About this file

This is a site visit log for solicitation number 36C26125R0014, documenting attendees for a site visit related to replacing an inpatient robot PAD at the VA Palo Alto Health Care System. The site visit is scheduled for December 13th, 2024 at 10:00 AM PST at Building 100 Lobby, 3801 Miranda Avenue, Palo Alto, CA 94304.

The log contains details for an RFI due date of December 20th and proposal due date of December 30th, both to be emailed to alison.weinstein@va.gov and charee.harris@va.gov. The document shows multiple attendees from companies including Sentinel, Construction San Francisco, and several VA personnel. The log includes columns for badge numbers, printed names, company names, and contact information including phone numbers and email addresses.

View the file

Other files

File Type Posted
Wage Decision Number CA20240018 12.20.2024.pdf PDF
36C26125R0014 0007.docx DOCX document
36C26125R0014 0006.docx DOCX document
36C26125R0014 0005.docx DOCX document
12.20.2024 Response to RFIs.docx DOCX document
36C26125R0014 0004.docx DOCX document
Updated Enclosure 9_Inpatient Pharmacy Robot_ICRA.pdf PDF
36C26125R0014 0003 SF30.docx DOCX document
36C26125R0014 0001.docx DOCX document
VA Palo Alto Site Plan.pdf PDF
36C26125R0014 0002.docx DOCX document
S02 RFI FORM.docx DOCX document
P07 DOL WAGE CA20240018 10.18.2024.pdf PDF
Enclosure 4_AIO Readiness Guide.pdf PDF
S02 - Past Performance Questionnaire ROBOT .docx DOCX document
Enclosure 11_B100 E1-120 GPR Report.pdf PDF
Enclosure 13_Exist Air Compressor-Air Dryer location.pdf PDF
Enclosure 12_Yuyama Equipment Specs.pdf PDF
Enclosure 3_Blister Packager Specs.pdf PDF
Enclosure 9_Inpatient Pharmacy Robot_ICRA.pdf PDF
S02 RFI FORM.docx DOCX document
SPECS.zip ZIP file
Enclosure 8_AIO Layout.pdf PDF
Enclosure 7_Reflected Ceiling Plan above Robot.pdf PDF
Enclosure 10_Pharmacy Robot Replacement B100 Structural Drawings.pdf PDF
Enclosure 2_Yuyama Packager Specs.pdf PDF
Enclosure 1_Omnicell XR2 Customer Readiness Guide.pdf PDF
852.219-75 VA NOTICE OF LIMITATIONS SUBCONTRACTING-CERTIFICATE OF COMPLIANCE.docx DOCX document
Enclosure 5_Scanner Specifications.pdf PDF
Enclosure 14_New Patch Panel Location.pdf PDF
36C26125R0014.docx DOCX document
Cost Breakdown.docx DOCX document
Enclosure 6_Fit-Test Plan.pdf PDF
Show all 33

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .