J.3_Past_Performance_Information_Form.pdf

PDF 108 KB Posted

Attached to
Dockside Repairs to NOAA Ship HENRY B. BIGELOW
Solicitation number
EA-133M-18-00003
Issued by

About this file

J.3 Past Performance Information Form

View the file

Other files

File Type Posted
A0003_EA-133M-18-RP-00003.pdf PDF
HB-512_FV04_Fan_List_-_Cleaning.pdf PDF
RFP_EA-133M-18-00003.Rev.1.pdf PDF
HB_FY18_Dockside_Repair_Spec_(09-19-17).pdf PDF
A0002_EA-133M-18-RP-00003.pdf PDF
Freeman_Marine_Drawing_P0007776-001_Rev00_-_Sliding_Door.pdf PDF
A0001_EA-133M-18-RP-00003.pdf PDF
HB-170_FH22_Mast,_Rigging_&_Flagstaff_Layout_&_Details.pdf PDF
Compressed Air Hose Assy.pdf PDF
HB-170 FH22 Mast, Rigging _ Flagstaff Layout _ Details.pdf PDF
STANDARD_SPECS.zip ZIP file
HB-512 FV02 HVAC Diagram.pdf PDF
HB-512-4030 Assy Unit 4030 HVAC A_D.pdf PDF
Steering System Hose Assy.pdf PDF
Black-Grey Water Hose Assy.pdf PDF
MOC-510-1B HVAC Cleaning.pdf PDF
Oily Waste Hose Assy.pdf PDF
MOC-300-3 General Requirements for Electrical-Electronic Items.pdf PDF
Chilled Water Hose Assy.pdf PDF
16 CFR 1630 Standard for the Surface Flammability of Carpets and Rugs —
Furuno FAR 3000 Brochure.pdf PDF
HB-512-2010 Assy Unit 2010 HVAC A_D.pdf PDF
FSV DWG 451-00 Radar Diagrams with detailed wiring —
HB-512-2020 Assy Unit 2020 HVAC A_D.pdf PDF
HB-634 FZ04 Deck Covering Key Plan _ Sched.pdf PDF
HB-512-1020 Assy Unit 1020 HVAC A_D.pdf PDF
Auxiliary SW Cooling Hose Assy.pdf PDF
AMC-000-1F General Requirements for Contract Repair Work on NOAA Ships.pdf PDF
Bigelow Flex Hoses.xlsx XLSX spreadsheet
TECH_MANUALS.zip ZIP file
(X-Band) FAR-3220 Installation Manual.pdf PDF
Navy MIL-D-3134J Deck Covering Materials.pdf PDF
Potable Water Hose Assy.pdf PDF
(S-Band) FAR-3230 Installation Manual.pdf PDF
HB-512-5010 Assy Unit 5010 HVAC A_D.pdf PDF
HB-110 FH04 Hull Sternbody Scantlings FR. 49 - FR. 82.pdf PDF
HB-631 FF04 Paint Schedule.pdf PDF
RFP_EA-133M-18-00003_BIGELOW_DOCKSIDE.pdf PDF
(093)Rescue Boat Handling System_rev 1.pdf PDF
J.2__USDL_Poster.pdf PDF
(128) Steering Gear.pdf PDF
HB-438 FE81 IBS System Block Wiring Diagram.pdf PDF
MOC-631-2D Coating Systems for Steel Surfaces.pdf PDF
HB-512-5050 Assy Unit 5050 HVAC A_D.pdf PDF
Sea Water Washdown Hose Assy.pdf PDF
EA-133M-18-RP-00003_DRAWINGS.zip ZIP file
HB-512-4020 Assy Unit 4020 HVAC A_D.pdf PDF
(091)refrigerationsys-scientificfreezer.pdf PDF
HB-085 FA02 General Arrangements.pdf PDF
J.4__Past_Performance_Questionnaire.pdf PDF
Show 40 more

Latest 50 of 55 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOLICITATION: EA-133M-18-RP-00003

ATTACHMENT: J.3

1. Refer to Section L of Solicitation EA-133M-18-RP-00003, Instructions to Offerors, REQUIREMENTS FOR

PROPOSAL CONTENT.

* * * The offeror shall complete this form in its entirety for each contract identified in the offeror’s Volume I – Past Performance Proposal.***

2. Check one of the following statements:

CPARS - The referenced Contract Number has a completed CPAR and can be located in the Past Performance Information Retrieval System (PPIRS).

Past Performance Questionnaire (Fill-in Data under item 3 prior to sending to Agency/Client POC)

The Point of Contact or Project Manager associated with the work completed under the referenced Contract Number has been sent this form and the Past Performance Questionnaire to complete and return to Contract Specialist, Sarah Rall prior to the closing date of the solicitation: October 10, 2017, 1:00 pm EST.

EMAIL: sarah.rall@noaa.gov

3. Provide the following data in its entirety.

a. Contract Number and Client point of contact (including 2 points of contact with telephone numbers)

POC #1: /Phone:

POC #2: /Phone:

b. Ship Name, Hull Number:

c. Dollar Value of the contract (Original: $ and Final: $ )

d. Type of service performed and whether Prime or Sub Contractor: Type: , Prime or Sub:

e. Contract performance period at the start of the contract: Start: End:

f. Actual performance dates upon completion: Begun: Completed:

g. Contract Type:

h. Percentage of growth in contract price (Additional work divided by award price) and the extent of Subcontracting:

Growth Percentage: % Extent of Subcontracting:

NOTE: It is the responsibility of the Offeror to follow‐up and to encourage references to submit the questionnaire prior to the solicitation closing date of: October 10, 2017, 1:00 pm EST.

CONTRACT NUMBER: AGENCY OR CLIENT:

PAST PERFORMANCE INFORMATION FORM Form of

File details come from the government source that posted it. Updated .