Enclosure 11_B100 E1-120 GPR Report.pdf
PDF 1 MB Posted
- Attached to
- Amendment 0007 Replace Inpatient Robot - PAD 36C261-24-AP-5262 | 640-25-1-5281-0005 | project 640-24-113 |
- Solicitation number
- 36C26125R0014
About this file
This document is a Statement of Work (SOW) for a project to replace an inpatient pharmacy robot at the Veterans Affairs Palo Alto Healthcare System (VAPAHCS) in Palo Alto, California.
The SOW outlines the scope of work, which includes preparing the room, anchoring the new Omnicell XR-2 robot and Yuyama packager equipment, connecting required utilities, and installing finishes. Key details include the project phasing, coordination requirements with the equipment vendor, compliance with codes and standards, interim life safety measures, and infection control procedures. The contractor must complete the work within a 9-week timeframe prior to the new robot's go-live date. The SOW provides a list of attachments containing additional specifications, drawings, and equipment details. The federal agency involved is the Department of Veterans Affairs.
View the file
Other files
Show all 33
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Antonio Guzman
Safe2core
7/16/2024 | 9 Photos
Building 100 E1-120 GPR Report
Cover Page 1 / 7 3801 Miranda Ave - Building 100 E1-120 GPR Report
Building 100 E1-120 GPR Report 7/16/2024
Section 1
GPR Concrete Scanning Job Summary Report
Client: Bagg Engineers Jobsite Location: Palo Alto VA Hospital Pharmacy, 3801 Miranda Avenue, Palo Alto, CA, Building 110 E1-120 Date of Work: 06/15/2024 Technician: Adrian Novoa Equipment Used: GSSI StructureScan System equipped with a 1.6 MHz antenna
Scope of Work A Ground Penetrating Radar (GPR) scan was conducted over an area of 400 square feet of the concrete slab at the Palo Alto VA Hospital Pharmacy. The purpose of the scan was to identify any subsurface features prior to the installation of new equipment.
Findings
1. Slab Composition:The slab was identified as a pandeck structure with wire mesh reinforcement.
The wire mesh was found to be spaced 6 inches on center.
2. Detected Features:Wire Mesh: Uniformly spaced wire mesh reinforcement detected throughout the scanned area.
Possible Conduit: One possible conduit was detected and marked with tape and red marker for visibility.
Recommendations
1. Avoid Marked Areas:During the installation of new equipment, ensure to avoid the area marked with tape and red marker where the possible conduit is located.
Section 1 2 / 7 3801 Miranda Ave
Project: 3801 Miranda Ave
Date: 6/15/2024, 3∶25pm
Creator: Adrian Novoa
Project: 3801 Miranda Ave
Date: 6/15/2024, 3∶25pm
Creator: Adrian Novoa
Section 1 3 / 7 3801 Miranda Ave https://img.companycam.com/jP6teM22kmtA4ci-lkBlhX51tcb7B33VMSBeJjys_u4/rs:fit:4032:4032/q:80/aHR0cHM6Ly9jb21w/YW55Y2FtLXBlbmRp/bmcuczMuYW1hem9u/YXdzLmNvbS9mNWJk/YjIxZC0xZTQ1LTQw/NjMtYWMyNS1kM2Y5/OTkxM2E3MmMuanBl/Zw.jpg https://img.companycam.com/XL5uDXcqZS493v_WxnpsQVRcNIyj5Cqj39J_wh1bicM/rs:fit:4032:4032/q:80/aHR0cHM6Ly9jb21w/YW55Y2FtLXBlbmRp/bmcuczMuYW1hem9u/YXdzLmNvbS9mMTZh/ZDRjMS03MWMwLTQ2/N2MtOTdjMC1iZjQ1/ZGM2YzFlOTAuanBn.jpg
Project: 3801 Miranda Ave
Date: 6/15/2024, 3∶25pm
Creator: Adrian Novoa
Project: 3801 Miranda Ave
Date: 6/15/2024, 3∶25pm
Creator: Adrian Novoa
Section 1 4 / 7 3801 Miranda Ave https://img.companycam.com/UM51Dst0T5ZxEBXtD3R8BHs-x8wO-wCy5ujpL7zDljI/rs:fit:4032:4032/q:80/aHR0cHM6Ly9jb21w/YW55Y2FtLXBlbmRp/bmcuczMuYW1hem9u/YXdzLmNvbS9kZDAz/Nzg1MC0xNjljLTQz/YjMtOTM2Yi0xNDNj/M2JkN2NmODIuanBn.jpg https://img.companycam.com/FXa_QEI20uQYxgxLyNlWJ4FgnthZpMSNWpUm1AwW2JU/rs:fit:4032:4032/q:80/aHR0cHM6Ly9jb21w/YW55Y2FtLXBlbmRp/bmcuczMuYW1hem9u/YXdzLmNvbS9kMjI5/Y2UwZi02MjZjLTQ4/YTYtODgyMi1iMmZm/OTQxZTIzYzUuanBl/Zw.jpg
Project: 3801 Miranda Ave
Date: 6/15/2024, 3∶26pm
Creator: Adrian Novoa
Project: 3801 Miranda Ave
Date: 6/15/2024, 3∶26pm
Creator: Adrian Novoa
Section 1 5 / 7 3801 Miranda Ave https://img.companycam.com/T2dXfJL9LdX3CjwYR86tR053zcumXChHB7W83JZYyAc/rs:fit:4032:4032/q:80/aHR0cHM6Ly9jb21w/YW55Y2FtLXBlbmRp/bmcuczMuYW1hem9u/YXdzLmNvbS9iMzI5/NWQwYi0xMzM5LTQ2/ODMtOTYwMi0xODEx/NjRmZGEzZDIuanBn.jpg https://img.companycam.com/trh4s3QaVLFZs9FVSYW0a0aoITDzCJryy6zooxvHOnI/rs:fit:4032:4032/q:80/aHR0cHM6Ly9jb21w/YW55Y2FtLXBlbmRp/bmcuczMuYW1hem9u/YXdzLmNvbS81OGRh/MTI4Zi0yM2EwLTRj/NWMtYTY2MS0xNjZl/Y2JlODQ5MTkuanBn.jpg
Project: 3801 Miranda Ave
Date: 6/15/2024, 3∶29pm
Creator: Adrian Novoa
GPR sample data from the field
Project: 3801 Miranda Ave
Date: 7/16/2024, 7∶57am
Creator: Antonio Guzman
Section 1 6 / 7 3801 Miranda Ave https://img.companycam.com/dSUdTL2gfox2ogDj03jzHwv-qyZQCGlNLZIMK6RhXs0/rs:fit:4032:4032/q:80/aHR0cHM6Ly9jb21w/YW55Y2FtLXBlbmRp/bmcuczMuYW1hem9u/YXdzLmNvbS85MTkx/ZmVlNi00NzcxLTQ5/NzUtOWUwZC1jOTUz/NjhiODIwZTMuanBl/Zw.jpg https://img.companycam.com/qimWMn3lWsRceFpFlUalK14Ynvlplz1lz7SMfRuUccc/rs:fit:4032:4032/q:65/aHR0cHM6Ly9jb21w/YW55Y2FtLXBlbmRp/bmcuczMuYW1hem9u/YXdzLmNvbS81YjIz/NzQ5Ni1iYmViLTRm/NzYtYjU4MS01YWM4/NDZlZTc2NTguanBl/Zw.jpg
9 Post Processed image
- shallow flute at 4.5" deep
- deep flute at 7.5" deep GPR are depth readings are +/- 1"
Project: 3801 Miranda Ave
Date: 7/18/2024, 3∶24pm
Creator: Antonio Guzman
Section 1 7 / 7 3801 Miranda Ave https://img.companycam.com/v5fVa4qKcCv7Yi1BSqzBDFq_UB74mRkRou4e2E3Fnws/rs:fit:4032:4032/q:65/aHR0cHM6Ly9jb21w/YW55Y2FtLXBlbmRp/bmcuczMuYW1hem9u/YXdzLmNvbS83Mjhl/NjMwNi1iYTU2LTQ0/N2MtYmNkZS01MDRh/NjA1MDMwMjcuanBl/Zw.jpg
File details come from the government source that posted it. Updated .