ENCLOSURE 3 - Past Performance Questionaire.pdf

PDF 153 KB Posted

Attached to
Space and Earth Science Data Analysis (SESDA V) RFP Federal contract opportunity
Solicitation number
80GSFC21R005
Issued by
National Aeronautics and Space Administration Goddard Space Center

About this file

This document contains a past performance questionnaire template for evaluation of contractors on a Space and Earth Science Data Analysis solicitation. The solicitation is issued by the National Aeronautics and Space Administration Goddard Space Flight Center for the Space and Earth Science Data Analysis (SESDA V) requirement. The past performance questionnaire is to be completed by references for offerors on their performance of relevant contracts and returned to NASA by the specified due date. It requests information on the contractor's performance in areas such as quality, schedule, cost, management and subcontracting. Ratings are to be provided using definitions for very high, high, moderate, low and very low performance. Contract details and the evaluator's role are also to be provided.

View the file

Other files for this federal contract opportunity

Other files attached to Space and Earth Science Data Analysis (SESDA V) RFP, newest first.
File Type Posted
Amendment -3 80GSFC21R005 SF30..pdf PDF
Set 2- Question and Responses.pdf PDF
SESDA V - 80GSFC21R005 - Amendment 2..pdf PDF
Final RFP Q-A Responses.pdf PDF
1 - Cover Letter RFP 80GSFC21R005.pdf PDF
ATTACHMENT G - Contract Historical Data.pdf PDF
ENCLOSURE 2 - Contract Historical Data.pdf PDF
SESDA V - EXHIBITS 1A-1C.pdf PDF
ATTACHMENT A - Statement of Work.pdf PDF
ATTACHMENT I - IT Security Applicable Document.pdf PDF
ATTACHMENT K - IT Security Management Plan.pdf PDF
ENCLOSURE 4 - IT Security Management Plan Template.pdf PDF
3 - FINAL RFP 80GSFC21R005 Page 2-131.pdf PDF
ATTACHMENT F - Organizational Conflict of Interest - OCI Avoidance.pdf PDF
ATTACHMENT H - PIV.pdf PDF
ATTACHMENT J - Government Furnished Property.pdf PDF
ATTACHMENT L - Installation Accountable Government Property (IAGP).pdf PDF
ENCLOSURE 1 - GPM-Specified Non-Mgmt DL Categories DL Hours and PDs Enclosure.pdf PDF
SESDA V - EXHIBITS 2A - 11B.pdf PDF
ATTACHMENT B -Direct Labor Rates Indirect rates and Fee Matrices.pdf PDF
2 - SF33-14 Page 1.pdf PDF
ATTACHMENT C - Financial Management Reporting Requirements.pdf PDF
ATTACHMENT D - Safety and Health Plan.pdf PDF
ATTACHMENT E - Quality Assurance Plan.pdf PDF
ATTACHMENT M - DEI.pdf PDF
ENCLOSURE 5 - Government Quality Assurance Surveillance Plan.pdf PDF
ENCLOSURE 6 - Standard Contents of a Safety Health Plan.pdf PDF
Show all 27

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFP 80GSFC21R005

ENCLOSURE 3

PAST PERFORMANCE QUESTIONNAIRE

SPACE AND EARTH SCIENCE DATA ANALYSIS (SESDA-V)

PAST PERFORMANCE QUESTIONNAIRE INSTRUCTIONS

(Updated May, 2018)

CO Instruction: Section V should be reviewed for applicability (e.g. small business subcontracting would not apply to a set-aside procurement) and should be further tailored and some items may be deleted if desired, particularly for smaller procurements)

Sections 1-3 provide for contract-related descriptive information and identification of the evaluator.

Section 4 lists the major work elements within our Statement of Work (SOW). Please provide your assessment of the “relevant experience” and “performance” associated with our SOW evidenced within the contract for which you are a reference. “Experience” means a contractor who has performed work in the specific SOW Element. “Did not Perform” means that the specific SOW element was not performed under the contract.

Section 5 evaluates the contractor’s technical, schedule, and cost performance and management. (Additional pages may be used for comments if desired). If you cannot answer any questions, please circle “N/R” for Not Rated.

The following definitions are offered for your use in assigning a performance rating for each of the factors in Sections 5 and 6:

Very High

(VH)

The Offeror’s relevant past performance is of exceptional merit;

indicating exemplary performance in a timely, efficient, and economical manner; very minor (if any) problems with no adverse effect on overall performance.

High

(H)

The Offeror’s relevant past performance demonstrates very effective performance that would be fully responsive to contract requirements with contract requirements accomplished in a timely, efficient, and economical manner for the most part with only minor problems with little identifiable effect on overall performance.

Moderate

(M)

The Offeror’s relevant past performance demonstrates effective performance; fully responsive to contract requirements; reportable problems, but with little identifiable effect on overall performance.

Low

(L)

The Offeror’s relevant past performance meets or slightly exceeds minimum acceptable standards; adequate results; reportable problems with identifiable, but not substantial, effects on overall performance.

Very Low

(VL)

The Offeror’s relevant past performance does not meet minimum acceptable standards in one or more areas; remedial action required in one or more areas; problems in one or more areas which, adversely affect overall performance.

N/R Not Rated

Section 6 provides for evaluation of the contractor’s management of cost and award/incentive fee history.

RETURN THIS QUESTIONNAIRE TO NASA Goddard Space Flight Center BY TBD. Attn: TBD , Code 210.

Greenbelt, MD 20771 Phone: 301-286-????

e-mail: ???? @nasa.gov

1. Contract Information

A. Name of Company/Division Being Evaluated:_____________________

B. Address:_____________________________________________

C. Contractor Cage Code and/or DUNS number

D. Contract Number:_______________________________________

E. Contract Type:_________________________________________

F. Period of Performance (including options): From:______ To:_______

G. Total Contract Value:_____________________________________

H. Award Information: Competitive: Yes___ No___ Basis of Selection: Technical___ Cost/Price___ Other (specify)_________________________

2. Description of Contract

Briefly describe the services provided under this contract:

During the contract performance being evaluated, this firm was the:

Prime Contractor____ Significant Subcontractor ____ Team Member ____ Other (describe)____________________________________________

Does a corporate or business relationship exist between the firm being evaluated and your organization?

Yes ___ No ___. If yes, please describe: ___________________________

3. Evaluator Information

Name: _____________________________________________________ Title: _______________________________________________________ Agency/Company: ____________________________________________ E-mail Address: _______________________________________________ Phone: ______________ Date Questionnaire Completed: _____________ Role in Program/Contract: ______________________________________ Length of Involvement in this Program/ Contract: _____________________

This form contains Source Selection Information when completed. See FAR 3.104. 4

4. SOW Survey Relevance Ratings: Please check the appropriate blocks for Relevance (Performed or Did Not Perform)

SOW ELEMENT

PERFORMED

DID NOT

PERFORM

3.1 Science Support

3.1.1 Mission planning, operations and systems development

3.1.2 Engineering support for instrument development

3.1.3 Mission ground systems

3.1.4 Production data processing

3.1.5 Science data acquisition, archiving and distribution

3.1.6 Scientific data processing tools development

3.1.7 Modeling, analysis, and information extraction

3.1.8 Science data user training and utilization support

3.1.9 Proposals and scientific documentation support

3.2 Information systems and technology support

3.2.1 Computer systems engineering, development and maintenance

3.2.2 Telecommunications and network management

3.2.3 Computer systems management

3.3 Science communication, education, and public outreach

This form contains Source Selection Information when completed. See FAR 3.104. 5

5. General Performance Survey

NO PERFORMANCE QUESTIONS

PERFORMANCE RATING

(Please Circle)

QUALITY

1. Quality of services and support provided VH H M L VL N/R

2. Timely identification and mitigation of risks VH H M L VL N/R

3.

Ability to identify and correct performance deficiencies in a timely manner

VH H M L VL N/R

4.

Demonstrated understanding and compliance with mission safety requirements

VH H M L VL N/R

5. Successful management of tasks/tasks plans VH H M L VL N/R

Comment:

SCHEDULE

6.

Timeliness, quality, and accuracy of schedule estimates and reporting

7. Ability to meet/exceed schedule milestones VH H M L VL N/R

COST

8.

Ability to establish realistic cost estimates and adhere to estimated costs

VH H M L VL N/R

9.

Ability to anticipate, identify and control cost growth.

BUSINESS/MANAGEMENT

10.

Communicating/interfacing with Government and overall responsiveness to Government requests

VH H M L VL N/R

11.

Ability to effectively manage the contract including subcontractor performance, if applicable

VH H M L VL N/R

12.

Ability to recruit and retain highly skilled personnel, including ability to fill key vacancies in a timely manner.

VH H M L VL N/R

13.

Ability to process task orders and/or changes effectively and efficiently.

This form contains Source Selection Information when completed. See FAR 3.104. 6

Section 6:

What is the Contract Value:

Initial Value Current Value Estimated Cost: $___________ $____________

Fee: $___________ $____________

Total Value: $___________ $_____________

What are the total contract expenditures to date (cost/fees to date based on invoices, reports, etc)?

What is the Annual Contract Value to Date (The current contract expenditures to date divided by the number of years of performance to date)?

For example (note, these example numbers may not relate to this specific procurement):

Assume your contract is a current five year contract, is still ongoing, and the latest cost report reflects a cost/fee of $43,500,000 through the first 2 years and 4 months (to date). In this example, current/total Contract Expenditures incurred to Date are $43,500,000 and associated period of performance for those expenditures, expressed in years, is 2.33 years.

Therefore, the Average Annual Cost/Fee Incurred to Date: $18,669,528 ($43,500,000/2.33 years)

Was there a cost overrun? ( ) Yes ( ) No If yes, please explain:

If this was an award fee contract, what are the individual and/or average ratings of performance by your organization? Please attach any available award fee letters or database entries.

Please comment on particularly strong/weak points of Contractor’s performance (technical, schedule, and/or cost). If the Overall Contract Performance Rating below is less than Very High, please provide some explanation in this section on why a higher rating was not provided.

Overall Contract Performance Rating (circle one)

Very High High Moderate Low Very Low

If less than Very High Performance Rating, please explain:

This form contains Source Selection Information when completed. See FAR 3.104. 7

Please add any other comments you may feel are pertinent.

Rater’s Signature Date

File details come from the government source that posted it. Updated .