DTFH71-17-R-00014_-_Amendment_0001.pdf

PDF 2 MB Posted

Attached to
Veterans Drive (Route 30) Federal contract opportunity
Solicitation number
DTFH71-17-R-00014
Issued by
Department of Transportation Federal Highway Administration

About this file

Amendment 0001 The RFP Proposal due date of August 4, 2017 at 2:00 p.m. will remain the same.

View the file

Other files for this federal contract opportunity

Other files attached to Veterans Drive (Route 30), newest first.
File Type Posted
DTFH71-17-R-00014_-_Amendment_0005.pdf PDF
DTFH71-17-R-00014_-_Amendment_0004.pdf PDF
DTFH71-17-R-00014_-_Amendment_0003.pdf PDF
DTFH71-17-R-00014_-_Amendment_0002.pdf PDF
Pre-proposal_Sign-in_Sheet.pdf PDF
VETS-4212.pdf PDF
Subcontracting_Plan_Form.doc DOC document
ADV_Offeror's_Qualifications_Form_-_VI_DPC_34(1).doc DOC document
Plans_Section_H.pdf PDF
Plans_Section_G.pdf PDF
Plans_Section_D.pdf PDF
Plans_Section_V.pdf PDF
Plans_Section_W.pdf PDF
Plans_Section_U.pdf PDF
Plans_Section_M.pdf PDF
Plans_Section_C.pdf PDF
Plans_Section_A.pdf PDF
Plans_Section_S.pdf PDF
Plans_Section_E.pdf PDF
Plans_Section_N.pdf PDF
Plans_Section_B.pdf PDF
Plans_Section_R.pdf PDF
Plans_Section_F.pdf PDF
Plans_Section_T.pdf PDF
NEPA_FONSI.pdf PDF
Permit_2_NPDES.pdf PDF
Permit_1_Building.pdf PDF
SCR_Supplemental_Public_Works_Technical_Specs.pdf PDF
Right_of_Way_Docs.pdf PDF
Permit_3_CZM_&_Extension.pdf PDF
FP03_Eng.pdf PDF
RFP_Solicitation_-_VI_DPC_34(1).pdf PDF
Permit_4_USACE.pdf PDF
Report_Traffic_2008.pdf PDF
Permit_Tracking_Form.pdf PDF
Report_Structural_Wall_Calculations.pdf PDF
Report_Coastal_Engineering.pdf PDF
FP03_Errata.pdf PDF
Report_Traffic_Management_Plan.pdf PDF
Report_Stormwater_Management.pdf PDF
SCR_Supplemental_WAPA_Technical_Specs.pdf PDF
Report_Geotechnical.pdf PDF
NEPA_EA.pdf PDF
Pre-bid_Meeting_Notice.docx DOCX document
Synopsis_-_VI_DPC_34(1).pdf PDF
Show all 45

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

DTFH7117R00014

x x

8 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT

THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

Sterling VA 20166-6511

EFLHD-CO

21400 Ridgetop Circle Construction Office Eastern Federal Lands Highway Div.

Federal Highway Administration

Sterling VA 20166-6511

EFLHD-AC

21400 Ridgetop Circle Acquisitions Office Eastern Federal Lands Highway Div.

Federal Highway Administration

VI DPC 34(1)07/07/20170001

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

06/20/2017

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

VI DPC 34(1), Veterans Drive (Route 30)

The purpose of this Amendment is to:

1) Provide a summary of responses to questions/clarifications submitted by potential bidders.

2) Provide missing Section E plan sheets E-14 thru E-27.

3) Provide Pre-Bid Meeting Minutes.

The RFP Proposal Package (both Technical and Price proposals) due date of August 4, 2017 at

2:00 p.m. will remain the same.

15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

NSN 7540-01-152-8070

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

Amendment No. 0001

Info Page 1 of 1

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

Project VI DPC 34(1)

Veterans Drive (Route 30) Solicitation: DTFH71-17-R-00014

The purpose of this Amendment is to:

1) Provide a summary of responses to questions/clarifications submitted by potential bidders.

2) Provide missing Section E plan sheets E-14 thru E-27.

3) Provide Pre-Bid Meeting Minutes.

The RFP Proposal Package (both Technical and Price proposals) due date of August 4, 2017 at 2:00 p.m. will remain the same.

Questions/Clarifications

Bidders can send written questions or inquiries for clarification to: eflhd.contracts@dot.gov.

Questions can be submitted at any time, but questions submitted within 7 days of the bid opening may not be answered in time for the bidder to properly incorporate the responses into their bids.

The following questions and issues were submitted via email. The Government response or clarification is provided. Due to the repetitive nature of several questions and issues, the wording of the questions may have been revised and some questions have not been included.

The Government’s direct response to the sender may also have been updated below for better clarity.

1. Please confirm if sheet piling is, or is not allowed to be used during the construction of this project.

Response: The environmental compliance documents do not allow sheet piling to be used for either the permanent wall construction or for the temporary construction of a cofferdam. Sheet piles may be used for miscellaneous items that are permitted by the environmental compliance documents, such as underground utility installations.

2. Must the professional engineer that stamps the final plans for the retaining wall be licensed in the U.S. Virgin Islands or will a U. S. State Certification suffice? Subsection 104.03(b)(2) of the Special Contract Requirements (SCRs) indicates that wall drawings are to be submitted by a “proficient engineer”.

Response: According to Subsection 104.03(b)(2) of the SCRs and the definition of a professional engineer (PE) in Subsection 101.04 of the FP-03 (standard specifications book), the plans for the modular block wall are to be signed by a PE who is proficient in the pertinent design field of the work and is certified in the United States or its territories.

3. Can the “lifting loops” used to handle the concrete retaining wall blocks be galvanized (as opposed to stainless steel)? The “lifting loops” are not a structural reinforcement item. Sheet W- 2, Note 8 of the Wall Profiles package indicates that “reinforcing steel” shall be stainless steel.

Response: The lifting loops must be stainless steel also.

4. Sheet W-2, Note 12 of the Wall Profiles package calls for “integral color” to be added to the concrete mix. Would it be acceptable to utilize the integral color in just the front 12 inches of the face of the block and then use uncolored concrete for the balance of the block? There would NOT be a “cold joint” between the two different colors of concrete. The second pour of the uncolored concrete would take place right after the first 12 inches of colored concrete is placed.

Response: Using integral color for just the front 12 inches of the concrete face of the block will not be acceptable. The concrete mix must be uniform throughout the block.

5. There will be a significant portion of the retaining wall that will be buried below the scour line. Would it be acceptable that retaining wall blocks that will be buried below grade have no mailto:eflhd.contracts@dot.gov integral color added? Would it be acceptable that the retaining wall blocks that will be buried below grade have no “architectural” face surface, but rather be smooth formed concrete?

Response: Yes, it would be acceptable to provide blocks without integral colored concrete and/or provide blocks without an concrete face architectural surface provided they are entirely below grade.

6. Sheet W-3, Note 4 refers to Sheets U-1 to U-15 for additional Wall Details. Where are these Sheets?

Response: The note in question reads “See Hardscape Plans, sheet U-1 to U-15 for additional wall details.” The intention of this note is to direct contractors/bidders to the hardscape plans, which are part of Section U of the plans and contain information of items that are to be built on top or in the vicinity of the wall. For example, sheet U-12 provides the details for the concrete bollards that are built on top of the wall.

7. Subsection 257.05 of the SCRs (RFP / Solicitation, page 135 of 212) indicates that there must be a field representative of the wall manufacturer on site during wall construction. Does this mean on site for the entire duration of the construction? Can you confirm that the “wall manufacturer” is the entity that actually manufactures the blocks (as opposed to a representative of the entity that has designed the block being utilized on the project)?

Response: The wall manufacturer field representative does not have to be on the project throughout the entire duration of the construction of the wall. The wall manufacturer is to be onsite during critical wall placement operations, such as leveling the blocks and coming up out of water, in order to ensure proper installation of the wall.

The Contractor must provide a representative from the wall manufacturing or design company that can provide insights and recommendations regarding the installation of the wall and can handle difficulties that occur during installation of the wall to ensure its proper installation.

8. Subsection 720.02(c) of the SCRs (RFP / Solicitation, page 172 of 212) says that the retaining wall blocks must be finished on the front face with “class 1 finish”. What is this? The blocks will have an architectural finish that is a part of the production process.

Response: Class 1 finish is an ordinary surface finish, which is explained in Subsection

552.16 of the FP-03.

9. Subsection 720.02(f)(3) of the SCRs (RFP / Solicitation, page 173 of 212) says that surface defects on smooth concrete cannot be greater than 1/8” and on the face no greater than 5/16”. Is a bug-hole (a naturally occurrence with concrete, especially on the vertical sides of a form) considered a defect? If so, this will be hard to achieve and at a minimum require the use of self-consolidating concrete.

Response: A bug-hole could be considered a defect if it does not comply with the concrete finish specifications. Appropriate concrete mix design, concrete admixtures, concrete form materials and form releases, and concrete placement will minimize the size and frequency of bug-holes or eliminate bug-holes.

10. Will bidders be allowed to contact Parsons Brinkerhoff for questions?

Response: No. All questions must be submitted in writing to EFLHD.Contracts@dot.gov.

11. We would like to request a bid extension of 4 weeks so that we may be able to provide the best possible bid submittal.

Response: We cannot provide an extension at this time. All proposals are due August 4, 2017 as stated in the solicitation.

mailto:EFLHD.Contracts@dot.gov

Sheet:

FROM

S-24

FL. -1.73

MHHW=0.82'

FL. 0.00

FROM

S-25

MHHW=0.82'

MODEL NAME =Rdxsrd_shgPEN TABLE = $PENTBLL$PLOT DRIVER = $PLTDRVL$ 7/3/2017 10:10:58 AM T:\Projects\173908_VeteransDr\drainage\phase_1\DRXSRD01.dgnhiltonst

E-14

DETAIL "A"

22 3/4"

23 3/4"

23 3/4"

" 3/4"

DEPARTMENT OF PUBLIC WORKS

FP ID NO.

ST THOMAS

COUNTY

ROAD NO.

RTE 30DATE

CHECKED

DRAWN

DESIGNEDR E V I S I O N S

DESCRIPTIONBYDATE

U.S.V.I.

DPC-34(1)

FP ID NO.

RTE 30

MIAMI, FL 33126 Ph. (305) 261-4785

7650 CORPORATE CENTER DRIVE SUITE 300

Marie-Elsie Dowell, P.E., No. 1235E

ENGINEER OF RECORDDATE

CHECKED

DRAWN

DESIGNEDR E V I S I O N S

DESCRIPTIONBYDATE

BRINCKERHOFF

PARSONS

Reference

Sheet

VETERANS DRIVE M. PAREDES

O. MIGUEL

MAY, 2017

DRAINAGE STRUCTURES

.7

S-25

FROM

E x is t

R

W

EL -3.28

36" SS

EL 0.82

BE

EL -1.88

10" WM

EL -2.30

24" WM

S-25A

FL -0.90 (AH)

FL -1.58 (BK)

BOT. EL. -3.58

INLET EL. 3.92

INDEX NO. 200, 201

FRAME & GRATE PER DETAIL "A"

ALT. A (4' DIA)

CONST. MANHOLE TYPE P-7

STA. 237+37.72 (65.89 RT)

.8

1:

S-24

E x is

W

EL -3.17

36" SS

EL 1.19

BE

EL -1.02

10" WM

EL -3.01

24" WM

FL 0.15 (LT)

FL 0.15 (AH)

BOT. EL. -1.85

TOP EL. 4.38

INDEX NO. 200, 201

FRAME & GRATE PER DETAIL "A"

ALT. A (4' DIA)

CONST. MANHOLE TYPE P-7

STA. 237+19.29 (38.06 LT)

RETAINING WALL

RETAINING WALL

18" RCP

MHHW=0.82'

18" RCP

18" RCP

TO SEA WALL

18" RCP

18" RCP

MHHW=0.82'

CURB INLET

FROM EXIST.

TO SEA WALL

18" RCP

00 1010 2020 3030 4040 5050 60 70 80

237+37.72

¡ CONST. VETERANS DR.

-8

-4

-12

-6

-10

-2

S-25

-8

-4

-12

-6

-10

-2

S-24

237+19.29

-4

-6

-2

-4

-6

-2

00 1010 2020 3030 4040 5050 60 70 8060

VERTICAL 1" = 10'

HORIZONTAL 1" = 10'

SCALE:

S-25A

E-15

Sheet:

DETAIL "A"

22 3/4"

23 3/4"

23 3/4"

" 3/4"

CHECKED

DRAWN

FP ID NO.

MIAMI, FL 33126 Ph. (305) 261-4785

7650 CORPORATE CENTER DRIVE SUITE 300

Marie-Elsie Dowell, P.E., No. 1235E

ENGINEER OF RECORDDATE

CHECKED

DRAWN

DESIGNEDR E V I S I O N S

DESCRIPTIONBYDATE

VETERANS DRIVE M. PAREDES

O. MIGUEL

MAY, 2017

DRAINAGE STRUCTURES

(C O

N T

R A

C T

O R

T

O

V E

R I F

Y

E L

U N

K N

O W

N

E X I S

T

W M

3.74

1:

EL -5.22

36" SS

EL -2.18

BE

EL -3.10

10" WM

S-25A

S-27FROM

S-25TO

FL -0.78 (BK, AH)

FL -1.55 (LT, RT)

BOT. EL. -3.55

TOP EL. 4.39

INDEX NO. 200, 201, 307

CONST. CONFLICT MANHOLE TYPE J-7 (5'X5')

STA. 237+72.69 (57.87 RT)

3.04

E x is

W

P

G L

E

L

.2

P

G L

E

L

.2

(C O

N T

R A

C T

O R

T

O

V E

R I F

Y

E L

U N

K N

O W

N

E X I S

T

W M

S-26

S-27

S-26A

18" RCP

S-26B

EL -3.13

36" SS

TO S-25

FL -0.33 (RT)

FL -0.31 (LT)

BOT. EL. -3.50

TOP EL. 4.04

INDEX NO. 200, 201, 307

CONST. CONFLICT MANHOLE TYPE J-7 (5'X5')

STA. 238+17.09 (12.72 LT)

FL -0.50 (LT)

FL -0.50 (RT)

BOT. EL. -2.50

INLET EL. 3.92

INDEX NO. 200, 201, 211

CONST. INLET TYPE P-5 (ALT. B)

STA. 238+21.91 (20.24 RT)

EL -1.90

10" WM

EL 1.10

BE

FL -0.30 (RT)

BOT. EL. -2.30

INLET EL. 3.92

INDEX NO. 200, 201, 210

(ALT. A, 3'-6" DIA.)

CONST. INLET TYPE P-1

STA. 238+16.25 (17.61 LT)

FL -0.60 (LT)

FL -0.60 (AH)

BOT. EL. -2.60

GRATE EL. 4.24

INDEX NO. 200, 201

FRAME & GRATE PER DETAIL "A"

ALT. A (4' DIA)

CONST. MANHOLE TYPE P-7

STA. 238+24.50 (41.08 RT)

MHHW=0.82'

24" RCP

CONC. COLLAR

FL -1.60

24" RCP

18" RCP

18" RCP

(TO REMAIN)

EXIST. INLET & RCP

LIGHTING CONDUIT

0.208%

18" RCP

MHHW=0.82'

18" RCP

LIGHTING CONDUIT

0.365% 0.556%

237+60.43

238+24.50

-8

-4

-12

-6

-10

-2

-8

-4

-12

-6

-10

-2

S-27

¡ CONST. VETERANS DR.

238+16.25

S-26

238+21.91

S-26A

00 1010 2020 3030 4040 5050 60 70 80 90

DESCRIPTIONBYDATE

DESIGNEDR E V I S I O N S

DESCRIPTIONBYDATE

VERTICAL 1" = 10'

HORIZONTAL 1" = 10'

SCALE:

S-29A

S-29B

S-29C

E-16

CHECKED

DRAWN

FP ID NO.

MIAMI, FL 33126 Ph. (305) 261-4785

7650 CORPORATE CENTER DRIVE SUITE 300

Marie-Elsie Dowell, P.E., No. 1235E

ENGINEER OF RECORDDATE

CHECKED

DRAWN

DESIGNEDR E V I S I O N S

DESCRIPTIONBYDATE

VETERANS DRIVE M. PAREDES

O. MIGUEL

MAY, 2017

DRAINAGE STRUCTURES

P G

L

E

L

.7

0.02 0.02

P G

L

E

L

.7

0.02 0.02

3.09

TO BE REMOVED

EXIST RCP

S-29A

EL -2.93

36" SS

FL -0.31 (RT)

FL -0.34 (LT)

BOT. EL. -3.50

TOP EL. 4.26

INDEX NO. 200, 201, 307

CONST. CONFLICT MANHOLE TYPE J-7 (5'X5')

STA. 240+15.48 (23.87 LT)

S-29

EL -0.45

BE

EL -0.63

10" WM

CONFLICT MANHOLE

0.02 0.02

P G

L

E

L

.6

0.02 0.02

2.98

FL -1.16

CONFLICT MANHOLE

S-29B

EL -3.16

36" SS

FL -1.06 (RT)

FL -1.06 (LT)

BOT. EL. -3.50

TOP EL. 4.17

INDEX NO. 200, 201, 307

CONST. CONFLICT MANHOLE TYPE J-7 (5'X5')

STA. 240+36.72 (23.83 LT)

P G

L

E

L

.6

S-29C

FL -1.04 (RT)

BOT. EL. -1.29

GRATE EL. 3.52

INDEX NO. 221

CONST. GUTTER INLET TYPE V

STA. 240+34.82 (88.30 LT)

EL -1.38

BE

EL -2.12

10" WM

ITS

30" RCP

MHHW=0.82'

30" RCP FL -0.43

FROM

SIGNAL CONDUIT

LIGHTING CONDUIT

0.106%

CONDUIT

SIGNAL

MHHW=0.82'

24" RCP

24" RCP

24" RCP

CURB INLET

FROM EXISTING

LIGHTING CONDUIT

0.092%

CONDUIT

SIGNAL

240+15.48

240+36.72

-8

-4

-12

-6

-10

-2

-8

-4

-12

-6

-10

-2

¡ CONST. VETERANS DR.

240+34.82

HORIZONTAL 1" = 10'

SCALE:

E-17

CHECKED

DRAWN

FP ID NO.

MIAMI, FL 33126 Ph. (305) 261-4785

7650 CORPORATE CENTER DRIVE SUITE 300

Marie-Elsie Dowell, P.E., No. 1235E

ENGINEER OF RECORDDATE

CHECKED

DRAWN

DESIGNEDR E V I S I O N S

DESCRIPTIONBYDATE

VETERANS DRIVE M. PAREDES

O. MIGUEL

MAY, 2017

DRAINAGE STRUCTURES

P G

L

E

L

.6

0.02 0.02

P G

L

E

L

.6

0.02 0.02

3.14

S-28

S-31TO

FL -1.34 (AH)

BOT. EL. -3.34

INLET EL. 4.17

INDEX NO. 200, 201, 211

CONST. INLET TYPE P-5 (ALT. B)

STA. 240+50.00 (28.75 RT)

EL -3.19

36" SS

EL -1.22

10" WM

EL 0.36

BE

.0

S-29

TO S-29A

FLOW LINE ELEVATION)

30" RCP (MATCH EXIST.

FL. 0.65 (AH)

FL. 0.65 (BK)

BOT. EL. -1.35

GRATE EL. 3.96

INDEX NO. 200, 201

CONST. TYPE 5 (CAST IN PLACE)

STA. 10+77.50 (10.00' LT)

18" RCP

MHHW=0.82'

SIGNAL CONDUIT

LIGHTING CONDUIT

CONDUIT

SIGNAL

240+50.00

-8

-4

-12

-6

-10

-2

-8

-4

-12

-6

-10

-2

-8

-4

-12

-6

-10

-2

-8

-4

-12

-6

-10

-2

S-28

¡ CONST. HOSPITAL GADE

S-29

10+77.50

MHHW=0.82'

HORIZONTAL 1" = 10'

SCALE:

E-18

CHECKED

DRAWN

FP ID NO.

MIAMI, FL 33126 Ph. (305) 261-4785

7650 CORPORATE CENTER DRIVE SUITE 300

Marie-Elsie Dowell, P.E., No. 1235E

ENGINEER OF RECORDDATE

CHECKED

DRAWN

DESIGNEDR E V I S I O N S

DESCRIPTIONBYDATE

VETERANS DRIVE M. PAREDES

O. MIGUEL

MAY, 2017

DRAINAGE STRUCTURES

P G

L

E

L

.4

0.02 0.02 P

G L

E

L

.4

0.02 0.02

3.11

S-29FROM

S-33FROM

S-30

S-34FROM

S-31

S-32

S-28FROM

18" RCP

FL -1.61

(56.01 RT)

STA. 241+20.00

CONFLICT MANHOLE

S-30A

EL -3.19

36" SS

EL -1.55

10" WM

EL 0.30

BE

FL -1.56 (LT)

FL -1.56 (RT)

BOT. EL. -6.56

TOP EL. 4.46

SEE DETAILS ON SHEET E-028

CONST. MANHOLE (SPECIAL)

STA. 241+20.00 (39.49 RT)

FL -1.54 (AH)

FL -0.50 (LT)

FL -1.54 (BK)

FL -1.54 (RT)

BOT. EL. -3.54

INLET EL. 3.96

INDEX NO. 200, 201, 211

CONST. INLET TYPE P-6 (ALT. B)

STA. 241+20.00 (28.75 RT)

FL -0.37 (RT)

FL -0.35 (LT)

BOT. EL. -3.50

TOP EL. 3.99

INDEX NO. 200, 201, 307

CONST. CONFLICT MANHOLE TYPE J-7 (5'X5')

STA. 241+20.00 (22.17 LT)

FL -0.35 (AH)

FL -0.35 (BK)

FL -0.35 (RT)

BOT. EL. -2.35

INLET EL. 3.96

INDEX NO. 200, 201, 211

CONST. INLET TYPE P-6 (ALT. B)

STA. 241+20.00 (28.75 LT)

P G

L

E

L

.6

0.02 0.02

P G

L

E

L

.6

0.02 0.02

3.09

S-33

S-30TO

EL -3.40

36" SS

EL -1.52

10" WM

FL -0.13 (BK)

BOT. EL. -2.13

INLET EL. 4.18

INDEX NO. 200, 201, 210

CONST. INLET TYPE P-1 (ALT. A, 3'-6" DIA.)

STA. 241+93.79 (28.75 LT)

EL 0.99

BE

18" RCP

MHHW=0.82'

18" RCP

18" RCP

18" RCP

LIGHTING CONDUIT

LIGHTING CONDUIT 0.289%

0.357%

MHHW=0.82'

18" RCP

LIGHTING CONDUIT

LIGHTING CONDUIT

241+20.00

241+93.79

-8

-4

-12

-6

-10

-2

-8

-4

-12

-6

-10

-2

S-30 S-31 S-32

S-33

HORIZONTAL 1" = 10'

SCALE:

E-19

CHECKED

DRAWN

FP ID NO.

MIAMI, FL 33126 Ph. (305) 261-4785

7650 CORPORATE CENTER DRIVE SUITE 300

Marie-Elsie Dowell, P.E., No. 1235E

ENGINEER OF RECORDDATE

CHECKED

DRAWN

DESIGNEDR E V I S I O N S

DESCRIPTIONBYDATE

VETERANS DRIVE M. PAREDES

O. MIGUEL

MAY, 2017

DRAINAGE STRUCTURES

P G

L

E

L

.7

0.02 0.02 P

G L

E

L

.7

0.02 0.02

3.01

S-34

S-31TO

EL -3.31

36" SS

EL -0.53

10" WM

FL -1.21 (BK)

BOT. EL. -3.21

INLET EL. 4.29

INDEX NO. 200, 201, 211

CONST. INLET TYPE P-5 (ALT. B)

STA. 242+31.54 (28.75 RT)

EL 1.30

BE

P G

L

E

L

.8

0.02 0.02

P G

L

E

L

.8

0.02 0.02

KANAL GADE

3.19

EL -3.98

36" SS

EL -1.60

BE

EL -0.54

BE

18" RCP

MHHW=0.82'

LIGHTING CONDUIT

LIGHTING CONDUIT

(TO REMAIN)

EXIST. CONC. BOX CULVERT

6'X2.67' CBC

MHHW=0.82'

FL -0.64

(TO REMAIN)

EXIST. INLETS

LIGHTING CONDUIT

0.414%

ON SHEET E-29, E-30 & E-31

SEE BOX CULVERT EXTENSION DETAILS

VERIFY & MATCH EXIST. FLOW LINE ELEVATION

CONDUIT

LIGHTING

242+31.54

242+73.77

-8

-4

-12

-6

-10

-2

-8

-4

-12

-6

-10

-2

S-34

CD-1

00 1010 2020 3030 4040 5050 60 70 80

HORIZONTAL 1" = 10'

SCALE:

E-20

CHECKED

DRAWN

FP ID NO.

MIAMI, FL 33126 Ph. (305) 261-4785

7650 CORPORATE CENTER DRIVE SUITE 300

Marie-Elsie Dowell, P.E., No. 1235E

ENGINEER OF RECORDDATE

CHECKED

DRAWN

DESIGNEDR E V I S I O N S

DESCRIPTIONBYDATE

VETERANS DRIVE M. PAREDES

O. MIGUEL

MAY, 2017

DRAINAGE STRUCTURES

P G

L

E

L

.0

0.02 0.02 1:

P G

L

E

L

.0

0.02 0.02

3.01

S-35

S-38TO

EL -2.42

36" SS

FL 0.23 (AH)

BOT. EL. -1.77

INLET EL. 4.56

INDEX NO. 200, 201, 210

CONST. INLET TYPE P-1 (ALT. A, 3'-6" DIA.)

STA. 243+18.79 (28.75 LT)

EL -0.76

10" WM

P G

L

E

L

.2

0.02 0.02

1:

P G

L

E

L

.2

0.02 0.02

2.95

S-36

S-40FROM

S-37

FROM S-38

EL -2.28

36" SS

EL 0.68

BE

EL -0.81

10" WM

FL -0.62 (LT)

FL -0.62 (RT)

BOT. EL. -5.62

TOP EL. 5.18

SEE DETAILS ON SHEET E-028

CONST. MANHOLE (SPECIAL)

STA. 243+94.29 (40.08 RT)

FL -0.60 (AH)

FL -0.35 (LT)

FL -0.60 (RT)

BOT. EL. -2.60

INLET EL. 4.78

INDEX NO. 200, 201, 211

CONST. INLET TYPE P-5 (ALT. A) 6' DIA.

STA. 243+94.29 (28.75 RT)

MHHW=0.82'

18" RCP

LIGHTING CONDUIT

LIGHTING CONDUIT

EL -0.61

BE

18" RCP

FL -0.68

(56.01 RT)

STA. 243+94.29

18" RCP

18" RCP

18" RCP

MHHW=0.82'

LIGHTING CONDUIT

LIGHTING CONDUIT

0.462%

0.286%

243+18.79

243+94.29

-8

-4

-12

-6

-10

-2

-8

-4

-12

-6

-10

-2

S-35

S-36 S-37

HORIZONTAL 1" = 10'

SCALE:

E-21

CHECKED

DRAWN

FP ID NO.

MIAMI, FL 33126 Ph. (305) 261-4785

7650 CORPORATE CENTER DRIVE SUITE 300

Marie-Elsie Dowell, P.E., No. 1235E

ENGINEER OF RECORDDATE

CHECKED

DRAWN

DESIGNEDR E V I S I O N S

DESCRIPTIONBYDATE

VETERANS DRIVE M. PAREDES

O. MIGUEL

MAY, 2017

DRAINAGE STRUCTURES

P G

L

E

L

.3

0.02 0.02 1:

P G

L

E

L

.3

0.02 0.02

3.04

S-38

S-39FROM

S-35FROM

S-36TO

18" RCP

EL -2.28

36" SS

EL -0.00

BE

EL -0.77

10" WM

FL 0.50 (AH)

FL -0.05 (BK)

FL -0.05 (RT)

INLET EL. 4.93

INDEX NO. 200, 201, 211

CONST. INLET TYPE P-5 (ALT. A) 7' DIA.

STA. 244+43.79 (28.75 LT)

P G

L

E

L

.7

0.02 0.02 0.02

P G

L

E

L

.7

0.02 0.02

3.19

EL -2.28

10" WM

S-40FROM

S-36TO

S-40A S-39A

FROM S-39

TO S-38

FL -0.21 (BK, AH)

FL -1.26 (LT, RT)

BOT. EL. -3.26

TOP EL. 5.66

INDEX NO. 200, 201, 307

CONST. CONFLICT MANHOLE TYPE P-7

STA. 245+54.30 (31.66 LT)

FL 0.94 (BK, AH)

FL 0.90 (LT, RT)

BOT. EL. -1.10

TOP EL. 5.30

INDEX NO. 200, 201, 307

CONST. CONFLICT MANHOLE TYPE J-7 (5.5'X5')

STA. 245+59.90 (26.63 LT)

EL 0.44

BE

18" RCP

18" RCP

MHHW=0.82'

LIGHTING CONDUIT

0.411%

MHHW=0.82'

FL -1.45

24" RCP

FLOW LINE ELEVATION

VERIFY & MATCH EXIST.

18" RCP

18" RCP

18" RCP

18" RCP

LIGHTING CONDUIT

LIGHTING CONDUIT

3.72% 0.679%

24" RCP

244+43.79

245+57.55

-8

-4

-12

-6

-10

-2

-8

-4

-12

-6

-10

-2

S-38

S-40A

HORIZONTAL 1" = 10'

SCALE:

E-22

CHECKED

DRAWN

FP ID NO.

MIAMI, FL 33126 Ph. (305) 261-4785

7650 CORPORATE CENTER DRIVE SUITE 300

Marie-Elsie Dowell, P.E., No. 1235E

ENGINEER OF RECORDDATE

CHECKED

DRAWN

DESIGNEDR E V I S I O N S

DESCRIPTIONBYDATE

VETERANS DRIVE M. PAREDES

O. MIGUEL

MAY, 2017

DRAINAGE STRUCTURES

P G

L

E

L

.7

0.02 0.02 1:

P G

L

E

L

.7

0.02 0.02

3.18

S-39 S-40

S-36TO

S-38TO

EL 1.42

BE

FL -0.17 (BK)

BOT. EL. -2.17

INLET EL. 5.33

INDEX NO. 200, 201, 211

CONST. INLET TYPE P-5 (ALT. A)

STA. 245+76.79 (28.75 RT)

FL 1.00 (BK)

BOT. EL. -1.00

INLET EL. 5.33

INDEX NO. 200, 201, 211

CONST. INLET TYPE P-5 (ALT. A)

STA. 245+76.79 (28.75 LT)

P G

L

E

L

.8

0.02 0.02

P G

L

E

L

.8

0.02 0.02 1:

21:2

.4

2.67

S-41 S-42

S-45TO

S-44TO

EL 1.76

BE

FL 1.08 (AH)

BOT. EL. -0.92

INLET EL. 5.39

INDEX NO. 200, 201, 211

CONST. INLET TYPE P-5 (ALT. A)

STA. 248+44.79 (28.75 LT)

FL -0.11 (AH)

BOT. EL. -2.11

INLET EL. 5.39

INDEX NO. 200, 201, 211

CONST. INLET TYPE P-5 (ALT. A)

STA. 248+44.79 (28.75 RT)

18" RCP

18" RCP

MHHW=0.82'LIGHTING CONDUIT

LIGHTING CONDUIT

18" RCP

MHHW=0.82'

LIGHTING CONDUIT

18" RCP

CONDUIT

LIGHTING

245+76.79

248+44.79

-8

-4

-12

-6

-10

-2

-8

-4

-12

-6

-10

-2

S-39 S-40

S-41 S-42

HORIZONTAL 1" = 10'

SCALE:

E-23

CHECKED

DRAWN

FP ID NO.

MIAMI, FL 33126 Ph. (305) 261-4785

7650 CORPORATE CENTER DRIVE SUITE 300

Marie-Elsie Dowell, P.E., No. 1235E

ENGINEER OF RECORDDATE

CHECKED

DRAWN

DESIGNEDR E V I S I O N S

DESCRIPTIONBYDATE

VETERANS DRIVE M. PAREDES

O. MIGUEL

MAY, 2017

DRAINAGE STRUCTURES

P G

L

E

L

.4

0.02 0.02 P

G L

E

L

.4

0.02 0.02

1:

21:2

.0

3.07

S-43 S-44

S-47FROM S-48FROM

S-42FROM

S-41FROM

S-45

18" RCP

18" RCP

24" RCP

EL 1.26

BE

FL -1.00 (LT)

FL -1.00 (RT)

BOT. EL. -5.60

TOP EL. 5.41

SEE DETAILS ON SHEET E-028

CONST. MANHOLE (SPECIAL)

STA. 249+70.00 (38.92 RT)

FL -0.49 (AH)

FL 0.55 (LT)

FL -0.49 (BK)

FL -0.99 (RT)

BOT. EL. -2.99

INLET EL. 5.01

INDEX NO. 200, 201, 211

CONST. INLET TYPE P-6 (ALT. A)

STA. 249+70.00 (28.75 RT)

FL 0.72 (AH)

FL 0.72 (LT)

FL 0.70 (BK)

FL 0.72 (RT)

BOT. EL. -1.30

INLET EL. 5.01

INDEX NO. 200, 201, 211

CONST. INLET TYPE P-6 (ALT. A)

STA. 249+70.00 (28.75 LT)

FL 0.75 (RT)

BOT. EL. -1.25

GRATE EL. 4.08

INDEX NO. 232

CONST. DBI TYPE C

STA. 249+70.00 (40.30 LT)

S-46

P G

L

E

L

.9

0.02 0.02

P G

L

E

L

.9

0.02 0.02 1:

21:2 4

.5

0.71

S-48

S-50FROM

S-47

S-49FROM

S-44TO

S-45TO

FL -0.02 (AH)

FL -0.02 (BK)

BOT. EL. -2.02

INLET EL. 5.48

INDEX NO. 200, 201, 211

CONST. INLET TYPE P-5 (ALT. A)

STA. 251+02.79 (28.75 RT)

FL 1.24 (AH)

FL 1.17 (BK)

BOT. EL. -0.83

INLET EL. 5.48

INDEX NO. 200, 201, 211

CONST. INLET TYPE P-5 (ALT. A)

STA. 251+02.79 (28.75 LT)

EL 3.44

BE

24" RCP

18" RCP

MHHW=0.82'

FL -1.05

(56.00 RT)

STA. 249+70.00

18" RCP

18" RCP

LIGHTING CONDUIT

0.312%

0.333%

CONDUIT

LIGHTING

18" RCP

18" RCP

MHHW=0.82'

LIGHTING CONDUIT

CONDUIT

LIGHTING

249+70.00

251+02.79

-8

-4

-12

-6

-10

-2

-8

-4

-12

-6

-10

-2

S-44 S-45 S-46S-43

S-47 S-48

HORIZONTAL 1" = 10'

SCALE:

E-24

CHECKED

DRAWN

FP ID NO.

MIAMI, FL 33126 Ph. (305) 261-4785

7650 CORPORATE CENTER DRIVE SUITE 300

Marie-Elsie Dowell, P.E., No. 1235E

ENGINEER OF RECORDDATE

CHECKED

DRAWN

DESIGNEDR E V I S I O N S

DESCRIPTIONBYDATE

VETERANS DRIVE M. PAREDES

O. MIGUEL

MAY, 2017

DRAINAGE STRUCTURES

P G

L

E

L

.3

0.02 0.02

P G

L

E

L

.3

0.02 0.021:2 1:

.0

6.27

S-49 S-50

S-48TO

S-47TO

18" RCP

18" RCP

EL 2.54

BE

FL 1.64 (BK)

BOT. EL. -0.36

INLET EL. 5.94

INDEX NO. 200, 201, 211

CONST. INLET TYPE P-5 (ALT. A)

STA. 252+36.79 (28.75 LT)

FL 0.46 (BK)

BOT. EL. -1.54

GRATE EL. 5.96

INDEX NO. 221

CONST. GUTTER INLET TYPE V

STA. 252+36.79 (28.75 RT)

P G

L

E

L

.4

0.02 0.02

P G

L

E

L

.4

0.02 0.021:2 1:

.1

0.48

S-51 S-52

S-55TOS-54TO

18" RCP

18" RCP

EL 2.53

BE

FL 1.72 (AH)

BOT. EL. -0.28

INLET EL. 6.03

INDEX NO. 200, 201, 211

CONST. INLET TYPE P-5 (ALT. A)

STA. 254+94.79 (28.75 LT)

FL 1.72 (AH)

BOT. EL. -0.28

INLET EL. 6.03

INDEX NO. 200, 201, 211

CONST. INLET TYPE P-5 (ALT. A)

STA. 254+94.79 (28.75 RT)

MHHW=0.82'

LIGHTING CONDUIT

CONDUIT

LIGHTING

MHHW=0.82'LIGHTING CONDUIT

LIGHTING CONDUIT

252+36.79

254+94.79

-8

-4

-12

-6

-10

-2

-8

-4

-12

-6

-10

-2

S-49 S-50

S-51 S-52

HORIZONTAL 1" = 10'

SCALE:

E-25

CHECKED

DRAWN

FP ID NO.

MIAMI, FL 33126 Ph. (305) 261-4785

7650 CORPORATE CENTER DRIVE SUITE 300

Marie-Elsie Dowell, P.E., No. 1235E

ENGINEER OF RECORDDATE

CHECKED

DRAWN

DESIGNEDR E V I S I O N S

DESCRIPTIONBYDATE

VETERANS DRIVE M. PAREDES

O. MIGUEL

MAY, 2017

DRAINAGE STRUCTURES

P G

L

E

L

.1

0.02 0.02

P G

L

E

L

.1

0.02 0.021:2 1:

.7

-0.47

S-53

S-54

S-57FROM

S-51FROM

S-55

S-56

S-58FROM

S-52

FROM

18" RCP

18" RCP

18" RCP

24" RCP

18" RCP

18" RCP

24" RCP

EL 2.70

BE

FL 1.35 (AH)

FL 0.85 (LT)

FL 1.35 (BK)

FL 0.85 (RT)

BOT. EL. -1.15

INLET EL. 5.66

INDEX NO. 200, 201, 211

CONST. INLET TYPE P-6 (ALT. A)

STA. 256+19.00 (28.75 LT)

FL 0.95 (RT)

BOT. EL. -1.05

GRATE EL. 4.73

INDEX NO. 232

CONST. DBI TYPE C

STA. 256+19.00 (40.30 LT)

FL 1.35 (AH)

FL 0.70 (LT)

FL 1.35 (BK)

FL 0.70 (RT)

BOT. EL. -1.30

INLET EL. 5.66

INDEX NO. 200, 201, 211

CONST. INLET TYPE P-6 (ALT. A)

STA. 256+19.00 (28.75 RT)

FL 0.68 (LT)

FL 0.68 (RT)

BOT. EL. -3.92

TOP EL. 6.07

SEE DETAILS ON SHEET E-028

CONST. MANHOLE (SPECIAL)

STA. 256+19.00 (38.92 RT)

4.21

P G

L

E

L

.5

0.02 0.02

P G

L

E

L

.5

0.02 0.021:2 1:

.1

S-59FROM

S-57 S-58

S-60FROM

S-55TOS-54TO

18" RCP 18" RCP

18" RCP 18" RCP

EL 1.91

BE

FL 1.76 (AH)

FL 1.76 (BK)

BOT. EL. -0.24

INLET EL. 6.07

INDEX NO. 200, 201, 211

CONST. INLET TYPE P-5 (ALT. A)

STA. 257+54.79 (28.75 RT)

FL 1.76 (AH)

FL 1.76 (BK)

BOT. EL. -0.24

INLET EL. 6.07

INDEX NO. 200, 201, 211

CONST. INLET TYPE P-5 (ALT. A)

STA. 257+54.79 (28.75 LT)

FL 0.65

(56.00 RT)

STA. 256+19.00

MHHW=0.82'

LIGHTING CONDUIT

LIGHTING CONDUIT

0.273%

0.200%1.11%

MHHW=0.82'

LIGHTING CONDUIT

LIGHTING CONDUIT

256+19.00

257+54.79

-8

-4

-12

-6

-10

-2

-8

-4

-12

-6

-10

-2

S-54 S-55 S-56S-53

S-57 S-58

00 1010 2020 3030 4040 5050 60 70 80 90304050

HORIZONTAL 1" = 10'

SCALE:

S-61A

E-26

CHECKED

DRAWN

FP ID NO.

MIAMI, FL 33126 Ph. (305) 261-4785

7650 CORPORATE CENTER DRIVE SUITE 300

Marie-Elsie Dowell, P.E., No. 1235E

ENGINEER OF RECORDDATE

CHECKED

DRAWN

DESIGNEDR E V I S I O N S

DESCRIPTIONBYDATE

VETERANS DRIVE M. PAREDES

O. MIGUEL

MAY, 2017

DRAINAGE STRUCTURES

P G

L

E

L

.9

0.02 0.02

P G

L

E

L

.9

0.02 0.021:2 1:

.5

4.11

S-59 S-60

S-58TO

S-57TO

18" RCP 18" RCP

EL 2.00

BE

FL 2.16 (BK)

BOT. EL. 0.16

INLET EL. 6.47

INDEX NO. 200, 201, 211

CONST. INLET TYPE P-5 (ALT. A)

STA. 258+89.79 (28.75 RT)

FL 2.16 (BK)

BOT. EL. 0.16

INLET EL. 6.47

INDEX NO. 200, 201, 211

CONST. INLET TYPE P-5 (ALT. A)

STA. 258+89.79 (28.75 LT)

P

G L

E

L

.1

0.02 0.02

P G

L

E

L

.1

0.02 0.02

1:

4.22

S-61

ES-1

(TO REMAIN)

& RCP

EXIST. INLET

(TO REMAIN)

EXIST. RCP

24" RCP

FLOW LINE ELEVATION

VERIFY & MATCH EXIST.

CONST. CONC. COLLAR

30" RCP

12-INCH THICK

CLASS 1

LOOSE RIPRAP

FLOW LINE ELEVATION

VERIFY & MATCH EXIST.

CONST. CONC. COLLAR

FL 0.94

(36.75 RT)

STA. 259+67.40

(TO REMAIN)

EXISTING INLET

EL 0.65

BE

FL -0.90 (LT)

FL -0.90 (RT)

BOT. EL. -2.90

INLET EL. 6.71

INDEX NO. 200, 201, 211

CONST. INLET TYPE P-5 (ALT. A)

STA. 259+67.40 (28.41 LT)

S-61A

TOP EL. 7.74

INDEX NO. 201

CONST. PARTIAL MANHOLE TYPE J-8 TOP

STA. 259+69.47 (1.38 LT)

ITS

MHHW=0.82'

LIGHTING CONDUIT

LIGHTING CONDUIT

MHHW=0.82'

LIGHTING CONDUIT

LIGHTING CONDUIT

258+89.79

259+67.40

-8

-4

-12

-6

-10

-2

-8

-4

-12

-6

-10

-2

S-59 S-60

ES-1 S-61

00 1010 2020 3030 4040 5050 60 70 80 90304050

HORIZONTAL 1" = 10'

SCALE:

E-27

CHECKED

DRAWN

FP ID NO.

MIAMI, FL 33126 Ph. (305) 261-4785

7650 CORPORATE CENTER DRIVE SUITE 300

Marie-Elsie Dowell, P.E., No. 1235E

ENGINEER OF RECORDDATE

CHECKED

DRAWN

DESIGNEDR E V I S I O N S

DESCRIPTIONBYDATE

VETERANS DRIVE M. PAREDES

O. MIGUEL

MAY, 2017

DRAINAGE STRUCTURES

P G

L

E

L

.3

0.02 0.02

P G

L

E

L

.3

0.02 0.02 1:21:

2.96

S-62

ES-3FROM

OF-8TO

24" RCP

24" RCP

EL 2.34

BE

FL 1.72 (AH)

FL 1.72 (BK)

BOT. EL. -0.28

INLET EL. 6.88

INDEX NO. 200, 201, 211

CONST. INLET TYPE P-5 (ALT. A)

STA. 260+18.29 (27.75 RT)

P G

L

E

L

.7

0.02 0.02

P G

L

E

L

.7

0.02 0.02 1:2

6.50

.7

S-62TO

ES-3

FL 2.72 (BK)

ADJUST RCP CONNECTION (BK)

EXIST. INLET (TO REMAIN)

STA. 260+18.18

ES-2

(TO REMAIN)

EXIST. INLET

24" RCP

18" RCP

MHHW=0.82'

LIGHTING CONDUIT

LIGHTING CONDUIT

MHHW=0.82'

260+18.29

261+59.14

-8

-4

-12

-6

-10

-2

-8

-4

-12

-6

-10

-2

S-62

ES-3

Pre-Bid Meeting Minutes

Project VI DPC 34(1) Improvements to Route 30 (Veterans Drive)

June 28, 2017 2nd Floor Conference Room, Department of Public Works, USVI

10:00 AM

Introduction

I want to start by welcoming you to the pre-bid meeting for the VI DPC 34(1) project, Improvements to Route 30 (Veterans Drive) form Hospital Gade to the intersection between Longbay Road and W.G. Lane.

Thank you for all being here today and showing interest in our project. Today, we will be providing a project overview, we will go over the different Bid Documents, and briefly go over the proposal instructions.

Project Overview

The VI DPC 34(1) project consists of the reconstruction and widening of 0.46 miles of Veterans Drive (Route 30) from west of Hospital Gade to Long Bay Road in the city of Charlotte Amalie, St. Thomas, USVI.

This is the first phase of the overall improvements to Veterans Drive which will be done from Kronprindsens Tvaer Gade to the Long Bay Road/ W.G. Lewis Lane intersection (approximately

1.38 miles).

Veterans Drive will be widened towards the bay to add 2 additional traffic lanes, medians, and a promenade, among other features.

The work includes roadway excavation, embankment, aggregate base, asphalt pavement milling, hot asphalt concrete pavement, reinforced concrete pavement, concrete curb and gutter, concrete, brick, and cobblestone sidewalk, precast modular block retaining walls, drainage, utility (water, telephone, sewer, power, and irrigation) adjustments and replacements, traffic signal and street lighting replacements, and other miscellaneous work.

The purpose of this project is to alleviate the existing traffic congestion, provide additional roadway capacity, improve safety for motorists and pedestrians, enhance the aesthetics of the waterfront, and enhance cultural and historical features.

We estimate the price for this project will be greater than $25 million.

Bid Documents

Let’s discuss the bid documents that are available on the Federal Business Opportunities Website.

The documents that are available are:

1. Request for Proposal – The request for proposal contains many clauses related to the contract and the procedures on how to submit a solicitation. It includes the following sections:

- Notice to Offerors – which contains information the offerors need to be aware of. For example, some of the items discussed in this section are:

o The prime contractor need to perform with its own forces work equivalent to at least 35% of the contract;

o A reminder to review Subsection 109.05 of the FP, which discusses direct and indirect payment under a pay item in the bid schedule;

o Information about the location on where the RFP documents are located and where to send your questions to. If you have any questions remember to email them to eflhd.contracts@dot.gov. Also, remember that the contractor is solely responsible for monitoring the web pages noted above for all changes to the solicitation and acting on said changes; and o The DBE Subcontracting goal for this project is 15% of the total contract amount and that the contractor must submit a subcontracting plan, among other items.

- Checklist for Offer Submittals – which is a checklist of items included in the proposal package that are required to be completed and returned to the address in Block 7 of the Standard Form 1442 (Solicitation, Offer, and Award) or be filled online. This checklist is for informational purposes only and is not required to be filled out by the bidder. Remember that failure to submit a complete bid may be cause to reject your bid.

- DBE Commitments Forms – include these with your bids.

- SF-1442 Solicitation, Offer, and Award.

- Proposal Schedule Instructions (which we will discuss in detail later).

- Proposal Schedule – which is where you put your prices for the different pay items.

- SF-24 Bid Bond.

After these sections, the RFP has the Federal Acquisition Regulation & Transportation Acquisition Regulation Solicitation Provisions & Contract Clauses sections, which includes:

- Index to Federal and Transportation Acquisition Regulations – which are clauses that are included in the contract by reference and can be accessed electronically as indicated in the document.

- Representations and Certifications (OCRA online) – this section discusses items such as business sizes.

- FAR and TAR Instruction to Bidders – contains information such as that the contract will be a firm-fixed price contract, the bid guarantee that is to be 20% of the bid price or $3M (whichever is less), information about protests, and site visits, among other information. It is important to point out that Jomo McClean is the point of contact for site visits and visits can be arranged during normal duty hours, but he is not available for answering any questions. All questions must be directed to EFLHD at eflhd.contracts@dot.gov.

- Socioeconomic Program Requirements – this section contains information about socioeconomic requirements such as the Buy American – Construction Materials, Buy American – Construction Materials under trade agreements, Nondiscrimination because of age policy and other socioeconomic requirements.

- Minimum Wage Schedule – if these rates change before award, the wage schedule will be updated in the contract.

- FAR and TAR Clauses General Contract Requirements – this section includes general contract clauses such as Contractor Employee Whistleblower Rights and Requirement To Inform Employees of Whistleblower Rights, Performance and Payment Bonds – Construction, and Value Engineering – Construction, among others.

- FAR and TAR Construction Contract Requirements – this section includes FAR and

TAR clauses that apply to construction contracts, such as Commencement, Prosecution, and Completion of Work, Liquidated Damages, Variations in Estimated Quantity, and the Post Award Evaluation of Contractor Performance, among others.

- Special Contract Requirements (J-Pages) – these are requirements that amend and supplement the Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects (FP-03). This is a good time to remember the hierarchical order of our contract documents. This is FAR, TAR, Special Contract Requirements, Plans, and lastly the standard specifications. This means that the information in this pages are requirements that supersede or supplement what is in the plans and standard specifications, so understanding them is important to provide an accurate bid and properly perform the work.

- FAR and TAR Representation and Certifications Clauses (Section K) – includes the

Certification Regarding Responsibility Matters, Information Regarding Responsibility Matters, Compliance with Veterans’ Employment Reporting Requirements, Prohibition on Conducting Restricted Business Operations in Sudan— Certification.

2. Plans – broken down into Sections (A, B, C, D, E, F, G, H, M, N, R, S, T, U, V, and W).

3. FP-03 – standard specifications.

4. FP-03 Errata – corrections made to the specifications.

5. DPW and WAPA Supplemental Specifications

a. These two supplemetal specifications contain special requirements for applicable

DPWs and WAPA work.

6. Reports

a. Environmental Assessment – there are reports within the Environmental

Assessment that were not broken down into separate reports. These includes reports such as the SWPPP and the Asbestos and Lead Containing Materials Survey Report.

b. Finding of No Significant Impact (FONSI)

c. Traffic Management Plan

d. Traffic Report (2008)

e. Geotechnical

f. Costal Engineering

g. Stormwater Management

h. Structural computations for the modular block wall

7. ROW Documents

8. Permits

9. ADV Offerors Qualifications, Subcontracting Plan, and VETS-4212 forms.

It is important to remember that these reports and other bid documents may contain requirements or information that will be necessary to successfully complete the work. For example, the EA, FONSI, and Environmental Permits may contain requirements that are not directly specified in plans or specifications, but must be met regardless.

Request for Proposal Procedures

The Proposal Instructions in the RFP were discussed with the attendees after the general discussion of the bidding documents. The proposal due date is August 4 at 2:00 p.m.

We encourage everyone to submit technical questions in writing to eflhd.contracts@dot.gov by July 23. This date is set, because after this date we cannot guarantee that your questions will be answered with sufficient time for you to be able to take action. This doesn’t mean that a question cannot be submitted after this date.

File details come from the government source that posted it. Updated .