E-500-261-003 IQC Project Manual.pdf
PDF 2 MB Posted
- Solicitation number
- BPM057754
- Issued by
- Capitol Heights Town, Maryland
About this file
This is a Project Manual for a construction contract issued by the State of Maryland Department of General Services (DGS) for upgrades to walk-in refrigerator/freezer units at the Eastern Shore Hospital Center in Cambridge, Maryland (Project E-500-261-003). The work encompasses the replacement of exterior units and interior freezer panels, including removal of existing equipment, installation of new units with equal or higher efficiency, electrical tie-ins, drainage system modifications, installation of safety controls and sensors, and comprehensive system testing. The contractor must conduct a thorough site investigation to verify electrical supply, piping, insulation adequacy, and delivery logistics prior to beginning work. The project requires factory-authorized operator training and delivery of two bound operations and maintenance manuals to the facility. The contract duration is 365 days from award, with all materials and work warranted for two years from system acceptance. Contractors are strongly urged to complete a pre-bid site visit, as submission of a bid constitutes acknowledgment of site inspection completion.
This solicitation is restricted to Small Business Enterprises approved for the Master Contractors Central Region contract, with Minority Business Enterprises encouraged to respond. The project classification is designated as "A." All work must comply with state, hospital, and local code standards, with material quality requirements mandated per manufacturer recommendations and applicable industry standards. Contractor selection shall follow the instructions contained in the General Conditions for Construction Contracts (August 2013) and the Instructions to Bidders for Construction Projects (March 2007). Demolished materials become contractor property and must be removed from the site. All storage expenses related to inadvertent manifestations are the contractor's obligation. Specific pricing terms, bid amounts, and response deadlines are referenced as attachments available on eMarylandMarketplace but are not detailed within this project manual document.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT MANUAL
FOR
THE UPGRADES TO THE WALK-IN REFRIGERATOR/FREEZERS
AT
The Eastern Shore Hospital Center located at 5262 Woods Rd, Cambridge, MD 21613
FOR THE
DEPARTMENT OF GENERAL SERVICES
DGS PROJECT NUMBER: E-500-261-003
DATE: December 12, 2025
PROJECT CLASSIFICATION: “A”
Minority Business Enterprises are Encouraged to Respond to this Solicitation
STATE OF MARYLAND
DEPARTMENT OF GENERAL SERVICES BOARD OF PUBLIC WORKS
Atif Chaudhry., Secretary Wes Moore, Governor Room 1405 Brooke E. Lierman, Comptroller 301 West Preston Street Dereck E. Davis, Treasurer Baltimore Md. 21201
TABLE OF CONTENTS
DIVISION 0 - PROCUREMENT AND CONTRACTING REQUIREMENTS
- Notice To Bidders - Solicitation Fact Sheet (eMarylandMarketplace attachment)
- Instructions to Bidders for Construction Projects (March 2007) (eMarylandMarketplace attachment)
- General Conditions for Construction Contracts (August 2013) (eMarylandMarketplace attachment)
- Bid Proposal Affidavit (eMarylandMarketplace attachment)
- Contractors Questionnaire
- Bid Bond, if applicable (eMarylandMarketplace attachment)
- Minority Business Enterprise Utilization Procedures (July 2014) (eMarylandMarketplace attachment)
- MBE Attachment D-1A Forms (eMarylandMarketplace attachment)
- List of Prevailing Wage Rates, if applicable
- Addenda, if any (eMarylandMarketplace attachment)
- List of Drawings
- Pre-Bid Conference/Site Visit – Refer to: State Finance and Procurement Article §14-302(a)(7)(v) and COMAR 21.11.03.09.C.(2)(e).
Specifications:
DIVISION 1 GENERAL REQUIREMENTS # OF
PAGES
Section - I Summary of Work 6
SECTION – I
SUMMARY OF WORK
WORK COVERED BY CONTRACT DOCUMENTS
A. General Statement Concerning Work Covered: The following statements of the Work covered by the Contract Documents do not constitute complete descriptions of the entirety of work involved. The work to be accomplished under this Contract is located at The Eastern Shore Hospital Center on 5262 Woods Rd Cambridge Md.
The scope of Work under this base bid, shall consist of, but not be limited to providing all construction, permits, labor, materials, equipment, services, supplies, testing, instrumentation necessary to, and incidental to the completion of all work as specified herein.
B. The work of this project shall be performed as a construction contract. Without intending to limit or restrict the extent of Work required, the Work is summarized as follows:
Project: Replace the exterior units and interior freezer panels. Please refer to the attached photos for reference. This includes but not limited to any ancillary components to ensure a fully functional system that meets hospital and all regulatory standards.
Project #: E-500-261-003 This scope is intended to be a summary of the work to be performed, but is not intended to be a complete description of each task involved.
Scope of Work—Investigation: The adequacy of the electrical supply, piping, insulation and any other component needed should be checked to insure that those items will meet the needs of the new system throughout the operating range.
The delivery method including rigging and transporting of the equipment from the delivery vehicle to the insta to the installation location should be thoroughly reviewed by the contractor. To not create any damage to the area.
Scope of Work—Demolition: Remove the existing units and any ancillary piping or components as needed.
Dispose of all debris appropriately.
Scope of Work—Installation: Provide and install the new units, components, ancillary piping or equipment of equal or higher efficiency Any submission of equipment must be approved by DGS and ESHC representatives.
Make tie-ins to the existing electrical panels.
Install and connect new drain valves and any necessary piping as needed.
Install all other appurtenances such as safety controls, gauges, flow controls, sensors, and any additional equipment that is necessary to meet current laws and code requirements.
Test run the freezers upon completion of the installation running them successfully through the full operating range for a minimum of 48 hours each, prior to turning over to the Facility.
Provide factory authorized training for the humidifiers to the Facility operators, including operation and maintenance of the units.
Provide 2 bound operations and maintenance manuals to the Facility for the units.
All materials and work shall be warranted for a period of two years from the acceptance of the system.
All work performed is to meet all state, hospital and local code standards.
PROTECTION
Protect installed products until completion of project.
DURATION OF THE CONTRACT:
365 days
CONTRACT AWARD:
Potential Bidders are strongly urged to inspect the site prior to submitting their bid for this work and to familiarize themselves with all existing conditions.
The submission of a bid will be construed that the bidder has completed such a visit. Any later compensatory claims by the Contractor for labor, equipment, or materials will not be considered if the claim is due to the Contractor’s negligence to visit the site.
NOTE: All quantities and sizes listed are approximate. The Contractor shall be responsible to obtain his/her measurements for this project and bidding purposes. All storage expenses for inadvertent manifestations shall be the obligation of the contractor.
MATERIAL QUALITY
All material used for the performance and completion of this work are to be used and designed for the purposes for which they are installed. Materials are to be utilized in accordance with the manufactures recommendations and/or the applicable industry standards for such use. Materials are to be finished, delivered, erected, connected and finished in every detail and shall be selected and arranged to fit properly into the available space in the specified areas. Where no material(s) quality are specified and there are several appropriate material choices to select for a given use, the material(s) having the higher durability or suitability for the purpose shall be utilized. Any such material selection instances are to be approved by the DGS Project Manager.
MATERIALS OWNERSHIP
Except for items or materials indicated to be reused, reinstalled, or otherwise indicated to remain Owner's property. Demolished materials shall become Contractor's property and shall be removed from Project site.
See attached pictures of the current equipment.
| DURATION OF THE CONTRACT: |
| MATERIAL QUALITY |
| All material used for the performance and completion of this work are to be used and designed for the purposes for which they are installed. Materials are to be utilized in accordance with the manufactures recommendations and/or the applicable... |
| MATERIALS OWNERSHIP |
| Except for items or materials indicated to be reused, reinstalled, or otherwise indicated to remain Owner's property. Demolished materials shall become Contractor's property and shall be removed from Project site. |
| See attached pictures of the current equipment. |