SCR_Supplemental_WAPA_Technical_Specs.pdf
PDF 258 KB Posted
- Attached to
- Veterans Drive (Route 30) Federal contract opportunity
- Solicitation number
- DTFH71-17-R-00014
About this file
SCR_Supplemental_WAPA Technical Specs
View the file
Other files for this federal contract opportunity
Show all 45
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
Project DPC-34(1)
IMPROVEMENTS TO VETERANS DRIVE – PHASE 1A (ROUTE 30)
Government of the Virgin Islands of the United States
Supplemental Specifications
The following Construction Specifications are provided by the Government of the Virgin Islands of the United States and the VI Water and Power Authority. The subsections are not written in the “FP-03” imperative format.
The following technical specifications are all inclusive and may have language that does not apply to the work in this contract.
Review the entire specification document and perform work as described in accordance with the applicable Section’s Construction Specifications. Disregard any specification language that does not pertain to the work described in contract.
TABLE OF CONTENTS
Title Page
Page
Table of Contents ..............................................................................................................................i
Division 1 - General Requirements 01000 General Specifications .......................................................................................... 01000-1 01005 Miscellaneous Requirements ................................................................................... 01005-1 01039 Coordination and Meetings ................................................................................... 01039-1 01400 Quality Control ......................................................................................................01400-1
13.2 01500 Temporary Facilities ................................................................................................. 01500-1
01568 Erosion Control and Containment of Construction Materials .............................. 01568-1 01620 Transportation and Handling ................................................................................ 01620-1 01630 Storage and Protection .......................................................................................... 01630-1
14.2 01710 Cleanup ......................................................................................................................01710-1
01730 Guarantees and Warranties ...................................................................................... 01730-1
Division 2 – Site Work 02230 Site Clearing ............................................................................................................. 02230-1 02315 Excavation, Trenching and Back Fill .................................................................... 02315-1 02316 Rock Removal ......................................................................................................... 02316-1 02535 Electric Duct Bank................................................................................................... 02535-1 02536 Electric Manholes .................................................................................................... 02536-1 02550 Sidewalks and Curbs ............................................................................................. 02550-1 02615 Ductile-Iron Pipe and Fittings ............................................................................... 02615-1 02623 PVC Pressure Pipe ................................................................................................... 02623-1 02713 Water Service Connections ................................................................................... 02713-1 02740 Bituminous Pavement .............................................................................................. 02740-1 02750 Rigid Pavement ........................................................................................................ 02750-1
Division 15 – Mechanical 15101 Gate valves, Hydrants, and Appurtenances .......................................................... 15101-1
Appendix
A. Hydrostatic Testing
DIVISION 1
SECTION 01000
GENERAL SPECIFICATIONS
1. Definitions
2. Abbreviations
3. Handling and Distribution
4. Materials - Samples - Inspection
5. Contractor's Shop and Working Drawings
6. Occupying Private land
7. Interference with and Protection of Streets
8. Storage of Materials and Equipment
9. Safety
10. Sanitary regulations
11. Lines, Grades and Measurements
12. Dimensions of Existing Structures
13. Work to Conform
14. Pipe Location
15. Limits of Normal Excavation
16. Computation of Quantities
17. Planning and Progress Schedules
18. Precautions during Adverse Weather
19. Electrical Energy
20. Protection against Electrolysis
21. Record Contract Drawings
22. District Meter and St. John Terminal Leak Repair
23. Electric Pad
1. Definitions. Wherever the words defined in this section or pronouns used in their stead occur in the Contract Documents, they shall have the meanings herein given.
1.1. As Directed, As Required, Etc. Wherever in the Contract Documents, or on the Drawings, the words "as directed," "as ordered," "as requested," "as required," "as permitted," or words of like import are used, it shall be understood that the direction, order, request, requirement, or permission of the Engineer is intended. Similarly, the works "approved," "acceptable," "suitable," " satisfactory," and words of like import shall mean approved by, acceptable to, suitable to, or satisfactory to the Engineer.
1.2. Elevation. The figures given on the Drawings or in the other Contract Documents after the word "elevation" or abbreviation of it shall mean the distance in feet above the datum adopted by the Engineer.
1.3. Rock. The word "rock", wherever used as the name of an excavated material of material to be excavated, shall mean only boulders and pieces of concrete or masonry exceeding 1 cu. yd. in volume, or solid ledge rock which, in the opinion of the Engineer, requires, for its removal drilling, hammering, blasting, wedging, sledging, barring, or breaking up with a power-operated tool. No soft or disintegrated rock which can be removed with a hand pick or power-operated excavator or shovel, or loose, shaken, or previously blasted rock or broken stone in rock fillings or elsewhere, and no rock exterior to the maximum limits of measurement allowed, which may fall into the excavation, will be measured or allowed as "rock".
1.4. Earth. The word "earth", wherever used as the name of an excavated material or material to be excavated, shall mean all kinds of material other than rock as above defined.
2. Abbreviations. Where any of the following abbreviations are used in the Contract Documents, they shall have the meaning set forth opposite each.
AASHTO - American Association of State Highway and Transportation Officials
ACI - American Concrete Institute
AISC - American Institute of Steel Construction
ANS - American National Standard
ANSI - American National Standards Institute
ASCE - American Society of Civil Engineers
ASTM - American Society for Testing and Materials
AWWA - American Water Works Association
FP-03 - Federal "Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects" 2003, by the Federal Supply Services of the General Services Administration, Washington, D. C.
125-lb. ANS - American National Standard for Cast-iron
250-lb. ANS - Pipe Flanges and Flanged Fittings, Designation B16.1-1975, for the appropriate class
AWG - American or Brown and Sharpe Wire Gage
NPT - National Pipe Thread
NSI - National Sanitation Foundation
OS&Y - Outside screw and yoke
Stl. WG - U S Steel Wire, Washburn and Moen, American Steel and Wire or Roebling Gage
USS Gage - United States Standard Gage
WOG - Water, Oil, Gas
WSP - Working steam pressure
3. Handling And Distribution. The Contractor shall handle, haul, and distribute all materials and all surplus materials from the different portions of the work, as necessary or required; shall provide suitable and adequate storage space for materials and equipment during the progress of the Work, and be responsible for the protection, loss of or damage to materials and equipment furnished by him, until the final completion and acceptance of the Work.
Storage and demurrage charges by transportation companies and vendors shall be borne by the Contractor.
4. Materials - Samples – Inspection. Unless otherwise expressly provided on the Drawings or in any of the other Contract Documents, only new materials and equipment shall be incorporated in the Work. All materials and equipment furnished by the Contractor to be incorporated in the Work shall be subject to the inspection of the Engineer. No material shall be processed or fabricated for the Work or delivered to the Work site without prior concurrence of the Engineer.
As soon as possible after execution of the AGREEMENT, the Contractor shall submit to the Engineer the names and addresses of the manufacturers and suppliers of all materials and equipment he proposes to incorporate into the Work. When shop and working drawings are required as specified below, the Contractor shall submit prior to the submission of such drawings, data in sufficient detail to enable the Engineer to determine whether the manufacturer and/or the supplier have the ability to furnish a product meeting the Specifications. As requested, the contractor shall also submit data relating to the materials and equipment he proposes to incorporate into the Work in sufficient detail to enable the Engineer to identify and evaluate the particular product and to determine whether it conforms to the Contract requirements. Such data shall be submitted in a manner similar to that specified for submission of shop and working drawings. Facilities and labor for the storage, handling, and inspection of all materials and equipment shall be furnished by the Contractor. Defective materials and equipment shall be removed immediately from work site. If the Engineer so requires, either prior to or after commencement of the Work, the Contractor shall submit samples of materials for such special tests, as the Engineer deems necessary to demonstrate that they conform to the Specifications. Such samples shall be furnished, taken, stored, packed, and shipped by the Contractor as directed. Except as otherwise expressly specified, the Owner shall make arrangements for, and pay for, the tests.
All samples shall be packed so as to reach their destination in good condition, and shall be labeled to indicate the material represented, the name of the building or work and location for which the material is intended, and the name of the Contractor submitting the sample. To ensure consideration of samples, the Contractor shall notify the Engineer, by letter that the samples have been shipped and shall properly describe the samples in the letter. The letter of notification shall be sent separate from and should not be enclosed with the samples (properly described in the letter).
The Contractor shall submit data and samples, or place his orders, sufficiently early to permit consideration, inspection and testing before the materials and equipment are needed for incorporation in the Work. The consequences of the Contractor’s failure to do so shall be his sole responsibility.
In order to demonstrate the proficiency of workmen, or to facilitate the choice among several textures, types, finishes, surfaces, etc., the Contractor shall provide such samples of workmanship of wall, floor, finish, etc., as may be required.
When required, the Contractor shall furnish to the Engineer triplicate sworn copies of manufacturer's shop or mill tests (or reports from independent testing laboratories) relative to materials, equipment performance ratings, and concrete data.
After review of the samples, data, etc., the materials and equipment used on the Work shall in all respects conform therewith.
5. Contractor's Shop and Working Drawings. The Contractor shall submit shop and working drawings of concrete reinforcement, piping layout, materials fabricated especially for the Contract, and materials and equipment for which such drawings are specifically requested.
Such drawings shall show the principal dimensions, weight, structural and operating features, space required, clearances, type and/or brand of finish or shop coat, grease fittings, etc., depending on the subject of the drawing. When it is customary to do so, when the dimensions are of particular importance, or when so specified, the drawings shall be certified by the manufacturer or fabricator as correct for the Contract. As part of the shop drawing submittal, submit a list with the names, identification numbers, and quantities of spare parts, instruments, and equipment to be provided by the Contractor.
When so specified, or if considered by the Engineer to be acceptable, manufacturer's specifications, catalog data, descriptive matter, illustrations, etc., may be submitted in place of shop and working drawings. In such a case, the requirements shall be as specified for shop and working drawings, insofar as applicable, except that the submission shall be in quadruplicate.
The Contractor shall be responsible for the prompt and timely submittal of all shop and working drawings so that there shall be no delay to the Work due to the absence of such drawings. Prior to the submittal of any shop drawings, the Contractor shall submit a schedule of proposed shop drawing transmittals. The schedule shall identify the subject matter of each transmittal, the corresponding specification section number and the proposed date of submission. During the progress of the Work, the schedule shall be revised and resubmitted as necessary.
No material or equipment shall be purchased or fabricated especially for the Contract until the required shop and working drawings have been submitted as hereinabove provided and reviewed for conformance to the Contract requirements. All such materials and equipment and the work involved in their installation or incorporation into the Work shall then be as shown in and represented by said drawings.
Until the necessary review has been made, the Contractor shall not proceed with any portion of the Work or the design of any details, which are dependent upon the design, or details of work, materials, equipment or other features for which review is required.
All shop and working drawings shall be submitted to the Engineer by/or through the Contractor, who shall be responsible for obtaining the shop and working drawings. All shop and working drawings shall be prepared on standard size, 24-inch by 36-inch or 11-inch by 17-inch sheets, except those, which are made by changing existing standard shop or working drawings. All drawings shall be clearly marked with the names of the Owner, contractor, and building, equipment, or structure to which the drawing applies, and shall be suitably numbered. Each shipment of drawings shall be accompanied by a Transmittal Form furnished by the Contractor giving a list of the drawing numbers and the names mentioned above.
Only drawings, which have been checked and corrected by the fabricator, should be submitted to the Contractor by his subcontractors and vendors. Prior to submitting drawings to the Engineer, the Contractor shall check thoroughly all such drawings to be satisfied that the subject matter thereof conforms to the Drawings and Specifications in all respects. All drawings that are correct shall be marked with the date, checker's name, and indication of the Contractor's approval, and then shall be submitted to the Engineer; other drawings shall be returned for correction.
If a shop drawing shows any deviation from the Contract requirements, the Contractor shall make specific mention of the deviations in the Transmittal Form furnished by the Contractor and provide a description of the deviations in a letter attached to the submittal.
The review of shop and working drawings hereunder will be general only, and nothing contained in this GENERAL SPECIFICATION shall relieve, diminish or alter in any respect the responsibilities of the Contractor under the Contract Documents and, in particular, the specific responsibility of the Contractor for details of design and dimensions necessary for proper fitting and construction of the work as required by the Contract and for achieving the result and performance specified there under.
The marked-up reproducible of the shop and working drawings or one marked-up copy or catalog cuts will be returned to the Contractor. The Contractor shall furnish additional copies of such drawings or catalog cuts when so required.
6. Occupying Private Land. The Contractor shall not (except after written consent from the proper parties) enter or occupy with men, tools, materials, or equipment, the land outside the rights-of-way or property of the Owner. A copy of the written consent shall be given to the Engineer.
7. Interference With and Protection of Streets. The Contractor shall not close or obstruct any portion of a street, road, or private way without obtaining permits therefore from the proper authorities. If any street, road or private way shall be rendered unsafe by the contractor's operations, he shall make such repairs or provide such temporary ways or guards as shall be acceptable to the proper authorities.
Streets, roads, private ways, and walkways not closed shall be maintained passable and safe by the contractor, who shall assume and have full responsibility for the adequacy and safety of provisions made therefore.
The Contractor shall, at least 24 hours in advance, notify the Police (Traffic Safety) and Fire Departments in writing, with a copy to the Engineer, if the closure of a street or road is necessary. He shall cooperate with the Police Department in the establishment of alternate routes and shall provide adequate detour signs, plainly marked and well lighted in order to minimize confusion. The traffic signs shall conform to the Traffic Control Specifications hereafter described.
8. Storage of Materials and Equipment. All excavated materials and equipment to be incorporated in the work shall be stored so as not to injure any part of the Work or existing facilities and to ensure free access at all times to all parts of the Work and to all public utility installations in the vicinity of the Work. Materials and equipment shall be kept neatly piled and compactly stored in such locations as will cause a minimum of inconvenience to public travel and adjoining owners, tenants and occupants.
9. Safety. The Contractor shall take all necessary precautions and provide all necessary safeguards to prevent personal injury and property damage. The Contractor shall provide protection for all persons including but not limited to his employees and employees of other contractors or subcontractors; members of the public; and employees, agents, and representatives of the Owner, the Engineer, and regulatory agencies that may be on or about the Work. The Contractor shall provide protection for all public and private property including but not limited to structures, pipes, and utilities, above and below ground.
The Contractor shall provide and maintain all necessary safety equipment such as fences, barriers, signs, lights, walkways, guards and fire prevention and fire-fighting equipment and shall take such other action as is required to fulfill his obligations under this subsection.
The Contractor shall comply with all applicable Federal, State and local laws, ordinances, rules and regulations and lawful orders of all authorities having jurisdiction over the safety of persons and protection of property.
The contractor shall designate a responsible member of his organization at the site whose duty shall be the prevention of accidents. This responsible person shall have the authority to take immediate action to correct unsafe precautions and programs.
10. Sanitary Regulations. The Contractor shall provide adequate sanitary facilities for the use of those employed on the Work. Such facilities shall be made available when the first employees arrive on the site of the Work, shall be properly secluded from public observation, and shall be constructed and maintained during the progress of the Work in suitable numbers and at such locations and in such a manner as may be required. The Contractor shall maintain the sanitary facilities in a satisfactory and sanitary condition at all times and shall enforce their use. He shall rigorously prohibit the committing of nuisances on the site of the Work, on the lands of the Owner, or on adjacent property.
11. Lines, Grades and Measurements. The Contractor shall employ a competent civil engineer, registered within the Virgin Islands as a Professional Engineer or Land Surveyor. The Contractor shall require said engineer to establish all lines, elevations, reference marks, batter boards, etc., needed by the Contractor during the progress of the Work, and from time to time to verify such marks by instrument or other appropriate means.
The Engineer shall be permitted at all times to check the lines, elevations, reference marks, batter boards, etc., set by the Contractor, who shall correct any errors in lines, elevations, reference marks, batter boards, etc., disclosed by such check. Such a check shall not be construed to be an approval of the Contractor's work and shall not relieve or diminish in any way the responsibility of the Contractor for the accurate and satisfactory construction and completion of the entire Work.
The Contractor shall make, check, and be responsible for all measurements and dimensions necessary for the fittings in the Work.
12. Dimensions of Existing Structures. Where the dimensions and locations of existing structures are of importance in the installation or connection of any part of the Work, the Contractor shall verify such dimensions and locations in the field before the fabrication of any material or equipment which is dependent on the correctness of such information.
13. Work to Conform. During its progress and on its completion, the Work shall conform truly to the lines, levels, and grades indicated on the Drawings or given by the Engineer and shall be built in a thoroughly substantial and workmanlike manner, in strict accordance with the Drawings, Specifications, and other Contract Documents and the directions given from time to time by the Engineer.
14. Pipe Location. Exterior pipelines will be located substantially as indicated on the Drawings, but the right is reserved to the Owner, acting through the Engineer, to make such modifications in location as may be found desirable to avoid interference with existing structures or for other reasons. where fittings, etc., are noted on the Drawings, such notation is for the Contractor's convenience and does not relieve him from laying and jointing different or additional items where required. Small interior piping is indicated diagrammatically on the Drawings, and the exact location is to be determined in the field. Piping shall be arranged in a neat, compact, and workmanlike manner, with a minimum of crossing and interlacing, so as not to interfere with equipment or access ways, and, in general, without diagonal runs.
15. Limits of Normal Excavation. For pipes in trench, the normal width of the trench shall be measured between vertical planes which are a distance apart equal to the sum of 2 feet plus the outside diameter of the pipe. The normal depth shall be measured to a distance of 0.5 ft. below the bottom of the pipe.
For concrete placed directly against undisturbed earth, the normal width and depth of the excavation of such concrete shall be measured to the neat lines of the concrete as indicated on the Drawings or as ordered.
For concrete placed against rock surfaces resulting from rock excavation, the normal width and depth of the excavation shall be measured to 4 inch outside the neat lines of the concrete as indicated on the Drawings or as ordered.
For other structures, except manholes as noted below, the normal width shall be measured between vertical planes 1 ft. outside the neat lines of the several parts of the structure, except that the width at any elevation shall be measured as not less than the width at a lower elevation. The normal depth shall be measured to the underside of that part of the structure for which the excavation is made.
No additional width or depth of trench excavation in earth or rock shall be allowed at standard circular manholes.
Wherever bell holes are required for jointing pipe, they shall be provided without additional compensation over and above the resulting from measurements as above described.
16. Computation of Quantities. For estimating quantities in which the computation of areas by geometric methods would be comparatively laborious, it is agreed that the plain-meter shall be considered an instrument of precision adapted to the measurement of such areas.
It is further agreed that the computation of the volume of prismoids shall be by the method of average end areas.
17. Planning and Progress Schedules. Before starting the Work and from time to time during its progress, as the Engineer may request, the Contractor shall submit to the Engineer a written description of the methods he plans to use in doing the Work and the various steps he intends to take.
Within 15 days after the date of formal execution of AGREEMENT, the Contractor shall prepare and submit to the Engineer (a) a written schedule fixing the dates on which additional drawings, if any, will be needed by the Contractor and (b) a written schedule fixing the respective dates for the start and completion of various parts of the Work. Each such schedule shall be subject to review from time to time during the progress of the Work.
18. Precautions During Adverse Weather. During adverse weather and against the possibility thereof, the Contractor shall take all necessary precautions so that the Work may be properly done and satisfactory in all respects. When required, protection shall be provided by use of tarpaulins, wood and building-paper shelters, or other suitable means.
19. Electrical Energy. The Contractor shall make all necessary applications and arrangements and pay all fees and charges for electrical energy for power and light necessary for the proper completion of the work and during its entire progress. The Contractor shall provide and pay for all temporary wiring, switches, connections, and meters.
The Contractor shall provide sufficient electric lighting so that all work may be done in a workmanlike manner when there is not sufficient daylight.
20. Protection Against Electrolysis. Where dissimilar metals are used in conjunction with each other, suitable insulation shall be provided between adjoining surfaces so as to eliminate direct contact and any resultant electrolysis. The Insulation shall be bituminous impregnated felt, heavy bituminous coatings, nonmetallic separators or washers, or other acceptable materials.
21. Record Contract Drawings. Contractor shall keep one (1) record copy of all Contract Documents, reference documents, and all technical submittals at the Site in good order and annotated to show all changes made during the construction process. Record drawings shall be up-dated and kept current on a daily basis by the Contractor. The record drawings will be reviewed by the Engineer prior to approval of the Contractor's pay requests. At the completion of the Project and before final payment is made, Contractor shall furnish the Engineer with two
(2) set of clean, legible and clear documents , reflecting all changes herein described. Changes to the drawings shall be drafted in a neat and workmanlike manner. Contractor shall also submit the record drawings on a CD-R disk based on the design plans furnished by VIWAPA in electronic format (Auto Cad). Accurate and approved as built drawings will be submitted prior to final payment (retainage) on the contract.
Features on the new installed system shall be shown as follows:
A. For fittings and change in pipe direction (both horizontal and vertical) show station location and off set distance (right or left) and depth from top of pavement. All existing utilities encountered must be shown with depth, station location and detail of the crossing.
B. For valves, corporation stops, curb stops, stub-outs end caps and acoustic access points, show a minimum of three horizontal distances ties from permanent objects and depth from top of pavement. Permanent features include corners of concrete walls, building foundation corners, manhole covers and similar features. Where only semi-permanents features are available then four distance ties shall be used, such features include utility poles, trees, fence corners and similar features.
The information may be shown in a tabular format on each sheet provided the distance reference points are clearly identified and referenced.
22. District Meter and St. John Terminal Leak Repair. Install district meter vault, related piping and meter as shown on drawings. The location is on the section of pipe line installed previously, Phase 1B, where 12 inch stub outs have been furnished for this purpose. The finished installation shall be protected by bollards as shown. The meter assembly, 8 inch Sensus Fireline, will be furnished by VI WAPA to be installed by the contractor. The installation shall be tested for leakage.
The existing submarine pipe line land terminal connection has a known leak. The terminal is located in close proximity of the WAPA water production plant in Estate Enighed, St. John.
The connection needs to be excavated to expose the fittings. The leaking joint (the transition fitting from the submarine pipe to the standard ductile iron pipe) must be disassembled; the cause of the lead determined, new gaskets furnished and reassembled utilizing a transition fitting furnished by VI WAPA. The assembly shall be pressure tested to 150 psi for two hours. The lack of visible leakage at that assembly shall be considered satisfactory completion of the work. In the even the pressure does not hold or the allowable leakage is in excess of the allowable, then further work will be based on time and materials expended, but only after written authorization of the WAPA Engineer. The work area is to be backfilled.
Included in the St. John leak repair is the replacement of the sun shield, a lengthwise cut PVC pipe, over the submarine water pipe in the surf zone. Two shield sections have been torn loose. These are to be placed over the submarine pipe and strapped with five bands of stainless steel strapping spaced equally over the pipeline. The shields are at the site or will be furnished by VI WAPA at their St. Thomas plant.
23. Work At Electric Pad. The electric pad work is a modification of the existing high voltage electric above ground terminal connection for one of two St. John 34.5 KV submarine transmission lines. Prior to any work on this facility, the contractor must advise WAPA’s Manager of Construction in writing a minimum of 7 days, of the intent to perform the work.
WAPA will disconnect the power from the facility and disconnect the terminal connections. The contractor will be given written confirmation that the power is disconnected and that work can then proceed.
Once the work has started it must be completed without interruption, as the power supply to the island of St. John during that time is dependent on the other single remaining undersea cable.
Consequently the risk exists should a problem develop on the one operational cable; WAPA will be unable to furnish power to St. John. Hence it is imperative that work at the Red Hook site be completed without interruption and in the shortest possible time.
The existing terminal enclosure and below ground sleeve are to be removed and reused for the reconstructed pad. Care shall be exercised during the removal to avoid damage. Caution is also to used while working around existing components, including the riser pole, manhole, underground ducts and water system facilities. Should damage take place, WAPA will charge the contractor for damage; require repair or replacement of any damaged component. The two existing conduits are to be incorporated with the new conduits. The contract plans show a generalized detail; the actual conduit arrangement may vary, provided all conduits terminate in the enclosure. Backfill is to be compacted to 95% maximum density. Construct new concrete pad and remount the enclosure. WAPA will reenergize the system.
END OF SECTION
SECTION 01005
MISCELLANEOUS REQUIREMENTS
1. General
2. Traffic Control
3. Interference with Existing Works
4. Maintaining Water, Fire, and Sewage Flows
5. Buried Utility Warning and Identification Tape
6. Existing Utilities
1. General. The contractor shall conform to all miscellaneous requirements as herein specified.
2. Traffic Control. The following standards and specifications are considered to be part of the Traffic Control Plan:
- Section 635 of the Standard Specifications, FP-03.
- Section 635 of the Supplemental Specifications.
- Manual on Uniform Traffic Control Devices, current edition.
- All signs shall be faced with sheeting conforming to Type II-A or Type III. See section
718, FP-03.
In addition to the above standards and specifications, the specific provisions for this project are also set forth as follows:
A. Maintenance of Traffic.
1. Two-way traffic, one lane each way, will be maintained on weekdays during the peak hours on two-way streets. Work that will interfere with two-way traffic will be conducted on weekends or during off-peak periods. During weekends and off-peak periods, alternating one-way traffic on one lane may be maintained by the use of flagmen to control and maintain traffic. Two-way traffic must be restored by the end of each workday.
2. No trench w will be left open or uncovered by a road plate overnight.
Access for VIWAPA to existing utilities will be maintained at all times.
B. General Requirements.
1. Traffic Control Devices shall be furnished by the Contractor and shall be maintained in compliance with the Federal Manual of Uniform Traffic Control Devices (MUTCD), current edition, and latest revision at time of contract. The Contractor shall be responsible for maintaining signs at all times or as directed by the Engineer. Signs, permanent or temporary, that are not current to the traffic pattern will be removed or covered with plywood.
2. Suspension of Work. If the Contractor fails to comply with the provision for traffic control as set forth in the plans or with provisions of the MUTCD, the Engineer shall suspend work until the Contractor complies with the necessary requirements.
3. Prior Notice. Ten (10) days prior to implementation of any maintenance of Traffic Phase, the Contractor will provide The Public Works Department, through the Project Engineer, a description of the type of work to be done. During construction, the Contractor shall inform the Engineer of any changes in traffic patterns within the work zone. Prior to any restriction of traffic, the Contractor and The Public Works Department will issue a news release describing the work and the traffic patterns that will be employed.
4. All work shall be prosecuted in a manner to permit unimpeded traffic flow in conformance with the Traffic Control Plan whenever possible. The interruption of traffic shall not be permitted except as identified unless specifically allowed by the Engineer. Work operation shall be scheduled to minimize disruption at peak traffic periods.
5. Access to the site will be by normal traffic patterns. The Contractor shall identify proposed haul routes and prepare traffic control plans of those routes.
6. Pedestrians. Facilities for pedestrian crossing shall be maintained at all times.
Facilities for the safe stopping, loading, and unloading of buses shall be maintained at all times.
7. Drive way Access. Access to driveways and roadways must be maintained at all times, except as provided in the TCP.
8. Trenches and Ditches. Excavation made for pipe, conduit, or utilities resulting in open trenches shall be maintained and protected at all times. No unprotected open trenches will be permitted after suspension of the day's work. Use of metal plates over open trenches is restricted to immediate use after excavation to maintain traffic and shall be backfilled immediately with approved material and paved if traffic must be maintained. The Contractor shall not open more than 400 feet of trench without backfilling. The Contractor shall maintain adequate drainage of traveled roadways during all phases of construction and shall protect against erosion damage.
9. Temporary Pavement Marking shall be applied as directed by the Engineer.
10. Permanent Pavement Markings shall be installed within twenty-four hours of completion of final surfacing on any single approach to either of the intersections.
11. Variations from the Traffic Control Plan. If the Contractor feels he can improve on the Traffic Control Plan, he is encouraged to submit his proposal in writing for consideration and approval by the Engineer.
12. Contractor's Traffic Control Plan. Prior to commencing work, the Contractor shall submit for the Engineer's approval his proposed method of controlling traffic. Any suggestions to improve on traffic control shall be submitted for the Engineer's approval at this time. Prior coordination with the Dept. of Public Works is required to arrive at a mutually agreed upon TCP.
13. The employment or presence of traffic flagmen, special officers, or police shall in no way relieve the Contractor of any responsibility or liability which is his under the terms of the contract.
14. All work conducted within rights-of-way must be prearranged through the Department of Public Safety. A Road Closure Permit must be obtained. All traffic pattern drawings; safety signs and flagmen are the responsibility of the Contractor.
Contractor is to make all necessary arrangements with the Department of Public Safety.
It may be required that work be performed on Saturdays, Sundays or Holidays to accommodate traffic conditions.
3. Interference With Existing Works. The Contractor shall at all times conduct his operations so as to interfere as little as possible with existing works. The Contractor shall develop a program, in cooperation with the Engineer and interested officials, which shall provide for the construction and putting into service of the new works in the most orderly manner possible. This program shall be adhered to except as deviations there from are expressly permitted. All work of connecting with, cutting into, and reconstructing existing pipes or structures shall be planned to interfere with the operation of the existing facilities for the shortest possible time when the demands on the facilities best permit such interference, even though it may be necessary to work outside of normal working hours to meet these requirements. Before starting work which will interfere with the operation of existing facilities, the Contractor shall perform all possible preparatory work and shall see that all tools, materials, and equipment are made ready and at hand. The Contractor shall make such minor modifications in the work relating to existing structures as may be necessary, without additional compensation.
The Contractor shall have no claim for addition al compensation by reason of delay or inconvenience in adapting his operations to meet the above requirements.
4. Maintaining Water, Fire And Sewage Flows. It is essential to the operation of the existing water, fire, and sewage system that there be no interruption in the flows of water or sewage. To this end, the Contractor shall provide, maintain, and operate all temporary facilities such as dams, pumping equipment, conduits, and all other labor and equipment necessary to maintain and intercept the water, fire, and sewage flows.
5. Buried Utility Warning And Identification Tape. Where PVC pipes are used, provide detectable metallic backed tape or similar manufactured specifically for warning and identification of buried piping. Provide tape in rolls, 3 inches minimum width, color-coded for the utility involved with warning and identification imprinted in bold black letters continuously and repeatedly over entire tape length. Warning and identification shall be CAUTION BURIED ELECTRICAL PIPING BELOW or similar. Use permanent code and letter coloring unaffected by moisture and other substances contained in trench backfill material. Bury tape with the printed side up at a depth of 12 inches below the top surface of earth or the top surface of the sub-grade under pavements.
6. Existing Utilities.
A. Verification of the location of the Existing Utilities. Representations of existing utilities, facilities, and structures in the Contract Documents are based upon the best available information. The Owner and the Engineer will not be responsible for the completeness or accuracy thereof nor for any deductions, interpretations, or conclusions drawn there from.
The Contractor shall verify to his own satisfaction by test pit or other means, the actual location of existing utilities prior to construction in their vicinity.
1. Should the Contractor in the course of his operations encounter any underground utilities the presence of which was not previously known, or a different type than shown, he shall immediately notify the Engineer and take all necessary precautions to protect the utility and maintain continuance of service until said utilities can be adjusted by the appropriate owners.
2. Contractor will notify all public utility corporations, jurisdictional agencies, or other owners to make all necessary adjustments to public utility fixtures and appurtenances within or adjacent to the limits of construction. Delays and additional cost resulting from a failure of the Contractor to notify the utility or to provide adequate notice to the utility shall be at no additional cost to the Owner, when such facilities are indicated in the Contract Document, and in such case, no extension of time will be granted for delays caused by utility adjustments.
3. Damage caused to utilities either directly or indirectly by the Contractor shall be repaired and the facilities restored to their original condition to the satisfaction of the Engineer and the utility owner, at no additional cost, irrespective whether utilities are shown on the plans.
B. Working in the Vicinity of Existing Utilities. At least 3 working days prior to starting work in the vicinity of utility structures and appurtenances, Contractor shall notify Engineer and appropriate utility companies and jurisdictional agencies. Contractor shall support and protect all utility structures and appurtenances in accordance with the requirements of the Contract Documents and the utility companies, and shall take any other step necessary to protect the structures from disturbance or damage.
When the contractor is stubbing the conduits under the existing cabinet at sta. 10+25A, an outage will be necessary as there is 15KV in the cabinet.
C. Reconnecting Existing Utilities. All existing utilities shall be reconnected. Interruption to existing services shall be minimized. Contractor shall verify all water lines (potable and sea) to ensure that no cross-connections to the new potable distribution system and sea water lines occur.
SECTION 01039
COORDINATION AND MEETINGS
Part 1. General.
1.1. Section Includes:
A. Coordination and project conditions.
B. Field engineering.
C. Preconstruction meeting.
D. Site mobilization meeting.
E. Progress m e e t i n g s .
F. Pre-installation meetings.
G. Equipment electrical characteristics and components.
H. Examination.
I. Preparation.
J. Cutting and Patching.
K. Alteration project procedures.
1.2. Related Sections. Not Used.
1.3. Coordination and Project Conditions.
A. Coordinate scheduling, submittals, and Work of the various sections of the Specifications to ensure an efficient and orderly sequence of construction elements.
B. Verify all existing utility locations.
1.4. Field Engineering.
A. Contractor shall locate and protect all survey control and reference points, and shall accurately replace and have verified by the Engineer any such point, which is damaged or moved, at his own expense.
B. Control datum for survey is that shown on Drawings. The survey shall establish certain reference points and benchmarks in the immediate vicinity of the work areas. The Contractor shall lay out all additional lines and grades and otherwise do all layout and measurement necessary for the proper completion of the work.
C. Verify setbacks and easements; confirm drawing dimensions and elevations.
D. Provide field engineering services. Establish elevations, lines, and levels, utilizing recognized engineering survey practices.
E. The Contractor shall furnish assistance to the Engineer as requested to check the layout or otherwise control the work. Such assistance shall be understood to include the provision of suitable manpower to assist the Engineer in taping measurements, holding a survey rod for checking grades and the like.
F. The Engineer reserves the right to inspect or check any of this work, and the Contractor shall not claim added compensation for any delay occasioned by the Engineer exercising this right, nor for any corrective work which is required as a result of the Engineer's inspections.
1.5. Preconstruction Meeting.
A. Engineer will schedule a meeting after Notice of Award.
B. Attendance Required: Owner, Engineer and Contractor.
C. Agenda.
1. Submission of list of testing agency and other parties providing services on the project.
2. Procedures and processing of field decisions, submittals, and substitutions, applications for payments, proposal request, Change Orders, and Contract closeout procedures.
3. Procedures for layout of the project, establishing controls, limits of right-of-way and easements.
4. Scheduling.
D. Engineer will record minutes and distribute copies to participants and those affected by decisions made.
1.6. Site Mobilization Meeting.
A. Engineer may schedule a meeting at the Project site prior to Construction start-up.
B. Attendance Required. Engineer, Contractor's Superintendent, and major Subcontractors.
C. Agenda.
1. Use of site by Owner and Contractor.
2. Owner's requirements.
3. Construction facilities provided by Contractor.
4. Temporary utilities provided by Contractor.
5. Security and housekeeping procedures.
6. Schedules.
7. Application for payment procedures.
8. Procedures for testing.
9. Procedures for maintaining record documents.
D. Engineer will record minutes and distribute copies to participants and those affected
1.7. Progress Meetings.
A. Schedule and administer meetings throughout progress of the Work at weekly intervals or intervals agreed to by Owner/Engineer/Contractor.
B. Engineer will make arrangements for meetings, prepare agenda with copies for participants, and preside at meetings.
C. Attendance Required. Job superintendent, major Subcontractors and suppliers, Engineer, as appropriate to agenda topics for each meeting.
D. Agenda.
1. Review minutes of previous meetings.
2. Review of Work progress.
3. Field observations, problems, and decisions
4. Identification of problems which impede planned progress.
5. Review of submittals schedule and status of submittals.
6. Review of off-site fabrication and delivery schedules.
7. Maintenance of progress schedule
8. Corrective measures to regain projected schedules
9. Planned progress during succeeding work period
10. Coordination of projected progress
11. Maintenance of quality and work standards
12. Effect of proposed changes on progress schedule and coordination
13. Other business relating to Work
E. Engineer will record minutes and distribute copies to participants and those affected
SECTION 01400
QUALITY CONTROL
1.1. Section Includes:
A. Quality assurance - control of installation.
B. Tolerances.
C. References and standards.
D. Mock-up.
E. Inspecting and testing laboratory services.
F. Manufacturers' field services.
1.2. Related Sections.
A. Section 01000 General Specifications: Contractor’s Shop and Working Drawings.
1.3. Quality Assurance - Control Of Installation
A. Monitor quality control over suppliers, manufacturers, Products, services, site conditions, and workmanship, to produce Work of specified quality.
B. Comply with manufacturers' instructions, including each step in sequence.
C. Should manufacturers' instructions conflict with Contract Documents, request clarification from Engineer before proceeding.
D. Comply with specified standards as minimum quality for the Work except where more stringent tolerances, codes, or specified requirements indicate higher standards or more precise workmanship.
E. Perform Work by persons qualified to produce required and specified quality.
F. Verify that field measurements are as indicated on shop drawings or as instructed by the manufacturer.
G. Secure Products in place with positive anchorage devices designed and sized to withstand stresses, vibration, physical distortion, or disfigurement.
1.4. Tolerances.
A. Monitor fabrication and installation tolerance control of Products to produce acceptable Work. Do not permit tolerances to accumulate.
B. Comply with manufacturers' tolerances. Should manufacturers' tolerances conflict with Contract Documents, request clarification from Engineer before proceeding.
C. Adjust Products to appropriate dimensions; position before securing Products in place.
1.5. References and Standards.
A. For Products or workmanship specified by association, trade, or other consensus standards, complies with requirements of the standard, except when more rigid requirements are specified or are required by applicable codes.
B. Conform to reference standard by date of issue current on date of Contract Documents, except where a specific date is established by code.
C. Obtain copies of standards where required by product specification sections.
D. Neither the contractual relationships, duties, or responsibilities of the parties in Contract nor those of the Engineer shall be altered from the Contract Documents by mention or inference otherwise in any reference document.
1.6. Mock-Up. Not Used.
1.7. Inspection and Testing…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .