AM0001-_Section_J_Updated_Attachments_and_Exhibits..pdf

PDF 386 KB Posted

Attached to
Operations and Maintenance Services at the GSA Auburn Complex - Auburn, WA
Solicitation number
EQ10PMP-17-0050
Issued by

About this file

Section J Updated Attachments and Exhibits

View the file

Other files

File Type Posted
AM0014_.pdf PDF
AM0013.pdf PDF
AM0012.pdf PDF
AM0011_EQ10PMP170050..pdf PDF
Section_J_-_Attachment_09_Checklist.v2.pdf PDF
Pre-proposal_Q&A_final.pdf PDF
WD_2015-5545_Rev5_12262017_Pt_Angeles.pdf PDF
AM0010_EQ10PMP170050..pdf PDF
Schedules_of_Pricing_-final.xlsx XLSX spreadsheet
AM0009_EQ10PMP170050_.pdf PDF
AM0008_EQ10PMP170050_.pdf PDF
Attachment_08a_.pdf PDF
AM0007_EQ10PMP170050.pdf PDF
AM0006_EQ10PMP170050.pdf PDF
AM0004_.pdf PDF
Section_H_-_Special_Contract_Requirements.pdf PDF
AM0003_EQ10PMP170050.pdf PDF
Auburn_Complex_PWS_Final_Draft.pdf PDF
AM0002_EQ10PMP170050_final.pdf PDF
Auburn_Complex_Inventory_Master_10-14-17.xlsx XLSX spreadsheet
AM0001_-_pg_6_and_42_of_Auburn_WOMA_Solicitation.v2.pdf PDF
AM0001_EQ10PMP170050.pdf PDF
Auburn_Complex_PWS.pdf PDF
Auburn_WOMA_Solicitation.v2.pdf PDF
Section_J_-_Entire_Attachments_&_Exhibits.pdf PDF
Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 5 Schedule of Pricing: O&M Services

The contractor must provide all management, supervision, labor, materials, supplies and equipment (except as otherwise provided), and shall plan, schedule, coordinate and assure effective performance of all services described herein. The Contractor must provide O&M Services in accordance with the requirements of this solicitation at:

GSA Administrative Building (WA0811KA): 400 15th Street SW, Auburn, WA 98001 Daycare Center (WA0123KA): 520 15th Street SW, Auburn, WA

98001 Warehouse #1 (WA0824KF): 2701 C Street SW, Auburn, WA

98001 Warehouse #2 (WA0825KF): 2703 C Street SW, Auburn, WA

98001 Warehouse #3 (WA0822KF): 2507 C Street SW, Auburn, WA

98001 Warehouse #4 (WA0823KF): 2509 C Street SW, Auburn, WA 98001

Warehouse #5 (WA0821KF): 2201 C Street SW, Auburn, W 98001

Warehouse #6 (WA0833KF): 2203 C Street SW, Auburn, WA 98001

Warehouse #7 (WA0831KF): 1901 C Street SW, Auburn, WA 98001

Warehouse #8 (WA0832KF): 1903 C Street SW, Auburn, WA 98001

Warehouse #9 (WA0817KF): 1901 C Street SW, Auburn, WA 98001

Sprinkler / Pump House (WA0818KF): 2801 C Street SW, Auburn, WA 98001

Fleet Management Building (WA0819KF): 2601 C Street SW, POV Facility (WA0834KF): 2501 C Street SW, Auburn, WA

SCHEDULE OF PRICING: O&M Services Block 19 Item

No:

Block 20 Services

Block 21 Quantity

Block 22 Unit

Block 23 Unit Price

Block 24 Amount

TRANSITION PERIOD (XX/XX/XXXX XX/XX/XXXX)

O&M Services – TBD MO N/A N/A O&M Services – TBD MO N/A N/A

BASE PERIOD: (03/01/2018 - 02/28/2019)

0001 O&M Services - Administrative Bldg

(WA0811KA)

MO

0002 O&M Services – Daycare

Center (WA0123KA)

0003 O&M Services –

Warehouse #1

(WA0824KF)

12 MO

0004 O&M Services –

Warehouse #2

(WA0825KF)

0005 O&M Services –

Warehouse #3

(WA0822KF)

0006 O&M Services –

Warehouse #4

(WA0823KF)

0007 O&M Services –

Warehouse #5

(WA0821KF)

0008 O&M Services –

Warehouse #6

(WA0833KF)

0009 O&M Services –

Warehouse #7

(WA0831KF)

0010 O&M Services –

Warehouse #8

(WA0832KF)

0011 O&M Services –

Warehouse #9

(WA0817KF)

0012 O&M Services – 12 MO $ $

Sprinkler / Pump House

(WA0818KF)

0013 O&M Services – Fleet Management Building

(WA0819KF)

0014 O&M Services –

POV Facility (WA0834KF)

OPTION YEAR 1: (03/01/2019 - 02/29/2020)

1001 O&M Services -

1002 O&M Services – Daycare

1003 O&M Services –

Warehouse #1

1004 O&M Services –

Warehouse #2

1005 O&M Services –

Warehouse #3

1006 O&M Services –

Warehouse #4

1007 O&M Services –

Warehouse #5

1008 O&M Services –

Warehouse #6

1009 O&M Services –

Warehouse #7

1010 O&M Services –

Warehouse #8

1011 O&M Services –

Warehouse #9

1012 O&M Services –

Sprinkler / Pump House

1013 O&M Services –

Fleet Management Building

O&M Services – POV Facility (WA0834KF)

OPTION YEAR 2: (03/01/2020 - 02/28/2021)

2001 O&M Services -

2002 O&M Services – Daycare

2003 O&M Services –

Warehouse #1

2004 O&M Services –

Warehouse #2

2005 O&M Services –

Warehouse #3

2006 O&M Services –

Warehouse #4

2007 O&M Services –

Warehouse #5

2008 O&M Services –

Warehouse #6

2009 O&M Services –

Warehouse #7

2010 O&M Services –

Warehouse #8

2011 O&M Services – Warehouse #9

2012 O&M Services –

Sprinkler / Pump House

2013 O&M Services –

Fleet Management Building

2014 O&M Services –

POV Facility (WA0834KF)

OPTION YEAR 3: (03/01/2021 - 02/28/2022)

3001 O&M Services -

3002 O&M Services – Daycare

3003 O&M Services –

Warehouse #1

3004 O&M Services –

Warehouse #2

3005 O&M Services –

Warehouse #3

3006 O&M Services –

Warehouse #4

3007 O&M Services –

Warehouse #5

3008 O&M Services –

Warehouse #6

3009 O&M Services –

Warehouse #7

3010 O&M Services – 12 MO $ $

Warehouse #8

3011 O&M Services –

3012 O&M Services –

Sprinkler / Pump House

3013 O&M Services –

Fleet Management Building

3014 O&M Services –

POV Facility (WA0834KF)

OPTION YEAR 4: (03/01/2022 - 02/28/2023)

4001 O&M Services -

4002 O&M Services – Daycare

4003 O&M Services –

Warehouse #1

4004 O&M Services –

Warehouse #2

4005 O&M Services –

Warehouse #3

4006 O&M Services –

Warehouse #4

4007 O&M Services –

Warehouse #5

4008 O&M Services –

Warehouse #6

4009 O&M Services –

Warehouse #7

4010 O&M Services –

Warehouse #8

4011 O&M Services –

Warehouse #9

4012 O&M Services –

Sprinkler / Pump House

4013 O&M Services –

Fleet Management Building

4014 O&M Services –

POV Facility (WA0834KF)

Attachment 6 Schedule of Pricing: Profit and G&A

The contractor must provide all management, supervision, labor, materials, supplies and equipment (except as otherwise provided), and shall plan, schedule, coordinate and assure effective performance of all services described herein. The Contractor must provide O&M Services in accordance with the requirements of this solicitation at:

Daycare Center (WA0123KA): 520 15th Street SW, Auburn, WA

98001 Warehouse #1 (WA0824KF): 2701 C Street SW, Auburn, WA

98001 Warehouse #2 (WA0825KF): 2703 C Street SW, Auburn, WA

98001 Warehouse #3 (WA0822KF): 2507 C Street SW, Auburn, WA

98001 Warehouse #4 (WA0823KF): 2509 C Street SW, Auburn, WA 98001

Warehouse #5 (WA0821KF): 2201 C Street SW, Auburn, W 98001

Warehouse #6 (WA0833KF): 2203 C Street SW, Auburn, WA 98001

Warehouse #7 (WA0831KF): 1901 C Street SW, Auburn, WA 98001

Warehouse #8 (WA0832KF): 1903 C Street SW, Auburn, WA 98001

Warehouse #9 (WA0817KF): 1901 C Street SW, Auburn, WA 98001

Sprinkler / Pump House (WA0818KF): 2801 C Street SW, Auburn, WA 98001

Fleet Management Building (WA0819KF): 2601 C Street SW, SCHEDULE OF PRICING: Profit and G&A

TRANSITION PERIOD (XX/XX/XXXX – XX/XX/XXXX)

% PROFIT % G&A

O&M Services – TBD MO N/A N/A O&M Services – TBD MO N/A N/A

BASE PERIOD: (03/01/2018 - 02/28/2019)

0001 O&M Services -

0002 O&M Services – Daycare

0003 O&M Services –

Warehouse #1

0004 O&M Services –

Warehouse #2

0005 O&M Services –

Warehouse #3

0006 O&M Services –

Warehouse #4

0007 O&M Services –

Warehouse #5

0008 O&M Services –

Warehouse #6

0009 O&M Services –

Warehouse #7

0010 O&M Services –

Warehouse #8

0011 O&M Services –

Warehouse #9

0012 O&M Services –

Sprinkler / Pump House

0013 O&M Services –

Fleet Management Building

0014 O&M Services – 12 MO % %

POV Facility (WA0834KF)

OPTION YEAR 1: (03/01/2019 - 02/29/2020)

1001 O&M Services -

1002 O&M Services – Daycare

1003 O&M Services –

Warehouse #1

1004 O&M Services –

Warehouse #2

1005 O&M Services –

Warehouse #3

1006 O&M Services –

Warehouse #4

1007 O&M Services –

Warehouse #5

1008 O&M Services –

Warehouse #6

1009 O&M Services –

Warehouse #7

1010 O&M Services –

Warehouse #8

1011 O&M Services –

Warehouse #9

1012 O&M Services –

Sprinkler / Pump House

1013 O&M Services –

Fleet Management Building

1014 O&M Services –

POV Facility (WA0834KF)

OPTION YEAR 2: (03/01/2020 - 02/28/2021)

2001 O&M Services -

2002 O&M Services – Daycare

2003 O&M Services –

Warehouse #1

2004 O&M Services –

Warehouse #2

2005 O&M Services –

Warehouse #3

2006 O&M Services –

Warehouse #4

2007 O&M Services –

Warehouse #5

2008 O&M Services –

Warehouse #6

2009 O&M Services –

Warehouse #7

2010 O&M Services –

Warehouse #8

2011 O&M Services –

Warehouse #9

2012 O&M Services –

Sprinkler / Pump House

2013 O&M Services –

Fleet Management Building

2014 O&M Services –

POV Facility (WA0834KF)

OPTION YEAR 3: (03/01/2021 - 02/28/2022)

3001 O&M Services -

3002 O&M Services – Daycare 12 MO % %

3003 O&M Services –

Warehouse #1

3004 O&M Services –

Warehouse #2

3005 O&M Services –

Warehouse #3

3006 O&M Services –

Warehouse #4

3007 O&M Services –

Warehouse #5

3008 O&M Services –

Warehouse #6

3009 O&M Services –

Warehouse #7

3010 O&M Services –

Warehouse #8

3011 O&M Services –

Warehouse #9

3012 O&M Services –

Sprinkler / Pump House

3013 O&M Services –

Fleet Management Building

3014 O&M Services –

POV Facility (WA0834KF)

OPTION YEAR 4: (03/01/2022 - 02/28/2023)

4001 O&M Services -

4002 O&M Services – Daycare

4003 O&M Services –

Warehouse #1

4004 O&M Services – Warehouse #2

4005 O&M Services –

Warehouse #3

4006 O&M Services –

Warehouse #4

4007 O&M Services –

Warehouse #5

4008 O&M Services –

Warehouse #6

4009 O&M Services –

Warehouse #7

4010 O&M Services –

Warehouse #8

4011 O&M Services –

Warehouse #9

4012 O&M Services –

Sprinkler / Pump House

4013 O&M Services –

Fleet Management Building

4014 O&M Services –

POV Facility (WA0834KF)

Attachment 7 Schedule of Pricing: Switchgear Services

The contractor must provide all management, supervision, labor, materials, supplies and equipment (except as otherwise provided), and shall plan, schedule, coordinate and assure effective performance of all services described herein. The Contractor must provide O&M Services in accordance with the requirements of this solicitation at:

Daycare Center (WA0123KA): 520 15th Street SW, Auburn, WA 98001

Warehouse #1 (WA0824KF): 2701 C Street SW, Auburn, WA 98001

Warehouse #2 (WA0825KF): 2703 C Street SW, Auburn, WA 98001

Warehouse #3 (WA0822KF): 2507 C Street SW, Auburn, WA 98001

Warehouse #4 (WA0823KF): 2509 C Street SW, Auburn, WA 98001 Warehouse #5 (WA0821KF): 2201 C Street SW, Auburn, W

98001 Warehouse #6 (WA0833KF): 2203 C Street SW, Auburn, WA

98001 Warehouse #7 (WA0831KF): 1901 C Street SW, Auburn, WA

98001 Warehouse #8 (WA0832KF): 1903 C Street SW, Auburn, WA

98001 Warehouse #9 (WA0817KF): 1901 C Street SW, Auburn, WA

98001 Sprinkler / Pump House (WA0818KF): 2801 C Street SW, Auburn, WA 98001 Fleet Management Building (WA0819KF): 2601 C Street SW, SCHEDULE OF PRICING: Switchgear Services

BASE PERIOD: (03/01/2018 - 02/28/2019) Annual Infrared 3 Year Testing

000x

O&M Services - Administrative Bldg

(WA0811KA) 12 $

000x

O&M Services – Daycare Center

(WA0123KA) 12 $

000x O&M Services – Warehouse #1

(WA0824KF) 12 $

000x O&M Services – Warehouse #2

(WA0825KF) 12 $

000x O&M Services – Warehouse #3

(WA0822KF) 12 $

000x O&M Services – Warehouse #4

(WA0823KF) 12 $

000x O&M Services – Warehouse #5

(WA0821KF) 12 $

000x O&M Services – Warehouse #6

(WA0833KF) 12 $

000x O&M Services – Warehouse #7

(WA0831KF) 12 $

000x O&M Services – Warehouse #8

(WA0832KF) 12 $

000x O&M Services – Warehouse #9

(WA0817KF) 12 $

000x O&M Services – Sprinkler / Pump House (WA0818KF) 12 $

000x O&M Services – Fleet Management Building (WA0819KF) 12 $

000x O&M Services – POV Facility (WA0834KF) 12 $

OPTION YEAR 1: (03/01/2019 - 02/29/2020)

100x O&M Services - 12 $

Administrative Bldg

(WA0811KA)

100x

O&M Services – Daycare Center

(WA0123KA) 12 $

100x O&M Services – Warehouse #1

(WA0824KF) 12 $

100x O&M Services – Warehouse #2

(WA0825KF) 12 $

100x O&M Services – Warehouse #3

(WA0822KF) 12 $

100x O&M Services – Warehouse #4

(WA0823KF) 12 $

100x O&M Services – Warehouse #5

(WA0821KF) 12 $

100x O&M Services – Warehouse #6

(WA0833KF) 12 $

100x O&M Services – Warehouse #7

(WA0831KF) 12 $

100x O&M Services – Warehouse #8

(WA0832KF) 12 $

100x O&M Services – Warehouse #9

(WA0817KF) 12 $

100x O&M Services – Sprinkler / Pump House (WA0818KF) 12 $

100x O&M Services – 12 $

Fleet Management Building (WA0819KF)

100x O&M Services – POV Facility (WA0834KF) 12 $

OPTION YEAR 2: (3/01/2020 – 02/28/2021) ************ 3 YEAR TESTING DUE *********** 200x O&M Services -

Administrative Bldg

(WA0811KA) 12 $

200x O&M Services – Daycare Center

(WA0123KA) 12 $

200x O&M Services – Warehouse #1

(WA0824KF) 12 $

200x O&M Services – Warehouse #2

(WA0825KF) 12 $

200x O&M Services – Warehouse #3

(WA0822KF) 12 $

200x O&M Services – Warehouse #4

(WA0823KF) 12 $

200x O&M Services – Warehouse #5

(WA0821KF) 12 $

200x O&M Services – Warehouse #6

(WA0833KF) 12 $

200x O&M Services – Warehouse #7

(WA0831KF) 12 $

200x O&M Services – Warehouse #8

(WA0832KF) 12 $

200x O&M Services – 12 $

200x O&M Services – Sprinkler / Pump House (WA0818KF) 12 $

200x O&M Services – Fleet Management Building (WA0819KF) 12 $

200x O&M Services – POV Facility (WA0834KF) 12 $

OPTION YEAR 3: (03/01/2021 - 02/28/2022)

300x O&M Services -

Administrative Bldg

(WA0811KA) 12 $

300x O&M Services – Daycare Center

(WA0123KA) 12 $

300x O&M Services – Warehouse #1

(WA0824KF) 12 $

300x O&M Services – Warehouse #2

(WA0825KF) 12 $

300x O&M Services – Warehouse #3

(WA0822KF) 12 $

300x O&M Services – Warehouse #4

(WA0823KF) 12 $

300x O&M Services – Warehouse #5

(WA0821KF) 12 $

300x O&M Services – Warehouse #6

(WA0833KF) 12 $

300x O&M Services – Warehouse #7

(WA0831KF) 12 $

300x O&M

Warehouse #8

(WA0832KF) 12 $

300x O&M Services – Warehouse #9

(WA0817KF) 12 $

300x O&M Services – Sprinkler / Pump House (WA0818KF) 12 $

300x O&M Services – Fleet Management Building (WA0819KF) 12 $

300x O&M Services – POV Facility (WA0834KF) 12 $

OPTION YEAR 4: (03/01/2022 - 02/28/2023)

400x O&M Services -

Administrative Bldg

(WA0811KA) 12 $

400x O&M Services – Daycare Center

(WA0123KA) 12 $

400x O&M Services – Warehouse #1

(WA0824KF) 12 $

400x O&M Services – Warehouse #2

(WA0825KF) 12 $

400x O&M Services – Warehouse #3

(WA0822KF) 12 $

400x O&M Services – Warehouse #4

(WA0823KF) 12 $

400x O&M Services – Warehouse #5

(WA0821KF) 12 $

400x O&M Services – 12 $

Warehouse #6

400x O&M Services – Warehouse #7

(WA0831KF) 12 $

400x O&M Services – Warehouse #8

(WA0832KF) 12 $

400x O&M Services – Warehouse #9

(WA0817KF) 12 $

400x O&M Services – Sprinkler / Pump House (WA0818KF) 12 $

400x O&M Services – Fleet Management Building (WA0819KF) 12 $

400x O&M Services – POV Facility (WA0834KF) 12 $

Attachment 8 Schedule of Pricing: Additional Services

Daycare Center (WA0123KA): 520 15th Street SW, Auburn, WA

98001 Warehouse #1 (WA0824KF): 2701 C Street SW, Auburn, WA

98001 Warehouse #2 (WA0825KF): 2703 C Street SW, Auburn, WA

98001 Warehouse #3 (WA0822KF): 2507 C Street SW, Auburn, WA

98001 Warehouse #4 (WA0823KF): 2509 C Street SW, Auburn, WA 98001

Warehouse #5 (WA0821KF): 2201 C Street SW, Auburn, W 98001

Warehouse #6 (WA0833KF): 2203 C Street SW, Auburn, WA 98001

Warehouse #7 (WA0831KF): 1901 C Street SW, Auburn, WA 98001

Warehouse #8 (WA0832KF): 1903 C Street SW, Auburn, WA 98001

Warehouse #9 (WA0817KF): 1901 C Street SW, Auburn, WA 98001

Sprinkler / Pump House (WA0818KF): 2801 C Street SW, Auburn, WA 98001

Fleet Management Building (WA0819KF): 2601 C Street SW, SCHEDULE OF PRICING: ADDITIONAL SERVICES

Block 19 Item No. Block 20 Services Block 21

Quantity Block 22

Unit Block 23 Unit

Price Block 24 Amount

TRANSITION PERIOD (XX/XX/XXXX – XX/XX/XXXX)

0 NA $

0 NA $

BASE PERIOD: (03/01/2018 - 02/28/2019)

0003 Additional Services – Regular 50 HR $ 0004 Additional Service - OT 50 HR $ 0005 Emergency Call Back Service 50 HR $ 0006 Miscellaneous Services – Regular 50 HR $ 0007 Miscellaneous Services – OT 50 HR $

OPTION YEAR 1: (03/01/2019 - 02/29/2020)

1003 Additional Services – Regular 50 HR $ 1004 Additional Service - OT 50 HR $

1005 Emergency Call Back Service 50 HR $ 1006 Miscellaneous Services – Regular 50 HR $ 1007 Miscellaneous Services – OT 50 HR $

OPTION YEAR 2: (03/01/2020 - 02/28/2021)

2003 Additional Services – Regular 50 HR $ 2004 Additional Service - OT 50 HR $ 2005 Emergency Call Back Service 50 HR $ 2006 Miscellaneous Services - Regular 50 HR $ 2007 Miscellaneous Services – OT 50 HR $

OPTION YEAR 3: (03/01/2021 - 02/28/2022)

3003 Additional Services – Regular 50 HR $ 3004 Additional Service - OT 50 HR $ 3005 Emergency Call Back Service 50 HR $ 3006 Miscellaneous Services - Regular 50 HR $ 3007 Miscellaneous Services – OT 50 HR $

OPTION YEAR 4: (03/01/2022 - 02/28/2023)

4003 Additional Services – Regular 50 HR $ 4004 Additional Service - OT 50 HR $ 4005 Emergency Call Back Service 50 HR $ 4006 Miscellaneous Services - Regular 50 HR $ 4007 Miscellaneous Services – OT 50 HR $

Attachment 9

CHECKLIST OF ITEMS TO SUBMIT

REQUEST FOR PROPOSAL

Posted: 11/20/2017

Submission Sheet for Request for Proposal Operations & Maintenance Services Acquisition GSA Auburn Complex

SUBMISSION CHECKLIST -

1. CONTENTS OF EACH IN VOLUMES AS INSTRUCTED IN THE RFP

VOLUME I: CONTRACT DOCUMENTS

SF 1449 SOLICITATION /CONTRACT/ORDER FOR COMMERCIAL ITEMS

CHECKLIST OF ITEMS TO SUBMIT

VENDOR VALIDATION INFORMATION SHEET

VOLUME II: SUPPLIES/SERVICES AND PRICING

SCHEDULE OF PRICING: O&M SERVICES

SCHEDULE OF PRICING: PROFIT AND G&A

SCHEDULE OF PRICING: SWITCHGEAR

SCHEDULE OF PRICING: ADDITIONAL SERVICE LINES

SCHEDULE OF PRICING: SUBCONTRACTED SERVICES

VOLUME III: TECHNICAL EVALUATION FACTORS

EVALUATION FACTOR 1, TECHNICAL EVALUATION QUESTIONS: ATTACHMENT 10

EVALUATION FACTOR 2, WORK PLAN EVALUATION QUESTIONS: ATTACHMENT 11

EVALUATION FACTOR 3, SERVICE DELIVERY QUESTIONS: ATTACHMENT 12

EVALUATION FACTOR 4, SWITCHGEAR SUBCONTRACTOR SELECTION: ATTACHMENT 13

VOLUME IV: PAST PERFORMANCE QUESTIONNAIRE: ATTACHMENT 14 (TO BE RECEIVED FROM

REFERENCES)

CONTRACTOR-SUPPLIED EXPERIENCE QUESTIONNAIRE: ATTACHMENT 15

2. LIST OF EXHIBITS

EXHIBIT 1 – QUALITY ASSURANCE PLAN (QASP)

EXHIBIT 2A- GREEN PURCHASING REPORT - NON BIO-BASED REPORT

EXHIBIT 2B- GREEN PURCHASING REPORT - BIO-BASED REPORT

EXHIBIT 3 – SOLID WASTE AUDIT REPORT

EXHIBIT 4 – SUMMARY OF ENVIRONMENTALLY SUSTAINABLE PRODUCT ATTRIBUTES AND

OFFERINGS

EXHIBIT 5 – MONTHLY REPORT TEMPLATE

EXHIBIT 6 – BUILDING OPERATING PLAN TEMPLATE

EXHIBIT 7 – SMART BUILDING

EXHIBIT 8 – WATER TREATMENT

EXHIBIT 9 – OPERATIONAL PERFORMANCE TARGETS

EXHIBIT 10 – ENERGY AND WATER EFFICIENCY USE PLAN

EXHIBIT 11 – ENERGY AND WATER EFFICIENCY MONTHLY REPORT

EXHIBIT 12 – ANNUAL ENERGY& WATER EFFICIENCY REPORT

EXHIBIT 13 – QUALIFICATIONS OF ELECTRICAL TESTING TECHNICIANS (ETT)

EXHIBIT 14 – MISCELLANEOUS BEST PRACTICES

EXHIBIT 15 – BUILDLING INFORMTION SHEETS

EXHIBIT 16 – PREVENTIVE MAINTENANCE GUIDES/5850 REV 2012

EXHIBIT 17 - SOLID WASTE AND RECYCLING REPORTEQ

EXHIBIT 18 – CONTRACTOR INFORMATION WORKSHEET

EXHIBIT 19 – DELIVERABLE CHART

EXHIBIT 20 – PERFORMANCE WORK STATEMENT

EXHIBIT 21 – SPECIAL DOCUMENT REQUIREMENTS

2. ACKNOWLEDGEMENT OF ALL EXHIBITS: ______________________ (SIGNATURE REQUIRED)

3. LIST OF ATTACHMENTS

ATTACHMENT 1: STANDARD FORM 1449

ATTACHMENT 2: VENDOR VALIDATION INFORMATION

ATTACHMENT 3: COLLECTIVE BARGAINING AGREEMENT

ATTACHMENT 4: WAGE DETERMINATION

ATTACHMENT 5: SCHEDULE OF PRICING: O&M SERVICES

ATTACHMENT 6: SCHEDULE OF PRICING: PROFIT AND G/A

ATTACHMENT 7: SCHEDULE OF PRICING: SWITCHGEAR SERVICES

ATTACHMENT 8: SCHEDULE OF PRICING: ADDITIONAL SERVICE LINE ITEMS

ATTACHMENT 9: CHECKLIST OF ITEMS TO SUBMIT

ATTACHMENT 10: TECHNICAL EVALUATION QUESTIONS

ATTACHMENT 11: WORK PLAN EVALUATION QUESTIONS

ATTACHMENT 12: SERVICE DELIVERY QUESTIONS

ATTACHMENT 13: SWITCHGEAR SUBCONTRACTOR SELECTION

ATTACHMENT 14: PAST PERFORMANCE QUESTIONNAIRE

ATTACHMENT 15: CONTRACTOR-SUPPLIED EXPERIENCE QUESTIONNAIRE

ATTACHMENT 16: SCHEDULE OF PRICING: SUBCONTRACTED SERVICES

3. ACKNOWLEDGEMENT OF ATTACHMENTS _____________________ (SIGNATURE REQUIRED)

4. LIST OF AMENDMENT(S)

Amendment # 1______ (Initial)

Amendment # 2______ (Initial)

Amendment # 3______ (Initial)

Amendment # 4______ (Initial)

Amendment # 5______ (Initial)

Amendment # 6______ (Initial)

Amendment # 7______ (Initial)

4. ACKNOWLEDGEMENT OF AMENDMENT(S) (IF APPLICABLE) _____________________________

(SIGNATURE REQUIRED)

Attachment 14

PAST PERFORMANCE QUESTIONNAIRE

GSA Auburn Complex

Instructions for Past Performance References and Questionnaire:

Vendor shall provide a list of no more than five (5) past performance reference points of contact identified below to include name, phone numbers and/or email addresses for each past performance reference. This list shall be provided with proposal to GSA.

The vendor shall request the references complete the Past Performance Questionnaire included herein. The Questionnaire must be submitted directly to the Contract Specialist no later than the due date of the quotes. Completed questionnaires submitted with the Quote will not be considered. The Government will use information submitted by the vendor references and other sources such as other federal agencies, commercial sources and Past Performance Information Retrieval System (PPIRS) to assess Past Performance.

PLEASE RETURN COMPLETED FORM to Ms. Tara Thomas at: tara.thomas@gsa.gov

REFERENCE PROVIDED FOR: (Vendor Name): ____________________________________

CUSTOMER NAME: ___________________________________________________________

Contract Type: ________________________________________________________________

Period of Performance: _________________________________________________________

Square Footage of Building: ______________________________________________________

Total Number of Floors: _________________________________________________________

Name of Facility/Address: ________________________________________________________

City and State: ________________________________________________________________

Total Value of Contract (including Options): $________________________________________

DESCRIPTION OF CONTRACT

Briefly describe all services provided under this contract. You may use one (1) additional sheet if necessary.

mailto:tara.thomas@gsa.gov

RESPONDENT IDENTIFICATION

Name: ________________________________________________________________________

Agency / Company: _____________________________________________________________

Address: _____________________________________________________________________

Telephone: ___________________________________________________________________

Email Address: _________________________________________________________________

Using the following definitions, please complete the past performance questionnaire.

OUTSTANDING

Performance meets contractual requirements and provides many additional benefits to your company. The contractual performance of the element or sub-element being assessed was accomplished with few minor problems for which corrective actions taken by the contractor was highly effective.

VERY GOOD

Performance meets contractual requirements and provides some benefits to your company. The contractual performance of the element or sub-element being assessed was accomplished with some minor problems for which corrective actions taken by the contractor was effective.

ACCEPTABLE

Performance meets contractual requirements. The contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory.

MARGINAL

Performance does not meet some contractual requirements. The contractual performances of the element or sub-element being assessed reflect a serious problem for which the contractor has not yet identified corrective action. The contractor's proposed actions appear only marginally effective or were not fully implemented.

UNACCEPTABLE

Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element or sub-element contains a serious problem(s) for which the contractor's corrective actions appear or were ineffective.

1. What was your role in the contract?

a. Contracting Officer

b. Contracting Officer’s Representative

c. Property Manager

d. Other: _______________________________________

2. Has the contract or task orders been partially or completely terminated?

a. Yes

b. No

Default (Please give a brief explanation below) Other: (Please explain)

3. Rate the contractor’s record in adhering to their predetermined Preventive Maintenance Schedule.

a. Outstanding

b. Very Good

c. Acceptable

d. Marginal

e. Unacceptable

4. Rate how the company completed tasks/milestones/deliverables within the contract requirements.

a. Outstanding

b. Very Good

c. Acceptable

5. Rate the company’s ability to recruit and maintain workforce that understand the nature of work and the required disciplines to accomplish the work.

a. Outstanding

b. Very Good

c. Acceptable

6. Rate the company’s ability to authorize funding within needed timeframes (i.e. was onsite funding approval available)

a. Outstanding

b. Very Good

c. Acceptable

7. Rate the company cooperation in administrative negotiations to add or delete contract work?

b. Very Good

c. Acceptable

8. Rate the company’s success with regard to their quality control plan/performance plan.

b. Very Good

c. Acceptable

9. Rate the company’s ability/skill in identifying and mitigating risks.

b. Very Good

c. Acceptable

10. Rate the contractor’s record in managing complex projects at multiple, geographically dispersed sites. (if applicable)

a. Outstanding

b. Very Good

c. Acceptable

11. Rate the contractor’s record in effectively managing subcontractors?

b. Very Good

c. Acceptable

12. Rate the contractor’s communication plan.

b. Very Good

c. Acceptable

13. Rate the contractor’s pro-activity in suggesting solutions and cost savings.

b. Very Good

c. Acceptable

14. What would you consider the strengths shown by this company through the course of this contract?

15. What would you consider the weaknesses shown by this company through the course of this

16. What would you consider the deficiencies show by this company through the course of this

17. Please provide an overall rating of this contractor through Performance Period of this contract.

a. Outstanding

b. Very Good

c. Acceptable

If you have further information that was not covered by this questionnaire, but feel important, please provide below.

Attachment 16 Schedule of Pricing: Subcontracted Services for: “Identify service here”_

For each maintenance service for equipment and systems that will be performed by subcontractors, as identified by the contractor in the response to Section J – Attachment 11 Question 3.e., the contractor must provide the estimated pricing information for each service type. Please use separate schedule of pricing sheet for each of the services identified by the contractor in the response to Section J – Attachment 11 Question 3.e.

Daycare Center (WA0123KA): 520 15th Street SW, Auburn, WA 98001

Warehouse #1 (WA0824KF): 2701 C Street SW, Auburn, WA 98001

Warehouse #2 (WA0825KF): 2703 C Street SW, Auburn, WA 98001

Warehouse #3 (WA0822KF): 2507 C Street SW, Auburn, WA 98001

Warehouse #4 (WA0823KF): 2509 C Street SW, Auburn, WA 98001 Warehouse #5 (WA0821KF): 2201 C Street SW, Auburn, W

98001 Warehouse #6 (WA0833KF): 2203 C Street SW, Auburn, WA

98001 Warehouse #7 (WA0831KF): 1901 C Street SW, Auburn, WA

98001 Warehouse #8 (WA0832KF): 1903 C Street SW, Auburn, WA

98001 Warehouse #9 (WA0817KF): 1901 C Street SW, Auburn, WA

98001 Sprinkler / Pump House (WA0818KF): 2801 C Street SW, Auburn, WA 98001 Fleet Management Building (WA0819KF): 2601 C Street SW, BASE PERIOD: (03/01/2018 – 02/28/2019) Service Type

#/Mo. $$/Mo. $$/Yr.

000x O&M Services - Administrative Bldg

(WA0811KA)

TBD 12 0

000x O&M Services – Daycare Center

(WA0123KA)

TBD 12 0

000x O&M Services – Warehouse #1

(WA0824KF)

TBD 12 0

000x O&M Services – Warehouse #2

(WA0825KF)

TBD 12 0

000x O&M Services – Warehouse #3

(WA0822KF)

TBD 12 0

000x O&M Services – Warehouse #4

(WA0823KF)

TBD 12 0

000x O&M Services – Warehouse #5

(WA0821KF)

TBD 12 0

000x O&M Services – Warehouse #6

(WA0833KF)

TBD 12 0

000x O&M Services – Warehouse #7

(WA0831KF)

TBD 12 0

000x O&M

TBD 12 0

Warehouse #8

(WA0832KF)

000x O&M Services – Warehouse #9

(WA0817KF)

TBD 12 0

000x O&M Services – Sprinkler / Pump House (WA0818KF)

TBD 12 0

000x O&M Services – Fleet Management Building (WA0819KF)

TBD 12 0

000x O&M Services – POV Facility (WA0834KF)

OPTION YEAR 1: (03/01/2019 -

02/29/2020)

Service Type

#/Mo. $$/Mo. $$/Yr.

100x O&M Services - Administrative Bldg

(WA0811KA)

TBD 12 0

100x O&M Services – Daycare Center

(WA0123KA)

TBD 12 0

100x O&M Services – Warehouse #1

(WA0824KF)

TBD 12 0

100x O&M Services – Warehouse #2

(WA0825KF)

TBD 12 0

100x O&M Services – Warehouse #3

(WA0822KF)

TBD 12 0

100x O&M Services – Warehouse #4

100x O&M

Warehouse #5

(WA0821KF)

TBD 12 0

100x O&M Services – Warehouse #6

(WA0833KF)

TBD 12 0

100x O&M Services – Warehouse #7

(WA0831KF)

TBD 12 0

100x O&M Services – Warehouse #8

(WA0832KF)

TBD 12 0

100x O&M Services – Warehouse #9

(WA0817KF)

TBD 12 0

100x O&M Services – Sprinkler / Pump House (WA0818KF)

TBD 12 0

100x O&M Services – Fleet Management Building (WA0819KF)

TBD 12 0

100x O&M Services – POV

OPTION YEAR 2: (3/01/2020 –

02/28/2021)

Service Type

#/Mo. $$/Mo. $$/Yr.

200x O&M Services - Administrative Bldg

(WA0811KA)

TBD 12 0

200x O&M Services – Daycare Center

(WA0123KA)

TBD 12 0

200x O&M Services –

#1

200x O&M Services – Warehouse #2

(WA0825KF)

TBD 12 0

200x O&M Services – Warehouse #3

(WA0822KF)

TBD 12 0

200x O&M Services – Warehouse #4

(WA0823KF)

TBD 12 0

200x O&M Services – Warehouse #5

(WA0821KF)

TBD 12 0

200x O&M Services – Warehouse #6

(WA0833KF)

TBD 12 0

200x O&M Services – Warehouse #7

(WA0831KF)

TBD 12 0

200x O&M Services – Warehouse #8

(WA0832KF)

TBD 12 0

200x O&M Services – Warehouse #9

(WA0817KF)

TBD 12 0

200x O&M Services – Sprinkler / Pump House (WA0818KF)

200x O&M Services – TBD 12 0

Fleet Management Building (WA0819KF)

200x O&M Services – POV

OPTION YEAR 3: (03/01/2021 -

02/28/2022)

Service Type

#/Mo. $$/Mo. $$/Yr.

300x O&M Services - Administrative Bldg

(WA0811KA)

TBD 12 0

300x O&M Services – Daycare Center

(WA0123KA)

TBD 12 0

300x O&M Services – Warehouse #1

(WA0824KF)

TBD 12 0

300x O&M Services – Warehouse #2

(WA0825KF)

TBD 12 0

300x O&M Services – Warehouse #3

(WA0822KF)

TBD 12 0

300x O&M Services – Warehouse #4

(WA0823KF)

TBD 12 0

300x O&M Services – Warehouse #5

(WA0821KF)

TBD 12 0

300x O&M Services – Warehouse #6

(WA0833KF)

TBD 12 0

300x O&M

#7

(WA0831KF)

300x O&M Services – Warehouse #8

(WA0832KF)

TBD 12 0

300x O&M Services – Warehouse #9

(WA0817KF)

TBD 12 0

300x O&M Services – Sprinkler / Pump House (WA0818KF)

TBD 12 0

300x O&M Services – Fleet Management Building (WA0819KF)

TBD 12 0

300x O&M Services – POV

OPTION YEAR 4: (03/01/2022 -

02/28/2023)

Service Type

#/Mo. $$/Mo. $$/Yr.

400x O&M Services - Administrative Bldg

(WA0811KA)

TBD 12 0

400x O&M Services – Daycare Center

(WA0123KA)

TBD 12 0

400x O&M Services – Warehouse #1

(WA0824KF)

TBD 12 0

400x O&M Services – Warehouse #2

(WA0825KF)

TBD 12 0

400x O&M Services – Warehouse #3

400x O&M

Warehouse #4

(WA0823KF)

TBD 12 0

400x O&M Services – Warehouse #5

(WA0821KF)

TBD 12 0

400x O&M Services – Warehouse #6

(WA0833KF)

TBD 12 0

400x O&M Services – Warehouse #7

(WA0831KF)

TBD 12 0

400x O&M Services – Warehouse #8

(WA0832KF)

TBD 12 0

400x O&M Services – Warehouse #9

(WA0817KF)

TBD 12 0

400x O&M Services – Sprinkler / Pump House (WA0818KF)

TBD 12 0

400x O&M Services – Fleet Management Building (WA0819KF)

TBD 12 0

400x O&M Services – POV

October 2017

SECTION J. LIST OF ATTACHMENTS

J. LIST OF ATTACHMENTS

(LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS)

LIST OF EXHIBITS

EXHIBIT 1

EXHIBIT 2A

EXHIBIT 2B

EXHIBIT 3

EXHIBIT 4

EXHIBIT 5

EXHIBIT 6

EXHIBIT 7

EXHIBIT 8

EXHIBIT 9

EXHIBIT 10

EXHIBIT 11

EXHIBIT 12

EXHIBIT 13

EXHIBIT 14

EXHIBIT 15

EXHIBIT 16

EXHIBIT 17

EXHIBIT 18

QUALITY ASSURANCE PLAN (QASP)

Green PURCHASING REPORT - Non Bio-based Report

Green PURCHASING REPORT - Bio-based Report

SOLID WASTE AUDIT REPORT - RESERVED

SUMMARY OF ENVIRONMENTALLY SUSTAINABLE PRODUCT

ATTRIBUTES and OFFERINGS

MONTHLY REPORT TEMPLATE

BUILDING OPERATING PLAN TEMPLATE

SMART BUILDING - RESERVED

WATER TREATMENT

OPERATIONAL PERFORMANCE TARGETS

ENERGY AND WATER EFFICIENCY USE PLAN

ENERGY AND WATER EFFICIENCY MONTHLY REPORT

ANNUAL ENERGY& WATER EFFICIENCY REPORT

QUALIFICATIONS OF ELECTRICAL TESTING TECHNICIANS (ETT)

MISCELLANEOUS BEST PRACTICES - RESERVED

BUILDLING INFORMTION SHEETS

PREVENTIVE MAINTENANCE GUIDES/5850 rev 2012

SOLID WASTE and RECYCLING REPORTEQ

CONTRACTOR INFORMATION WORKSHEET

EXHIBIT 19

EXHIBIT 20

EXHIBIT 21

DELIVERABLE CHART

PERFORMANCE WORK STATEMENT

SPECIAL DOCUMENT REQUIREMENTS

LIST OF ATTACHMENTS

ATTACHMENT 1 STANDARD FORM 1449

ATTACHMENT 2 VENDOR VALIDATION INFORMATION

ATTACHMENT 3 COLLECTIVE BARGAINING AGREEMENT

ATTACHMENT 4 WAGE DETERMINATION

ATTACHMENT 5 SCHEDULE OF PRICING: O&M SERVICES

ATTACHMENT 6 SCHEDULE OF PRICING: PROFIT AND G/A

ATTACHMENT 7 SCHEDULE OF PRICING: SWITCHGEAR SERVICES

ATTACHMENT 8 SCHEDULE OF PRICING: ADDITIONAL SERVICE LINE ITEMS

ATTACHMENT 9 CHECKLIST OF ITEMS TO SUBMIT

ATTACHMENT 10 TECHNICAL EVALUATION QUESTIONS

ATTACHMENT 11 WORK PLAN EVALUATION QUESTIONS

ATTACHMENT 12 SERVICE DELIVERY QUESTIONS

ATTACHMENT 13 SWITCHGEAR SUBCONTRACTOR SELECTION

ATTACHMENT 14 PAST PERFORMANCE QUESTIONNAIRE

ATTACHMENT 15 CONTRACTOR-SUPPLIED EXPERIENCE QUESTIONNAIRE

ATTACHMENT 16 SCHEDULE OF PRICING: SUBCONTRACTED SERVICES

EXHIBIT 9

J.9. Energy & Water Operational Performance Targets [The purpose of this document is to clearly identify the building-specific energy and water performance targets for the Contractor. These targets will be established in consultation with the Regional Energy Coordinator. This section also identifies how the energy and water performance will be monitored through the monthly progress reporting requirements of section C.11 of PWS, Monthly Progress Reports, and the Building Energy and Water Efficiency Plan as required in section C.21.6 of PWS, Energy and Water Efficiency.]

This document presents the Energy and Water Operational Performance Targets for the [GSA Auburn Complex]

The Energy Independence and Security Act of 2007 (Public Law 110-140) requires Federal agencies to improve energy efficiency by 30% by end of FY 2015 as compared to the 2003 baseline (while targeting an annual reduction in energy use of roughly 3%). Executive Order 13514, Federal Leadership in Environmental, Energy, and Economic Performance mandates Federal agencies reduce potable water use intensity relative to their 2007 baseline by 26% total reduction by FY2020 (while targeting an annual reduction in water use of roughly 2% annually).

To comply with these mandates GSA has initiated internal Regional Targets on an annual basis so that the overall agency effort is successful. Each year a new internal Regional Target is established by the Energy Center of Expertise and each region is responsible for meeting that target. Within each region, it is up to the Regional Energy Coordinator, in collaboration with the Property Manager [and the O&M Contractor], to establish performance targets for each facility to ensure that the Regional Targets are met. To meet the regional objective, separate but reasonable and achievable reduction targets will be set for each building taking into account many parameters and circumstances such as historical energy and water usage, climate, age, performance, capital projects, and other mutually agreeable factors. [The solicitation development process does not explicitly involve the Regional Energy Coordinator. However, it is strongly recommended that the assigned Regional Energy Coordinator be consulted in developing building-specific energy and water performance targets. This approach will allow for establishing targets that are appropriate, reasonable and manageable for both the Contractor and GSA. When the O&M contract is being renewed/extended, it is recommended that the O&M Contractor also be consulted when establishing new/revised energy and water performance targets.] Further, the energy and water performance targets established below are to be revisited and revised as appropriate for each contract extension period, or as other major events may warrant. [Major equipment failures, building damage, tenant mission changes requiring significantly more overtime utilities, prolonged severe weather, and faulty energy or water use data are examples of events that can justify a revision to building-specific performance targets during the contract period. In these cases, the Regional Energy Coordinator should be consulted regarding possible target revision.

Input from the Contractor should also be obtained, but the adjustments to the targets should be done with the concurrence of the Regional Energy Coordinator.]

These energy and water performance targets are to be accomplished simultaneously to GSA’s overall quality workplace/tenant satisfaction goals.

Energy Performance Targets

The energy performance target for this building, which is the sum of all building energy uses (electricity, natural gas, purchased steam/high temperature hot water, purchased chilled water, fuel oil, and any other purchased or site-generated energy) used in the 12-month contract period, has been established to support regional objectives in meeting Federal mandates. The energy usage index (EUI) measured in Btu/GSF (British thermal units/gross square foot) is the standard unit of measurement for tracking energy consumption. The GSA Regional Energy Coordinator has been consulted to determine the most practical and achievable energy performance target for this building.

The annual energy performance target for the building identified above is ____________ [Insert target in Btu/GSF as recommended by the Regional Energy Coordinator] Btu/GSF as measured by the _________ [insert EUAS utility bill data OR ION enterprise energy management system (EEM) data as appropriate]. Historical building energy use intensity data for the most recent 3 years [change to “5 years” if data are included in the appendix] are included in Appendix A (Building Energy Use History). This historical data is intended to provide a relative measure of the building’s current energy usage and overall annual usage trends.

Contractor energy efficiency performance will be monitored through the monthly progress reports (see section C.11, Monthly Progress Reports), monthly tracking against the Contractor-developed Building Energy and Water Efficiency Use Plan (see section C.21.6, Energy and Water Efficiency), and evaluated over the full 12-month contract term to determine success in meeting the building energy performance target. GSA recognizes that there are factors/events that will impact the overall measured building energy performance, that many of these factors/events are outside the Contractor’s control, and that there may be resulting impacts, both negative and positive. These factors/events will be considered by GSA in evaluating the Contractor’s energy efficiency performance. It is the Contractor’s responsibility to provide timely data analysis, and summaries of findings and recommendations to GSA for issues that impact the building’s energy performance. [This paragraph defines an ongoing process of energy management review by GSA and the Contractor, while also reinforcing the monthly progress reporting requirements and the value of the Building Energy and Water Efficiency Plan.]

Water Performance Targets

The annual water performance target for this building has been established to support regional objectives in meeting Federal mandates for potable water use. The water usage index measured in gal/GSF (gallons/gross square foot) is the standard unit of measurement for tracking water consumption. (Note that the gross square footage used for both the energy and water usage indexes are the same.) The GSA Regional Energy Coordinator has evaluated the water usage data to determine the most practical and achievable target to meet the annual regional targets.

The annual water performance target for the building identified above is ____________ [Insert target in gal/GSF as recommended by the Regional Energy Coordinator] gal/GSF as measured by the _________ [insert EUAS utility bill data OR EEM data as appropriate]. Historical building water use intensity data for the most recent 3 years [change to “5 years” if data are included in the appendix] are included in Appendix B (Building Water Use History). This historical data is intended to provide a relative measure of the building’s current water usage and overall annual usage trends.

Contractor water efficiency performance will be monitored through the monthly progress reports (see section C.11, Monthly Progress Reports), monthly tracking against the Contractor-developed Building Energy and Water Efficiency Plan (see section C.21.6, Energy and Water Efficiency), and evaluated over the full 12-month contract term to determine success in meeting the building water performance target. GSA recognizes that there are factors/events that will impact the overall measured building water performance, that many of these factors/events are outside the Contractor’s control, and that there may be resulting impacts, both negative and positive. These factors/events will be considered by GSA in evaluating the Contractor’s energy efficiency performance. It is the Contractor’s responsibility to provide timely water usage data, data analysis, and summaries of findings and recommendations to GSA for issues that impact the building’s water performance. [This paragraph defines an ongoing process of energy management review by GSA and the Contractor, while also reinforcing the monthly progress reporting requirements and the value of the Building Energy and Water Efficiency Plan.]

APPENDIX A – BUILDING ENERGY USE HISTORY

[Complete the table below using information as reported from the EUAS or EEM. There may be cases where it is desired to include data from months that have not yet been reported by the EUAS. In these cases, use care to make sure all energy source units is correctly converted to Btus, and that all building energy sources normally included in the EUAS reports are correctly totaled.]

Table A-1. Building Energy Use Intensity History Reporting Period [see note 1 below]

FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 Contract Period [Insert dates]

Total Building Energy Use Intensity

(BTU/GSF)

[Optional] [Optional] [Required] [Required] [Required] [Required]

[Notes:

1. Current columns (i.e. FY 2018) should be changed as needed to coincide with consecu-tive rolling 12-month periods other than fiscal years (October 1 through September 30) at the discretion of the Regional Energy Manager and/or the Property Manager. Cases where the most recent 12 month period may be preferred over using fiscal year data are those where a significant change in the building operations affecting the building energy use such as major tenant changes, equipment changes, or operating requirement changes result.

2. Consider including additional narrative information to the table shown by adding details or descriptions as notes (such as this), especially if large year-to-year changes occur in the reported annual energy use and the changes can be attributed (with confidence) to factors such as weather extremes, changes in tenant needs, major equipment change-outs, installation of efficiency measures, or other appropriate factors.]

APPENDIX B – BUILDING WATER USE HISTORY

[Complete the table below using information as reported from the EUAS or EEM. There may be cases where it is desired to include data from months that have not yet been reported by the EUAS. In these cases, use care to make sure metered water units is consistent and correct.]

Table B-1. Building Water Use Intensity History Reporting Period [see note 1 below]

FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 Contract Period [Insert dates]

Building Water Use Intensity

(GAL/GSF)

[Optional] [Optional] [Required] [Required] [Required] [Required]

[Notes:

1. Current columns (i.e. FY 2018) should be changed as needed to coincide with consecu-tive rolling 12-month periods other than fiscal years (October 1 through September 30) at the discretion of the Regional Energy Manager and/or the property manager. Cases where the most recent 12-month period may be preferred over using fiscal year data are those where a significant change in the building operations affecting the building water use, such as major tenant changes, equipment changes, or operating requirement changes.

2. Consider including additional narrative information to the table shown by adding details or descriptions as notes (such as this), especially if large year-to-year changes occur in the reported annual energy use and the changes can be attributed (with confidence) to factors such as weather extremes, changes in tenant needs, major equipment change-outs, installation of efficiency measures, or other appropriate factors.]

ADP50D3.tmp
Attachment 5
Attachment 6

File details come from the government source that posted it.