This document is a Statement of Work (SOW) for a construction project to prepare the site at the Veterans Affairs Palo Alto Healthcare System (VAPAHCS) for the installation of a new Inpatient Pharmacy Robot and Yuyama Packager. The key details are:

The project includes removing the existing robot and packager, providing site preparation and modifications to accommodate the new, larger equipment, and connecting required utilities. Specific tasks include floor and ceiling repairs, equipment anchoring, utility connections for power, data, HVAC, and compressed air. The project will be executed in multiple phases to coordinate with the equipment vendor's installation schedule. The contractor must follow interim life safety measures, infection control procedures, and coordinate with VAPAHCS staff to minimize disruption to daily operations. The anticipated duration for the robot and packager installation is 9 weeks and 1 week respectively. The contractor must comply with applicable VA construction standards, codes, and design guides. Submittals, schedules, and coordination with the Contracting Officer's Representative are required.

View the file

Other files

File Type Posted
Wage Decision Number CA20240018 12.20.2024.pdf PDF
36C26125R0014 0007.docx DOCX document
36C26125R0014 0006.docx DOCX document
36C26125R0014 0005.docx DOCX document
12.20.2024 Response to RFIs.docx DOCX document
12.13.2024 Site Visit Log.pdf PDF
36C26125R0014 0004.docx DOCX document
Updated Enclosure 9_Inpatient Pharmacy Robot_ICRA.pdf PDF
36C26125R0014 0003 SF30.docx DOCX document
36C26125R0014 0001.docx DOCX document
VA Palo Alto Site Plan.pdf PDF
36C26125R0014 0002.docx DOCX document
S02 RFI FORM.docx DOCX document
P07 DOL WAGE CA20240018 10.18.2024.pdf PDF
Enclosure 4_AIO Readiness Guide.pdf PDF
S02 - Past Performance Questionnaire ROBOT .docx DOCX document
Enclosure 11_B100 E1-120 GPR Report.pdf PDF
Enclosure 13_Exist Air Compressor-Air Dryer location.pdf PDF
Enclosure 12_Yuyama Equipment Specs.pdf PDF
Enclosure 3_Blister Packager Specs.pdf PDF
Enclosure 9_Inpatient Pharmacy Robot_ICRA.pdf PDF
S02 RFI FORM.docx DOCX document
SPECS.zip ZIP file
Enclosure 8_AIO Layout.pdf PDF
Enclosure 7_Reflected Ceiling Plan above Robot.pdf PDF
Enclosure 10_Pharmacy Robot Replacement B100 Structural Drawings.pdf PDF
Enclosure 2_Yuyama Packager Specs.pdf PDF
Enclosure 1_Omnicell XR2 Customer Readiness Guide.pdf PDF
852.219-75 VA NOTICE OF LIMITATIONS SUBCONTRACTING-CERTIFICATE OF COMPLIANCE.docx DOCX document
Enclosure 5_Scanner Specifications.pdf PDF
Enclosure 14_New Patch Panel Location.pdf PDF
36C26125R0014.docx DOCX document
Cost Breakdown.docx DOCX document
Show all 33

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Scale: 1/8" = 1'-0"

BUILDING 100

PHARMACY

BUILDING 100

OVERALL PLAN

Negative Air required for

*IP&C

During Construc tion

Attachment 2

NOTE: THIS LAYOUT FOR SCHEMATIC

PURPOSE ONLY. REFER TO DRAWING FROM

OMNICELL ON NEXT PAGE.

*IP&C - Inpatient Pharmacy and Compounding

Starc Wall with Door Required for Infection Control & Prevention

11'-10 1/4"

18'-10"

File details come from the government source that posted it. Updated .