J.4__Past_Performance_Questionnaire.pdf

PDF 136 KB Posted

Attached to
Dockside Repairs to NOAA Ship HENRY B. BIGELOW
Solicitation number
EA-133M-18-00003
Issued by

About this file

J.4 Past Performance Questionnaire

View the file

Other files

File Type Posted
A0003_EA-133M-18-RP-00003.pdf PDF
HB-512_FV04_Fan_List_-_Cleaning.pdf PDF
RFP_EA-133M-18-00003.Rev.1.pdf PDF
HB_FY18_Dockside_Repair_Spec_(09-19-17).pdf PDF
A0002_EA-133M-18-RP-00003.pdf PDF
Freeman_Marine_Drawing_P0007776-001_Rev00_-_Sliding_Door.pdf PDF
A0001_EA-133M-18-RP-00003.pdf PDF
HB-170_FH22_Mast,_Rigging_&_Flagstaff_Layout_&_Details.pdf PDF
Compressed Air Hose Assy.pdf PDF
HB-170 FH22 Mast, Rigging _ Flagstaff Layout _ Details.pdf PDF
STANDARD_SPECS.zip ZIP file
HB-512 FV02 HVAC Diagram.pdf PDF
HB-512-4030 Assy Unit 4030 HVAC A_D.pdf PDF
Steering System Hose Assy.pdf PDF
Black-Grey Water Hose Assy.pdf PDF
MOC-510-1B HVAC Cleaning.pdf PDF
Oily Waste Hose Assy.pdf PDF
MOC-300-3 General Requirements for Electrical-Electronic Items.pdf PDF
Chilled Water Hose Assy.pdf PDF
16 CFR 1630 Standard for the Surface Flammability of Carpets and Rugs —
Furuno FAR 3000 Brochure.pdf PDF
HB-512-2010 Assy Unit 2010 HVAC A_D.pdf PDF
FSV DWG 451-00 Radar Diagrams with detailed wiring —
HB-512-2020 Assy Unit 2020 HVAC A_D.pdf PDF
HB-634 FZ04 Deck Covering Key Plan _ Sched.pdf PDF
HB-512-1020 Assy Unit 1020 HVAC A_D.pdf PDF
Auxiliary SW Cooling Hose Assy.pdf PDF
AMC-000-1F General Requirements for Contract Repair Work on NOAA Ships.pdf PDF
Bigelow Flex Hoses.xlsx XLSX spreadsheet
TECH_MANUALS.zip ZIP file
(X-Band) FAR-3220 Installation Manual.pdf PDF
Navy MIL-D-3134J Deck Covering Materials.pdf PDF
Potable Water Hose Assy.pdf PDF
(S-Band) FAR-3230 Installation Manual.pdf PDF
HB-512-5010 Assy Unit 5010 HVAC A_D.pdf PDF
HB-110 FH04 Hull Sternbody Scantlings FR. 49 - FR. 82.pdf PDF
HB-631 FF04 Paint Schedule.pdf PDF
RFP_EA-133M-18-00003_BIGELOW_DOCKSIDE.pdf PDF
(093)Rescue Boat Handling System_rev 1.pdf PDF
J.2__USDL_Poster.pdf PDF
(128) Steering Gear.pdf PDF
HB-438 FE81 IBS System Block Wiring Diagram.pdf PDF
MOC-631-2D Coating Systems for Steel Surfaces.pdf PDF
HB-512-5050 Assy Unit 5050 HVAC A_D.pdf PDF
Sea Water Washdown Hose Assy.pdf PDF
EA-133M-18-RP-00003_DRAWINGS.zip ZIP file
HB-512-4020 Assy Unit 4020 HVAC A_D.pdf PDF
(091)refrigerationsys-scientificfreezer.pdf PDF
HB-085 FA02 General Arrangements.pdf PDF
HB-512-1010 Assy Unit 1010 HVAC A_D.pdf PDF
Show 40 more

Latest 50 of 55 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation #: EA-133M-18-RP-00003

Source Selection Information

Attachment: J4

PAST PERFORMANCE QUESTIONNAIRE

REFERENCE CONTRACT #:

Send Completed Questionnaire to Contract Specialist, Sarah Rall no later than October 10, 2017, 1:00 pm EST:

Sarah.rall@noaa.gov

1. QUALITY OF SERVICE

Assess the contractor’s performance to contract requirements, specifications, and standards of good workmanship (e.g. commonly accepted technical, professional, or environmental standards).

(Check the appropriate rating box.)

RATING ADJECTIVAL

RATING

DEFINITION

EXCEPTIONAL

Performance meets contractual requirements and exceeds many to the Government’s benefit. The element being assessed was accomplished with few minor problems for which corrective actions taken by the Contractor were highly effective.

VERY GOOD

Performance meets contractual requirements and exceeds some to the Government’s benefit. The element being assessed was accomplished with some minor problems for which corrective actions taken by the Contractor were effective.

SATISFACTORY

Performance meets contractual requirements. The element being assessed contains some minor problems for which corrective actions taken by the Contractor appear or were

MARGINAL

Performance does not meet some contractual requirements. The element being assessed reflects a serious problem for which the Contractor has not yet identified corrective actions.

UNSATISFACTORY

Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The element being assessed contains a serious problem(s) for which the Contractor’s corrective actions appear or were ineffective.

Comments:

Solicitation #: EA-133M-18-RP-00003 Attachment: J.4

Source Selection Information

2. SCHEDULE

Assess the timeliness of the contractor against the completion of the contract, task orders, milestones, delivery schedules, and administrative requirements (e.g. efforts that contribute to or affect the schedule variance).

(Check the appropriate rating box.)

RATING ADJECTIVAL

RATING

DEFINITION

EXCEPTIONAL

Performance meets contractual requirements and exceeds many to the Government’s benefit. The element being assessed was accomplished with few minor problems for which corrective actions taken by the Contractor were highly effective.

VERY GOOD

Performance meets contractual requirements and exceeds some to the Government’s benefit. The element being assessed was accomplished with some minor problems for which corrective actions taken by the Contractor were effective.

SATISFACTORY

Performance meets contractual requirements. The element being assessed contains some minor problems for which corrective actions taken by the Contractor appear or were

MARGINAL

Performance does not meet some contractual requirements. The element being assessed reflects a serious problem for which the Contractor has not yet identified corrective actions.

UNSATISFACTORY

Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The element being assessed contains a serious problem(s) for which the

Source Selection Information

Solicitation #: EA-133M-18-RP-00003 Attachment: J.4

3. COST CONTROL

Assess the contractor’s effectiveness in forecasting, managing, and controlling cost.

(Check the appropriate rating box.)

RATING ADJECTIVAL

RATING

DEFINITION

EXCEPTIONAL

Performance meets contractual requirements and exceeds many to the Government’s benefit. The element being assessed was accomplished with few minor problems for which corrective actions taken by the Contractor were highly effective.

VERY GOOD

Performance meets contractual requirements and exceeds some to the Government’s benefit. The element being assessed was accomplished with some minor problems for which corrective actions taken by the Contractor were effective.

SATISFACTORY

Performance meets contractual requirements. The element being assessed contains some minor problems for which corrective actions taken by the Contractor appear or were

MARGINAL

Performance does not meet some contractual requirements. The element being assessed reflects a serious problem for which the Contractor has not yet identified corrective actions.

UNSATISFACTORY

Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The element being assessed contains a serious problem(s) for which the

Solicitation #: EA-133M-18-RP-00003 Attachment: J.4

4. MANAGEMENT

Assess the integration and coordination of all activities needed to execute the contract, specifically the timeliness, completeness and quality of problem identification, corrective action plans, proposal submittals, the contractor’s history of reasonable and cooperative behavior, and customer satisfaction.

(Check the appropriate rating box.)

RATING ADJECTIVAL

RATING

DEFINITION

EXCEPTIONAL

Performance meets contractual requirements and exceeds many to the Government’s benefit. The element being assessed was accomplished with few minor problems for which corrective actions taken by the Contractor were highly effective.

VERY GOOD

Performance meets contractual requirements and exceeds some to the Government’s benefit. The element being assessed was accomplished with some minor problems for which corrective actions taken by the Contractor were effective.

SATISFACTORY

Performance meets contractual requirements. The element being assessed contains some minor problems for which corrective actions taken by the Contractor appear or were

MARGINAL

Performance does not meet some contractual requirements. The element being assessed reflects a serious problem for which the Contractor has not yet identified corrective actions.

UNSATISFACTORY

Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The element being assessed contains a serious problem(s) for which the

Solicitation #: EA-133M-18-RP-00003 Attachment: J.4

ADDITIONAL COMMENTS, IF ANY:

Rater’s Name:

Rater’s Signature:

Date:

Send Completed Questionnaire to Contract Specialist, Sarah Rall no later than October 10, 2017, 1:00 pm EST:

Sarah.rall@noaa.gov

File details come from the government source that posted it. Updated .