fire Alarm Box Pull Stations (10EA)10PriceThroughoutFLSF-ALM-16-01Y
300xF-22Fire Extinguisher, Pressure w/gauge(15 EA)15PriceThroughoutFLSF-FEX-06-01M
300xF-24Fire Extinguisher, Inspection(15 EA)15PriceThroughoutFLSF-FEX-02-01Y
300xF-34Fluores Fix, Ind. 2 tube, 48" (46EA)46PriceBldg.ELEC-LTG-02-05Y
300xF-34Fluores Fix, Louver, 2 tube, 48" (9EA)9PriceBldg.ELEC-LTG-02-05Y
300xF-34Fluores Fix, Louver, 3 tube, 48" (94EA)9PriceBldg.ELEC-LTG-02-05Y
300xF-34Fluores Fix, Louver, 8 tube, 48"(35EA)35PriceBldg.ELEC-LTG-02-05Y
300xI-04Fan Coil Unit, Ceiling Hung1PriceSSA Computer RoomHVAC-FAN-02-01Y
300xI-04Fan Coil Unit, Ceiling Hung1PriceSSA Computer RoomHVAC-FLT-01-03M
300xL-03Lighting, Special Fixture (62EA)62PriceStairsELEC-LTG-02-05Y
300xL-03Lighting, Special Fixture Mercury Vapor (2EA)2PriceSkylightELEC-LTG-02-05Y
300xL-04Lighting, 12' to 25' high incandescent (3EA)3PriceOutsideELEC-LTG-02-05Y
300xV-09ABackflow Preventer (0 to 1.5 In.)1PriceBoiler RoomPLMB-VLV-05-01Y
300xW-09Water Treatment for Heating System (1)1PriceBoiler RoomHVAC-WTM-01-01M
300xX-76ASME Boiler Inspection (1)1PriceBoiler Room
300xX-77ASME Unfired Pressure Vessel Inspection (1)1PriceBoiler Room
300xTravel - NTE $500.00/order ($4000/year)1per orderAuburn to Port Angeles
OPTION PERIOD IV: 03/01/2022- 02/28/2023
CLINGuide #Equipment DiscriptionQTYUnitLocationPM StandardUnit Price
400xA-04Air Compressor - Binks - 1.5 HP1PriceBoiler RoomHVAC-AIR-02-06M
400xA-10AHeat Pump - Carrier - Model 50QJ006500-5 HP1PriceRoofHVAC-ACR-03-01Y
400xA-10AHeat pump - Carrier - Model 38CQ 020- 1.5 HP1PriceRoofHVAC-ACR-03-01Y
400xA-11AAir Handling Unit - 490 CFM - Mdl 40DQ018 300B1PriceSSA Computer RoomHVAC-AHU-01-01Y:
400xA-11AAir Handling Unit - 490 CFM - Mdl 40DQ018 300B1PriceSSA Computer RoomHVAC-FLT-01-03M
400xA-11AAir Handling Unit - 1750 CFM - Mdl 39BA050 - A691PriceAtticHVAC-AHU-01-01Y:
400xA-11AAir Handling Unit - 1750 CFM - Mdl 39BA050 - A691PriceAtticHVAC-FLT-01-03M
400xB-02ALow Press Steam Boiler, Cast Iron - Weil McLain - 1,583,900 BTU rating steam 66001PriceBoiler RoomHVAC-BLR-01-01Y
400xB-04Burner, Carlin - 1,690,000 BTU1PriceBoiler RoomHVAC-BLR-04-01Y
400xF-01Alarm Check Valves(11 EA)11PriceBldgFLSF-VLV-03-01W
400xF-02Deluge & Preaction Valves 2 1/2" (2 EA)2PriceBsmtFLSF-VLV-01-01Y
400xF-09Fire Dept. Connection1PriceFront Bldg.FLSF-HSE-02-03M
400xF-143 smoke detectors - 1 each floor Automatic Fire Detection Device - Smoke detector3PriceThroughoutFLSF-ALM-03-01Y
400xF-14AAuto Fire Detection Waterflow Alarms (4)4PriceThroughoutFLSF-ALM-04-03M
400xF-15Fire Panels - local systems1PriceBsmtFLSF-ALM-13-01Y
400xF-17Fire Alarm Box Pull Stations (10EA)10PriceThroughoutFLSF-ALM-16-01Y
400xF-22Fire Extinguisher, Pressure w/gauge(15 EA)15PriceThroughoutFLSF-FEX-06-01M
400xF-24Fire Extinguisher, Inspection(15 EA)15PriceThroughoutFLSF-FEX-02-01Y
400xF-34Fluores Fix, Ind. 2 tube, 48" (46EA)46PriceBldg.ELEC-LTG-02-05Y
400xF-34Fluores Fix, Louver, 2 tube, 48" (9EA)9PriceBldg.ELEC-LTG-02-05Y
400xF-34Fluores Fix, Louver, 3 tube, 48" (94EA)9PriceBldg.ELEC-LTG-02-05Y
400xF-34Fluores Fix, Louver, 8 tube, 48"(35EA)35PriceBldg.ELEC-LTG-02-05Y
400xI-04Fan Coil Unit, Ceiling Hung1PriceSSA Computer RoomHVAC-FAN-02-01Y
400xI-04Fan Coil Unit, Ceiling Hung1PriceSSA Computer RoomHVAC-FLT-01-03M
400xL-03Lighting, Special Fixture (62EA)62PriceStairsELEC-LTG-02-05Y
400xL-03Lighting, Special Fixture Mercury Vapor (2EA)2PriceSkylightELEC-LTG-02-05Y
400xL-04Lighting, 12' to 25' high incandescent (3EA)3PriceOutsideELEC-LTG-02-05Y
400xV-09ABackflow Preventer (0 to 1.5 In.)1PriceBoiler RoomPLMB-VLV-05-01Y
400xW-09Water Treatment for Heating System (1)1PriceBoiler RoomHVAC-WTM-01-01M
400xX-76ASME Boiler Inspection (1)1PriceBoiler Room
400xX-77ASME Unfired Pressure Vessel Inspection (1)1PriceBoiler Room
400xTravel - NTE $500.00/order ($4000/year)1per orderAuburn to Port Angeles

Attachment 16 - Sub. Services

Attachment 16
Schedule of Pricing: Subcontracted Services for: (Identify Here)
For each maintenance service for equipment and systems that will be performed by subcontractors, as identified by the contractor in the response to Section J – Attachment 11 Question 3.e., the contractor must provide the estimated pricing information for each service type. Please use separate schedule of pricing sheet for each of the services identified by the contractor in the response to Section J – Attachment 11 Question 3.e.
SCHEDULE OF PRICING: Subcontracted Services
Item No:ServicesQuantityUnitService Type$$/Mo.$$/Yr.
BASE PERIOD: (03/01/2018 - 02/28/2019)
000XO&M Services - Administrative Bldg (WA0811KA)12MO$$
000XO&M Services – Daycare Center (WA0123KA)12MO$$
000XO&M Services – Warehouse #1 (WA0824KF)12MO$$
000XO&M Services – Warehouse #2 (WA0825KF)12MO$$
000XO&M Services – Warehouse #3 (WA0822KF)12MO$$
000XO&M Services – Warehouse #4 (WA0823KF)12MO$$
000XO&M Services – Warehouse #5 (WA0821KF)12MO$$
000XO&M Services – Warehouse #6 (WA0833KF)12MO$$
000XO&M Services – Warehouse #7 (WA0831KF)12MO$$
000XO&M Services – Warehouse #8 (WA0832KF)12MO$$
000XO&M Services – Warehouse #9 (WA0817KF)12MO$$
000XO&M Services –Sprinkler / Pump House (WA0818KF)12MO$$
000XO&M Services – Fleet Management Building (WA0819KF)12MO$$
000XO&M Services – POV Facility (WA0834KF)12MO$$
000XO&M Services - Washington State Office Building (12MO$$
OPTION PERIOD 1: (03/01/2019 - 02/28/2020)
100XO&M Services - Administrative Bldg (WA0811KA)12MO$$
100XO&M Services – Daycare Center (WA0123KA)12MO$$
100XO&M Services – Warehouse #1 (WA0824KF)12MO$$
100XO&M Services – Warehouse #2 (WA0825KF)12MO$$
100XO&M Services – Warehouse #3 (WA0822KF)12MO$$
100XO&M Services – Warehouse #4 (WA0823KF)12MO$$
100XO&M Services – Warehouse #5 (WA0821KF)12MO$$
100XO&M Services – Warehouse #6 (WA0833KF)12MO$$
100XO&M Services – Warehouse #7 (WA0831KF)12MO$$
100XO&M Services – Warehouse #8 (WA0832KF)12MO$$
100XO&M Services – Warehouse #9 (WA0817KF)12MO$$
100XO&M Services –Sprinkler / Pump House (WA0818KF)12MO$$
100XO&M Services – Fleet Management Building (WA0819KF)12MO$$
100XO&M Services – POV Facility (WA0834KF)12MO$$
100XO&M Services - Washington State Office Building (12MO$$
OPTION PERIOD 2: (03/01/2020 - 02/28/2021)
200XO&M Services - Administrative Bldg (WA0811KA)12MO$$
200XO&M Services – Daycare Center (WA0123KA)12MO$$
200XO&M Services – Warehouse #1 (WA0824KF)12MO$$
200XO&M Services – Warehouse #2 (WA0825KF)12MO$$
200XO&M Services – Warehouse #3 (WA0822KF)12MO$$
200XO&M Services – Warehouse #4 (WA0823KF)12MO$$
200XO&M Services – Warehouse #5 (WA0821KF)12MO$$
200XO&M Services – Warehouse #6 (WA0833KF)12MO$$
200XO&M Services – Warehouse #7 (WA0831KF)12MO$$
200XO&M Services – Warehouse #8 (WA0832KF)12MO$$
200XO&M Services – Warehouse #9 (WA0817KF)12MO$$
200XO&M Services –Sprinkler / Pump House (WA0818KF)12MO$$
200XO&M Services – Fleet Management Building (WA0819KF)12MO$$
200XO&M Services – POV Facility (WA0834KF)12MO$$
200XO&M Services - Washington State Office Building (12MO$$
OPTION PERIOD 3: (03/01/2021 - 02/28/2022)
300XO&M Services - Administrative Bldg (WA0811KA)12MO$$
300XO&M Services – Daycare Center (WA0123KA)12MO$$
300XO&M Services – Warehouse #1 (WA0824KF)12MO$$
300XO&M Services – Warehouse #2 (WA0825KF)12MO$$
300XO&M Services – Warehouse #3 (WA0822KF)12MO$$
300XO&M Services – Warehouse #4 (WA0823KF)12MO$$
300XO&M Services – Warehouse #5 (WA0821KF)12MO$$
300XO&M Services – Warehouse #6 (WA0833KF)12MO$$
300XO&M Services – Warehouse #7 (WA0831KF)12MO$$
300XO&M Services – Warehouse #8 (WA0832KF)12MO$$
300XO&M Services – Warehouse #9 (WA0817KF)12MO$$
300XO&M Services –Sprinkler / Pump House (WA0818KF)12MO$$
300XO&M Services – Fleet Management Building (WA0819KF)12MO$$
300XO&M Services – POV Facility (WA0834KF)12MO$$
300XO&M Services - Washington State Office Building (12MO$$
OPTION PERIOD 4: (03/01/2022 - 02/28/2023)
400XO&M Services - Administrative Bldg (WA0811KA)12MO$$
400XO&M Services – Daycare Center (WA0123KA)12MO$$
400XO&M Services – Warehouse #1 (WA0824KF)12MO$$
400XO&M Services – Warehouse #2 (WA0825KF)12MO$$
400XO&M Services – Warehouse #3 (WA0822KF)12MO$$
400XO&M Services – Warehouse #4 (WA0823KF)12MO$$
400XO&M Services – Warehouse #5 (WA0821KF)12MO$$
400XO&M Services – Warehouse #6 (WA0833KF)12MO$$
400XO&M Services – Warehouse #7 (WA0831KF)12MO$$
400XO&M Services – Warehouse #8 (WA0832KF)12MO$$
400XO&M Services – Warehouse #9 (WA0817KF)12MO$$
400XO&M Services –Sprinkler / Pump House (WA0818KF)12MO$$
400XO&M Services – Fleet Management Building (WA0819KF)12MO$$
400XO&M Services – POV Facility (WA0834KF)12MO$$
400XO&M Services - Washington State Office Building (12MO$$

GSA Administrative Building (WA0811KA): 400 15th Street SW, Auburn, WA 98001 Daycare Center (WA0123KA): 520 15th Street SW, Auburn, WA 98001 Warehouse #1 (WA0824KF): 2701 C Street SW, Auburn, WA 98001 Warehouse #2 (WA0825KF): 2703 C Street SW, Auburn, WA 98001 Warehouse #3 (WA0822KF): 2507 C Street SW, Auburn, WA 98001 Warehouse #4 (WA0823KF): 2509 C Street SW, Auburn, WA 98001 Warehouse #5 (WA0821KF): 2201 C Street SW, Auburn, W 98001 Warehouse #6 (WA0833KF): 2203 C Street SW, Auburn, WA 98001 Warehouse #7 (WA0831KF): 1901 C Street SW, Auburn, WA 98001 Warehouse #8 (WA0832KF): 1903 C Street SW, Auburn, WA 98001 Warehouse #9 (WA0817KF): 1901 C Street SW, Auburn, WA 98001 Sprinkler / Pump House (WA0818KF): 2801 C Street SW, Auburn, WA 98001 Fleet Management Building (WA0819KF): 2601 C Street SW, Auburn, WA 98001

File details come from the government source that posted it.