DTMA98R20120001-000007.pdf

PDF 161 KB Posted

Attached to
Ship Management Services for Three RRF Vessels
Solicitation number
DTMA98R20120001
Issued by

About this file

Amendment No. 7

View the file

Other files

File Type Posted
DTMA98R20120001_JandA.pdf PDF
Amend 6 J.7 Past Performance Information Data.docx DOCX document
DTMA98R20120001-000006.pdf PDF
DTMA98R20120001-000005.pdf PDF
DTMA98R20120001-000004 Final Amend 4.pdf PDF
Amend 3 J.7 Past Performance Information Data.docx DOCX document
Amend 3 J.15 Pricing Sheet.xlsx XLSX spreadsheet
DTMA98R20120001-000003 Final.pdf PDF
Cape Henry Horn COI.pdf PDF
Cape H Preproposal Conf Slides.pptx PPTX presentation
DTMA98R20120001-000002.pdf PDF
TE9 Fleet Manual 4th Edition January 31 2005.pdf PDF
TE10 MSC SOM.pdf PDF
DTMA98R20120001-000001.pdf PDF
TE11 Standard Job Description Report - CAPE H.xlsx XLSX spreadsheet
TE6 Estimated Value.pdf PDF
ATTACHMENTS Section J.pdf PDF
TE-13 MA-496 —
TE3 NS5 Business Protocol Guidance.pdf PDF
TE4 Vessel Status - CAPE H.pdf PDF
DTMA98R20120001 SF-33 C thru M.pdf PDF
TE7 Required Vessel Speed.pdf PDF
TE8 PCS Requirements Matrix.pdf PDF
TE2 QASP.pdf PDF
TE-16 Suisun Bay Reserve Fleet Safety Rules.pdf PDF
TE-14 JRRF Combined Fleet Safety Rules and Policy.pdf PDF
TE5 Logistics Maintenance Manual.pdf PDF
TE1 Operations Maint Manual Jan 09.pdf PDF
TE-15 Beaumont Reserve Fleet Safety Rules Revised Oct 2011.pdf PDF
TE12 WIND SPEED BY PORT.pdf PDF
Attachment J.19 Incumbent CBA-MOUs.pdf PDF
Show all 31

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

DTMA98R20120001

x x

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT

THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

Washington DC 20590-0001 Mail Stop W-28-201

00091

1200 New Jersey Avenue, SE

MAR-380

Office of Acquisition U.S. DOT/Maritime Administration

WASHINGTON DC 20590-0001

00091

MAIL STOP W-28-201

1200 NEW JERSEY AVENUE SE

Office of Acquisition MAR-380 U.S. DOT/ Maritime Administration

04/03/2012000007

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

02/13/2012

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Ship Manager Services for Three RRF Vessels

SUMMARY OF CHANGES

1. Answers to offeror's questions are attached.

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

Melinda Simmons-Healy

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

NSN 7540-01-152-8070

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

Solicitation DTMA98R20120001 Amendment No. 000007 Questions & Answers

No. QUESTION ANSWER

1 If a bidder lists a current contract with the Maritime Administration, do we have to submit a Form J‐7 for this contract reference? The RFP states, “Note: IT IS NOT NECESSARY TO

REQUEST PERFORMANCE DATA FROM MARAD

UNDER MARAD SHIP MANAGER CONTRACTS.

The past performance evaluation team has access to this.” The meaning of this statement is unclear, but seems to indicate that a Form J‐7 is not required to be submitted by the bidders.

Current contracts with the Maritime Administration may be submitted using the form at Attachment J.7.

2 If a bidder lists multiple contracts with the Maritime Administration, is each contract counted as one past performance reference?

This seems to be indicated by the added sentence contained in Section L.9.1.b in Amendment 0006. Since every Ship Group is treated as a separate contract, this would mean that each contract associated with a Ship Group would be counted toward the five allowable references. Please clarify.

Each contract with the Maritime Administration submitted using the form at Attachment J.7 is considered as one past performance reference.

3 Requirements formerly listed in section L.8 have now been moved to section L.9.1.g. Is MARAD requesting a separate proposal section for this requirement or is this requirement considered inclusive of the data provided in section L.9.1.a.2? Paragraph L.9.1.g limits the proposal to four contracts while section L.9.1.a.2 limits the proposal to five contracts.

These paragraphs appear to be duplications with conflicting requirements.

Paragraph L.9.1.g was included inadvertently and is hereby removed in its entirety.

4 An offeror who uploaded their proposal for DTMA98R20120001 on Thursday 3/29 asked if the changes in Amendment 6 required them to resubmit our proposal.

As a minimum, by the final date/time established for receipt of proposals, the offeror must acknowledge receipt of all amendments issued to the solicitation including amendments issued subsequent to an offeror submitting their proposal. Up until the date/time established for receipt of proposals, the offeror may either revise or not revise their proposal in any way they deem appropriate.

File details come from the government source that posted it. Updated .