Attachment_J.18_Crash_Data_Acquisition_Network_Setup_Requirements.pdf

PDF 116 KB Posted

Attached to
Modernization for the Operation of the National Automotive Sampling System (NASS)
Solicitation number
DTNH22-14-R-00002
Issued by

About this file

New Attachment J.18

View the file

Other files

File Type Posted
Attachment_J_18_Crash_Data_Acquisition_Network_Setup_Requirements.docx DOCX document
DTNH22-14-R-00002_Revised_Amend__2_Corrections_and_Changes_05-14-2014.pdf PDF
Rev._Attachment_J.12_General_Requirement_4_CISS_Training_Location_Hypothetical_Task_05-14-2014.pdf PDF
Responses_to_Solicitation_QA_(DTNH22-14-R-00002)_05-14-2014.pdf PDF
Rev._Attachment_J.10_General_Requirement_2_CISS_PSU_Operation_Task_05-14-2014.pdf PDF
DTNH22-14-R-00002 _Amend._2.pdf PDF
Rev._Attachment_J.9_General_Requirement_1_CISS_Zone_Center_Operation_Task_05-14-2014.pdf PDF
Amendment_0001.pdf PDF
Attachment_J.3_Past_Performance_Questionnaire.docx DOCX document
Attachment_J.4_Small_Business_Subcontracting_Plan.docx DOCX document
Attachment_J.7_CISS_Staff_Qualifications.docx DOCX document
Attachment_J.12_General_Requirement_4_CISS_Training_Location_Hypothetical_Task_vl _04-18-2014.docx DOCX document
Attachment_J.5_Agency_Procedures_for_Release_and_Security.pdf PDF
Attachment_J.6_Area_Documentation.docx DOCX document
Attachment_J.8_Staffing_Assignments.docx DOCX document
Attachment_J.13_General_Requirement_5_CISS_Injury_Coding_Hypothetical_Task_vl _04-18-2014.docx DOCX document
Attachment_J.15_General_Requirement_7_CRSS_Quality_Control_Hypothetical_Task_vl _04-18-2014.docx DOCX document
SF33.pdf PDF
Attachment_J.1_Disclosure_of_Lobbying_Activities.pdf PDF
Attachment_J.17_General_Requirement_9_CRSS_Training_Hypothetical_Task_vl _04-18-2014.docx DOCX document
Attachment_J.11_General_Requirement_3_CISS_Training_Development_Hypothetical_Task_vl _04-18-2014.docx DOCX document
Attachment_J.10_General_Requirement_2_CISS_PSU_Operation_Task_vl _04-18-2014.docx DOCX document
Attachment_J.16_General_Requirement_8_CRSS_PSU_Operations_and_Coding_Center_Hypothetical_Task_vl _04-18-2014.docx DOCX document
Attachment_J.9_General_Requirement_1_CISS_Zone_Center_Operation_Task_vl _04-18-14.docx DOCX document
Attachment_J.14_General_Requirement_6_CISS_Crash_Reconstruction_Hypothetical_Task_vl _04-18-2014.docx DOCX document
Attachment_J.2_Subcontract_Checklist.docx DOCX document
DTNH22-14-R-00002.pdf PDF
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

C D A N R E Q U I R E M E N T S

Crash Data Acquisition Network

Crash Data Acquisition Network

Please note that the responsible party for selection and installation of a site(s) may be required to respond to each requirement as part of a Certification &

Accreditation (C&A) process.

New Field Site Setup Requirements

The Crash Data Acquisition Network support group is providing contractors field site setup information for new data collection sites to ensure compliance with requirements.

The Crash Data Acquisition Network wants to ensure that any contractor who is awarded a field site(s) within

CDAN complies with the requirements listed below.

Physical Controls

1.1 Facility should have secured access points (doors, windows, ceilings).

1.2 Tenant should have control over keys, pin numbers, access cards to location.

1.3 There should be restricted shared access with other

tenants/landlord.

1.4 Emergency lighting should be in place throughout

the building.

1.5 Fire/smoke detection devices should be present

throughout the building.

1.6 Environmental controls (temperature, humidity) should be controllable by tenant for the identified space.

1.7 Pipes should not be located directly over workspaces

and or computer hardware such as servers or network equipment.

1.8 Deliveries should be made to a secure location

within the space or the building. Packages cannot be left outside or in front of the office door in a publicly accessible space.

Access Controls

2.1 If available, identify any building monitoring

devices (CCTV, guards, and sign in logs) and ensure that the space is included under that monitoring;

identify facility intrusion alarms and procedures.

2.2 Building visitor logs must be maintained for up

to one calendar year.

2.3 There must be a controlled entry to the space so

that visitors can be properly identified.

Networking Controls: Wired

3.1 Internet Service Provider (ISP) must be able

to provide business-class service to facility (10mbps download, 5mbps upload minimum speeds recommended).

3.2 Digital Subscriber Line (DSL) not recommended.

3.3 Internet and telephone line locations must be

secured and restricted access only.

3.4 Cabling within space should not be located within

shared (other tenants adjacent) walls.

3.5 All network cables need to be a at least Category 6

or better.

3.6 Network cables should be subject to best-

practices cable management and not exposed to any environmental hazards.

Networking Controls: Wireless

4.1 If used, local area wireless network must use

a minimum of WPA2 (Personal) private key encryption. WPA2 Enterprise is highly recommended where available.

4.2 Wireless encryption keys must be changed at least

once every 60 days.

4.3 WPS passcode service must be disabled on the

wireless router and any connected devices (range extenders, etc).

4.4 SSID must not provide any identifying information

such as office # or phrases identifying the nature of the work being performed (aka, “DOT OFFICE #12” or “CDAN”). We recommend that the SSID should be comprised of a random string of alpha numeric characters.

4.5 Wireless network must be set to the lowest power

which covers the required service area. Setting the router to max power is NOT recommend and will very likely lead to signal bleed out to unauthorized areas.

Emergency Precautions

5.1 There should be a means to cut power to the systems in

emergency situations.

5.2 Tenant must be able to use short-term uninterruptible

power supplies (UPS).