MOC-300-3 General Requirements for Electrical-Electronic Items.pdf

PDF 21 KB Posted

Attached to
Dockside Repairs to NOAA Ship HENRY B. BIGELOW
Solicitation number
EA-133M-18-00003
Issued by

About this file

Not Listed

View the file

Other files

File Type Posted
A0003_EA-133M-18-RP-00003.pdf PDF
HB-512_FV04_Fan_List_-_Cleaning.pdf PDF
RFP_EA-133M-18-00003.Rev.1.pdf PDF
HB_FY18_Dockside_Repair_Spec_(09-19-17).pdf PDF
A0002_EA-133M-18-RP-00003.pdf PDF
Freeman_Marine_Drawing_P0007776-001_Rev00_-_Sliding_Door.pdf PDF
A0001_EA-133M-18-RP-00003.pdf PDF
HB-170_FH22_Mast,_Rigging_&_Flagstaff_Layout_&_Details.pdf PDF
Compressed Air Hose Assy.pdf PDF
HB-170 FH22 Mast, Rigging _ Flagstaff Layout _ Details.pdf PDF
STANDARD_SPECS.zip ZIP file
HB-512 FV02 HVAC Diagram.pdf PDF
HB-512-4030 Assy Unit 4030 HVAC A_D.pdf PDF
Steering System Hose Assy.pdf PDF
Black-Grey Water Hose Assy.pdf PDF
MOC-510-1B HVAC Cleaning.pdf PDF
Oily Waste Hose Assy.pdf PDF
Chilled Water Hose Assy.pdf PDF
16 CFR 1630 Standard for the Surface Flammability of Carpets and Rugs —
Furuno FAR 3000 Brochure.pdf PDF
HB-512-2010 Assy Unit 2010 HVAC A_D.pdf PDF
FSV DWG 451-00 Radar Diagrams with detailed wiring —
HB-512-2020 Assy Unit 2020 HVAC A_D.pdf PDF
HB-634 FZ04 Deck Covering Key Plan _ Sched.pdf PDF
HB-512-1020 Assy Unit 1020 HVAC A_D.pdf PDF
Auxiliary SW Cooling Hose Assy.pdf PDF
AMC-000-1F General Requirements for Contract Repair Work on NOAA Ships.pdf PDF
Bigelow Flex Hoses.xlsx XLSX spreadsheet
TECH_MANUALS.zip ZIP file
(X-Band) FAR-3220 Installation Manual.pdf PDF
Navy MIL-D-3134J Deck Covering Materials.pdf PDF
Potable Water Hose Assy.pdf PDF
(S-Band) FAR-3230 Installation Manual.pdf PDF
HB-512-5010 Assy Unit 5010 HVAC A_D.pdf PDF
HB-110 FH04 Hull Sternbody Scantlings FR. 49 - FR. 82.pdf PDF
HB-631 FF04 Paint Schedule.pdf PDF
RFP_EA-133M-18-00003_BIGELOW_DOCKSIDE.pdf PDF
(093)Rescue Boat Handling System_rev 1.pdf PDF
J.2__USDL_Poster.pdf PDF
(128) Steering Gear.pdf PDF
HB-438 FE81 IBS System Block Wiring Diagram.pdf PDF
MOC-631-2D Coating Systems for Steel Surfaces.pdf PDF
HB-512-5050 Assy Unit 5050 HVAC A_D.pdf PDF
Sea Water Washdown Hose Assy.pdf PDF
EA-133M-18-RP-00003_DRAWINGS.zip ZIP file
HB-512-4020 Assy Unit 4020 HVAC A_D.pdf PDF
(091)refrigerationsys-scientificfreezer.pdf PDF
HB-085 FA02 General Arrangements.pdf PDF
J.4__Past_Performance_Questionnaire.pdf PDF
HB-512-1010 Assy Unit 1010 HVAC A_D.pdf PDF
Show 40 more

Latest 50 of 55 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MOC-300-3

September 2000

NATIONAL OCEANIC AND ATMOSPHERIC ADMINISTRATION (NOAA)

MARINE OPERATIONS CENTER

STANDARD SPECIFICATION MOC-300-3

GENERAL REQUIREMENTS FOR ELECTRICAL/ELECTRONIC ITEMS

1. SCOPE. This specification provides general requirements for work performed on electrical and electronic systems.

2. REFERENCES.

2.1 IEEE STD 45-(Latest Rev), Recommended Practice for Electric Installations on Shipboard (series)

2.2 U. S. Coast Guard 46 CFR 110 through 113, “Subchapter J - Electrical Engineering”

3. REQUIREMENTS.

3.1 The contractor shall accomplish all work in these

specifications in accordance with the requirements of References 2.1 and 2.2, and using the best marine and shipbuilding practices.

3.2 The quality of all materials provided by the contractor shall be in accordance with References 2.1 and 2.2, suitable for marine service, and have the same shape, color, and finish as the existing or damaged materials when they were new.

3.3 All new cabling shall be low smoke and sized for the cable’s intended use.

3.4 All machinery, piping, cabling, ducts, insulation, paint work, deck tile, or any other article removed, disturbed, or damaged in the process of accomplishing the work required by these specifications shall be replaced, renewed, or repaired. All paneling removed shall be replaced, including any required alterations. Paneling damaged by the contractor shall be renewed equal to the original when new. All flanges and joints broken or loosened shall be properly remade using new gaskets of the proper size and material.

3.5 All electronic racks installed shall be securely fastened to overhead and deck structural or steel members to prevent movement.

3.6 Any disturbed painted or varnished surfaces shall be cleaned, MOC-300-3

September 2000 painted, and/or varnished with original type and color of paint or varnish.

3.7 Any extension of electrical cabling shall be through a junction box. Any removal of electrical cabling shall be to the nearest junction box.

3.8 All electrical junction boxes, receptacles, hangers, and

miscellaneous electrical fittings shall be in accordance with References 2.1 and 2.2.

3.9 All electrical cabling installed by the contractor shall be run behind paneling in existing cableways and shall be securely banded to the hangers. If existing cableways are not available, new cableways shall be established.

3.10 All electrical cabling installed by the contractor shall be identified at each end with embossed metal tags. Where cables are marked within a junction or terminal box, nonconductive labels shall be used. The contractor shall number cabling with a marking system similar to that used on the ship.

3.11 All manufacturer's or supplier's standard warranties on

equipment installed on the ship shall be assigned in writing by the contractor to the Government.

3.12 Three copies all manufacturer's technical manuals, prints, and drawings shall be delivered to the COTR. Spare parts and surplus installation materials shall be delivered to the COTR.

4. QUALITY ASSURANCE.

4.1 All items disturbed and all devices used, repaired, altered, furnished, or installed by the contractor shall be demonstrated to be fully operational upon completion of work.

END OF SPECIFICATION

1. SCOPE. This specification provides general requirements for work performed on electrical and electronic systems.
2. REFERENCES.
2.1 IEEE STD 45-(Latest Rev), Recommended Practice for Electric Installations on Shipboard (series)
2.2 U. S. Coast Guard 46 CFR 110 through 113, “Subchapter J - Electrical Engineering”
3. REQUIREMENTS.
3.1 The contractor shall accomplish all work in these specifications in accordance with the requirements of References 2.1 and 2.2, and using the best marine and shipbuilding practices.
3.2 The quality of all materials provided by the contractor shall be in accordance with References 2.1 and 2.2, suitable for marine service, and have the same shape, color, and finish as the existing or damaged materials when they were new.
3.3 All new cabling shall be low smoke and sized for the cable’s intended use.
3.4 All machinery, piping, cabling, ducts, insulation, paint work, deck tile, or any other article removed, disturbed, or damaged in the process of accomplishing the work required by these specifications shall be replaced, renewed, or repaired. All p...
3.5 All electronic racks installed shall be securely fastened to overhead and deck structural or steel members to prevent movement.
3.6 Any disturbed painted or varnished surfaces shall be cleaned, painted, and/or varnished with original type and color of paint or varnish.
3.7 Any extension of electrical cabling shall be through a junction box. Any removal of electrical cabling shall be to the nearest junction box.
3.8 All electrical junction boxes, receptacles, hangers, and miscellaneous electrical fittings shall be in accordance with References 2.1 and 2.2.
3.9 All electrical cabling installed by the contractor shall be run behind paneling in existing cableways and shall be securely banded to the hangers. If existing cableways are not available, new cableways shall be established.
3.10 All electrical cabling installed by the contractor shall be identified at each end with embossed metal tags. Where cables are marked within a junction or terminal box, nonconductive labels shall be used. The contractor shall number cabling with...
3.11 All manufacturer's or supplier's standard warranties on equipment installed on the ship shall be assigned in writing by the contractor to the Government.
3.12 Three copies all manufacturer's technical manuals, prints, and drawings shall be delivered to the COTR. Spare parts and surplus installation materials shall be delivered to the COTR.
4. QUALITY ASSURANCE.
4.1 All items disturbed and all devices used, repaired, altered, furnished, or installed by the contractor shall be demonstrated to be fully operational upon completion of work.