MOC-510-1B HVAC Cleaning.pdf

PDF 27 KB Posted

Attached to
Dockside Repairs to NOAA Ship HENRY B. BIGELOW
Solicitation number
EA-133M-18-00003
Issued by

About this file

Not Listed

View the file

Other files

File Type Posted
A0003_EA-133M-18-RP-00003.pdf PDF
HB-512_FV04_Fan_List_-_Cleaning.pdf PDF
RFP_EA-133M-18-00003.Rev.1.pdf PDF
HB_FY18_Dockside_Repair_Spec_(09-19-17).pdf PDF
A0002_EA-133M-18-RP-00003.pdf PDF
Freeman_Marine_Drawing_P0007776-001_Rev00_-_Sliding_Door.pdf PDF
A0001_EA-133M-18-RP-00003.pdf PDF
HB-170_FH22_Mast,_Rigging_&_Flagstaff_Layout_&_Details.pdf PDF
Compressed Air Hose Assy.pdf PDF
HB-170 FH22 Mast, Rigging _ Flagstaff Layout _ Details.pdf PDF
STANDARD_SPECS.zip ZIP file
HB-512 FV02 HVAC Diagram.pdf PDF
HB-512-4030 Assy Unit 4030 HVAC A_D.pdf PDF
Steering System Hose Assy.pdf PDF
Black-Grey Water Hose Assy.pdf PDF
Oily Waste Hose Assy.pdf PDF
MOC-300-3 General Requirements for Electrical-Electronic Items.pdf PDF
Chilled Water Hose Assy.pdf PDF
16 CFR 1630 Standard for the Surface Flammability of Carpets and Rugs —
Furuno FAR 3000 Brochure.pdf PDF
HB-512-2010 Assy Unit 2010 HVAC A_D.pdf PDF
FSV DWG 451-00 Radar Diagrams with detailed wiring —
HB-512-2020 Assy Unit 2020 HVAC A_D.pdf PDF
HB-634 FZ04 Deck Covering Key Plan _ Sched.pdf PDF
HB-512-1020 Assy Unit 1020 HVAC A_D.pdf PDF
Auxiliary SW Cooling Hose Assy.pdf PDF
AMC-000-1F General Requirements for Contract Repair Work on NOAA Ships.pdf PDF
Bigelow Flex Hoses.xlsx XLSX spreadsheet
TECH_MANUALS.zip ZIP file
(X-Band) FAR-3220 Installation Manual.pdf PDF
Navy MIL-D-3134J Deck Covering Materials.pdf PDF
Potable Water Hose Assy.pdf PDF
(S-Band) FAR-3230 Installation Manual.pdf PDF
HB-512-5010 Assy Unit 5010 HVAC A_D.pdf PDF
HB-110 FH04 Hull Sternbody Scantlings FR. 49 - FR. 82.pdf PDF
HB-631 FF04 Paint Schedule.pdf PDF
RFP_EA-133M-18-00003_BIGELOW_DOCKSIDE.pdf PDF
(093)Rescue Boat Handling System_rev 1.pdf PDF
J.2__USDL_Poster.pdf PDF
(128) Steering Gear.pdf PDF
HB-438 FE81 IBS System Block Wiring Diagram.pdf PDF
MOC-631-2D Coating Systems for Steel Surfaces.pdf PDF
HB-512-5050 Assy Unit 5050 HVAC A_D.pdf PDF
Sea Water Washdown Hose Assy.pdf PDF
EA-133M-18-RP-00003_DRAWINGS.zip ZIP file
HB-512-4020 Assy Unit 4020 HVAC A_D.pdf PDF
(091)refrigerationsys-scientificfreezer.pdf PDF
HB-085 FA02 General Arrangements.pdf PDF
J.4__Past_Performance_Questionnaire.pdf PDF
HB-512-1010 Assy Unit 1010 HVAC A_D.pdf PDF
Show 40 more

Latest 50 of 55 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MOC-510-1B

October 2000

Supercedes

AMC-510-1A

August 1995

NATIONAL OCEANIC AND ATMOSPHERIC ADMINISTRATION (NOAA)

MARINE OPERATIONS CENTER

STANDARD SPECIFICATION MOC-510-1B

HVAC CLEANING

1. SCOPE. This specification contains the general requirements for cleaning HVAC systems ducts, equipment and components on and for NOAA ships.

2. REFERENCES.

a. NOAA Standard Specification AMC-000-1(series), "General Requirements For Ship Repair Contract Work on NOAA Ships"

3. REQUIREMENTS.

3.1 General.

3.1.1 The Contractor shall provide all labor, material, services, tools, equipment, and supervision needed to accomplish the required work.

3.1.2 Remove all interferences necessary to complete the

required work. An interference is any structure, equipment, piping, sheathing, cable, insulation, or other part of the ship which interferes with access to the ducting or equipment being cleaned. After the work has been completed, restore the removed interference(s) to a condition equal to existing.

3.1.3 Some existing overhead panels on NOAA ships contain

asbestos. To the extent possible, the contractor should plan the work to avoid removal of asbestos-containing panels. Whenever asbestos-containing panels are removed to accomplish the required work, they shall be renewed with new non-asbestos panels of the same general appearance, rigidity and strength. Comply with section 4.11.7 of reference 2.a when removing and disposing of existing asbestos-handling panels. Contractors are encouraged to conduct a pre-bid inspection of the ship to determine how many, if any, asbestos-containing panels must be removed.

3.1.4 Prior to starting work, the contractor shall prepare and submit to the COTR or Port Engineer a work plan and schedule.

The work plan and schedule shall outline the location and methods of gaining access to ducts and components for cleaning, and the day and time specific sections of the HVAC system will be inoperable. As changes occur in the schedule, the COTR or Port Engineer shall be advised.

3.2 Ducting. The following requirements apply to cleaning of

heating, ventilation, and air-conditioning ducts.

3.2.1 Work shall be scheduled to minimize disruption of the

ships' HVAC system. On ships having more than one HVAC system, only one system shall be inoperative at a time. Restore all systems to full operation at the end of each work shift, except when work will continue immediately on another work shift.

3.2.2 The contractor shall use existing access openings in ducts to the extent practical. Where necessary, the contractor shall cut new accesses in the ducts. New access openings shall be sealed with new sheet metal covers, gaskets, and screws.

3.2.3 When cleaning ducting of systems that have hot and cold air mixing boxes and air flow control boxes, the boxes shall be opened, removed, disassembled, and otherwise protected as necessary to prevent components from being damaged by the high volume air flow required during cleaning. Steps to be taken to comply with this requirement shall be included in the work plan and schedule.

3.2.4 Ducts shall be cleaned of all dirt, dust, lint, grit, debris, and other foreign particles as follows:

a. Using a high-vacuum truck capable of pulling a minimum of 12,000 cubic feet per minute (cfm) through a 10-inch diameter duct, pull a high-volume reverse air flow through each section of ducting. While the high-volume air is being pulled through the ducting, the entire interior of the ducting shall be air blasted with a "skipper" hose delivering compressed air at a minimum of 125 psig.

b. For ducts having a cross-sectional area less than 75 square inches, the reverse air flow velocity shall not be less than 350 feet-per-second. This velocity is roughly equivalent to pulling 12,000 cfm of air through a 10-inch diameter duct.

c. For ducts having a cross-sectional area of 75 square inches and greater, the reverse air flow velocity shall not be less than that which can be created by pulling 12,000 cfm of air through the duct.

d. Take necessary precautions and steps to ensure that ducting and components are not collapsed or otherwise damaged due to the excess vacuum created when pulling the reverse air.

e. If required to obtain the required air flow in individual branch ducts, temporarily blank off the registers, terminals and other openings in other branch lines.

3.3 Clean the interior side of all fans, filters, coils, diffusers, dampers, mixing boxes, preheaters, heaters and other components in the specified HVAC system using solvents and brushes as needed to remove all dirt, dust, lint, grit, debris, and other foreign particles.

4. QUALITY ASSURANCE.

4.1 All cleaning shall be inspected and accepted by the COTR or Port Engineer prior to reinstalling access openings.

5. NOTES.

5.1 Reference 2.a may not be issued with all bid solicitations.

However, a copy of the applicable section will be provided upon request. Prospective bidders may obtain a copy by contacting the Marine Operations Center, Marine Engineering Division, 439 West York Street, Norfolk, VA, telephone (757) 441-6201.

END OF SPECIFICATION