Enclosure 10_Pharmacy Robot Replacement B100 Structural Drawings.pdf
PDF 552 KB Posted
- Attached to
- Amendment 0007 Replace Inpatient Robot - PAD 36C261-24-AP-5262 | 640-25-1-5281-0005 | project 640-24-113 |
- Solicitation number
- 36C26125R0014
About this file
This document is a Statement of Work (SOW) for a federal contract opportunity to replace an inpatient pharmacy robot at the Veterans Affairs Palo Alto Health Care System (VAPAHCS) in Palo Alto, California.
The key details are:
- The existing inpatient pharmacy robot has reached the end of its useful life and needs to be replaced with a new Omnicell XR2 robot.
- The work is to be executed in multiple phases, with the contractor responsible for site preparation, utility connections, equipment anchoring, and finish work.
- The new robot weighs 15,658 lbs and has a larger footprint than the existing model, requiring modifications to the existing room.
- The contractor must coordinate closely with the equipment vendor during the phased installation and decommissioning process to minimize impact on the pharmacy's daily operations.
- The project is expected to take approximately 9 weeks total, with the robot installation phase lasting 4 weeks.
- The contractor must comply with applicable VA, NFPA, and other healthcare facility codes and standards.
View the file
Other files
Show all 33
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STRUCTURAL GENERAL NOTES STRUCTURAL SHEET INDEX
S100 STRUCTURAL GENERAL NOTES
S201 FIRST FLOOR FRAMING PLAN
S500 ANCHOR DETAILS
· GENERAL
A. THESE DRAWINGS ARE COPY RIGHTED INSTRUMENTS OF SERVICE OF HOHBACH-LEWIN, INC.
FOR USE ONLY ON THIS PROJECT.
B. CONTRACTOR RESPONSIBILITY - CONSTRUCTION DOCUMENTS REPRESENT THE FINISHED
STRUCTURE. THE CONTRACTOR IS SOLELY RESPONSIBLE FOR CONSTRUCTION MEANS,
METHODS, SEQUENCES AND SAFETY PRECAUTIONS, INCLUDING BUT NOT LIMITED TO SHORING
AND TEMPORARY BRACING.
C. DIMENSIONS - USE WRITTEN DIMENSIONS ONLY. VERIFY ALL DIMENSIONS AT JOB SITE BEFORE
COMMENCING WORK AND REPORT ANY DISCREPANCIES. WHERE NO DIMENSIONS ARE
PROVIDED, OBTAIN CLARIFICATION PRIOR TO PROCEEDING WITH WORK. DO NOT SCALE
DRAWINGS.
D. COORDINATION - OPENINGS THROUGH WALLS AND FLOORS FOR MECHANICAL AND
ELECTRICAL SYSTEMS SHALL BE COORDINATED BY CONTRACTOR AND CONSTRUCTED PER
TYPICAL DETAILS SHOWN IN THESE DOCUMENTS. NO MECHANICAL OR ELECTRICAL SYSTEM
COMPONENTS SHALL BE EMBEDDED IN SLABS OR WALLS UNLESS SPECIFICALLY DETAILED IN
THESE DOCUMENTS.
E. OMISSIONS AND CONFLICTS - OMISSIONS OR CONFLICTS BETWEEN VARIOUS ELEMENTS OF
THE CONSTRUCTION DOCUMENTS SHOULD BE BROUGHT TO THE ATTENTION OF THE DESIGN
TEAM. IF CERTAIN FEATURES ARE NOT FULLY DELINEATED IN THE CONSTRUCTION DOCUMENTS, THEIR CONSTRUCTION SHALL BE OF THE SAME CHARACTER AS FOR SIMILAR CONDITIONS
THAT ARE DELINEATED.
F. STRUCTURAL DRAWINGS ARE INTENDED TO BE USED WITH ARCHITECTURAL AND MECHANICAL
DRAWINGS. THE CONTRACTOR IS RESPONSIBLE FOR COORDINATING SUCH REQUIREMENTS
INTO THEIR SHOP DRAWINGS AND WORK.
G. THERE SHALL BE NO CHANGE IN SIZE OR DIMENSION OF A STRUCTURAL MEMBER, NOR SHALL
ANY OPENINGS BE MADE IN ANY STRUCTURAL MEMBER, WITHOUT THE WRITTEN APPROVAL OF
THE ENGINEER.
H. THE CONTRACTOR IS RESPONSIBLE FOR LIMITING THE AMOUNT OF CONSTRUCTION LOAD
IMPOSED UPON THE STRUCTURE. CONSTRUCTION LOADS SHALL NOT EXCEED THE DESIGN
CAPACITY OF THE STRUCTURE AT THE TIME THE LOADS ARE IMPOSED.
I. THE CONTRACTOR SHALL INFORM THE ENGINEER IN WRITING OF ANY DEVIATION FROM THE
CONTRACT DOCUMENTS.
J. SEE DRAWINGS OTHER THAN STRUCTURAL FOR: TYPES OF FLOOR FINISH AND THEIR
LOCATION, DEPRESSIONS IN FLOOR SLABS, OPENINGS IN WALLS AND FLOORS REQUIRED BY
ARCHITECTURAL AND MECHANICAL FEATURES, AND ROADWAY PAVING, WALKS, RAMPS,
STAIRS, CURBS, ETC.
K. TYPICAL DETAILS - DETAILS NOTED AS TYPICAL ARE APPLICABLE WHERE SPECIFIED ON
THE STRUCTURAL DRAWINGS AND WHEREVER THE CONDITION OCCURS THROUGHOUT THE
PROJECT, INCLUDING LOCATIONS WHERE THE DETAIL IS NOT EXPLICITLY SPECIFIED OR
REFERENCED. IT IS THE CONTRACTOR'S RESPONSIBILITY TO IDENTIFY LOCATIONS
WHERE TYPICAL DETAILS ARE APPLICABLE PRIOR TO CONSTRUCTION.
· EXISTING CONSTRUCTION/ CONDITIONS:
A. SHORING: THE CONTRACTOR SHALL PROVIDE SHORING WHEREVER NECESSARY TO ALLOW
INSTALLATION OF THE WORK. THE CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR THE
DESIGN, INSTALLATION AND MAINTENANCE OF ALL SHORING AND TEMPORARY WORK
REQUIRED THROUGHOUT THE PROGRESS OF THE WORK.
B. EXISTING CONSTRUCTION: EXISTING CONSTRUCTION SHOWN ON THE DRAWINGS WAS OBTAINED
FROM LIMITED VISUAL OBSERVATIONS. THE CONTRACTOR SHALL VERIFY ALL EXISTING
CONDITIONS AND SHALL NOTIFY THE STRUCTURAL ENGINEER OF RECORD OF ALL EXCEPTIONS
AND RECEIVE DIRECTION PRIOR TO PROCEEDING WITH THE WORK IN QUESTION.
C. DEMOLITION: THE REMOVAL, CUTTING, DRILLING. ETC. OF EXISTING WORK SHALL BE
PERFORMED WITH GREAT CARE AND WITH APPROPRIATE TOOLS IN ORDER TO NOT
JEOPARDIZE THE STRUCTURAL INTEGRITY OF THE BUILDING. SEE ARCHITECTURAL DRAWINGS
FOR REQUIRED DEMOLITION.
· DESIGN BASIS
A. APPLICABLE CODE: INTERNATIONAL BUILDING CODE (IBC), 2021 EDITION, H-18-8
SEISMIC DESIGN REQUIREMENTS AND PG 18-10 STRUCTURAL DESIGN MANUAL.
B. LATERAL LOADS PER ASCE 7-22
1. DESIGN SEISMIC CRITERIA:
SDS = 1.52g FP= = 0.684 Wp
· EXPANSION ANCHORS (HILTI)
A. EXPANSION BOLTS SHALL BE HILTI KWIK-BOLT TZ2-CARBON STEEL ANCHOR (ESR-4266) OR
EQUAL PRODUCT. ALTERNATE PRODUCTS MUST BE SUBMITTED TO E.O.R. FOR SUBSTITUTION
PRIOR TO INSTALLATION PER SPECIFICATIONS.
B. INSTALLATION: INSTALL THE EXPANSION ANCHORS IN ACCORDANCE WITH THE REQUIREMENTS
GIVEN IN MANUFACTURER'S RECOMMENDATIONS FOR THE SPECIFIC ANCHOR. CONTRACTOR
TO NOTIFY E.O.R. OF ANY ANCHOR/ DOWEL LOCATIONS TO BE REPAIR. E.O.R. TO REVIEW AND
APPROVE ANCHORAGE LOCATIONS PRIOR TO THE EXPANSION ANCHORAGE INSTALLATION.
C. SPECIAL INSPECTION SHALL BE PROVIDED IN ACCORDANCE WITH SECTION 1704 OF THE IBC.
D. WHEN EXPANSION ANCHORS ARE USED FOR SILL PLATE BOLTING AWAY FROM THE EDGE, 10%
OF THE ANCHORS SHALL BE TENSION TESTED. FOR ALL OTHER STRUCTURAL APPLICATIONS,
ALL SUCH EXPANSION ANCHOR SHALL BE TENSION TESTED. WHEN EXPANSION ANCHORS ARE
USED FOR NON-STRUCTURAL APPLICATIONS, 50% OF ANCHORS SHALL BE TENSION TESTED. IF
ANY ANCHOR FAILS TESTING, TEST ALL ANCHORS OF THE SAME TYPE NOT PREVIOUSLY
TESTED UNTIL 20 CONSECUTIVE ANCHORS PASS.
E. CONCRETE AT TIME OF INSTALLATION SHALL HAVE A MINIMUM COMPRESSIVE STRENGTH OF
2,500 PSI AND SHALL HAVE A MINIMUM AGE OF 21 DAYS
* FOR SINGLE ANCHORS WITH NO EDGE DISTANCE OR SPACING REDUCTION.
FOR OTHER CASES, REDUCTION OF VALUES CALCULATED PER ACI 318 IS REQUIRED.
** TENSION TEST VALUES ONLY AND CORRESPOND WITH 1.25x MAXIMUM LRFD CONCRETE
STRENGTH IN TENSION
*** OPTIONAL TORQUE TESTS ARE BASED ON THE MANUFACTURERS MAXIMUM INSTALLATION
TORQUE AND IBC 1910A.5.4.2 AND SHALL BE PERFORMED WITH A CALIBRATED TORQUE
WRENCH AND SHALL ATTAIN THE SPECIFIED TORQUE WITH 1/2 TURN OF THE NUT PER
IBC 1910A.5.5.2.
VERIFY MINIMUM EXISTING CONCRETE STRENGTH IN FIELD. MIN.
f'c = 4000 PSI (LIGHT WEIGHT CONCRETE) *
DIA.
MIN.
EMBED
MIN.
HOLE
DEPTH
MIN. EDGE
DISTANCE
MIN.
SPACING
TENSION TEST
VALUE **
3/8" 2 1/2" 2 3/4" 2 1/2" 2 1/4" 3,452#
5/8" 3 1/4" 3 3/4" 4 1/2" 4 1/2" 4,921#
· SPECIAL INSPECTIONS
SPECIAL INSPECTIONS AND TESTING WILL BE PERFORMED IN ACCORDANCE WITH THE APPROVED PLANS AND SPECIFICATIONS, THE ATTACHED "STATEMENT OF SPECIAL INSPECTION" AND IBC SECTIONS 1704, 1705.
EACH CONTRACTOR RESPONSIBLE FOR THE CONSTRUCTION OF A SEISMIC FORCE RESISTING SYSTEM, DESIGNATED SEISMIC SYSTEM OR A SEISMIC RESISTING COMPONENT LISTED IN THE STATEMENT OF SPECIAL INSPECTIONS SHALL SUBMIT A WRITTEN STATEMENT OF RESPONSIBILITY TO THE COR AND THE
VA PRIOR TO THE COMMENCEMENT OF THE WORK ON THE SYSTEM OR COMPONENT. THE
CONTRACTOR'S STATEMENT OF RESPONSIBILITY SHALL CONTAIN THE FOLLOWING:
1. ACKNOWLEDGEMENT OF AWARENESS OF THE SPECIAL REQUIREMENTS CONTAINED IN THE
STATEMENT OF SPECIAL INSPECTIONS.
2. ACKNOWLEDGEMENT THAT CONTROL WILL BE EXERCISED TO OBTAIN CONFORMANCE WITH
THE CONSTRUCTION DOCUMENTS APPROVED BY THE BUILDING OFFICIAL.
3. PROCEDURES FOR EXERCISING CONTROL WITHIN THE CONTRACTOR'S ORGANIZATION, THE
METHOD AND FREQUENCY OF REPORTING AND THE DISTRIBUTION OF THE REPORTS.
4. IDENTIFICATION AND QUALIFICATION OF THE PERSON(S) EXERCISING SUCH CONTROL AND
THEIR POSITION(S) IN THE ORGANIZATION.
STATEMENT OF SPECIAL INSPECTIONS
THIS STATEMENT OF SPECIAL INSPECTION IS SUBMITTED IN FULFILLMENT OF THE REQUIREMENTS OF IBC
SECTIONS 1704.3. THE FOLLOWING ATTACHMENTS SUMMARIZE THE SPECIAL INSPECTIONS AND
STRUCTURAL TESTS REQUIRED FOR THIS PROJECT.
THESE REQUIREMENTS HAVE ALSO BEEN MADE PART OF THE APPROVED PLANS.
THE VA RECOGNIZES HIS OR HER OBLIGATION TO ENSURE THAT THE CONSTRUCTION COMPLIES WITH THE APPROVED PERMIT DOCUMENTS AND TO IMPLEMENT THIS PROGRAM OF SPECIAL INSPECTIONS. IN PARTIAL FULFILLMENT OF THESE OBLIGATIONS, THE VA WILL RETAIN AND DIRECTLY PAY FOR THE
SPECIAL INSPECTIONS AS REQUIRED IN IBC SECTION 1704.2
SPECIAL INSPECTORS WILL REFER TO THE APPROVED PLANS AND SPECIFICATIONS, THE ABOVE REFERENCED SCHEDULES, AND THE RELEVANT IBC SECTIONS FOR DETAILED SPECIAL INSPECTION REQUIREMENTS. ANY ADDITIONAL TESTS AND INSPECTIONS REQUIRED BY THE APPROVED PLANS AND
SPECIFICATIONS WILL ALSO BE PERFORMED.
INTERIM INSPECTION REPORTS SHALL BE SUBMITTED TO THE COR IN ACCORDANCE WITH IBC SECTION
1704.2.4. A FINAL REPORT OF SPECIAL INSPECTIONS DOCUMENTING REQUIRED SPECIAL INSPECTIONS, TESTING, AND CORRECTION OF ANY DEFICIENCIES NOTED IN THE INSPECTIONS SHALL BE SUBMITTED
PRIOR TO ISSUANCE OF A CERTIFICATE OF USE AND OCCUPANCY.
THIS PLAN HAS BEEN DEVELOPED WITH THE UNDERSTANDING THAT THE COR WILL:
· REVIEW AND APPROVE THE QUALIFICATIONS OF THE SPECIAL INSPECTORS
PERFORMING THE INSPECTIONS
· MONITOR SPECIAL INSPECTION ACTIVITIES TO ASSURE COMPLIANCE WITH PROJECT REQUIREMENTS
· REVIEW SUBMITTED INSPECTION REPORTS
· PERFORM INSPECTION
WIND + SEISMIC REQUIREMENTS (IBC SECTION 1704.3.2 & 1704.3.3)
THE STATEMENT OF SPECIAL INSPECTIONS SHALL IDENTIFY THE SEISMIC AND WIND FORCE LATERAL RESISTING SYSTEMS THAT ARE SUBJECT TO SPECIAL INSPECTIONS PER IBC SECTIONS 1705.12 OR
1705.13 AND 1705.11
SCHEDULE OF SPECIAL INSPECTIONS
INSPECTION FREQUENCY
C - CONTINUOUS INSPECTION
P - PERIODIC INSPECTION
X - DENOTES INSPECTION THAT IS EITHER ONE-TIME OR AT A FREQUENCY DEFINED IN SOME
OTHER MANNER
N - INSPECTION IS NOT REQUIRED
(6
7-
S he rid an
A ve nu e, S ui te
S T
R U
C T
U R
A L
C
I V
I L E
N G
I N
E E
R S
P al o A lto , C
A
STRUCTURAL
GENERAL NOTES
ABBREVIATIONS
& AND
@ AT
A.B. ANCHOR BOLT
ADD'L. ADDITIONAL
ARCH. ARCHITECTURAL
BLDG. BUILDING
BM. BEAM
B.O.C. BOTTOM OF CONCRETE
BOT. BOTTOM
{ CENTER LINE
CANT. CANTILEVER
CLR. CLEAR
COL. COLUMN
CONC. CONCRETE
CONN. CONNECTION
CONT. CONTINUOUS
CTR. CENTER
DBL DOUBLE
DET. DETAIL
DIA. DIAMETER
DO DITTO
DWG. DRAWINGS
E EAST
(E) EXISTING
EA. EACH
E.F. EACH FACE
E.J. EXPANSION JOINT
EL. ELEVATION
E.W. EACH WAY
EXP. EXPANSION
EXT. EXTERIOR
FDN. FOUNDATION
FIN. FINISH
F.F. FINISH FLOOR
F.G. FINISHED GRADE
FLR. FLOOR
F.O.C. FACE OF CONCRETE
F.R.T. FIRE RETARDANT TREATED
F.S. FAR SIDE
FTG. FOOTING
GA. GAUGE
GB GRADE BEAM
G.C. GENERAL CONTRACTOR
HCA HEADED CONC. ANCHOR
(STUD)
HD HOLDOWN
HDR HEADER
HGR. HANGER
HORIZ. HORIZONTAL
HT. HEIGHT
H.S. HIGH STRENGTH
H.S.B. HIGH STRENGTH BOLTS
HSS HOLLOW STEEL SECTION
HSSH HORIZONTAL SHORT
SLOTTED HOLES
IBC INTERNATIONAL BUILDING
CODE
INT. INTERIOR
LLH LONG LEG HORIZ.
LLV LONG LEG VERT.
LSH LONG SLOTTED HOLE
LONG. LONGITUDINAL
L.V.F. LOW-VELOCITY FASTENER
MAX. MAXIMUM
MECH. MECHANICAL
MANUF. MANUFACTURER
M.B. MACHINE BOLTS
MIN. MINIMUM
MISC. MISCELLANEOUS
MTL. METAL
N NORTH
(N) NEW
NO. NUMBER
N.S. NEAR SIDE
N.T.S. NOT TO SCALE
O.C. ON CENTER
OPG. OPENING
OPP. OPPOSITE
O.H. OPPOSITE HAND
} PLATE
PERP. PERPENDICULAR
R.C.J. ROUGHENED
CONSTRUCTION JOINT
REINF. REINFORCEMENT
REQD. REQUIRED
S SOUTH
S.A.D. SEE ARCHITECTURAL
DRAWINGS
S.C. SLIP CRITICAL
S.C.D. SEE CIVIL DRAWINGS
SCHED. SCHEDULE
SDS SELF-DRIVING SCREW
SIM. SIMILAR
S.J. SEISMIC JOINT
SYSTEM
S.M.D. SEE MECHANICAL
DRAWINGS
SMS SHEET METAL SCREW
S.O.G. SLAB-ON-GRADE
SPEC. SPECIFICATION
SQ. SQUARE
S.S. STAINLESS STEEL
STD. STANDARD
SSH SHORT SLOTTED HOLE
SYM. SYMMETRICAL
S.W. STUD WIDTH
T&B TOP AND BOTTOM
T&G TONGUE AND GROOVE
TD TIEDOWN
T.O.C. TOP OF CONCRETE
T.O.F. TOP OF FOOTING
T.O.S. TOP OF STEEL FRAMING
T.O.P. TOP OF PLATE/ TOP OF
PARAPET
TRANS. TRANSVERSE
TYP. TYPICAL
U.O.N. UNLESS OTHERWISE NOTED
U.T. ULTRASONIC TESTING
VERT. VERTICAL
V.I.F. VERIFY IN FIELD
W WEST
W/ WITH
WF WIDE FLANGE
W.H.S. WELDED HEADED STUD
W.J. WALL JOINT
W/O WITHOUT
W.P. WORK POINT
S100 Sheet No.
Drawn By
Scale
Date
Of Sheets HO
HB
AC
H-
LE
W
IN
Sheet Title
7/
/2
2:
P
M
J :\1
-1
\1
\S
TR
U C
\1
S1
.D
W G
Date
ISSUES / REVISIONS
DescriptionRev #
© COPYRIGHT UNAUTHORIZED REPRODUCTION, USE OR
DISTRIBUTION OF ANY MATERIALS HEREIN WITHOUT THE
WRITTEN PERMISSION OF HOHBACH-LEWIN, INC. VIOLATES
THE COPYRIGHT LAWS OF THE UNITED STATES.
06-14-2024
PH
AR
MA
CY
R
OB
OT
RE
PL
AC
EM
EN
T B1
BU
ILD
IN
G
0, DE
PA
RT
ME
NT
O F
VE
TE
RA
NS
A
FF
AI
RS
PA
LO
A
LT
O
HE
AL
TH
C
AR
E
SY
ST
EM
, P
AL
O
AL
TO
, C
A
BC2/MAK
AS NOTED
07-29-24 SUBMITTAL SET
OPTIONAL
TORQUE TEST
(ft-lb) *** CS
· CONCRETE CONSTRUCTION PER IBC 1705.3
TABLE 1705.3 CONCRETE
ITEM FREQ. NOTES
1. INSPECT ANCHORS POST-INSTALLED IN
HARDENED CONCRETE MEMBERS
A. MECHANICAL ANCHORS P/C ACI 318: 26.7.2 INSPECTION SHALL
BE PERIODIC OR CONTINUOUS AS
SPECIFIED BY MANUFACTURER OR
WHERE STATED ELSEWHERE IN
DRAWINGS
L
ANO
N I
G N
R E
R
A L
IA
E
E
ISSEFOR
P
D
C T
S
T R U
R E
T
SI
E R
S
G
T
E
U
R O
LCA I
ET
OF F
A N
S 3131
SAL
U O
D
C A
B
HOHC.
G
H
17 16
F
G
H
(E) W18x71
(E) W18x71
(E) W18x71
(E
W x
(E
W x
(E
W x
(E
W x
(E
W x
(E
W x
(E
W x
(E
W x
(E) W8x18
(E) W8x18
(E) 5 1/2" 4000 PSI L.W.C. FILL
OVER 2" METAL DECK W/ WELDED
WIRE MESH AT ±6" O.C., E.W.
(E
W x
E M
B E D
D E D
IN
T H K C
O N C
W A L L
(E
W x
E M
B E D
D E D
I N
T H K C
O N C W
A L L
(N) PHARMACY ROBOT,
CONFIRM LOCATION W/
MFR. DWGS., SEE ANCHOR
SCHEDULE 1/S500 FOR
ANCHORAGE BY ROBOT
SUBASSEMBLY COMPONENT
PARTIAL FIRST FLOOR FRAMING PLAN
1/4"=1'-0"
1'-6"
(E) 10" CONC. SLAB
1/
/8
13'-4 5/8"
STORAGE MODULE
USER MODULE
CART MODULE
AUTOPACKER MODULE
STORAGE MODULE
LINEAR RAIL
F
G
H
XR2 ROBOT CLEARANCE PLAN
1/4"=1'-0"
2'-0"
4'-0"
FRAMING PLAN NOTES:
1. FOR STRUCTURAL GENERAL NOTES, SEE SHEETS S100.
2. FOR STRUCTURAL ANCHORAGE SCHEDULE AND DETAILS, SEE SHEETS S500.
3. UNIT AND SUBASSEMBLY LOCATIONS ARE BASED ON THE MANUFACTURER PLAN DATED JUNE 11 2024. UNIT WEIGHTS ARE TAKEN AS THE GREATER OF VALUES FOUND IN THE MANUFACTURER PLAN
DATED JUNE 11 2024 AND XR2 CUSTOMER READINESS GUIDE CG-01258 REV-E.
CLEARANCE PLAN NOTES:
1. CLEARANCES AND UNIT LOCATION BELOW ARE BASED ON THE
MANUFACTURER PLAN DATED JUNE 11 2024.
(N) DOUBLE HEIGHT
EXTERNAL STORAGE RACKS
YUYAMA PACKAGER
S201 Sheet No.
Drawn By
Scale
Date
Of Sheets HO
HB
AC
H-
LE
W
IN
Sheet Title
7/
/2
8:
-1
\1
\S
TR
U C
\1
S2
.D
W G
Date
ISSUES / REVISIONS
DescriptionRev #
© COPYRIGHT UNAUTHORIZED REPRODUCTION, USE OR
DISTRIBUTION OF ANY MATERIALS HEREIN WITHOUT THE
WRITTEN PERMISSION OF HOHBACH-LEWIN, INC. VIOLATES
THE COPYRIGHT LAWS OF THE UNITED STATES.
06-14-2024
PH
AR
MA
CY
R
OB
OT
RE
PL
AC
EM
EN
T B1
BU
ILD
IN
G
0, DE
PA
RT
ME
NT
O F
VE
TE
RA
NS
A
FF
AI
RS
PA
LO
A
LT
O
HE
AL
TH
C
AR
E
SY
ST
EM
, P
AL
O
AL
TO
, C
A
BC2/MAK
AS NOTED
#1
(6
7-
S he rid an
A ve te
S T
R U
C T
U R
A L
C
I V
I L E
N G
I N
E E
R S
P al o A lto , C
A
PARTIAL 1ST FLOOR
FRAMING PLAN
07-29-24 SUBMITTAL SET
L
ANO
N I
G N
R E
R
A L
IA
E
E
ISSEFOR
P
D
C T
S
T R U
R E
T
SI
E R
S
G
T
E
U
R O
LCA I
ET
OF F
A N
S 3131
SAL
U O
D
C A
B
HOHC.
(3) SECTIONS WITH (12)
ANCHORS PER SECTION
1/2" DIA. ANCHOR HOLES,
PROVIDE ANCHORAGE PER
SCHEDULE 1/- (36 LOCATIONS)
1595 LB MAX.
(INCLUDING ROBOT AND
ONE SECTION OF RAIL)
LINEAR RAIL ANCHOR LAYOUT
3/8"=1'-0"
5'-6"
1' -9
/8
(6
7-
S he rid an
A ve te
S T
R U
C T
U R
A L
C
I V
I L E
N G
I N
E E
R S
P al o A lto , C
A
ANCHOR DETAILS
S500 Sheet No.
Drawn By
Scale
Date
Of Sheets HO
HB
AC
H-
LE
W
IN
Sheet Title
7/
/2
2:
-1
\1
\S
TR
U C
\1
S5
.D
W G
Date
ISSUES / REVISIONS
DescriptionRev #
© COPYRIGHT UNAUTHORIZED REPRODUCTION, USE OR
DISTRIBUTION OF ANY MATERIALS HEREIN WITHOUT THE
WRITTEN PERMISSION OF HOHBACH-LEWIN, INC. VIOLATES
THE COPYRIGHT LAWS OF THE UNITED STATES.
06-14-2024
PH
AR
MA
CY
R
OB
OT
RE
PL
AC
EM
EN
T B1
BU
ILD
IN
G
0, DE
PA
RT
ME
NT
O F
VE
TE
RA
NS
A
FF
AI
RS
PA
LO
A
LT
O
HE
AL
TH
C
AR
E
SY
ST
EM
, P
AL
O
AL
TO
, C
A
BC2/MAK
AS NOTED
710 4 1
25811
12 9 6 3
V .I.
F
/2
V .I.
F
EXPANSION ANCHOR, SEE SCHEDULE 1/-
(E) FINISH, PATCH AS REQ'D
(E) CONC. OVER METAL DECK PER PLANA
EMBED
SEE 1/-
V .I.
F
/2
V .I.
F
(E) FINISH, PATCH AS REQ'D
B
(N) 3/8"x18"18" 36 ksi STEEL }
(E) CONC. OVER METAL DECK PER PLAN
2"x1 1/2"1 1/2" MIN., TYP.
THRU BOLT ANCHOR DETAIL
1"=1'-0"
ANCHOR SCHEDULE
3/4" DIA. ANCHOR HOLES,
PROVIDE ANCHORAGE PER
SCHEDULE 1/- (16 LOCATIONS
PER STORAGE MODULE)
STORAGE MODULE
2160 LB MAX. WEIGHT
LEVELING FOOT (4 LOCATIONS)
LEVELING FOOT W/ 11/16" DIA.
ANCHOR HOLE, PROVIDE
ANCHORAGE PER SCHEDULE 1/-
(4 LOCATIONS)
AUTOPACKER MODULE
1732 LB MAX. WEIGHT
(INCLUDING ACCESS FRAME)
ACCESS FRAME
250 LB MAX. WEIGHT
LEVELING FOOT (3 LOCATIONS)
STORAGE MODULE ANCHOR LAYOUT
1"=1'-0"
AUTOPACKER MODULE ANCHOR LAYOUT
1"=1'-0"
CART MODULE ANCHOR LAYOUT
1"=1'-0"
5/8" DIA. ANCHOR HOLES,
PROVIDE ANCHORAGE PER
SCHEDULE 1/- (4 LOCATIONS)
LEVELING FOOT (4 LOCATIONS)
AT INTERIOR SLOTTED ANCHOR
HOLES PROVIDE MANUF.
RECOMMENDED KWIK
ANCHORS (4 LOCATIONS)
CART MODULE
1015 LB MAX. WEIGHT
(4) (N) 1/2" DIA. 36KSI THRU BOLT,
SEE SCHEDULE 1/-
PATCH (E) FIREPROOFING AS REQ'D
1'-7 3/8"
LEVELING FOOT W/ 3/8" DIA.
ANCHOR HOLE, PROVIDE
ANCHORAGE ER SCHEDULE
1/- (4 LOCATIONS)
USER MODULE
648 LB MAX. WEIGHT
1' -7
/4
USER MODULE ANCHOR LAYOUT
1"=1'-0"
2'-0 3/4"
/1
4'-3"
1' -1
/2
2'-0 3/4"
7"
1' -2
/8
3/4" DIA. ANCHOR HOLE,
PROVIDE ANCHORAGE PER
SCHEDULE 1/- (2 LOCATIONS)
07-29-24 SUBMITTAL SET
EXTERNAL STORAGE RACKS ANCHOR LAYOUT
1"=1'-0"
YUYAMA PACKAGER ANCHOR LAYOUT
1"=1'-0"
SUBASSEMBLY COMPONENT
QUANTITY IN
ASSEMBLY
ANCHOR1,2,3 DETAIL
CART MODULE 1
PROVIDE (4) 3/8" DIA KWIK BOLT W/ 3"
EMBED & (4) ANCHORS PER MAUFACTURER
DRAWINGS.
2A/- & 3/-
USER MODULE 1
PROVIDE (4) 3/8" DIA KWIK BOLT W/ 3"
EMBED
2A/- & 4/-
STORAGE MODULE 4
PROVIDE (16) 1/2" DIA. THRU BOLT
(64 TOTAL)
2B/- & 5/-
LINEAR RAIL 3
PROVIDE (12) 3/8" DIA KWIK BOLT W/3"
EMBED (36 TOTAL)
2A/- & 6/-
AUTOPACKAGER MODULE 1
PROVIDE (6) 5/8" DIA KWIK BOLT W/3.25"
EMBED
2A/- & 7/-
1 PRIOR TO DRILLING CONFIRM THERE IS A MINIMUM X" GAP BETWEEN NEW AND EXISTING HOLES WHERE X" IS 2 TIMES THE GREATER OF THE NEW AND EXISTING HOLES DIAMETERS. V.I.F. EXISTING HOLE LOCATIONS
AFTER REMOVAL OF EXISTING ROBOT.
2 WHERE ANCHORAGE IS NOT SPECIFIED, PROVIDE MANUF. RECOMMENDED KWIK ANCHORS.
3 ANCHORS WILL ATTACH DIRECTLY TO EQUIPMENT AT MANUFACTURER PROVIDED ANCHOR HOLES U.N.O.
UNIT NAME
QUANTITY
OF UNIT
ANCHOR1,2 DETAIL
DOUBLE HEIGHT EXTERNAL
STORAGE RACK
PROVIDE (4) 3/8" DIA KWIK BOLT W/ 3"
EMBED
2A/- & 8/-
YUYAMA PACKAGER 1
PROVIDE (4) 3/8" DIA KWIK BOLT W/ 3"
EMBED
2A/- & 9/-
PROVIDE NUT AT EACH THRU BOLT
YUYAMA PACKAGER
1930 LB MAX. WEIGHT
A PLAN
B
L4x4x1/4 EACH CORNER
EXPANSION ANCHOR, SEE SCHEDULE 1/- & 2A/-
(2) #10 SMS AT EACH CORNER (8 TOTAL)
YUYAMA PACKAGER
(E) FINISH & CONC. OVER METAL DECK SEE DET. 2A/-
B TYP
T Y P
9"
DOUBLE HEIGHT EXTERNAL
STORAGE RACK
489 LB MAX. WEIGHT
A PLAN
B
L4x4x1/4 EACH CORNER
EXPANSION ANCHOR, SEE SCHEDULE 1/- & 2A/-
(2) #10 SMS AT EACH CORNER (8 TOTAL EACH RACK)
DOUBLE HEIGHT EXTERNAL STORAGE RACK
(E) FINISH & CONC. OVER METAL DECK SEE DET. 2A/-
B TYP
T Y P
1' -6
2'-8"
4'-7"
PROVIDE L4x4 SEE AND
ANCHORAGE PER SCHEDULE 1/-
(4 LOCATIONS PER RACK)
B
PROVIDE L4x4 SEE AND
ANCHORAGE PER SCHEDULE 1/-
(4 LOCATIONS)
B
L
ANO
N I
G N
R E
R
A L
IA
E
E
ISSEFOR
P
D
C T
S
T R U
R E
T
SI
E R
S
G
T
E
U
R O
LCA I
ET
OF F
A N
S 3131
SAL
U O
D
C A
B
HOHC.
File details come from the government source that posted it. Updated .